Partial conversion of planned order into production order of AFS material

Dear Experts,
I am working with SAP 6.0 EHP4 with AFS add-on. My material is AFS specific material. I am not able to convert planned order into production order partially from MD04 screen as all the fields in the CO48 screen is grayed out. 
Please help...
Regards,
Alok Tiwari

Hi,
I am not able to get what is passing the start date.
Second thing is how you are generating the serial number - manually or automatic?
If you are generating serial number automatic, then it is not possible to generate it considering the basic start date.
But if you are entering the serial number manually, then there should not be any problem as system will accept that serial number which you enter at the time of conversion of planned order to production order.
Regards
Amit parkhi

Similar Messages

  • Not to convert planned  orders  into  production  orders.

    I donot  want  to  convert all the  planned  orders in a plant  into  production  orders on a specific date  only ( SAY on 5th Oct -2007 planned  orders  should  not  be  converted  to  production  orders in a  particular  plant).pl tell me  what  customisation is  required  to be  changed or  else  what is  the  solution.
                                                                             jpb

    Hi,
    Planned order is just a system proposed order its upto the user if they want to use all or part of it, for this they have to convert them.. If you dont want to convert them you can delete them as else the SNP will keep considering it as a valid supply.
    If the planned orders are not required on some particular dates on a permanent basis then you need to modify the Factory calender accordingly, so that the system will consider as if the resources are not available on thoese dates.
    Reward point plz...
    Regards,
    manjit.

  • Getting Error when convert the plan order into production order

    Hi Experts,
    When i converting the planorder into production order i am getting this error
    could you please suggest me hoew can i resolve this issue.
    Message no. CK466
    Diagnosis
    The system could not calculate a price for the internal activity with activity type 20000 of cost
    center 110TUP002 because none of the valuation strategies in valuation variant 006 was successful.
    System Response
    If the system issues a warning message or an information message, the costing item will be
    used in costing with a value of zero.
    If the system issues an error message, it sets the status "KF" (costed with errors).
    If the system issues a termination message, the cost estimate cannot be processed.
    Procedure
    1. Check the master data for activity type 20000 of cost center 110TUP002.
    2. If you have authorization for Customizing, check the valuation strategy for internal activities
    in valuation variant 006.
    Thanks&regards.
    Sateesh.C

    Hi,
    For the orders for which you get the error, note the dates, then check in KSBT, whether there is price maintained for that period.
    Eg: If the order has a start - 2nd Aug, 2010 & end 10th Aug, 2010, then check if price exists for period - 08, year - 2010
    Regards,
    Vivek
    Added
    If the values are maintained, then check the costing variants specified for the order type in OPL8 for plant - order type combination in cost accounting tab. Then in OPL1, check the details specified for the variants. If you're not sure on this, take help from your FI-Co colleague.

  • Reg.Stock transfer from Sale order into Production order

    Dear All
    We want to transfer the sale order stock in to production order.
    What I have to do ? Pls help me.
    Thanks
    Rajakumar.K

    Hi,
    Could you please explain in details?
    Other than the way of converting  sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material  in the production order components. If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order. Then proceed with material availability check.
    Regards,
    R.Brahmankar

  • Conversion of planned order to production order resulting into Runtime error

    Hello Gurus
         I am trying to convert Planned order into production order in MD04,  but I am getting ABAP Runtime error; for details please see image here posted.
    Please help me to resolve the issue.
    Thanks in advance!
    # If anybody wants remote access of my system through Team viewer I am ready to share my desktop for same.
    Regards!
    AKSHAY

    Hi Akshay,
    Overflow during arithmetical operation type P COMPUTE_BCD_OVERFLOW comes when the maximum of the internal ABAP field that is 99,999,999,999.99 many be quantity, cost value UoM conversion etc.
    Please check how this UOM (unit of measure) is defined in transaction CUNI. In this transaction, you may have set the Value-based commitment indicator. This indicator controls whether commitments for the chosen unit of measure are recorded on a quantity basis or a value basis.
    Please search OSS note for this dump and also raise this to OSS.
    Regards,
    R.Brahmankar

  • Planned order to production order conversion in APO

    Hi Gurus,
    Can you please tell me how i can convert planned order into production order in APO? How that production order will be transfer to ECC?
    Regards
    Rajib Pathak

    Hello Rajib,
    The following are required -->
    1. Active Intergration Model for production orders in R/3 .
    2. Distribution definition  (T.Code /sapapo/cp1) in APO.
    3. Retransfer settings (optional, read the F1 help here,before setting one) (T.code /sapapo/cp3)
    Also make right setting for transfer for inhouse production in /sapapo/rrpcust1 in APO.
    Then create a planned order and check the "Conversion indicator" in the product view (/sapapo/rrp3). or use transaction /sapapo/rrp7 to convert orders in mass.
    Thanks,
    Mahesh

  • Planned order to production order conversion

    Hi,
    I have one requirement from  my clinet. My client want to convert the planned order into production orders through a background job. We can use the t.code:co41  to convert the pld order into production order, but CO41 program can not be executed in background.
    Is there is a way to do this in background..
    Please advice.
    Thanks and Regards
    Puruhsothaman

    Puruhsothaman,
    Yes.  Use the standard SAP program PPBICO40 in your background batch job.
    Rgds,
    DB49

  • Conversion of planned order into prd order

    Dear Gurus
       Is it possible to convert planned order to prd order automaticaly ?Is there any setting in customising?
    thanks
    kk

    Hi
    In Standard SAP there is no such possibility.
    In real time normally it is not required like that.
    why because ,after looking into the planned order, planner/scheduler should convert planned oirder into production order. to have a better control.
    Planned order is one of the control step for proper scheduling.
    I do nto think it is required.
    If still business required to that you have to go in for customized programe with back ground scheduling.
    Regards
    YMREDDY

  • Planned order to production order

    Hello friends,
    Is it possible to convert 100 planned orders into 1 production order? I know it is not possible in SAP standard but is there any way that, this can be done thru Z development? If yes can you please explain how can i go about this?
    Narendra

    You have the option of converting several planned orders into production orders in a collective conversion. Use transaction CO41
    You branch to the initial screen for collectively converting planned orders.
    Only planned orders that allow in-house processing can be selected
    For further details see link
    http://help.sap.com/saphelp_47x200/helpdata/EN/b1/c040fb439a11d189410000e829fbbd/content.htm

  • BAPI for converting planned order to Production Order(in PP)?

    Hi all,
            Is there any standard BAPI for converting Planned order to Production Order?
    Thanks in advance,
    anjaly

    hi,
    check this..
    BAPI_PRODORD_CREATE_FROM_PLORD BAPI: Convert Planned Order into Production Order
    for more details check this link..
    Create a production order
    <b>reward points if it is helpful..</b>

  • Number range error for some materials when converting into Production order

    Hi,
    Please I need some help with my error.
    When trying to convert planned orders into production orders, I receive an error message saying Internal assignment not defined for number range XX.
    The strange part is that is only happening for two materials! Material type is the same one we always use.
    The planned orders have also the same type.
    Any idea?
    Thanks,

    Hi,
    I think for these 2 materials system is selecting the order type for which external number range is marked and ingternal number range is switched off.
    Can you go to CO01 and create a production order for these materials directly w/o assigning order type on intial screen. check which order type is detrmined by system and check its number range in co86.
    please check.

  • Partial conversion of Planned orders to Production orders

    Hi all
    I wan tot partially convert planned order to production order. I am able to do this with MD04. Is there a tcode for mass partial conversion. CO41 does not allow a partial conversion. Is there a way I can collectively do a partial conversion.
    thanks

    Hi John,
    To the best of my knowledge there is no t-code to do a mass partial conversion of planned orders.
    You can try with a lsmw recording of t-code co48 & then input your planned order numbers with the qty to be partially converted or alternatively use co41, change the qty & convert the planned orders, but with this you will need to re-run MRP to create another planned order for the balance qty.
    Hope the above helps.
    Regards,
    Vivek

  • BUG in  Conversion of Planned order to Production Order.

    Dear all,
    I got an error while conversion of planned order to production order are as follows,
    No Default values maintained for op.generation for order type ZFT1(matlPILSF002).
    Can anyone please guide me to proceed further.
    Kumar.

    Hi,
    Root cause behind this problem is, no Routing found.
    First complete below settings.
    - Go to OPJG And create defult Operation creation in case of no Routing found.This setting will generate the default Operation incase of no routing found during Order creation.
    - In T.code OPJF Create automatic selection parameters (Selection ID) for Routing.
    - In T.Code OPL8 Maintain Selection ID for Routing and also maintain type of Routing selection (3 - Automatic Routing selection)
    Regards,
    Dhaval

  • Conversion of planned orders to production orders

    Hi,
    we are doing mass conversion of planned orders to production orders and performing capacity availability check, how system will give log information based on these two things,
    when i perform availability check at time of order creation and will not allow to create if anything is missing (i selected user decides option in configuration), does it show any error log report and where can i see.
    When i perform availability check at time of release, if anything missing it will not allow to release and give a choice for a user to release in normal production order creation process, how it will work in mass conversion. is there any standard report to look at missing planned orders so that users will come to know and then decides whether to convert to production order or not.
    thanks in advance.

    Dear ,
    In SM38-Enter PPBICO40 -Execute -Here you need to Mark the Output log option with Erros only or Error Folder for each MRP controller  .Frist you do it in test mode and then remove test mode , mark the Output log option as per requured field and check the result .
    refer this useful thread : Program PPBICO40 for conversion of planned orders to production order
    Regards
    JH

  • Capacity check during Planned order to production order conversion

    Hello Gurus,
    I have a strange situation during capacity check.
    While Converting the planned order to Production order, I release the order and I don't get any warning. All work centers are available
    But for the same material/quantity/dates, if I create the Production order manually, release it, system check the capacity and I got the message the Capacity Over loaded (which is correct also as there are overload on the work centers).
    My question is why I am not getting this message while converting the planned order to production order.
    There are overload on the work centers and manual creation of Production order is working fine, but problem is during planned order to production order conversion.
    For information, I have maintained Finite scheduling indicator in OPKP, capacity availability indicator "NO CHECK" is also blank in OPJK.
    It will be grateful if you can please help me here.
    Thanks in advance,
    Sandeep Kumar

    Hi KK,
    Thanks for your feedback.
    I have checked all these settings but still no success.
    I am surprised but it is not a customizing issue I believe, because capacity is checked in Dev client while converting planned order to production order. I am facing this issue only in Staging client.
    Master Data is same. In CM01, in Quality(Staging) client, it is showing overload. while creating production order, it shows overload but only when convert from planned order to production order, it does not show overload .
    Please suggest what else I need to check.
    thanks in advance.
    Br,
    Sandeep Kumar