PIR Connsumption on Production not on Sales

Dear PP Gurus,
I must work with the planning without final assembly strategy, and need my PIR to be consumed when my process orders are confirmed (or perhaps when they are created), not when the actual sale is made.  This is because I am working using reorder points from my finished goods storage location, which triggers material transfers to these slocs, which then trigger planned orders if the requirement is not available in the plant. Then when I produce the product, it can stay on the shelf for months.  In the mean time the PIR still reserves the component materials until the sale is finally made and the PIR is consumed.  This causes redundancy in demand for component materials in my material resource planning cycle.
I am considering resorting to an ABAP program that could do the job by deducting them forcefully from table PLAF, and doing a scheduled run for this program before my MRP runs, and stop consumption for all materials in the material master, but I thought I'd ask you for one last cry of help...
Thanx in advance for your help.

Dear Mario,
I understand that using an ABAP program is the worst option, and this is why I am glad that i can get some help from this forum and you.
Our industry is a B-to-B process industry that suffers from very low levels of accuracy in planning.  This forces us to use a planning strategy without final assembly in order not to waste RMs.  The Second problem is that we have very high lead times for procurement i.e. 90 - 120 days, and at the same time we are required to deliver after a Sales Order with maximum 5 days.
We have more than 1000 products and 2000 raw materials that go interchangeably in each BOM.  We produce fragrances and flavors, which are very much like blending colors.
An example of this dilema is:
Yellow and blue makes green, and yellow and red makes orange.  If you waste yellow on unneeded green then you can not create any orange if you are required to.
You can imagine the effect of this issue when you have more than 2000 raw materials that go interchangeable in your 1000 finished products, which also are offered in more than 5 different package variations.
We have three distribution channels that are all trying to produce their orders, some planned and some not, and thus if we produce any material out of plan it can affect the raw materials allocated for a few other finished materials that where planned by another distribution channel.
So...
In order to solve this issue we are working with a planning strategy that allows us to procure materials for the plan, however does not produce. This gives us the luxury to still use the raw materials for other materials, if a planned independent requirement is not actually sold.
Our planning now is done 3 months in advance, and we buy raw materials accordingly.  We also buy some safety stock in order to create a buffer for some change.
We then procure these materials all on time however wait for an order to start actual production.
Case 1: Large Factories
When an order comes we externally (on excel) verify that this order from the respective distribution channel is actually planned.  Then we create the process order.  If not then we make sure that if we produce this material no shortages will occur, then if this is the case we proceed, if not then we delay the order so that no shortages occur.
Case 2: Traders
There is a second case which causes us the major part of my current problem.  Because we have traders that consume smaller quantities however much more frequently, we created a finished goods SLOC and made a reorder point for all materials pertaining to the traders and a replenishment quantity.  When stock reaches this reorder point in the SLOC, a transfer order is created to replenish this WH. Then since there is no stock of this material in the plant, a planned order is created. Again we make sure that the distribution channel has not passed its planned requirements like above in an external excel sheet before we turn the planned order to a process order.
The PROBLEM:
After all this happens when we produce this material and send it to our finished goods SLOC, the planned independent requirement is not consumed until after the material is actually sold.  This could take months.  In the mean time you have the material in-stock and at the same time the PIR for this material is creating demand for its components.  This demand is fake demand because we have already produced the product.
This problem also exists in my previous case (CASE 1) when a large customer creates an order and leaves it in my stock for a few weeks, for any reason.  During these two weeks I have his materials in stock, however have to wait until the material is delivered to him before my PIRs are consumed.  During these two weeks, I could have started procurement of a large amount of raw materials with no need.
Sooooo...... Finally all i need is for my PIRs to be consumed when I do my process order or when I do my confirmation, not when I actually sell the material to the customer.
If you have read to this point then you are a hero, and I thank you even if you don't have an answer for me.
If I am not clear in any point please tell me and I will try to explain more.
You help is extremely appreciated
Thank you...

Similar Messages

  • Consume PIR with Delivery, instead of with Sales Order

    Hi Experts,
    I am posting this question here, because in PP forum I did not find solution.
    Is it possible and how, planned independent requirements (PIR) to be consumed not with sales orders, but with outbound deliveries?
    I did the following customizing - created Z1 plannign strategy as a copy of strategy 40. In Z1 I changed the customer requirements type from KSV to 011 (Delivery requirement). Requirements transfer is disabled for sales orders and is enabled for deliveries.
    When delivery is created it is displayed and planned from MRP but it does not consume the PIR.
    Consumption mode and periods, as well as strategy Z1 are maintained in my material master.
    Please advise is this possible and how?
    Thanks in advance,
    Nikolay

    Hi Madhu and thank you for reply.
    Please find my answers bellow.
    1) Customer requirements will be taken into account first OK.
    Yes, but not SO, just outbound delivery.
    2) Sales orders that exceed planned independent requirements can influence production OK.
    Not sales orders, but deliveries must influence the production.
    3) The most important factor is the ability to react flexibly to the customer demand OK.
    OK
    4) Planned Independent requirements are allocated and reduced during sales order processing OK.
    The consumption must be done upon delivery, not on sales order.
    5) PIR's will be reduced at goods issue for delivery OK.
    I want to have PIR reduced when delivery is created.
    Thanks and waiting for your reply.
    BR,
    Nikolay

  • In the Production Order, Sales Quotation is displayed not the Sales Order

    Hello to All,
    I need a kind help from you.
    My scenario is as follows
    There is a Configurable Material (Finished Product)
    Sales quotation (VA21/2/3) were made for this material.
    Sales Order (VA01/2/3) with reference from the Sales Quotation were made for this same material.
    Now when I run the MRP (MD02) for this material, Planned Orders were created.
    Planned orders were converted to the Production Order.
    In the Production Order (say in Display mode), under the 'General' tab, there is a segment called 'Sales order'. In this segment, the sales order is being displayed if the Production Order is created for a sales order (MTO scenario).
    But, in my case, the Sales Quotation number is being displayed instead of the Sales order.
    My Issue which need your answers:
    Is it a standard SAP scenario?? I mean, if the production order is created for a sales order and again if the sales order is created earlier with reference to a sales quotation, then in the production order, the Sales quotation is displayed. Is it a standard?? Or it is showing wrongly? I mean, is it like that, always the sales order should be displayed in the Production order and not the sales quotation??
    Please suggest so that I can overcome this problem, if at all it is a problem.
    Some More Inputs (For your analysis/research):
    1. After the MRP run of the material the Planned Order is created. I have checked the planned order, and found tha the assignment of sales document (in this case Quotation) is done in the Planned order itslef. It is visible wthin the "Assigmnet" tab of the Planned Order.
    2. For the analysis purpose, I created one stand-alone Sales Order for the same material. I mean, without reference from any Sales Quotation. Then, when I run the MRP (md02), the Planned Order and then production order were created normally, with reference to the Sales order. This just for your kind information.
    3. I have checked the pegged requirement of the Production order in the MD04. It is showing the Sales order itself. But, if I see the production order (CO02/O03), it shows sales quotation.
    User Requirement:
    Evenif, the sales order is created with reference to a Sales Quotation, after MRP run, in the Planned and thereby subsequent production order, the Sales Order should display and not the Sales quotation.
    Please suggest.
    Thanks and Regards,
    Supriyo

    Hi
    Since your scenario is configurable material,  the system takes the reference of sales quotation only. Because the in case of configurable materials the sales quotation is the base and based on the sales quotation the sales order is created and subsequent production order.
    This is std SAP and for configurable materials the sales quotation is deciding factor
    Krishna

  • Product Not available for online sales.

    Hello
    Can some one please help me on this issue?
    We are using Crm 4.0 with back end as people soft.
    Sometimes we require some products not to be available for internet sales in the web shop. 
    We generally make those products not available for online sales by assigning it to category u201CObsoleteu201D which Blocks it for online sales
    But for the old orders in Open status containing these products, it should allow us to make any changes when order change files i.e. shipment and delivery comes.
    It throws an error that u201CProduct is not available for onlineu201D.
    I have tried the option locked given in the Product master,
    This option makes product not available for new orders but throws an error when order change files comes from People soft.
    Can you help / suggest if there any configuration settings which can
    -         Make those products not available for one line sales
    As well as
    -          Should allow processing of old orders in the open status
    Many Thanks
    Nimit
    Edited by: Nimit Pahwa on Aug 28, 2008 7:40 PM

    hi patrick,
    that feature must be in the delivery-blocker. I have no system at the moment, but it is there. ( parallel to the credit-check-status )
    Hans

  • Creation of IBase for Production data or sales order  in R/3

    Hi,
    My client is a locomotive manufacturing Company, They want to track the failure of parts in the locomotive  and any changes made in the locomotive during service.
    Kindly explain your thought on the following:
    1. Here Each locomotive will have an MBOM created for each sales order. We need to create a IBase equivalent to the MBOM in SAP R/3 47. Is it possible to create an IBase with reference to Production order or Sales order. Will it copy all the BOM components to IBase.
    Thanks in advance
    Manik

    Hi Madhu,
    There can be multiple reasons why it does not go to APO.
    Two of the most common overlooked points are:
    1.   ATP tick in integration model.
    2.   Activation of ATP in external system: this is done in SPRO in the data transfer section.
    Another common point is cheking rule: In SPRO see that your business event(SO) is enabled for ATP check.
    Also you can go to transaction CO09 for ATP simulation in R/3 .
    Hope it helps. Otherwise you can revert with specific questions.
    Regards
    Santanu Dawn

  • Product costing by sales order configuration steps

    hi
    plz send me product costing by sales order configuration steps.
    sir, i know manufacturing order configuration step but i do not sales order configuration.
    in the sales order also is same as manufacturing order like first we have to make planning cost , the planning cost should be updated to material master and next configure the actual cost.
    for first step- costing variant -okkn
    next -costing variant -opl1
    for sales order also same we need to update planning price first- what is costing variant
    for actual cost - what is costing variant
    plz tell me detail
    regards,
    sowmya
    Moderator: Please, read forum rules before posting

    Hi Sashikanth,
       Please send me the Configuration document for make to sales order.We are at Blue print stage need some docment for make to sales order.Plese send me the document it will will be very help full for me.
    My id is [email protected]
    Thanks in advance
    Regards,
    Nagaraju
    Edited by: nagaraju sami on Mar 9, 2008 11:58 AM

  • Make-to-order. Requirement linked to Quotation and not to Sales Order

    After we have changed our Make-To-Order Materials from unvaluated sales order stock to valuated Sales Order Stock we do face a problem with the Requirement for those Sales Orders lines which are started with a Quotation. After running MRP a planned Order is created (ok) but the Planned Order is linked to the Quotation line and not to the Sales order line. When converting the Planned order to a Production order the AFPOD-KDAUF field is the number of the Quotation and unfortunately not the Sales Order number.
    The Quotation looks ok. Item category is AGN and Schedule line category is BN (no MRP). When converting the Quotation into a Sales Order the Item category change to TAN and schedule lin category is now CP.
    The copy rules QT -> OR (VTAA) shows copying requirement = 501 Schedule qty >0 and DataT = 201 General Schedule line Data
    Anyone got a clue about where to look? ¨
    Thanks in advance
    Ken

    Hi Guys
    Thanks for your proposals.
    The Materials involved are standard items (FINI -> NORM) and our Set-up with item category TAN works perfectly when we create a Sales Order without a Quotation first. And the way we solve the problem manually right now is to convert the Quotation and delete in line item and recreate them manually. 
    I found that if i delete the requirement type in the Quotation and then convert the Quotation into a Sales Order then the Planned with be linked to the Sales Order = perfect.
    Any other ideas
    Best
    Ken

  • Preli cost compo struc of production orders to sales orders -Non valuated

    Hi experts
    We use Non valuated sales order cost/settlement and assembly order processing. So production order is created from sales order and prel cost estimate is created in the production order. Now we notice that the cost component struc in production order is not copied into sales order. Only the EK02 is copied with total cost.
    How to bring cost compo struc from production order to sales order ?
    This may be a special cost estimate with costing and Is it possible to bring cost compo struc to copa record type A or F.
    I know standard cost compo mapping in copa but I could not see the costing variant used in production order in copa master data configuration.
    regards
    KT

    If the sales order is not a cost object, you cannot cost in it, and you can therefor also not see the cost component split.
    When you sell the material, you can pull through the cost component to PA, via the material master using the COPA valuation strategy. However, only the info for the material in the sales doc line item.
    You don't link to a costing variant, you link using the above valuation strategy and the costing key. The costing variant sits inside the costing key.

  • Different product hierarchy in sales order and in service order

    Dear experts,
    In VA03, I notice that
    - under Line Item > Sales B, there is a field Product Hierarchy
    - under Line Item > Account assignment, there is a field Order. From here, it links to a service order. In the service order, I can see a field Product Hierarchy too.
    I would like to know if there is an implication when the field Product Hierarchy in sales order and in service order are different. Is it possible that this will cause an inconsistency?
    Usually these two fields have the same value, since the value in sales order is copied from service order. However, in my case, the product hierarchy is changed/updated in service order, but not in sales order.

    Hi,
    We have document pricing procedure maintained at two levels for Sales order or Billing type.
    The pricing procedure is determined based on SAles Area Customer pricing procedureDocument Pricing procedure+pricing procedure.
    Example :For Sales Document type the document pricing rpocedure will be A and for billing type 'B"
    Sales Area1A+Pricing procedure A
    Sales Area1B+Pricing procedure B
    Now A will be maintained in VOV8 and B will be maintained in VOFA.So two pricing procedures.
    Regards,

  • Product costing valuated sales order stock

    Hi all,
    We are in complex mfg & currently re-vamping all the ERP SAP instances ( totalling 13 company codes into one single)
    All 13 units( who use NON Valuated scenarios for cost object controlling) wil use valuated sales orders & projects. The old 13 companies will be trated as profit centers with transfer pricing functionality ( Multiple valuations)
    My issue is to get a product cost for sales order in <b>profit center view</b> ( plan cost) exactly same as to the marked standard cost itemisation of the FERT material.
    We mark & release the std cost in Jan & the client wants to have the same itemisation of the cost ( with same values) even if they create a sales order in 2nd or 3rd or last quarter. ( As you might be knowing that the sales order wil always cal;culate the values as per the current qty structure date. In Std SAP date control, there is nothing which allows us to cost exactly the same cost estimate as marked & released in JAn)
    Could somebody pls give pointers as how to get this sales order plan cost itemisation exactly equal to prevously marked & released itemisation ?
    We use the Std costing variant ( Costing Type = Profit center valuation) with Std date control.
    Thanks in advance to all of you,
    Warm Regards
    Dhiraj

    Hi,
    If the sales order stock is valuated, you have immediate access to its value in Financial Accounting. The assigned accounts are debited and credited as a result of the valuated goods movements. From the viewpoint of MRP, the sales order stock is available for the sales order only.
    If the sales order stock is not valuated, it is managed via a cost collector. The system does not carry out invoice verification postings for goods movements, and you cannot obtain an overview of how the stock is valuated until the end of the settlement period in Controlling.
    Valuated sales order stocks have the following advantages:
    The full costs are available at each manufacturing level.
    All goods movements are immediately reflected in Financial Accounting
    Assign points if helpful
    Regards,
    Saurabh

  • Upgrading final Cut Pro - recieved as a gift, and designated "Not for Sale"

    I've been working in FCP with a version that a friend, in the business, was given as a perk and passed on to me. The FCP that he gave me is marked "Not for Sale". I did register it.
    I just upgraded to Tiger and am having problems with dropping frames in capture. After looking at this discussion forum, I conclude that it's necessary to upgrade my FCP. Does anyone know if it Is possible to upgrade a product that was a promo gift, and thus designated, "Not For Sale"?

    So it was a promo item, and not an academic version? AKA, it says Not For Sale on the registration screen when FCP opens? Those versions are usually handed out to academic institutions and are so that students or teachers could use a full version without buying it. Unfortunately, the only way for you to upgrade is to buy a whole new full retail version.
    -Brian

  • Settelment of (MTO) Production order to sales order.

    HI ,
    Can any one tell ,
    When we settle Production Order in MTO to Sales order
    What are the Accounting Documents Generated, Wheter system will generate Controlling document or Accounting Document.
    I have done the Process, But i m getting CO document.
    If it is wrong Pls tell me settings wht i m missing.
    Also Pls let me know the importance of settleing the MTO Production order to Sales order.
    Becos when i settle it there is not reflect on Sales order as System is generating Co document.
    Regards,
    Pavanidlur

    Dear PAVANIDLUR,
    Normally its generated automatically; by because here the Production Order and the Sales Order are the Cost Objects.
    Settlement Entry:
    FI:
    WIP Balance Sheet Acoutnt ...............Dr
            to WIP Balance Sheet Account
    CO:
    Production order witll be Credited
    Sales order witll be Debited.
    Dear experts correct if i m wrong;
    Regards.
    Raj

  • Product Costs by Sales Orders

    HI,
    Is there any extractor that pulls the Product Costs by Sales Orders?
    The 0CO_PC_02 extractor extracts Product Cost by Order and Product Cost by Period. It extracts just the
    OR* entries from the COSB, COSS tables but not the
    VB* and PR* entries from the tables. Values of Transaction KABG
    Regards
    Vijay

    HI,
    Is there any extractor that pulls the Product Costs by Sales Orders?
    The 0CO_PC_02 extractor extracts Product Cost by Order and Product Cost by Period. It extracts just the
    OR* entries from the COSB, COSS tables but not the
    VB* and PR* entries from the tables. Values of Transaction KABG
    Regards
    Vijay

  • Product Costs by Sales Order - Settlement Options?

    Hello All -
    I am trying to understand if I need to settle to a sales order (SDI) or directly to material (MAT) or to COPA (PSG).
    If i look at my sales order, it has item category ZPSF, which product costs by sales order configuration shows a requirement class ZKE.  ZkE has a valuation of M, which means separate valuation of reference to sales document/project.
    Does this mean I need to settle to sales order first?
    Then i run vA88 to settle sales order to copa?
    if ZKE valuation is blank, does that mean its not valuated?  I have read on other sap help pages that means it is valuated.  Please clarify.
    also, when does one directly settle to MAT? what scenarios?  this confuses me.
    Thanks!
    Emmas

    I'll give this a try. When working in a make-to-order environment there are 2 settings in the requirments class that you must consider in determining how to settle the costs (and maybe the revenue as well).  The first setting is the account assignment category.  In the standard system "E" is used to designate the sales order as a cost collector.  "M" is used to if you don't want the sales order to be a cost collector.  Whether the sales order is a cost collector or not will determine your settlement options. 
    The second critical field is the valuation setting.  If you set it to "M" then the stock assigned to the sales order will be valuated (by valuated I mean that once the goods are produced they will be held in inventory as sales order stock with a value).  If you leave the valuation field blank then the stock assigned to the sales order will be held in inventory without a valuation. 
    If the sales order is not a cost collector then the cost to manufacture the order will be collected in your production order and the settlement rule for the production order will be to the material you are producing.  Since the material has a valuation, the costs collected in the production will be reduced by the material's valuation once it is received into finished goods inventory.  Any remaining costs are settled to wip or variance based on the production order's status and the RA key and variance key settings.
    If you have set the sales order as a cost collector then the production order costs can either settle to the finished material or to the sales order.  If you are using valuated sales order stock you would normal have the costs settle to the material and the production order would behave very much like the previous example.  If you are not using valuated stock then you would need to settle the costs to the sales order and all the production costs would accumalte in the sales order.
    If you are using the sales order as a cost collector than you will probably want to settle the sales order as well.  During the sales order settlement you have the option of settling the cost and revenue assigned to the sales order to COPA.  The settlement profile along with the RA key assigned to the sales order controls how these are settled.

  • Business Content for Product Cost by Sales Order

    Hi,
    We need to do reporting on costs associated to Sales Orders. The corresponding R/3 Area is "Product Cost by Sales Order" in Cost Object Controlling. We have looked at the standard cube for Cost Object Controlling (0PC_C01) but this cube only contain costs related to manufacturing orders, whereas we need to look at costs associated with sales orders after Result Analysis.
    Have you guys any ideas which content that might support this, if any?
    Many thanks!
    / David

    Hi Christian,
    please refer to SAP Note 584791: <a href="https://websmp208.sap-ag.de/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=0000584791&nlang=E">BW-BCT-CO: Costs not extracted on sales orders</a>.
    Unfortunately there's no DataSource providing the data you need for your analysis scenario. A custom development is needed (<i>awful!!</i>)
    <b>Note 584791 - BW-BCT-CO: Costs not extracted on sales orders</b>
    <b>Symptom</b>
    In R/3, costs are posted directly to sales orders. The costs have to be analyzed in the BW system. In the standard system, however, this data is not extracted into the BW system.
    <b>Other terms</b>
    0CO_OM_OPA_1; 0CO_OM_OPA_6
    <b>Solution</b>
    1. There are currently no DataSources for costs on sales orders in the standard BW Business Content. Unfortunately, there are currently no resources scheduled for a new development in this area either.
    2. Therefore, the DataSources and the Business Content must be created in the customer project within the framework of consulting as a customer solution concerning the generic extraction options of the BW Service APIs or function modules you have programmed yourself for extracting data.
    3. Technical background information about costs on sales orders:
    The transaction data is available in the following R/3 tables
    COSS and COSP - Totals records or COEP - Line items.
    This concerns records for the VB* object numbers.
    The master data of the sales orders is contained in the VBAK and VBAP tables.
    The 0CO_OM_OPA_1 and 0CO_OM_OPA_6 DataSources only extract costs for orders with master data in the AUFK table. These types of requests always have OR* object numbers. Therefore, these DataSources cannot be used for sales orders.
    However, you may be able to assign requests from the AUFK table (for example, maintenance orders or production orders) to a sales order through the AUFK-KDAUF table field.