Creation of IBase for Production data or sales order  in R/3

Hi,
My client is a locomotive manufacturing Company, They want to track the failure of parts in the locomotive  and any changes made in the locomotive during service.
Kindly explain your thought on the following:
1. Here Each locomotive will have an MBOM created for each sales order. We need to create a IBase equivalent to the MBOM in SAP R/3 47. Is it possible to create an IBase with reference to Production order or Sales order. Will it copy all the BOM components to IBase.
Thanks in advance
Manik

Hi Madhu,
There can be multiple reasons why it does not go to APO.
Two of the most common overlooked points are:
1.   ATP tick in integration model.
2.   Activation of ATP in external system: this is done in SPRO in the data transfer section.
Another common point is cheking rule: In SPRO see that your business event(SO) is enabled for ATP check.
Also you can go to transaction CO09 for ATP simulation in R/3 .
Hope it helps. Otherwise you can revert with specific questions.
Regards
Santanu Dawn

Similar Messages

  • ADDDITIVE COST FOR PRODUCT COST BY SALES ORDER SCENARIO.

    Dear friends,
    We are using costing for sales order & we have maintained the costing variant under the path IMG> Controlling> Product Cost Controlling> cost object controlling> Product cost by sales order >premliminary costing & order based costing>product costing for sales order costing>Costing variant for Product costing >Check costing variant for product costing.
    Under this we have maintained the Costing variant, Now we need to have Additive cost. But didnt found the tab in the costing variant where as when we check in T.code OKKN which is a part of Product cost planning we can find the Additive cost tab.
    How to run addtive costing run for Product cost by sales order scenario & please guide me with one example.
    Or else is there any configuration where we can assign standard costing variant PPC1 instead of Costing variant SOC1 ( which is a costing variant of Product cost by sales order.
    Please guide me
    regards,
    Sandeep

    Hi Sandeep,
    You may please try using Unit Costing for Sale Order.
    It is over an above the sale order costing you have done. So in case you want to post any additional known cost, you may do the unit costing for the sale order after the sale order costing.
    Trust this helps

  • Business Content for Product Cost by Sales Order

    Hi,
    We need to do reporting on costs associated to Sales Orders. The corresponding R/3 Area is "Product Cost by Sales Order" in Cost Object Controlling. We have looked at the standard cube for Cost Object Controlling (0PC_C01) but this cube only contain costs related to manufacturing orders, whereas we need to look at costs associated with sales orders after Result Analysis.
    Have you guys any ideas which content that might support this, if any?
    Many thanks!
    / David

    Hi Christian,
    please refer to SAP Note 584791: <a href="https://websmp208.sap-ag.de/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=0000584791&nlang=E">BW-BCT-CO: Costs not extracted on sales orders</a>.
    Unfortunately there's no DataSource providing the data you need for your analysis scenario. A custom development is needed (<i>awful!!</i>)
    <b>Note 584791 - BW-BCT-CO: Costs not extracted on sales orders</b>
    <b>Symptom</b>
    In R/3, costs are posted directly to sales orders. The costs have to be analyzed in the BW system. In the standard system, however, this data is not extracted into the BW system.
    <b>Other terms</b>
    0CO_OM_OPA_1; 0CO_OM_OPA_6
    <b>Solution</b>
    1. There are currently no DataSources for costs on sales orders in the standard BW Business Content. Unfortunately, there are currently no resources scheduled for a new development in this area either.
    2. Therefore, the DataSources and the Business Content must be created in the customer project within the framework of consulting as a customer solution concerning the generic extraction options of the BW Service APIs or function modules you have programmed yourself for extracting data.
    3. Technical background information about costs on sales orders:
    The transaction data is available in the following R/3 tables
    COSS and COSP - Totals records or COEP - Line items.
    This concerns records for the VB* object numbers.
    The master data of the sales orders is contained in the VBAK and VBAP tables.
    The 0CO_OM_OPA_1 and 0CO_OM_OPA_6 DataSources only extract costs for orders with master data in the AUFK table. These types of requests always have OR* object numbers. Therefore, these DataSources cannot be used for sales orders.
    However, you may be able to assign requests from the AUFK table (for example, maintenance orders or production orders) to a sales order through the AUFK-KDAUF table field.

  • Schedule line date in Sale order for backward sched.

    Dear Experts,
    In my MTO Scenario, I want to Use Backward Scheduling, so as any change in Schedule line dates in Sale order shall take effect at least in planned order Stage, i.e in output of MRP,
    But not happening so..
    I  have customized OPU5 and checked OPU3 as well,
    Please suggest...
    Regards
    Raghu

    HI Mario,
    Thanks for reply,
    I have not worked in this strategy but will try,
    What i found was, in Planned orders detailed scheduling tab, the Scheduling type appeares to be Forward, but when i convert it to Production order it shows backward scheduling.
    This duel behavior is difficult to understand.
    Regards
    Raghu

  • User exits for route determination in Sales order & Deliver creation

    Hi Gurus,
    I need to do some change in the route determination for both sales order & Delivery creation.
    Can anyone suggest me which user exit I have to use.
    Appropriate answers will be awarded.

    Hi,
    You can use the following exit for route determination - EXIT_SAPL0VRF_001.
    The FM documentation is below. Check the functionality:
    "The customer exit can be used for customer-specific route determination or to modify the inbound data for the company's own route determination.
    The following data is transferred to support customer-specific route determination:
    I_VBAK current order header (for route determination in sales order)
    I_VBKD order business data (for route determination in sales order)
    I_VBAP current order item (for route determination in sales order)
    I_VBPA current sales partner
    I_LIKP current delivery header (for route determination in delivery)
    The following data can be modified and transferred back to the standard route determination or used for a specific route determination:
    C_ALAND Country of departure
    C_AZONE Departure zone
    C_LLAND Destination country
    C_LZONE Receiving zone
    C_VSBED Shipping condition
    C_TRAGR Transportation group
    C_GRULG Weight group
    C_FLAG_GEN_VT Flag: Route determination with generic shipping
    requirements/transportation group.
    C_FLAG_INCR_GRULG Flag: Increase weight group if no route
    If you want to use a standard route determination with different parameters, trigger the exception 'CONTINUE_WITH_STANDARD'.
    In the log table C_PROT, the log data from the customer-specific route determination can be transferred back. In this case, the log entries always refer to customer-specific messages. To add a message to the log table, the function module SD_ROUTE_DET_LOG can be used (see below).
    If a route is determined in the customer-specific route-determination, it can be transferred back in the E_ROUTE field. If no route was found, the exception 'NO_ROUTE_FOUND' is to be triggered."
    Thanks.

  • Change pointers in CRM for Product Data Extraction using MDM_CLNT_EXTR

    Hi All,
    We want to extract Product data in Delta mode using MDM_CLNT_EXTR.
    I think change pointers are activated in CRM system in a different way. Please let me know steps to activate change pointers in CRM system for Product Data.
    Thanks in advance for your help.
    Regards,
    Shiv

    Hi,
       Please follow the below steps fro change pointers.
    1.      In the Implementation Guide (IMG, transaction SALE), choose Modeling and Implementing ® Master Data Distribution ®Replication of Modified Data ® Activate Change Pointers ‑ Generally.
    2.      Set the activation status Activate Change Pointers ‑ Generally, and save your entry (i.e BD61 Activate Change Pointers ).
    3.      Choose the activity Activate Change Pointers for Message Types like ORDERS.
    4.      Set the active indicator for the message type .
    5.      Save your entries.
    warm regards
    Mahesh.

  • Delivery date and sales order creation date

    Dear all
    Can you please explain the relation between delivery date and sales order date. In my case i can create delivery with delivery date as before the sales order date... how it is possible that i can create delivery before the sales order date.??
    Please explain.........
    Warm Regards
    Inder Pal

    Hi,
    Sales order date: Date on which the customer officially places an order to your company.
    All the commitment and product allocation counting starts with reference to this date.
    e.g. customer says that the goods are required from 20 days of placing order, then from this date the calculation starts.
    Delivery date: Date on which after the system goes through material availability date, replenishment time, calculates the date on which physically the goods can be delivered to the customer.
    e.g. customer orders 100 qty of material X in 15 days, you will hve to check this delivery date through availability check which can be done in sales order and also delivery.
    payment date is based on this delivery date.
    regards,
    Siddharth.

  • User Exit for Requested Delivery Date in Sales Order

    Hi
    Which user exit can be used to change Requested Delivery Date in Sales Order.
    Scenario:  Sales Document Type: OR has Lead Time: 7 days.  System always proposes delivery date after 7 days.  We need to change this Lead Time based on plant.
    Thanks in advance for your support.
    Regards
    Uma

    Hello,
      try with USEREXIT_MOVE_FIELD_TO_VBEP or USEREXIT_SAVE_DOCUMENT_PREPARE, of program MV45AFZZ.
    Hope to be useful.
    Best regards,
    Andrea

  • Changing proposed delivery date in sales order for one specific sales org

    Hi All,
    I want to change proposed delivery date in sales order automatically for one specific sales org only without changing lead time in VOV8.
    For that can I use MV45AFZZ. But it is asking access key to make changes. Is there any other user exit for the same. And how does exactly change it.
    Thanks in advanced.
    Points will be awarded.
    Regards,

    EXIT_SAPFV45E_001 has nothing to do with this - it is meant to update the purchase order from a sales order. It might not even be triggered if the sales order has no link to a purchase order.
    USEREXIT_SAVE_DOCUMENT is not really good for this either, because the delivery date has to be changed before that. If memory serves, it also influences the schedule lines and probably the ATP check and such. I would strongly advise against it. One of the other routines in MV45AFZZ should do just fine, USEREXIT_MOVE_FIELD_TO_VBAK for example.

  • Different Delivery dates for single material in sale order

    Dear All
                  I had a problem while creating a sale order, our customer orders a material for 100 SETS, but he needs 30 SETS On 30th July 2010 and remaining on 31st Aug 2010,
    how to mention the delivery dates in sale order, like for 30 SETS delivery date : 30.07.2010 and other 70 SETS Delivery Date : 31.08.2010.
    Thanks & Regards
    Maheshwar Rao. G
    Edited by: mahesh21973 on Jul 2, 2010 9:08 AM

    Hi,
    Maintain in sales order (VA01/VA02)Item details --> schedule lines enter the Qty with Delivery dates.
    SAM

  • Need the userid & creation date of sales order.

    Hi all,
    I need to know the userid and creation date of sales order. Can any body please tell me..

    check the fields ERNAM and ERDAT in the table VBAK.

  • Two Delivery dates in Sale Order against one item

    Dear All
    I need two delivery dates in sale order. one is default at the time of creation sale order. second i need actual delivery date which will be confirmed by production planning department after analysis the order whether material can be ready on that delivery date or it need to change. Actual delivery date may vary from original delivery date and both need to preserve in system. kindly provide solution. best regards.
    Manjit

    You need to select the Availability & Transfer of Req. check box in Schedule Line Configuration.It will transfer the req. to PP.So while creating the sale order , schedule Lines will be confirmed as per the Available Stock.
    System will give you the Default Delivery Date as the Date added after Lead Time in days in the Configuration.Else system will give the Current Date.
    Best regards,
    Ankur

  • Schedule Delivery Date in Sale Order

    Dear All,
    I have an order on 03.11.2009 (today) and its last delivery date is 15.11.2009. It means that I have to deliver the complete order on or before 15.11.2009.
    So where can I put this date in Sales Order?
    Regards,
    Vishal

    Hi Vishal,
    Your Last Delivery Date can be entered in the "Requested Delivery Date" field in the sales order.
    By doing so, the system will give us a confirmation that whether the delivery can be made possible on the Requested Delivery Date or NOT (The status can be seen by going in to the Schedule Line Level of your line item).
    The system also gives us the NEXT POSSIBLE DELIVERY DATE with the confirmed  Quantity as a Second Line item in the Schedule line level.
    The System considers mainly the Material Available Date to come to a conclusion on the Delivery Date of the goods. Also, there are other activities (Loading Time, Transporation Planning Time etc) for which some time will take and that also need to be considered (The same can be seen by going in to the Schedule Line Level of your line item and then click the Shipping button).
    Your Scenario: In your case, the delivery can happen ON OR BEFORE the Last Delivery Date.
    So for that follow the steps:
    Step 1: Put the Last Deliv Date in to the "Requested Deliv Date" field in Sales Order.
    Step 2: After enetering the other necessary details in the sales order then Save it. Now go the Schedule Line level of your line item and look for the Confirmation of the Delivery Quantity on the Requested Delivery Date.
    If Yes: Then its your wish that you can Prepond the Delivery Date by giving the required Delivery date during your delivery document creation.
    If No:
    Then you have look for the Next Possible date. OR Make sure that you can manage all your other activities like Loading, Transporation Planning etc. in 10 - 12 days time and make your material Availabilty today and do the delivery.
    Reagrds

  • User exits/BAdIs for Forecast consumption by sales order

    Hello Experts,
    My question here is: When Sales Order either new or change comes from ECC to APO, what are key fields considered for Forecast Consumption? Is requirements strategy is considered from location product master or Sales Order brings own data from ECC into it's own structure? I have read from SAP help or documentation that Sales Order coming from ECC does not use requirement strategy from Product Master. Rather it get its own fields like planning strategy/group / requirement class from ECC. It uses location product master only to get consumption parameters like forward/back word consumption days. So I am thinking to use some user exits or BAdIs to enhance the incoming sales orders to consume separate forecast categories in APO.
    My requirement is:
    For the same one product we want sales orders (can have two different order types or identify by a custom field) to consume two different order categories (ie. FA & FC) by enhancing incoming sales orders. So we have regular 1)Forecast key figure which is 'FA' category and 2)Forecast Additional key figure which is FC category. When we release two separate forecasts from DP we release into these two key figures and categories. Now we want incomping sales orders to consume these two categories separately when our sales orders are having two different order types (i.e OR and ZR).
    I want to kow what way we can acomplish this? Are there any user exits or BAdIs for this purpose?
    I looked arount BAdI /SAPAPO/DM_BADI_CSP and I am not quite sure it's going to help. Are there any others?
    I appreciate if anybody explain me the process?
    Thanks in advance!
    Raj

    Standard Logic --- Whatever plant is visible in the Sales Order, the sales order will appear under that Product Location in SNP
    There is no standard way of making the sales order visible in another location.
    Depending on your requirement(Ex: Forecast Consumption, planning etc),using APO-BW we can simulate the requirements in the other plant which can be a nightly run and not immediate.
    Now coming to your question, if the delivering plant is A, how does ECC Delivery document know when the sales order has plant B that the delivering plant is A.
    Can you be more specific.
    THanks
    Kumar

  • Product wise pending sales order

    Hello,
    From which transaction code we can find out the Product wise pending sales order list.
    thanks
    harish

    Hi,
    Kindly make use of filter options and change layout options.This might help you for report format.But ultimately the details are going to be the same I guess
    In the initial screen if you give the date range you will get the list of pending orders for that particular material and the organizational detail you give.
    Reward points if helpful.
    Regards,
    Amrish Purohit

Maybe you are looking for

  • Using a File Object

    I have downloaded a file from a FTP site into a File object. This file doesn't actually exist the file itself is in memory. Instead of using the renameTo() command to save the file to the hard drive I want to take the file and get its contents and st

  • PO Number is not copied when create SD document from Reference

    Hi Gurus, I created Billing request document (VA01) by reference with a contract (VA41) , but the PO number field ( VBKD-BSTKD) is not copied over. I have checked all the data transfer rountines, but still could not find out. Please help , which data

  • Install apps on iPhone 4S

    I thought this was supposed to be a seemless transistion.  How do I get the info from the apps from my last iphone (2g) onto the 4S?  Do I have to re-register and sign in to the apps?

  • Connecting to router

    how do i connect to my router from my computer so i can foward ports? WRT54G version 8. i try using 192.168.1.1. i doesnt work like on my old router, is there any way to connect to it? (please name multiple ways if there is) (also if there are free p

  • Reconciliation

    I am using SBO 2004 2b. In reconciliation how to import external bank statement in sbo. in pdf file of help on reconciliation it is shown that import button is there on "Process External Bank Statement". but in the version which i am using that butto