Planner groupwise break up cost for an equipment.

Hi,experts,
Is there any standard t-code available to view break up cost(dept.ment wise)  as well as total cost for a specfic period for an equipment?? As in a single equipment, many depts. r involved like instrumentation,electrical, mechanical etc. my client wants a report where they can view total cost for that equipment as well as break up cost like instrumentaion cost,electrical cost,mechanical cost etc.Please,guide me how to get this report.thanks in advance.
rgds
rajib

dear thyagarajan
many thanks for your prompt reply.Actually,we have certain equipments where depts. like  instruementation,mechanical dept. is involved and I have created the concept of main equipment and sub-equipment. Say, main equipment is "X" and sub-equipment is "Y" .Now,in main equipment master data "X",I had entered planner group for mechanical dept. and in sub-equipment "Y" ,I had entered planner group for instrumentation dept. , now if any problem comes in main equipment "X" , mechanical dept.will create main. order and if any problem comes in sub-equipment "Y", instrumentation dept. will create maintenance order.
Now, my client's requirement is to view total cost for that main equipment as well as dept. wise???how to get this report? as instrumentation is creating for order for their equipment ("Y") , not for the main equipment("X"),
please explain is there any std. t-code available for this.
rgds
rajib

Similar Messages

  • Lifecycle cost for an equipment

    Hi all,
    Can anybody point me in the right direction to record revenue for an equipment that is used as a part of Customer Service Order, ie. a technician might spend 5 hours on the job and had to use a particular equipment for 2 hours.  Those hours will then be charged out to a customer, resulting in revenue posting.
    The other half of my question is for that same equipment we need to collect all cost regarding maintenance and general operating cost such as oil consumption.  The maintenance cost could be recorded via PM Order but the oil consumption is a bit harder.
    What is the best way to set this up so at the end of the day we will have an equipment with all revenue and cost allocated to it.
    Regards,
    Gudmundur

    dear thyagarajan
    many thanks for your prompt reply.Actually,we have certain equipments where depts. like  instruementation,mechanical dept. is involved and I have created the concept of main equipment and sub-equipment. Say, main equipment is "X" and sub-equipment is "Y" .Now,in main equipment master data "X",I had entered planner group for mechanical dept. and in sub-equipment "Y" ,I had entered planner group for instrumentation dept. , now if any problem comes in main equipment "X" , mechanical dept.will create main. order and if any problem comes in sub-equipment "Y", instrumentation dept. will create maintenance order.
    Now, my client's requirement is to view total cost for that main equipment as well as dept. wise???how to get this report? as instrumentation is creating for order for their equipment ("Y") , not for the main equipment("X"),
    please explain is there any std. t-code available for this.
    rgds
    rajib

  • Break up of raw material cost for released finished materials

    Hi All,
    I have searched various threads before posting this question.
    Is there any standard report available to view the breakup of raw material cost for a release finished material.
    I have cost component split report but it shows everything in raw materials.... is there any report to show a break up of this raw materials cost.
    If there is no standard report can you please how I should develop a customized report.
    Thanks,
    Srini

    Dear Srinivas,
    You will get the cost breakup in the following report:
    CK84_99 - Itemization
    CK86_99 - Costed Multilevel BOM
    CK80_99 - Cost Components
    You will get the same information in CK13N
    From the standard SAP,  no report will show breakup for all the materials in single report at a time.
    We have developed the report through ABAP functionality
    Regards,
    Pavan Kumar Arvapally

  • Broken IPhone 6 how much will it cost for a refurbishment phone

    broken IPhone 6 how much will it cost for a refurbishment phone?

    If your iPod Touch, iPhone, or iPad is Broken
    Apple does not fix iDevices. Instead, they exchange yours for a refurbished or new replacement depending upon the age of your device and refurbished inventories. On rare occasions when there are no longer refurbished units for your older model, they may replace it with the next newer model.
    ATTN: Beginning July 2013 Apple Stores are now equipped to do screen repairs/replacements in-house on iPhone 5 and 5C. In some cases while you wait. According to Apple this is the beginning of equipping Apple Stores with the resources needed to do most repairs for iPhones, iPads, and iPod Touches that would not require major replacements. Later in the year the services may be extended as Apple Stores become equipped and staffed with the proper repair expertise. So, if you need a screen repaired or a broken screen replaced or have your stuck Home button fixed, call your local Apple Store to see if they are now doing these in-house.
    You may take your device to an Apple retailer for help or you may call Customer Service and arrange to send your device to Apple:
    Apple Store Customer Service at 1-800-676-2775 or visit online Help for more information.
    To contact product and tech support: Contacting Apple for support and service - this includes international calling numbers.
    You will find respective repair costs in the appropriate link:
    iPod Service Support and Costs
    iPhone Service Support and Costs
    iPad Service Support and Costs
    There are third-party firms that do repairs on iDevices, and there are places where you can order parts to DIY if you feel up to the task:
    1. iResq or Google for others.
    2. Buy and replace screen yourself: iFixit

  • External Service of 5Equipments, how to distribute the cost to indv equip?

    Hi Expert,
    if external vendor come to repair the 5boiler (equipments) and invoice us the total cost (labor, material, flight charge, allowance, hotel, taxi). how should i distribute the cost into EACH boiler?
    how should i create an order with 5boiler??
    Please advise
    Thank you
    Regards

    Hi,
    In addition, if there are more equipments under one Functional location & cost history is not required to capture at equipment level, then in Header Main Functional Location will be defined. In Object list, all the equipments will be defined. So that, it is possible to have link between equipments & operations.
    [Object List|http://help.sap.com/saphelp_erp60_sp/helpdata/en/3c/abb0a2413911d1893d0000e8323c4f/content.htm]
    You can see the Maintenance Orders report as normal. IW39 will not be a problem. There's a flag on the selection field (Incl Object List) to tell the system to look also in the object list.
    Cost Distribution - I feel you can create settlement rule as per Object List equipments by mentioning % in that. For example, if there are 5 equipments, then define settlement profile with 5 different settlement receivers 20% each as per the equipment.
    But this also updates only CO documents. But as per PM concerned, you cant distribute the cost.
    [Cost Distribution|multiple equipment in maintenance order?;
    Regards,
    Maheswaran.

  • How to estimate different cost via diffrent equipement to one product in SAP

    hello, everyone,
      Our factory have Two equipments , one is a new equipment A , the other is an old equipment B,
      they all produce the prodcut W , but the old equipment B consume electricity ,warm water and Raw material is much more than the new equipment  A.  So the cost price  of product W is different when they were produced by equipment B and equipment A.
      the Finacial Department and Sales Department want to know different cost price of product W via different equipments in the end of every month. Now we use two different material NO to deal with it(actually it is one product ) ,but this method take a lot trouble to stock, because  one product quantities were seperated by different material NO in Storage location.
      According to this requirement, we activate the split valation, but the customizing of  split valuation just supply one field for"  val.type in-house prod", at the same time , the t-code CK11N screen has not the field vauation type. if we don't estimate the material cost price by CK11N, when we create sales billing ,the system can not post COPA document  and give a error that is :“Valuation with material cost estimate: error with product "1180119998"
       may you have a good method to deal with this type of business or you ever met this kind of  business . may you share it , I appreciate you for your help !!!
        Davis
        Best&Regard.

    Davis,
    You can create different production order like one production order for new  equipment   Or Other For second old equipment  and old equipment order you can increase the material component quantity .
    or second  i agree with Mr. Biju K
    you can create two cost center
    old equipment : xxxxx
    new equipment : yyyyy
    you can create different work center base on two separate cost center so all cost book in separately in cost center.

  • HELP! Project for school. What is Apples benefits and costs for consumers?

    I have a project for school, and I'm focusing it around Apple. Ive done hours of research and cant find anything on the benefits and cost for Apples consumers. Help please?

    Macs need almost no IT support, and sometimes none at all. One private educational institution (about 1500 students at all grade levels) with which I have been affiliated a couple years ago decided to equip its students, teachers, and administrators with iPads, iMacs, and MacBook Airs.
    They have no IT staff. Zero.
    Another, fairly large (Fortune 500 company) recently decided to replace all its Windows computers with iMacs and iPads. Less than a year later they laid off 90% of their IT staff, and reduced its associated infrastructure a commensurate amount. This was a benefit I knew would occur, but the C-level suite didn't believe it until seeing it for themselves.
    (Edit to add... Blackberries were the only "supported" mobile device for a long time. iPhones were never supported, yet everyone eventually started using them anyway, even the IT staff. No one even seemed to notice this transition except in hindsight, after which it was already complete. Even today they're not "supported". Yet this business somehow not only managed to survive, it's been growing at a fairly healthy rate despite an awful economic climate.)
    Another educational institution, this time a public one with which I've been more recently affiliated, equips all its students and teachers with MacBook Pros at taxpayer expense. Their reason for doing so was a study concluding that Apple hardware lasts longer, is more resistant to malware and its associated problems, and require less support than PCs.
    Private institutions have always been sensitive to needless costs while institutions relying on public funding have traditionally been less sensitive to that need. That has been changing recently though. Taxpayers, teachers and students all win, of course IT staff has to find other employment for which they're qualified... whatever that may be.
    Of course these amount to nothing more than personal anecdotes, but you can probably find thousands more just like it.

  • How To get Characteristic values for an Equipment in a particular Class ?

    Hi All,
    How i will get  Characteristic values for an Equipment in a particular Class ?
    Any table or FM ?
    Thanks in advance
    Srikanta Gope

    Hi,
    You can use the FM BAPI_OBJCL_GETDETAIL to fetch the characteristic values for an equipment from the table parameters ALLOCVALUESNUM; ALLOCVALUESCHAR; ALLOCVALUESCURR.
    Or u can use the tables EQUI, KLAH, KSSK, AUSP, CABN
    Regards,
    Aditya

  • Specific Identification Cost for batch managed items (Follow-Up from P2P)

    Specific Identification Cost method is used for serial and batch managed item. Using this method, the outbound cost of such items would be the original cost of specific goods, which can be determined according to the serial or batch number of that item.
    Business One allows the user to receive batch managed items with a batch number that already exists in the DB. It’s possible that the received quantity is added to on-hand quantity in the warehouse. In such case, the quantity on-hand of that batch and the received quantity may have different costs.
    What should be the system behavior in such case:
    1. Block receipts to the same batch with different costs.
    2. Write the difference to a price difference account, as done in Standard Cost method.
    3. Manage the batch cost with Moving Average method.
    This thread is continuation from 'Specific Identification Cost for batch managed Items' <a href="http://p2p.sap.com/businessoneforum?type=join&login=1&uid=41FB661A76CED536C825C4E2B6FF4397&cid=91&go=z37225">discussion</a> in P2P SAP Business One Forum (Product Development Collaboration).
    Previous discussion on P2P is summarized in the attached file.

    Hi Peter,
    This is a very important functionality that you are describing here. For example, in the Steel industry, it could be extremely useful to cost by batch or serial number.
    If you receive a batch that already exists in the system and if the costing method for the product is moving average, then teh cost of the batch should be calculated based on the moving average as well.
    If the costing method is standard, then the cost should go in a variance account.
    If the costing method is FIFO, then it is a getting trickier...
    Regards,
    Vincent

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

  • Can anyone offer some advice i am looking to upgrade the OS system on one of my macbook pro's, currently running os10.4.11, I would like to upgrade to OS10.5? how would I go about this, and is there a cost, for what is an old operating system now?

    Can anyone offer some advice i am looking to upgrade the OS system on one of my macbook pro's, currently running os10.4.11, I would like to upgrade to OS10.5? how would I go about this, and is there a cost, for what is an old operating system now?

    Since your Mac probably came with 10.4, there is no longer a way to get 10.5 Leopard install media. IF it has the requirements, you may be able to upgrade to 10.6 Snow Leopard by buying the boxed install media at the Apple Store for $30.
    System requirements are found here: http://support.apple.com/kb/SP575
    General support can be found here: http://www.apple.com/support/snowleopard/

  • My iPod 5 32bytes ios 8 no longer works and is out of warranty, how much money would it cost for me to exchange it to apple for a new one?

    My iPod 5th generation iOS 8 32bytes is not bringing me to my home screen and is unresponsive, and gives me the constant apple logo each time I try to turn it on. My iPod is out of warranty, so I was wondering how much money would it cost for me to return my iPod back to Apple for a new one?

    Apple does not have a trade-in program. You can either try and restore your iPod, or you can try and sell it yourself. In some locations, Apple does provide for a recycling program, but the amount provided for devices is quite low.

  • Reducing freight cost for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    answered

  • SAP allows release of Standard Cost for Material with Moving Average Price

    Hi
    We set our Raw Material to use Moving Average Price (V) and price determination 2 (single level). And we activated material ledger.
    During mass calculation of standard cost (CK40N), If user accidentally forgot to restrict the Raw Material for being included in calculation, the system calculate standard cost anyway, even though I set it as Moving Average Price. And user is able to release it too without any problem.
    Why the system does not restrict it? By giving error maybe. Although as for now I can not find the wrong effect from releasing standard cost for MAP material, by your experience, is there any side effect that I should be aware of?
    Thanks

    CK40n is mass release of all materials. The release is not dependent on price indicator of the material in the master. It will calculate standard cost of all the materials.
    Releasing standard cost estimate of raw materials does not have any side effect as long your calculation is based on moving average price.
    Regards
    Divraj

  • How to get unit cost for finished goods in prod order

    HI all,
    IN a production order of type PP04, there is cost analysis you can get from CO03.  This shows the cost for finished goods and BOM components.  Would anyone know how the cost for finished goods are calculated ?  The issue i have is that the unit cost of the finished goods is not correct.  It is higher than what it should be.  I looked at the moving avg price at material master but the cost used in calculation is different than in material master.   Can anyone shed light how finished goods are calculated and why it is picking up a higher unit cost ?  Where is the higher cost coming from  for finished goods material as shown in CO03 ?  The BOM materials are picking unit cost correctly.  Would this have anything to do with cost settlement ?
    thank you.
    joyce

    Hi,
    Finished goods price will depend on BOM componenet price,  activity price and overhead price. Check whether this prices are picking correctly or not.
    Regards,
    Sreekanth

Maybe you are looking for

  • Application runs only in one user account

    Hello, While trying to install a Canon LiDE 200 scanner, I am experiencing this very odd problem: The "Setup" app on the install CD will only run in one of the two user accounts installed on my macbook (both are admins). In the other, the application

  • SQL to SQL Append

    Hi, I have a interface to load data from tables to table into same Oracle server, the target table is truncate every time that run interface and the data is just insert (don't update), i read that can use "IKM SQL to SQL Append" to avoid extra loadin

  • SET_ITEM_PROPERTY(':blk_update_pol.exgratia',visible,property_true);

    Hi everyone! Please help. I'm getting error FRM-41045: The items are within the same block. The item is visible upon running. I want to make a text item visible or invisible based on the value of a list item. I put my code in the when-list-change of

  • Web Service Commit (BAPI inside out)

    Hi all, I want to use update BAPI through web service which made by Web Service Wizard. I know we usually have to use BAPI_TRANSACTION_COMMIT to commit. Can I call single web service with commit? I found optional configrations in Service Definision (

  • Design Patterns for poor souls on LabVIEW Base

    Hi,    I attempting to design an application which requires the use of the event structure. Unfortunatley, I only have LabVIEWBase, so need to invent the wheel somewhat. The architecture I am trying to develop needs to support a User interface with 3