PO's against plant

Dear All,
Our's is extended classic scenario. 
In our organisation under one company there are totally 4 plants. 
But in SRM point of view all the organisations are assigned to one plant (eg. plant 0001). So all the po's has to be created against one plant (i.e 0001).
Recently we observed few PO's are creating against other plant (eg plant: 0002). After analysis we found that it is due to that particular organisation is assigned to two plants (0001 and 0002) in extended attributes (location).
Now my requirement is, is there any way to find the organisations which are assigned to second plant (eg 0002) apart from the plant 0001 in ebp org structure.
Please let me know if any one have idea about it.
Thanks in advance.
Regards,
Krish

FM
BBP_PDORG_GETDETAIL
should help you
BR
Dinesh

Similar Messages

  • Problem in  creation of any purchasing doc  against plant 0001

    Hi MM Experts,
    I am facing problem in creation of any purchasing doc (i.e: PR or PO) against plant 0001.This is available in the system and assigned to company code. I can create Material master with this plant 0001 and copy to create new plant. But Can't create any pur doc? also in plant list in pur doc showing the rest of the plant except plant 0001.
    I m working on ECC 6.0.
    Regards,

    Dear Sairam/Steve,
    I got solution for my problem. The problem is that address number not maintained for 0001 plant.This solution available from the following note. please go thro...
    Note 433997 introduced a new logic for the F4 help for plants.
    solution proposed in note 433997 :
    To maintain the address number of a plant subsequently, startTransaction OX10 for the affected plant ('Change plants') view. Click the 'Address' pushbutton (envelope) or (shiftF5). In the subsequent screen ('Change address'), press Enter or click the 'Copy' pushbutton and save using the 'Save' pushbutton (disk) or (CtrlS).
    Then the plant should have an address number and should also be displayed in the search help.
    Thank you all
    Regards,

  • Payments against plant maintenance order

    hello guys,
    I need to derive payments (to vendors) against plant maintenace order.
    Which ds should I select?

    ok

  • Need PO Total value control against plant or purchase org. or business area

    Currently we had individual PO release for its price..Also we need to control that particular plant for a particular PO type will not put Purchase order more than the Total Value in Rs. that a plant can spend..
    For Ex: Plant A can spend Rs 1 lahks in one month.. it can put many PO. but total PO Value should not be more than 1Lahk..
    Guide me wat is procedure..
    Thanks in advance

    Hi,
    option 1
    you can use blanket purchase order use limit, if GR is not compulsury in your case, than make a business process that plant can have only one PO in a month.
    option 2:
    use user exit, in that add value of all PO created in that month and if that value goes up to the required limit, give a error message.
    in case, if diffrent plant have diffrent usage limit (in Rs), use a Z-table and maintain the limit for respective plant, user exit will check values from Z-table and give message accordingly.
    regards,
    vikas

  • Document splitting: Post AR/AP items to HQ as against plants.

    We are in the process of implementing document splitting. During document posting, by default, receivables and payables will post to plant profit center. But we want to manage receivables and payables at HQ. I think we can achieve this by activating 'No Inheritance of A/c Assignments' check box for say a Vendor (or Customer) Invoice business transaction (using standard transaction variant 0001?) by configuring extended Document Splitting.
    I would like to know how the community members have handled such a requirement.
    Thanks

    Hello
    System updating the profit center from corrsponding expenses revenue items to Vendor custome line item
    as per your requirement it should be other than the expenses /  revenue profit center
    Can you please re check your requirement
    Thanks
    Kameshwar Rao

  • To verify plant of user (log on user) against plant data

    Dear Guru,
    In ABAP, How can I write code for verifying plant of user (log on user) with plant data in internal table.  To check whether they are the same.  Any good answer will be rewarded.  Thank you very much.
    Cheers,

    Hi
    Check the SY-UNAME with the the name of the Plant user
    Plant user data take it from T001W table
    and All logon User data will be in USR02 table
    take the data from corresponding tables and check.
    Reward points for useful Answers
    Regards
    Anji

  • Prevent Transaction Data against Plant

    Dear Experts,
       I have a plant that is no longer valid. I need to prevent users from creating transation data. I know I can use the authorization object M_MATE_WRK. Can someone please provide me with step by step instructions on how to do this.
    P.S: I need to prevent users from creating Puchase orders and creating materials etc. Please provide step by step instructions to prevent creating PO's.
    Thanks.
    Regards,
    Sapsols

    HI,
    I have faced this issue in one of my client and they were open to delete config i.e. Company code --> Plant config
    This will throw a error message when the try to create new POs on that plant..
    But, I would go with the solution of blocking material usage by seting appropriate X plant Status , but you are exposed to a issue of any user might change this status and still create the PO again.
    Also, another option is the sel deletion indicator for Plant. 
    Hope this helps,
    Thx
    MJ

  • Block material for sales order entry in specific plants

    Hi Experts,
    I wanted to know if there is a simple way to block material from being ordered in a specific plant other than maintaining exclusions. My situation is one sales org, two plants (A & B). Order entry should be blocked at plant A and not B.
    I tried using the material Cross-distribution-chain material status on Sales org 1, but this blocks across all plants.
    I also tried Plant-Specific Material Status on purchasing view, this blocks the material only if it is being procured (non stock). This does not work for materials that does not require procurement. Setting the material to deletion status in MM06 at the plant level will only give a warning.
    Any ideas or suggestions on how to handle this?
    Thanks,
    Nanda

    Lakshmipathi,
      Thank you. But I don't want to entirely cut off the plant from the sales org. I just don't want to be able to create sales order for a few materials in a specific plant. Ex. Material A should not be allowed on sales orders in plant X but should be allowed in plant Y, both are assigned to the same sales org 1000.
    I did some research and found there is no standard way to handle this in SAP, so I decided to go with a user exit MV45AFZZ. By checking against plant specific status (MARC-MMSTA) and if the value is 'XX' then issue an error message.
    Thanks,
    Nanda

  • MR11 - GR/IR Reconciliation - Error "Plant does not exist"

    Dear All,
    Background -
    We have a PO created in 2004 with one line item, against plant ABC for quntity 100 Units.
    MIRO has been done (100 uinits) with out MIGO and the vendor has been paid.
    The plant ABC was deleted in 2005.
    Problem-
    We want to reconcile the quantities for this PO. We get the error "plant ABC does not exist"
    Solutions tried but not ok -
    We can post a JV for accounting, but this PO will remain open.
    Do we have a solution for this?
    please let me know your sugesstions and ideas.
    regards,

    1)You can post a JV.
    2)Mark the line item for deletion of this PO.
    3) This will not appear in any report which will be run on plant basis.
    Reward if helpful

  • MC.9  drill down at storage location level

    In mc.9  report  stock against plant xxxx  at storage location drilldown
    I see
    In total  valuated stock is 0
    But
    at storage location 0040 I see  423.686 as valuated stock
    and at storage location 5M06 I see  minus 423.686  as valuated stock
    Client need to have not stock at plant level.
    In total I see 0
    But client is bothering about valuate stock he is getting at storage location level.
    Thanks,
    Kiran

    Hi Jurgen,
    For plant xxxx there is nil stock in mc.9 report. only I see sloc  to sloc transfer of qty. for example sloc 0001 has qty + 100 & sloc 0002 has qty -100.
    Finance is asking to user that this + - qty should not show in mc.9 and asking him to get it removed.
    What should I suggest to user and finance.
    Thanks,
    Kiran

  • Stock at Storage Location

    Hello there,
      Could anyone tell me the possibility of populating stock at storage location. I am using 2lis_03_BF and 2lis_03_UM for populating the Material Movements cube in BW 3.5. When we checked the data all the values for materials are populated against Plant level and the quantities at Plant - Storage location level.
      I have implemented the SAP How to Document for populating the values at storage location level but I have two issues on this.
    1. The actual values of materials are not accurate when displayed at Plant-Storage location level. Because they are calculated using Average value formula as per the note. How to realize the actual values at storage location level also taking into consideration the respective revaluation done at plant level?
    2. If I run the report for all Plants - storage locations it is either timing out or taking a lot of time to display. We are maintaining 45 plants and 10 storage locations.
    Could anyone tell me how to realize these values at storage location in an efficient way if possible.
    Thanks in advance,
    Raj

    Hi Anil,
    Thanks for the reply. Yes I did implement that note to get the values at storage location level. The values I am getting are not accurate after following this note. Example It is displaying the value of the material equally for all storage location which are valuated at different prices. ( Taking average values).
    Also If the material was revaluated the price correction is created at plant level and it is not taking the correction into consideration for displaying the individual values i.e against respective storage location. But I am getting the total result at storage location accurately.
    Is it possible in BW to display the values at storage location accurately as in R/3.
    Thanks,
    Raj

  • Delivery Performance Report..

    Hi All,
    We are using ECC 6.0 and want to measure the delivery performance both value and volume wise for the sales orders.Is there any standard way to check this in SAP or I need to use the tables VBEP, VBFA, LIPS and if I need to use these tables what  I need to do in SQVI.
    Thanks

    Delivery performance can be considered in two ways
    1)  Against a sale order, what has been delivered and
    2)  Against plant commitment, what has been delivered
    For the first one, you can consider VBAP and LIPS.  If your requirement is to capture the second one, then you have to consider the table where the plant commitment is stored and along with this table, you can consider LIPS.
    thanks
    G. Lakshmipathi

  • Questions on Rules-Based ATP and Purchase Requisitions for STOs

    Hello experts,
    We are working on rules-based ATP configuration and have several questions about the functionality.  Iu2019m hoping that some of you are using this functionality and can help give us direction.
    In our environment we have multiple distribution centers and multiple manufacturing plants.  We want to confirm sales orders against stock and production orders in any of those plants, depending on the locations that have stock or planned production.  For example, we will place a sales order against plant A.  If there is not enough stock in plant A then rules-based ATP will use location determination to check in plant B, then C.  The scope of check on the ATP check will include stock and released production orders.  We will configure plant A as the u201Cconsolidation locationu201D so if stock is found in plants B or C then stock transport orders will automatically be created to move the stock to plant A before shipping to the customer.
    We have configured rules-based ATP and this functionality is working well in our Development system.  The ATP check is executed and uses the rules-based ATP to find eligible stock in other plants.  The system is also creating purchase requisitions to move the stock to the consolidation plant. 
    Our first concern is that there doesnu2019t appear to be any firm linkage between the sales order and the resulting purchase requisition.  For example, if we create sales order 123 for plant A and the rules-based ATP finds stock in plant B it automatically creates a purchase requisition 987 to move the stock from plant B to plant A.  However, there doesnu2019t appear to be a linkage between sales order 123 and purchase requisition 987.  For instance, if we delete sales order 123 the purchase requisition doesnu2019t get deleted. 
    Our second concern is that the quantity on the purchase requisition can still be confirmed against later sales orders.  For example, say the above scenario resulted in a purchase requisition 987 that consumed all the stock available in plant B.  We then create a second sales order 456 for the same product.  Plant A is out of stock so the rules-based ATP looks in plant B.  We would expect that plant B would also not have any stock because itu2019s all been consumed by the purchase requisition.  Instead, the system creates a second purchase requisition to move quantity from plant B to plant A.  Itu2019s as if the system doesnu2019t realize that the purchase requisition 987 is already planning to move stock out of plant B.
    Does anyone have any thoughts or suggestions on these two scenarios?  Is there a way to configure the system so there is a hard linkage between the sales order and the purchase requisition so that if the sales order is deleted then the purchase requisition is also deleted?  Should ATP realize that purchase orders are consuming inventory and not allow later sales orders to confirm against that same inventory?  Any advice or experience would be greatly appreciated.
    Thanks,
    David Eady
    Application Delivery Team Lead
    Propex, Inc.

    Hi,
    The scheduling is done in SCM, and from there, whenever the RBA is triggered, the calculation is done always with the old route in SCM. Until you get back to R/3 this is when your route is determined. But the ATP check is always with the original route. So the idea would be that you change the values of the route while still in APO, this is possible via the user exit. Should be done in scheduling in APO.  
    Hope this information is helpful.
    Regards,
    Tibor

  • How to take Purchase order Pending quantity value from Table. ?

    Hai SAP Gurus,
                             Now Using ME2N, I am taking Pending Purchase Order Value against Plant wise & Material Type wise. Its takes lomg time to see this report.. Kindly guide me  how to takes those value from table..?
    ex:  Material Type     Plant 1
           RM                     1716294228
           HIBE                         63586533
           ERSA         27143712
           VERP      7551982745
           Components      7375781142
           Total                    Rs. 16734788360

    Hi
    It is possible through ME2N plantwise pend PO report.
    Put plant and WE101 in selection parameters

  • SAP Webi Reporting Query

    Hi Gurus
    I have a situation in my current project and looking for some possible situation:
    There is a hierarchical table as:
    District -> Plant -> Result
    Result values are stored against Plant. Business is looking at selecting District and and want a dynamic look-up on this table to find all Plants in this district and results against it to create graphs. Individual graphs to be created for unique combination of Plant and Result.
    This Webi report is on a Universe.
    Can we create any sub-queries or write and select statement for dynamic selection of unique Plant and Result values for populating graphs?
    This is a high priority requirement, any help will be appreciated.
    Regards

    Hi Ani,
    Try to create cascading prompts in UNIVERSE,will help you.,
    Business Objects 4 Information Design Tool - Cascading Prompts Part 1 - YouTube
    Regards,
    Ram

Maybe you are looking for

  • How to change space between folder icon and text on personal toolbar?

    I have a few folders on the personal toolbar with just a letter to indicate what they are, but on the theme I'm using, the letter is too far away from the folder it belongs to and partially falls under the next folder icon. I don't want to increase t

  • Codec for hdv

    hey guys~ i'm trying to open my hdv files and i'm missing codecs. which codec is necesarry for hdv files. thank you.

  • Urgent for Smart form logo

    HI, I have logo .i want to cahnge that name of logo.right now it is uploaded in se78.        how can we change the name of existing logo.       how can we download logo from se78 to our system to change the name. Thanks, kab.

  • Transaction marked rolled back

    Hi I'm have a FacadeBean F1 which uses Required transaction attribute which calls another Session Bean S1 which has default transaction attribute(Supports).This uses customized UserTransaction. In bean S1 this is the sequence of steps Method{ insert

  • PSE 10 exit app, PhotoShop Elements 10.0.exe stays running

    My drive crashed and had to be rebuilt. Reloaded PSE from my dvd. When I close PSE app PhotoShop Elements 10.0.exe does not close. PSE editor closes as it should. PSE will not restart unless I manually kill the executable. Other observations: I don't