PO stock transport order -  item change - field Customer in tab shipping

Dear all,
because of an existing modification it is necessary that I have to update the field customer at shipping tab of an stock transport order item when item's storage location was changed within TAC ME22N or ME21N.
Unfortunately SAP has not implemented this functionality within BAPIs or Userexits.
Does anyone has an idea where we have to place this modification?
Until the installation of the last support package, the modification changed the customer within include MM06EFPV_PTV_FUELLEN, form ptv_fuellen before calling function SD_TRANSFERDATA_DETERMINE and it worked.
Best regards and thank you for your replay!
Michael Schleis
PS: We are using SAP R/3 Enterprise Release 4.7 and the following Support Package
SAP_APPL     470     0029     SAPKH47029     Logistics and Accounting
Edited by: Michael Schleis on Mar 5, 2008 5:35 PM

Piotr,
You can default the shipping point in your STO based on the combination of shipping conditon (maintained in customer master), loading group (maintained in material master) and the plant in SPRO->Logistics Execution->Shipping->Basic Shipping Functions->Shipping Point and Goods Receiving Point Determination->Assign Shipping Points.
If you don't use any of the entries (for instance if you don't use the loading group), then just leave the entry blank in config.
Hope this helps.
H Narayan

Similar Messages

  • Stock Transport Order Without Delivery

    I m trying to transfer stock from one plant to another (within same company) without delivery.
    what all configuration do i need to do.
    pls. guide.
    I m little bit confused over stock transfer,
    Regards,
    Pramod Kumar

    Oh no, not at all!  This forum is meant to answer all your problems!
    Configure Inter company Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assigned to the ordering plant ( MM -> Purchasing ->
    Purchase Order -> Setup stock transport order -> assign the internal customer to the
    ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assign the supply source (Delivering Plant).
    Create a purchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order
    number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery
    document.
    Billing (Intercompany pricing conditions should be set).
    AND
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders,
    NLCC)
    4. PO type (which i believe you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you
    need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Company Plants, you need
    also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
    STO:
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order
    between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007
    via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the
    route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing
    procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area.
    Similarly select the receiving plant and assign the company code and sales area (The
    company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the
    receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data
    creation.
    Stock transfer between two plants in deffernet company codes is known as inter company
    stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area
    XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Deliveryy VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....

  • Multiple stock transport orders in single inv

    hi all,
    Pl.tell me how to make Multiple stock transport orders in single inv.
    For Ex: We have create 2 Sto's in differnt dates, while going VL10B  in Outbound delivery it is splitiing in two invoices.
    Pl.can any body explain how to control the Multiple invoices.
    kaushik

    Hi Kaushik
    Internal customer should be assaigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assaign the supply source ( Delivering Plant).
    Create a puchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assaign the purchase order number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
    Billing (Intercompany pricing conditions should be set).
    One more Process
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007
    via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the
    route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing
    procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area.
    Similarly select the receiving plant and assign the company code and sales area (The
    company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the
    receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data
    creation.
    Stock transfer between two plants in deffernet company codes is known as inter company
    stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area
    XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Deliveryy VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....
    STO
    Reward if useful to u

  • Stock Transport Order (STO)will not create delivery

    I have created a intercompany Stock Transport Order (STO) and it has created the shipping tab in the Purchase order(PO), and all seems to be correct.
    I have material in the plant, yet when I go to create the delivery using VL10G, the PO does not show as a choice. I also do not get an error, so I cannot tell why it is not creating the delivery.
    Is there a way to see an anaylis of why the STO is not showing as a choice?
    Thanks,

    Hi,
    Please check the delivery date in the STO created.and adjust the del creation date etc input fields at VL10G and try the posting.If there exists no error in the po created.

  • Change the valuation class of material [Stock transport order scenario]

    Dears,
    Client would like to change the valuation class of material.
    There is no open Purchase order/Process order/Purchase requistion and stock in plant.
    Scenario- One Stock transport order is created.
    For same goods issue (351-issuing plant) and goods receipt (101-receiving plant) is done.
    When we are going to change the valuation class of said material, message is "purchase order is open
    and it shows the no of STO [for which receipt and issue is done]"
    To resolve this issue we had first delete the STO line item no(ME22N). Then change the valuation class.
    (this allows). and then undelete the STO line item. Through this we can change the valuation class of material.
    Please advise in such business process that this is right way or there may be other option.
    Thanks & Regards
    Rajan

    rajanshah219,
    Here's my take on how to fix:
    *Manually change Config TCode OMT4 - change message MM 326 & 327 to type "W"   (if open order exists...now you can enter through warning messages)
    *If inventory exists, then issue out of stock to a cost center
    *Change valuation class
    *Put stock back into inventory (reverse to that same cost center)  Note issue out and reverse back into inventory must happen in the same posting period.
    **Valuation class should be changed as expected
    **Manually change config  TCode OMT4 - change message MM 326 & 327 back to type "E"
    Thanks,
    Jason

  • Changing of Stock Transport Order

    How can I find out who changed a Stock Transport Order, and on which date it was chaged.

    Hello,
    1)Normally, every change that has happened in SAP documents can be tracked through change tables CDHDR(Header Table) & CDPOS(Item Table).
    2)Another way of doing it, is going through menu path by opening the Stock Transport Order & selecting Environment-> Changes.
    Hope these details resolve your query.
    Regards
    Mahesh

  • Inv. receipt field for stock transport order

    guyz,
    when we are creating a normal PO(from me21n), in 'Invoice' tab of item overview screen, we can find following three fields
    inv. receipt
    GR. based IV
    final invoice
    however when i'm creating a stock transport order from ME21N, i'm not able to see 'Invoice' tab at all... i thought it couuld be related to document type and its field selection but not able to find these fields in field selection group for po document types....
    any help?

    Hi,
    In case of STO (Document Type "UB"), you will not find the "Invoice" Tab if it is between plants of same Co. Code and if you are using "Supplying Plant" instead of "Vendor". But if you want to do Invoice Verification for Freight/Delivery Cost, etc... you can fill the values for freight conditions in "Conditions" tab page and also assign a Vendor to the condition type itself by going into "Details"
    Standard Pricing Procedure - RM2000
    And in MIRO after GR (MIGO) > Select this STPO and also select "Only Planned Delivery Cost", it will populate the values and you can do LIV.

  • Commitment Item error in Stock transport order

    Hi all
    I have a stock transport order (STO) for a material non valuated in both sending and receiving plants.
    While creation , there is an error with respect to completion of an "committment item" *.
    If I input  the committment item in  STO create transaction in R3 , the STO is  saved  (permitting blank account assignment for the STO item  as intended)  and there is no further issue till post goods issue in sending plant or GR in receiving plant.
    The problem is however that this STO is triggered from APO and transferred via CIF to R3 while there is no chance to input the commitment item. This results into a CIF error with the STO not created  in both R3 and APO.
    Is there a way I could bypass this "committment stuff" in this situation?
    Thanks in advance
    Anton
    *The exact error message is as follows;
    "  No commitment item entered in item 00001 plant < >
       Message no. FI311
    Diagnosis
    The posted document contains at least one company code in which Funds Management, Cash Budget Management, or Project Cash Management is active. Therefore you must enter a commitment item in all involved company codes.
    Procedure
    Enter a commitment item.
    If you cannot enter a commitment item, check with your system administrator that your account assignment derivation is adjusted so that the system can automatically derive a commitment item from another account assignment, or from the G/L or cost element.   "

    Hi,
    Did you try using derivation rule using FMDERIVE in case funds management is active.
    Please also refer to the link below which guides on the item category to be assigned in Commitment item.
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/f0/ca5716260211d28a430000e829fbbd/frameset.htm
    Regards
    K.R

  • Stock transport Order - how to populate Storage location LGOBE field?

    For stock transport order (intra/Inter) , I would like to have the Storage location populated for the receiving plant(LGOBE). Can you please let me know the config necessary for the same? Thank you.

    Hi,
       If you want to default it based on plant, you may maintain the storage loc for external procurement in MRP2 view as shown below:
        The same will be defaulted when the plant is entered in the PO. If you change the plant in PO, the storage location maintained in the MRP view of that plant will be defaulted in the PO. You may test the scenario and revert back. Please note that the same storage location will be defaulted for all external procurement.
        Also, I hope the users will be creating PO for the particular plant only. If so, maintain the storage location in the personal settings - default values tab. Then the particular storage location will be always defaulted in ME21N for the particular user. You may choose any of the options.
    Regards,
    AKPT

  • Stock transport order and rescheduling date field

    hi,
    I am a bit surprise why "rescheduling date" field value in stock requirement list (MDO4) is always empty (and with exception message code 10) for my stock transport order?
    Did you guys having same problem?
    thanks.

    Does anyone know this?

  • Inter - Company Stock Transport Order Issue

    MM SAP Gurus,
    When I try working on "inter company stock transport order between two company codes."
    I found the errors while creating PO(using document type UB)
    ie.
    *1st Error -Material 1 not maintained in Plant 2.
    2nd Error - Customer 1 does not exist (please check entry in plant 1)
    3rd Error - Not possible to determine shipping data for material1)*
    i couldnt find out the error................................
    Here is the configuration done by me......
    Company codes:c1,c2
    Plant for c1:p1
    Plant for c2:p2
    I m going to create and transfer stock from p2 to p1.
    Here i m using stock transport order with billing(SD)
    Purchase org for c1:porg1
    Vendor for c1,porg1:v1
    I assigned plant p2 in additional purchase data of vendor v1.
    Sales area for c2:sorg2,ds2,d2
    Customer for sales area(sorg1,ds1,d1):cust1
    Now i go to mm->purchasing->purchase order->setup for stock transport order
    > for receiving plant p1 i assign cust1,sales area(sorg1,ds1,d1)
    > delivery type for supplying plant:NLCC
    >checking rule RP.
    i assigned doc.type UB into receiving plant p1 and supplying plant p2.
    Then, in ME21N used doc type UB, these r the errors::::::::::::::::::::::::::::::
    *1st Error -Material 1 not maintained in Plant 2.
    2nd Error - Customer 1 does not exist (please check entry in plant 1)
    3rd Error - Not possible to determine shipping data for material1)*
    I already maintained all this.
    The doc type NB also I tried ,,,,,,,but same errors r being shown.
    Also where to create the inter company a/cs for billing?
    Please check the attached file for the error and let me know.
    Thanks & Regards
    Keerthi ...

    Business partner
    ●     Vendor master u2013 supplying plant
    Create the vendor for the purchasing organization of the receiving plant.
    Assign the vendor to the supplying plant in the vendor master record.
    From the menu, choose Logistics ® Materials Management ® Purchasing ® Master Data ® Vendor ® Purchasing ® Change (Current). Go to the Purchasing View and choose Extras ® Additional Purchasing Data.
    ●     Customer master u2013 receiving plant
    Create a customer master record for the receiving plant. From this, both the address and the data that is relevant for shipping point determination, such as transportation zone and shipping condition are taken.
    From the menu, choose Logistics ® Sales and Distribution ® Master Data ® Business Partner ® Customer ® Create.
    The above is from help.SAP:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm
    Plz check this link for tht information.
    So, basing on this: I have customer 1 and vendor 1 for CC1......
    --> Customer 1 is assigned to the receiving plant with sales area1 in setup STO configuration.
    --> Vendor 1 is assigned to the supplying plant in the vendor master.
    --> My question for u is:
      1)  In ME21N, in the vendor field u assign the vendor from CC1 or CC2 (Because it says the vendor - external supplier if u read in F1 in tht vendor filed)
      Company code , Purc Org, plant all this will be from CC1 in ME21N, right?????????
    Material exists in both the plants P1 and P2.......right?????
    2) How to configure the inter - company accounts for the billing in sd for this STO scenario.???
    Please clarify these things.....
    You will be appreciated and rewarded too.
    Thanks
    Keerthi

  • ALE Stock Transport Orders

    Hi
    We have two instances both on 46c and want to pass stock transport orders between them automatically when they are created.
    We was lookin at doing this viw ALE.
    Could someone point me in the right direction on how to set this up or possable ways of doing this.
    Thanks in advance
    Barry

    hey,
    This can be done through ALE.
    The IDoc ORDERS02 is used to create stock transport orders.This IDoc contains only one transport order.
    Function module IDOC_INPUT_REC_SHIPMENTS can create a stock transport order, change the dates and quantities in an order, delete an entire order or individual items, and release individual items in an order. But it can not add an item to an existing order. Also, it does not distinguish between deletion and locking of the items. The following will list the important (not mandatory) fields required to build up an order IDoc for the function module to process successfully.
    To set up the ALE system you would need to set up Partner profile etc . etc,
    let me know if you need any more information.
    Cheerio,
    Disha

  • Impact of different division on Stock Transport Order

    We have a situation where we have one plant with one customer number, but we have 2 business areas of material going through it.  Example:  The material exists in divison 10 business area 15.  The customer is configured to business area 15. No problem here.  But we also have material in division 10 business area 13. The financial postings are correct, as the material comes out of 13 and goes into 13 on the receiving end, however on the stock transport order, it will show 10/15.  What is the impact of this? Will it affect reports? Do we need a separate plant for 10/13?  The configuration will not work with the business area blank. 
    Please advise. Thank you.

    Hi
    A product or service is always assigned to just one division. From the  point of view of sales and distribution, the use of divisions lets you organize your sales structure around groups of similar products or  product lines. This allows the people in a division who process orders  and service customers to specialize within a manageable area of  expertise.
    The system uses divisions to determine the sales areas and the business areas for a material, product, or service.
    So by changing division you are changing business area also. And you have cross and vertical reports business area wise and division wise. So standard report will not go wrong.
    regards
    Antony

  • Automatic delivery for stock transport order

    Hi,
    with ECC6 you have the possiblity to automatically create the delivery out of the stock transport order (STO) using the following customizing steps in SPRO:
    Materials Management ->Purchasing->Purchase Order->Set up Stock Transport Order->Activate Automatic Delivery Creation and CRM Billing
    Materials Management ->Purchasing->Purchase Order->Set up Stock Transport Order->Activate Automatic Delivery Creation for PO Type and Shipping Point
    We want to use a batch job that runs ME59N to autmatically convert the purchase requisitions to STO and deliveries. While testing we found out that ME59N gives a warning when the availability check in the STO is running in case there is not enough stock. But you still can create STO and delivery.
    In case you only create a STO and put it in VL10B to create the delivery it will only create delivery items with the quantities that are available in warehouse. So no stock means no delivery at that time.
    Is it also possible using ME59N to
    a) not create STO and delivery in case there is no stock
    b) only create STO and no delivery in case there is no stock
    Cheers
    mickey

    Hi,
    Setting to error message not possible as this would cause all STOs not be convertered where no stock is available. But we need this functionality only for one specific process.
    Omit faulty items we also tested and did not provide the result we need. It is related to faulty purchase requisition items.
    Cheers
    Mickey

  • Automatic Post Goods Issue Of Stock Transport Order

    Here is the scenario:
    We are using stock transport order to logically move inventory from one company to another company inside the same physical location. The material# is the same but the plant# is different.
    Process is as follows:
    Associate enters the purchase order
    If inventory exists - delivery is created automatically
    The delivery is also auto picked
    Currently, we have the inventory to PGI in a batch job several times a day.
    However, the user would like to have the inventory - move as soon as the delivery is created.
    Does anyone know of any technique - to post the inventory immediately.
    I was thinking along the line of a workflow/create of an idoc (WHSCON) to faciliate this.
    Kind Regards, Steve

    You could simply scedule the batch job to PGI right after the delviery creation job runs (just delay it a few seconds after the longest period of time the delivery creation job runs).
    So there would only be a very short delay, Looking at vl10g now to see is auto PGI is an option but I am thinking it is not
    (I will update my post if I find it is)
    Edit: It doesn't look like a standard option but I would imagine you could change a function code profile with custom user exit to trigger goods issue

Maybe you are looking for

  • CSS Help! Inserting flash into a div has caused layout change

    Hi, I am trying to insert flash into a div. I'm new to CSS so I think I must be doing something wrong. As soon as I insert the flash the layout goes wrong and all divs below it are pushed down out of my "main" div. I've now taken the flash.swf out an

  • Best way to put flash background on website?

    Hello, I am very new to both after effects and flash and need some help with a few things. I am trying to put a flash background on my website that will loop over and over. I created the file in after effects but understand that it is best to export

  • Which video cameras w/HD have a Fire Wire connectivity?

    Recently, I bought a Sony video camera w/HD that had a USB cable to transfer data from a video camera HD to IMac. However, when I've attempted to do that, an application IMovie informed me that I must have a Fire Wire cable which video camera didn't

  • Data/database availability between ETL process

    Hi I am not sure whether this is right forum to ask this question. But still I am requesting for help. We have a DSS database of size 1Tb. The batch process runs between 12:00 hours till 6:00 am. the presentation/reporting schema is of size 400 GB. T

  • UCCX Position in Queue issues after RNA

    Hello, we have a script using postion in queue logic. I tested the script and everything looked well however, this past month we have had complaints that callers were moving positions. They would go from 5 to 15 to 6. This is random and does not alwa