Planned Maintenance November 15 2014

Valued Customer,
We wanted to give you a heads-up on a planned maintenance window this weekend for Adobe Echosign. As part of our routine maintenance, and our ongoing work to increase the security, availability, and performance of the service, Adobe EchoSign will not be available this Saturday, November 15th, for approximately 90 minutes, starting at 9:01 PM PST. This is taking place during non-peak hours to minimize potential disruption to your business.
We apologize for any inconvenience in advance.
The Adobe EchoSign Team

I thought it was just at my end..
Yeah.. really slow...
Plus, it could not find LVOOP, which is highly unusual because it should be common.
Strange.. 

Similar Messages

  • Planned maintenance notifications to MEB

    Good Morning Guys
    I have been having problems processing planned maintenance notifications when creating revisiom and creating orders from revised revisions.
    Am getting two errors
    1.Task list A ENG 01: no conversion rule found for work center MA00/1000
    2.Error creating order for task list 02000038  4000290 A ENG 01 in revisions
    This is what i got from perfomace assistance
    Task list A ENG 01: no conversion rule found for work center MA00/1000
    Message no. WPSOR004
    Diagnosis
    The system tried to create an order for main work center MA00/1000 from task
    list A ENG 01. No conversion was found for work center MA00/1000 (valid from
    15.04.2014).
    System Response
    The system cannot convert the work center. The order creation process was
    canceled.
    Kind regards
    hussein

    Hi Hussein,
    Seems like issue of  validity date of Maint. Work Center . If it is, correct it in IR02.  and retry.
    Jogeswara Rao K

  • Query , logical DB or report about plan maintenance and functional location

    Hi,
    I've to do a report about a list of plan maintenance. I've to show the functional location affected by the plans but in the table MPOS the field TPLNR doesn't exist.
    But I have maintenance plans that affects to functional location only. I've not found any useful logical database or report to show this information.
    Could anybody help to me?
    Thanks
    Best Regards

    Dear
    The SAP is provded the option please check once again
    Table MPOS- Field ILOAN 
    First take the ILOAN from ILOA table by object reference is 2 (Field: OWNER) in output.
    Then put the Loc/acct assignment value at input of the MPOS table which is u received from ILOA table

  • ECatalog for SRM - Planned Maintenance

    Hi all,
    Currently, I have a requirement to develop an eCatalog for Planned Maintenance (PM) Order. For each PM order, there will be list of components need to be purchased from Vendor. When user click on 'Catalog' button (toolbar below of Component tab), it will prompt up a dialog box for user to key-in Catalog ID based on Plant and Maintenance Type, and direct the user to a vendor's catalog page (Internet browser like), where user can select the desired components for maintenance usage.
    Also, I notice that SAP version 4.7 only cater one Catalog as a standard, is there anyway to cater multiple catalogs instead (any BADI or user exits to achieve this)?
    The major challege for this development will be:
    - Multiple Catalogs
    - UoM Mapping (from Vendor's UoM to SAP UoM)
    - Product Category (from Vendor's Product Category to SAP Material Group)
    - Log file of each transaction (for trouble-shooting purpose, so that user can identify which part of the error occurs)
    I understand the above can be configured and development of BADI will be involved, however, I'm totally new to this eCatalog development. Hence, I would appreciate if someone can shed some light based on the requirement.
    Many thanks.
    Best regards,
    Patrick

    I'm able to create multiple catalog for Planned Maintenance (TCODE IW32) in R/3 (4.6c), and it has working fine.
    Regards,
    Patrick

  • Please explain why I have not received my $200 iPhone 6 Trade In Promo   Gift card. I sent it to Trade In Center in packaging sent to me by Verizon on November 26, 2014. I have called the Trade In Support team 877-835-2024 to check status and receive a di

    Please explain why I have not received my $200 iPhone 6 Trade In Promo   Gift card. I sent it to Trade In Center in packaging sent to me by Verizon on November 26, 2014. I have called the Trade In Support team 877-835-2024 to check status and receive a different response each time I call. 1)it was received and it takes weeks/months to perform analysis on the device 2) you sent it to the wrong address 3) just wait 4) i will 'expedite' your issue. I've asked to speak with supervisors and the CSR will not let me speak with anyone confirming 'you will just be told the same thing I am telling you'. Well - nothing ever comes of it. Please assist. I have been a Verizon customer for years and am frustrated with the lack of customer care. Like many others I am ready to switch carriers.

    I wanted to add my voice to the growing chorus of people complaining about VZW's trade in program. i received the exact same excuse for denying the full value of my perfectly good and DEACTIVATED iphone 4s.
    i DID manage to get through to the trade in team, and after explaining the situation, i was told that my problem could be escalated the the tech team. the anonymous trade-in woman transfers me to the normal VZW cust support line... huh?
    i wait again and finally get through. unlike the trade-in woman, the cust support rep immediately identifies himself. willie was as helpful as he was allowed to be, but sadly, that wasn't very much. the trade in people and VZW hold all of the cards.
    THEY say that the de-activation lock wasn't turned off, i say it was.
    there is no way to prove either assertion.
    there is no appeal.
    they just deny, deny, deny, as evidenced by all of the other complaints posted here and elsewhere.
    willie WAS able however, to get me an additional credit for my 'inconvenience'.
    while i genuinely appreciate his effort on my behalf, it doesn't absolve the company from the way they handle the trade-in program, whether it's farmed out to a 3rd party or not.
    i will be filing complaints with the PSC, BBB, and NYS Att'y General.

  • Nokia Software Updater planned maintenance break 1...

    Dear Updaters
    Nokia Software Updater planned maintenance break 12 Nov 2009, 0600 - 0700 GMT 
    There will be a planned maintenance break on Thursday, during which time the Nokia Software Updater service will not be available.
    During the maintenance break, customers already downloading software may not be able to update successfully, but customers already updating their device will be able to complete.
    We apologize for any inconvenience caused.
    The Nokia Software Update team

    Hi,
    Will this 'maintenance' actually resolve the issues, us very unhappy 6700 owners have with updating their software. I have been trying for 3 months now to get the software updated or refreshed as I have been told to do without sucess. If you look at the posts on this site I hope it does!!!
    A distraught Nokia 6700 owner.......!!!

  • What is actual process in plan maintenance module?

    Hi Expert,
    I want to know What is actual process in plan maintenance module? can u pls give me briefly description.
    Regards,
    Ram Rathode

    Ram,
    I assume you mean "Plant Maintenance" module.
    "Actual Process" Is also a bit misleading.  There are many distinct processes within the PM module, just as in any SAP module.
    Start with online help.
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/66/158661547611d182cc0000e829fbfe/frameset.htm
    which is a high level description.  If you want more, just coninue reading the sub-pages.
    Best Regards,
    DB49

  • Planned Maintenance Saturday November 13, 3:00 pm - Sunday November 14, 1:00 am CST (November 13 21:00 - November 14 07:00 GMT)

    Hello Everyone,
    Just wanted to notify you about planned ni.com maintenance:
    Saturday November 13, 3:00 pm - Sunday November 14, 1:00 am CST (November 13 21:00 - November 14 07:00 GMT)
    ni.com will be unavailable and unreliable throughout this time period.  You may be able to view the forums but may not be able to log in.
    Regards,
    Laura
    Web Support & Operations
    National Instruments

    There isn't a maintenance tonight (Nov 16) is there?  I'm getting some strange behavior and innability to create a new thread in the LabVIEW forum.

  • Scheduled system maintenance on US data center - November 23rd 2014

    To ensure the highest levels of performance and reliability, we've scheduled a database server upgrade on our US data center. To minimize the customer impact, the upgrade is scheduled at the most convenient hours and will take up to 8 hours to complete. During the maintenance procedure, creating and updating content, Partner registration, trial site creation, publish from Muse, sFTP, APIs and some site admin sections will not be available. Additionally, during the 8 hours maintenance procedure, all sites on the US data center will experience 4 sessions of 15 minutes downtime. Except for the 4 scheduled  downtime sessions, the website front-ends will not be impacted by the maintenance.
    Maintenance schedule:
    Start date and time: Sunday, November 23rd, 3:00 AM EST (check data center times)
    Duration: We are targeting a 8 hours maintenance window
    Customer impact:
    Partner registration, Trial site creation, Adobe Muse publish, APIs, FTP and some admin section will not be available through the entire maintenance window on all data centers
    All websites and services on US data center will experience 4 sessions of 15 minutes downtime sometimes within the maintenance window
    Creating or updating content  on sites located on US data center will be unavailable during the maintenance procedure
    For up to date information about system status, check the Business Catalyst System Status page. We apologize for any inconvenience caused by these service interruptions. Please make sure that your customers and team members are made aware of these important updates.
    Thank you for your understanding and support,
    The Adobe Business Catalyst Team

    agents will be online for update from console.
    Method 1: Update the protection agents from the Data Protection Manager Administrator Console
    Open the Data Protection Manager Administrator Console.
    Click the Management tab, and then click the
    Agents tab.
    In the Protected Computer
    list, select a computer, and then click Update on the Action pane.
    Click Yes, and then click
    Update Agents.
    Note You may have to restart the computer after you install the agent upgrades.
    Method 2:Update the protection agents on the protected computers
    Obtain the update protection agent package from the following directory on the System Center 2012 R2 Data Protection Manager server: 
    <var>Data_Protection_Manager_installation_location</var>\DPM\DPM\Agents\RA\4.2.1217.0
    The installation packages are as follows:
    For x86-based updates: i386\1033\DPMAgentInstaller_KB2904687.exe
    For x64-based updates: amd64\1033\DPMAgentInstaller_kb2904687_AMD64.exe
    Run the appropriate DPMAgentInstaller.exe package on each protected computer, based on the architecture of the agent.
    Open the Data Protection Manager Administrator Console on the System Center 2012 R2 Data Protection Manager server.  
    Click the Management tab, and then click the
    Agents tab. Select the protected computers, update the information, and then verify that the agent version number is 4.2.1217.0
    Have a nice day !!!

  • Wrong user ID appearing in entered by field of planned Maintenance Orders

    Hi,
    Only few planned orders those are generating from maintenance plan (Having order types PM02  and PM05 for QM Inspection plan), Instead of user ID system is being taken a code in entered by field as {IP1020100416 It looks like the combination of IP10 scheduling T-code of Maintenance plan and 020100416 = 16042010 is the created on date of Maintenance order}
    Please advise, what should I do to bring user ID instead of above shown code?

    This is the Batch input : Group name (contains the session name). It is not specific to any user. This is helpful in listing down all the maintenance call objects that the system generated during deadline monitoring.
    In the field Entered by, enter the group name that the system proposes on the initial screen of the date monitoring session.
    IP1019950101 --> All maintenance orders from January 1, 1995
    IP10199501 --> All maintenance orders in January 1995
    This is helpful when background scheduling is activated for Maintenance Plan.
    To View which User was responsible for the Scheduling of the maintenance Plans, View the Transaction IBIPA, give the user name it would list all of the Sessions run by this user and the Group Names for the correponding sessions.
    Edited by: Usman Kahoot on Jun 2, 2010 10:43 AM

  • From Classic Planning Maintenance to BPM Architect

    Hi,
    I'm Working w/ Planning 9.3.0.1 using classic maintenance (Mappings, Data and Medata Loads using DIM). I'd like to start using BPM architect because of its multiple features such as data synchronization. The service is currently stoped. I'd like to know what happens once I start the service. Can I still go back to classic maintenance? Do I need to import the current dimension hierachies to BPM architect for future maintenance? What are the steps and implications involved?
    Thanks in advance,
    Kloh

    Alp Burak wrote:
    Hi,
    I've been using EPMA ever since it's been released. It felt too stranger in the beginning as it was too buggy to use in early releases and also it was an entirely new way of creating your dimensions and application. However, as the time passed, I've seen it getting rid of all the bugs gradually and having new features in every new release. I wouldn't really want to go back to using classic application as its advantages for me are too great to just dismiss it. As Oracle and Hyperion put, this is the strategic way forward in the product roadmap anyway.
    AlpI have to disagree on this one, I am not a fan and it has not been welcomed too highy in the UK, a number of large projects have had to be shelved due to instabilities and problems.
    Ok, it is a product that has potential and if it was going to be maintained by business users, at present there are so many flaws, badly designed repository, a .net product mixed with Java when on the main hyperion products were going down the Java route, it has to run on windows, its interface tables are just a waste of time, its import files are not user friendly....
    I could go on :)
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Implementação de PM (Plan Maintenance)

    Bom dia a todos,
    Estou neste momento a acompanhar um processo de implementação de PM numa empresa do ramo petrolífero, gostaria de saber se alguém já fez um projecto deste género numa outra empresa. Se sim, gostaria também de saber se me podem facultar uns exemplos de roadmaps das várias fases de implementação do mesmo.
    Com os melhores cumprimentos.
    Edited by: amachado on Mar 26, 2010 9:39 AM

    hi
    have you set the deletion flag for the maintenance plan ,kindly refer the following link for the prerequisite for Archiving the maintenance plan
    http://help.sap.com/saphelp_47x200/helpdata/en/a4/96ba49e41c11d1951d00a0c93029cf/content.htm
    regards
    thyagarajan

  • Planned Maintenance/ Activity but no cycle time

    Hi PM Gurus,
    Quite new to Plant Maintenance, and would like to ask a question.
    I have a planned program for maintenance of some plantation, which requires maintenance lets say,
    on February and October of the year for one type of activity, and maybe June and September of the year, for another activity, so they may not have any cycle time, but they require to maintain it for twice
    a year. Its more of a program scheduled for each of numerous activities required to maintain
    the plantation.
    Is this considered as Preventive Maintenance or Ad-Hoc Maintenance, as there is no exact cycle
    time as required to be set for Preventive Maintenance, but its a planned activity.
    Thanks so much for your help. Best Regards

    pocoyo ford,
    The first question you probably need to answer is whether there is any legal requirement to prove you perform planned/routine/preventive/routine type maintenance. If so, then you will probably need to create maintenance plans (although there are other non-SAP methods too).
    If the maintenance is Feb/Oct then you can use a standar 6 monthly cycle. However, you may need to use factory calendar for the Jun/Sep cycle.
    But if one equipment toggles between a Feb/Oct and a Jun/Sep cycle, then maintenance plans may not be the most efficient way as you would need to change the maintenance plan each time the cycles change and the administration time may be too great...
    PeteA
    [www.pjas.com]

  • How to Retrive Planned Maintenance Notification from server

    Hi Experts
    I have database where Plant Maintenance Notification is already created. Now I want to retrieve Notification from the server. How we can do this.
    In other work how to use BAPI_ALM_NOTIF_GET_DETAIL.
    Thanks
    SIddhartha P

    Hi,
       Did you check here??
    /people/musarrat.husain2/blog/2007/10/23/a-beginners-guide-to-call-an-rfc-in-bls

  • Create plan maintenance using BAPI

    Hello expert I am new in Abap
    I have a new request for the customer.
    I have to upload data in order to create plan maintenace using BAPI. 
    the problem is that I do not know if there is a bapi to di this,
    I just know the transaccion which is IP42.
    I apreciate  if you can help me please

    Hi Stephanie,
      Check this following link for creation of sales order using bapi:
    http://www.sap-img.com/fu036.htm
    Have a look at these links also:
    http://abaplovers.blogspot.com/2008/02/bap-sales-order-create.html
    http://abaplovers.blogspot.com/2008/02/bapi-sales-order-create-code.html
    Hope this helps you.
    Regards,
    Chandra Sekhar

Maybe you are looking for

  • Page-break in alv background job for alv output variant not coming correctl

    Hi, I have created an ALV grid report. When i run the report in background i get the output with correct page-break on FIELD1. Now when i run the report in background with an "ALV output variant" (its the ALV variant that controls the fields display

  • Creating an Transaction ID in a WebService?

    Hello, SAPients. Here is a .NET developer that just begun working with SAP. I am facing a problem that I can't find the answer so far. I have a webpage that has 3 WebServices (all connecting to SAP). The first one captures the data using BAPI_BUPA_AD

  • Gforce 4 Mx440 wont work at 4x

    Hi i have a gforce mx 440 and i realice that it runs at 2X insted of 4X, i chek the forum and i´ve red tht i should load the 4-1 via driver in turbo mode...but the latest drivers doesn´t have that option...or at least doesn showm me that option. then

  • Vista 64 and flash player....

    I just bought a computer and have vista 64...is impossible install flash player...so...what do I have to do it for watch videos online?...there is any solution or another program?...I really don't understand NOTHING about computer..

  • OVM 2.2: Installing paravirtualization drivers

    After installing paravirtualization drivers on a windows guest, should you update any settings on the hypervisor? Like change the storage and network types?