Pricing condition issue using Variant Configuration

Hi Gurus,
I have created reference characteristic 'z_price' , with a reference table SDCOM and field VKOND and has values X and Y.
Assigned this characteristic to Class type 300.
\Also assigned dependency type procedure to the characteristic values X and Y.
$self.z_price = 'X' for X and similarly for 'Y'
created condition record VA00 for the characteristic values X and Y.
For X value 100$ and Y value is 200$.
So when i simulated or testing by creating a sales order, the net value is showing as '0' (Zero).
Is there any configuration required to change to make this effect in to consideration.
I assigned objectdepencies to configuration profile and did a test run, still it was not showing up.
I also checked pricing procedures and pricing procedure has condition type VA00.
So dont know what exactly i am missing here. Any one please guide me what are the other steps should i have to follow.
Note: configurable material is already used in production client , so i am trying to upgrade that material to pricing.
Thanks,
Naveen.
Thanks in advance,
Quantum.

HI Gina.
Thanks for your reply.
I have entered values in VK30 after your reply, but i dont see any changes after those entries.
Would you describe me, what exactly the use of VK30 Tcode, as i see i have to enter the description for the value.
Do i have to use these description somewhere in Object dependencies to trigger the Price?Please suggest.
Thanks,
Quantum.

Similar Messages

  • Is it possible to use variant configuration (with a Non-SAP solution) when creating ERP sales orders in SAP CRM WebUI

    Hello,
    our customer plans to use a Non-SAP solution for variant configuration (Camos) in SAP ERP (ECC 6.0) and in SAP CRM 7.0 EHP1 as well.
    ERP sales orders (and ERP quotations) should be created in SAP CRM (CRM WebUI).
    Is it possible to use variant configuration (with an external variant configuration tool) when creating ERP sales orders and quotations in the SAP CRM WebUI or do we have to implement SAP IPC for this?
    Thanks in advance.
    Regards,
    AEV

    Dear AEV,
    I think LORD (lean orders) should work with variant configuration as well. In the note 1236015 there is not restriction listed. However you need lord2 activated in ECC, and ECC system should be on EHP4.
    Best regards
    Rene

  • How to migrate pricing condition data using lsmw

    Hello All,
                 can any one explain how to migrate pricing condition data using lsmw.
    the scenario is we are trying to extend the pricing conditions from one sales area to other sales area on a combination of sales organization, distribution channel and division.

    Hi Sreedhar Kodali
    Pricing conditions can be extended with the following options:-
    1)  Customer / material with release status
    2)  Sales Org / Dist. Channel / Cust group / Material
    3)  Price List category / Currency / material with release status
    4)  Material with release status
    Assuming that your pricing condition in one sales area is different to another, first you have to create LSMW recording to extend the sales area and then pricing conditions can be uploaded accordingly.
    Thanks
    G. Lakshmipathi

  • Preparation of Cost Sheet using Variant Configuration

    We have a requirement which needs to be configured in Standard SAP using variant configuration ( as Suggested by our client )  without using any customized functionality the scenarios is as fallows:
    Preparation of Cost Sheet:
    Company XX needs to procure material M1 (Like Cartons) for Plant A, plant B which is manufactured by Primary Vendor PV1, PV2.
    The price for procurement of material M1 has to be determined using cost sheet
    Primary Vendor PV1, PV2 Procures Raw materials and Packaging materials required to manufacture material M1 from Secondary vendor SV1, SV2, SV3
    The rates of these materials are added into cost sheet as cost of components.
    The rate for these materials varies depending on quota allotted for that particular
    Secondary vendor SV1, SV2.
    Cost sheet consists of
    Cost of Component materials required for mfg Material M1( These components called Feed stock
    Materials are procured by secondary vendor)
    Working Capital of Primary Vendor
    Conversion cost
    Discounts
    Surcharges
    Transportation cost
    ETc.....
    Well Thanks in Advance....

    hi Rav,
    as you said i have configured the system and it is working fine.
    but the problem is, when creating sales related documents only Sales BOM selection should happen i.e. characteristics which have values related sales must only be shown to the sales person where he makes required selection.
    other materials/assemblies which are also configurable and which make complete production BOM are selected by the production person.
    what selection a production planner makes must not be shown to the sales person. 
    for eg; if you want to purchase a color printer you only tell sales guy , i want a color printer which can print at least 10 pages / min. you will not tell him what printer should be made of, what ICs or what PCBs it must have.  and also company management may not wish to show all things to the customer/sales person.
    if this is the situation how it can be mapped?
    alternative item concept can be used, but for a single material if there are 3 or 4 alternatives, will it work properly??
    Regards,
    Pavan

  • Custom ATP Check using Variant Configuration Data in sales order

    I have a requirement to modify the standard SAP ATP check by including the variant configuration data entered on a item.  Standard SAP does not use/include the characteristics data when doing the ATP. None of the available user exits would allow me to do this.
    The scenario is the client has a configurable product that exist in inventory as one item, base unit as IN2.  The batches that exist in inventory have the characteristics of width and length.  The order data specifies a width and a length, they need the ATP to identify the availability based on the characteristics of the batch.
    The solution was to present the user with a list of batches based on the characteristics that meet the criteria.  The user would then have the option of choosing one of the batches which would mean that the line item would include the batch #.  If the user does not want any of the batches, they could choose to select a Make to Order option, which would change the item category of the item, so that it creates a production order upon saving the order.
    The problem I am having implementing this solution is I have not been able to identify the internal table(s) that contains the characteristics data in SAPMV45A after the configuration screen is called.  If anyone knows where that information is during the sales order processing, it would be greatly appreciated.

    Hello Jean,
    Have you managed to find a solution as yet? I know you have not received any replies but am hoping you were able to resolve the problem as we are facing the exact issue on our project.
    Please let me know,
    Thanks,
    Tanya

  • Issue in Variant Configuration

    Hi all,
    I am working on Variant Configuration and i have a Configurable Material with Super BOM Structure.
    Separate Configuration Profiles are maintained for both Main Material and BOM Component.
    Configuration Process is Sales Order (SET), BOM Explosion is at Multilevel and Application is SD01.
    When i create a Sales Order, only BOM's of Main Material are getting Exploded, where as BOM of Components
    are not been Exploded. When i am trying to create a Sales Order directly for Configurable Component,
    then BOM gets Exploded.But this does not happen when i try for Main Material.
    Can any one help me in this regard?
    I want to know the reason for this and any further Customization settings, to make Components of Main Material
    as well as BOM Material get Exploded in Sales Order.
    Thanks in Advance.
    Regards,
    Ravi

    Hi ,
    The issue could be due to the following.
    When to enter the Main material  in the sales order. The Main Material Item Category will be "TAC" for which "Structure of scope" in IMG would have maintained hence it will explode BOM components. Now eventhougth BOM components have " Configuration profile" The item category is "TAE" which will not " Scope of Structure".
    Now goto IMG item category configuration and maintain " Bill of Material/ cobnfiguration" settings for TAE. it will explode multi level BOM.
    But when u enter the configurable BOM separately in sales order it will explode, because now BOM componet Item cat will be TAC
    Hope this will help u
    regards
    Arun Prasad
    Edited by: arun prasad on Jul 30, 2009 6:27 AM

  • User Exit - VA01 / VA02 Sales Order, using Variant Configuration Fields

    Hi,
    I'm doing a user exit for creating / changing a sales order (VA01/VA02), and in my program I'm trying to use the characteristic values in variant configuration: Extras -> Configuration.
    I know there's a whole bunch of data in SAPMV45A, but I can't seem to find what I need. Structure RV45A is the closest I can find, but the characteristic name / value fields appear empty during the execution of the user exit.
    Any help would be greatly appreciated.
    Thanks!

    R u creating your own user exit or using the ones which are available for VA01/VA02?
    If you can use existing ones, to get the more details abt them, please have a look at below link.
    http://help.sap.com/saphelp_46c/helpdata/en/1c/f62c7dd435d1118b3f0060b03ca329/content.htm
    I hope it helps.
    Best Regards,
    Vibha
    *Please mark all the helpful answers

  • Delete pricing conditions line using BAPI_SALESORDER_CHANGE

    Hi experts.
    I've read the forum and OSS about this topic and don't have clear if it's possible to delete a price condition position (using BAPI). Using tx. VA02 I can delete pricing conditions, that's why I think should be possible.
    We have a sales order created, and depending on the sold-to-party we have some discounts: RA00 (% discount) or RB00 (absolute discounts).
    In some cases we need to insert/update or delete these pricing conditions. For insert/update, we don't have any problem using
    BAPI_SALESORDER_CHANGE and setting the appropiate updateflag.
    But... what would be the procedure to delete a discount, for example, RA00 fixed on a sales order? Has the logic_switch be informed specially?
            wa_cond-itm_number = lt_cond-itm_number.
            wa_cond-cond_type  = lt_cond-cond_type.
            APPEND wa_cond TO i_cond.
            wa_condx-itm_number = lt_cond-itm_number.
            wa_condx-cond_type  = lt_cond-cond_type.
            wa_condx-updateflag = 'D'.
            APPEND wa_condx TO i_condx.
    Lots of thanks.
    Javier

    I am not positive on being able to delete a pricing condition through program.
    Online when you try to change the pricing, SAP suggests us to redetermines the Pricing rather than just changing the values. And also the pricing condition config also plays a role... I think there was a setting which says Pricing condition to be manual which means you can add or delete the conditoin.

  • BOM  explosion using variant configuration

    Hi
    I have a material (LAPTOP) and it has two BOM(RAM and HARD DISK).
    LAPTOP is my main material.
    Through VA01, when I try creating a Sales Order, I give the Material as LAPTOP and when I click "Configuration" menu, I will be showing the Variant Configuration Characteristic values for this material (LAPTOP) namely RAM and HARD DISK.
    When I select them and come back to VA01 scree, I could see both the sub materials (RAM and HARD DISK).
    But my question, I want to see only the one which I select. If I select RAM, then only RAM shoudl be displayed in my sales order not HARD DISK.
    I have created the Characteristics as "Multiple Value" assignmetn
    Please help.
    Thanks in Advance,
    Priya

    Hi Priya,
    Use Dependency concept ,to achieve your requirement.
    Regards,
    Subash.

  • Pricing condition issue

    Hello Experts,
    My business scenario is  that I have several surcharges which are count on different conditions. After all I need to create the condition that would be a sum of all mentioned surcharges. Basically I know pricing but for some reason I can't force this problem.
    In pricing procedure, after list of my surcharges, I made a standard summary (without condition type) in step 30. This sum works fine (gives a right value). After this sum I put my condition (ZSAM), which is counted directly from above sum (from step 30 to 30). It doesn't work. Value is '0' any time.
    Some settings in condition type ZSAM:
    Cond. class  - A Discount or surcharge
    Calculat.type - C Quantity
    Can You tell what could I missed in my configuration?
    Thanks in advance,
    Michal

    Dear Michal,
    Earlier respondent Rightly mentioned in addition to that,
    You need to maintain Calculation type as A-Percentage instead of C -Quantity for the ZSAM condition type, because you are going to calculate the ZSAM from the Sum(Value) so you need to give % of the sum.
    If you give quantity it will based on the material quatity not based on the sum value.
    I hope this will help you,
    Regards,
    Murali.

  • Double  Pricing condition issue

    Hi Guys,
    Here is my case.
    I have a contract with Price condition PB00 , XXXX . Where XXXX  is suplement price condition.
    I have a pricing procedure  with price condition PB00  XXXXand YYYY (not really important this one).
    When I create the PO
    PB00 come from the contract = all good
    XXXX come from the contract = It is good but for some reason there is a second contion XXXX that is also generated with a price of 0.
    So there is no impact on the price at all but in the case I have a lot of similar XXXX condition  it get not really tidy.
    Is anyone know how to avoid to "generated" this double up??
    Cheers
    Julien

    HI Gina.
    Thanks for your reply.
    I have entered values in VK30 after your reply, but i dont see any changes after those entries.
    Would you describe me, what exactly the use of VK30 Tcode, as i see i have to enter the description for the value.
    Do i have to use these description somewhere in Object dependencies to trigger the Price?Please suggest.
    Thanks,
    Quantum.

  • Variant Configuration Issue

    Hi
    I want to pass one characteristic value description into other characteristic text value, which i am controlling with procedure dependency.
    Currentely i can able to pass Chars value into other text chars with same value.
    For examples
    Char X    01 - Description A
                 02 - Description B
                 03 - Description C
    Char Y : ( text free form field )
    If i select Char A  01 in configuration then through dependency syntax I can able to pass '01' into char Y, but i want to pass A  Description in place of char' value.
    Please let me know how it is possible.
    Vicky

    Hi
    I am facing issue in Variant Configuration functionality.
    I am having 1 characteristic XYZ with values
    1 - data
    2-  cable
    3 - wire
    Another characteristic is ABC with no value, it is text field.
    Now in configuration of material if i select XYZ = 1 (data) then through procedure depedency i am passing a value 1 (same like XYZ). But i want to pass decription of characteristics value in char's ABC
    means if i select XYZ = 1 then in char's ABC = Data should come instead of '1'.
    Regards
    Vicky

  • Variant Condition "VA00" in Variant Confugration of a KAMT

    Hello,
    We are using Variant Configuration Process.
    KMAT material is added to Sales Order and configured as per the customer's requirements.
    Based on the selections (i.e. configuration), dependencies are in place to identify the Variants (Cond Type VA00) to pick the Varinat Price in Sales Order.
    E.g. If customer selects Red Colour handle, variant price for Red Habdle is selected.
    If during configuration, Red colour handle is selected, variant price of same is picked up.
    During configuration, if customer changes the selection from Red for Green Handle, then
                     it is expected that Price for Red handle is removed and Variant price for Green Handle gets picked up.
    Issue: In above example, system does not removed the variant price for Red Handle. This gives incorrect pricing.
    Please help
    Thanks

    Hi
    If during configuration, Red colour handle is selected, variant price of same is picked up.
    During configuration, if customer changes the selection from Red for Green Handle, then
    it is expected that Price for Red handle is removed and Variant price for Green Handle gets picked up.
    Issue: In above example, system does not removed the variant price for Red Handle.
    This gives incorrect pricing.
    1) Have you maintained dependency for "Green Handle", same as Red handle?
    2) Are you able to see "Green handle" as pricing variant in your variant configuration screen? If no, still red handle is appearing, means problem is with dependency.
    3) If green handle is appearing in variant configuration screen, have you maintained condition records VK11 for green handle as for red?
    Please confirm all above settings and reply.
    try and revert
    Edited by: Yadav on Oct 12, 2009 7:11 AM

  • Need help on variant configuration

    Hi Guru,
    Here we need to use variant configuration.But i am new in variant configuration.Can somebody tell me the different steps of variant configuration from PP side.I have gone through standard document. But still i need this information. The Industry in which I am going to implement this,is  producing Colored, profiled sheet to provide roofing solution.The metal roofing sheet can have different profile, different colour, different thickness, different width and so on.They have nearly three thousand  of different combination.
    Please respond.
    Regards
    Rajib

    Hi,
    Pls. find herewith Variant Configuration Procedure steps as below
    VARIANT CONFIGURATION:
    1.Create a Material - KMAT type with Item category (002)
    2.Create Charateristics in CT04 - Zbike, where in values mention the Color of the bile like Red, Blue etc
    Create another characteristics in CT04 - ZPrice, where directly go the additional data tab and maintain the table SDCOM and field VKOND (ABAP Dictionary it will ask for).
    3.Assign these two characteristics to a Class in CL01 - ZBikeclass ( Type 300) in characteristics tab page.
    4Then go to CU41 Configuration profile select the material and enter the description click on the class assignment ie assign Zbikclass.
    5Now go back to CT04 - enter Zbike -go to values- select Red- go to extras - Other Dependencies - Select Procedure enter in front 10 write - $self.ZPrice='Red' and save.
    6.Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save).
    7.Now select Blue- go to extras - Other Dependencies - Editor - Select Procedure enter in front of 10 write - $self.ZPrice='Blue' and save.
    8.Now go back go to extras - Other Dependencies - assignments and assign relationship ( by default it will come just save).
    9.Now go to VK11 - Enter VA00 (Condition)(For Std RVA001 Pricing Procedure) - enter variant Red and Blue give the rates accordingly and create the sales order.
    Variant Configuration: Complete Maintenance:
    Technical name: SAP_LO_VC_MAINTAIN
    Tasks
    The variant configuration processor sets up the rules for multi-variant products and maintains them in the database. He or she simulates and executes the configuration. This role is required wherever variant configuration is used.
    The complete model also contains sales order processing (VA01/VA02), and the connection to SCE/Internet Sales and Mobile Sales.
    Activities in Variant Configuration;
    Transaction
    Activity
    CC04
    Display product structure
    CWBPP
    Engineering Workbench
    Variant Configuration
    VA01
    Create sales order
    VA02
    Change sales order
    VA03
    Display sales order
    CU51
    Maintain configurable order BOM (multilevel)
    CU52
    Maintain configurable order BOM (single level)
    CU50
    Configuration simulation
    CU80
    Reporting functions for characteristics and values
    Configured Objects
    CU44
    Material
    CU45
    Standard network
    Assignment of Configured Materials
    CS40
    Create assignment for configured material
    CS41
    Change assignment for configured material
    CS42
    Display assignment for configured material
    Configuration Profile
    CU41
    Create configuration profile
    CU42
    Change configuration profile
    CU43
    Display configuration profile
    Dependencies: Single Dependency
    CU01
    Create single dependency
    CU02
    Change single dependency
    CU03
    Display single dependency
    Dependencies: Dependency Net
    CU21
    Create dependency net
    CU22
    Change dependency net
    CU23
    Display dependency net
    Dependencies: General
    CU05
    Dependency where-used list
    CU04
    Dependency list
    Tools: Variant Function
    CU65
    Create function
    CU66
    Change function
    CU67
    Display function
    CU68
    List functions
    Variant Table Structure
    CU61
    Create variant table
    CU62
    Change variant table
    CU63
    Display variant table
    CU64
    List variant tables
    Variant Table Contents
    CU60
    Maintain variant table contents
    CU59
    Transfer variant table contents to database table
    Knowledge Base for SCE: Knowledge-Base Object
    CU31
    Create knowledge-base object
    CU32
    Change knowledge-base object
    CU33
    Display knowledge-base object
    Runtime Version
    CU34
    Create runtime version
    CU35
    Change runtime version
    CU36
    Display/export runtime version
    CU37
    Create SCE database schema on PC
    For complete details of Variant Configuration go to the following link :
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/96/468f38721f9977e10000009b38f842/frameset.htm
    Hope this helps.
    Regards,
    Prakash

  • Sales Order text for Variant Configuration

    Hello
    I have researched my issue and also have asked other peers for guidance.  I feel that I am really close to getting my issue to work but I am not sure what I am missing, so I am hoping that someone can give me some advice as to what to check please.  See below for the description. 
    My issue is in reference to SD Variant Configuration and is outlined below.
    Overview
    Main Unit is a radio test set
    Test set can have an upgraded software
    Example
    Model 6015 u2013 standard test set
    Model 6015T u2013 Upgraded software test set
    Model 6015V u2013 Upgraded Software + test Set
    Requirement
    Use same Material Number using Variant Configuration for the upgrades
    Price is to default to the Upgraded price
    NOTE:
    Our materials are already established and are set up as material type Finished Goods; ERLA item category; sales order item category is a copy of TAC.   I am using a Configurable Material type KMAT, item category 0002 and linking to the FG material item category ERLA in the material master.
    I have created the Material Variant (KMAT) in MM01
    Created the characteristic in CT04
    Created Classification in MM02 for material FG
    Created Super BOM for Configurable Material in CS01 and added the upgrades as Alt Bom 2 for upgrade  and 3 for Upgrade+.  Also added the Alt BOM text
    Created Profile of configurable material in CU41
    For the Material I added the configurable material to MRP 3 screen in MM02
    Created the BOM link in CS40
    I simulate the material in CU50.  I enter my material; select the icon for configuration, I can see the characteristic Value Assignment nad see my characteristics Description.  I go to the value and use the drop down I then see the pop up of all the different values. 
    I have created Characteristic Reference VCSD_UPDATE_ARKTX with table VCSD_UPDATE and field ARKTX - no values
    I have created a characteristic Test_Choice with the 2 values one is Test Upgrade 1 and the other is Test Upgrade 2.  Both of these have the description as well.
    For Material Text:
    I have set up a reference characteristic using 30 character format (named VCSD_UPDATE_ARKTX),
    with table name VCSD_UPDATE and field name ARKTX.
    Then in the Configuration Profile(CU42) for configurable material,  added a procedure(named PR_PRODUCT_DESCRIPTION) to the dependencies which contains code that sets the description
    $self.VCSD_UPDATE_ARKTX = ''Test Upgrade 1u201D
      If $self.TEST_CHOICE = Test_Upgrade_1,
    $self.VCSD_UPDATE_ARKTX = ''Test Upgrade 2u201D
      If $self.TEST_CHOICE = Test_Upgrade_2,
    When Entering the sales order for Material Number XXXXXX, I receive a pop up that I can select which Alternate BOM (from CS02) I would like.  I select my line item and then select the configuration icon at the bottom of the sales order.  I see again my characterestics values (the same as CU50) but am unable to select the radio button.  Not sure if this part is standard.  Still no change in the sales order line item.  I have validated that I am using a copy of the standard TAC item category.  How does the text change to the correct value?  Am I missing a seeting somewhere.  Please provide any guidance with this as I have been trying to get this to work for over a month.
    Thank you for your time.  It is greatly appreciated.

    I have figured out that this will work if I go to the standard material (it is not KMAT but it is a FERT material type) and set the flag in the Material Master Basic Data 2 tab that this is a configurable material and not use KMAT material type for a super BOM.   The text changes for this scenario so it give me hope.
    This is not ideal, as I want to use the Super BOM because there are different variations (non stock items) that I need to pull through on the picking list in order to tell the end user which option needs to be loaded in the standard material.  At least I know the text can change on the sales order; but I am still struggling with the use of the super BOM and changing the sales text when there is use of a super bom as you tie that to the MRP 3 screen of the FERT material type.  I can set everything up, but the text will not change if I set up the material master this way.  Guidance is appreciated.
    Example
    Material 72433 (FERT)
    on sales order I enter 72433, my alternate BOM comes up with different Options.  Alternate BOM 1 is standard configuration;  My Alternate BOM 2 has Option 3 and 4 while alternate BOM 3 has option 5 and 6.  Alternate BOM 2 is a 6015T and Alternate BOM 3 is a 6015V.
    I want my sales order to pull through the text of 6015T or 6015V, whichever is chosen.  I want my picklist to print out the option that was selected.

Maybe you are looking for