Problem In Subcontract Reconillation / challan Closing
Hi,
I am facing problem in subcontract challna reconcillation with J1IFQ
Subcontract PO created for Finish material 'XYZ' qty 250 Nos one raw material 'ABC' one qty required for each finish good but in PO user have added 450 quanity of raw material now for Finish product for quanity 250 three Grs made
1 : 126
2: 61
3: 63
but the consumption of Raw material in GR is showing as 227,110,114 this becomes 451 now the reconcillation is done for first two GR aganist which the raw material assign is 227 + 110 = 337 now as only 113 qty of rm balance now we are doing reconillation for third GR system is giving error mesage 8I574
Material 1363 is not assigned fully, short by 1.000 NO, and it is not allowin gfor reconcillation also as the uinvocie verification is already done for the GR so insted of reversing all how to close the challan.
regards,
zafar
Dear,
Here is my understanding, that is if you give 250 nos to subcontractor, he will process and give you 250 nos. This should be you actual PO. Hence if you do GRN for 1 Nos, then consumption at vendor end (543) will also be made for 1 Nos. But, you said your user has maintained the input qty as 450 nos. And subsequently you have also done the GRN's.
If my understanding is correct then do the following:
Delete the material document assignment, which you have done for the first two GRN numbers. In J1ifq.
so that the challan balance qty and status will go back to its original position.
Then cancel the GRN's. All the three. So that all the stocks will go back to vendor location.
Correct the Input- ouput ratio in the purchase order as 1:1. Then do the GRN again and do the reconciliation.
Pls revert if you need anymore clarification.
Thanks
VJ
Similar Messages
-
Sub contracting Challan closing error
Dear All,
I am facing problem while doing challan closing in J1IF13 Error message i am getting is Document 0000005560 2010 is not released for accounting. Message no. 8I267
Please help me to solve this issue.
Vengatesh.SJust try it in J1IF T.Code
-
Itunes encountered problem and needs to be closed
i keep trying to open itunes, but before it even opens, it says theres a problem and needs to be closed. is there anyway i can fix this?
The first thing I'd suggest is to get a good antispyware checker and give it a go at your system. Some recent spyware has been reported by other users to shut down iTunes or prevent it from launching. From user reports, Ewido seems to be the best at catching it. You can download a free version of Ewido here.
If that doesn't cure the problem, make sure that any antivirus/antispyware application you have is set to allow iTunes to operate. Some antivirus/antispyware has been known to shut down iTunes.
If that still doesn't help, take a look at iTunes for Windows: Troubleshooting unexpected quits, freezes, or launch failures
If that still doesn't work, try deleting the iTunes preference files:
C:\Documents and Settings\<username>\Application Data\Apple Computer\iTunes\iTunes.pref
and
C:\Documents and Settings\<username>\Local Data\Application Data\Apple Computer\iTunes\iTunes.pref
You might have to turn on "show hidden files" to find them. (Right click "my computer", select open, select Tools menu -> Folder Options. Select View tab, "show hidden files" radio button is in the center scrolling panel.) Delete them or if you want to be able to put them back if it doesn't help, drag them to some other location. This will force iTunes to run the setup assistant the next time you launch iTunes. Note that you'll have to go back and set any preferences you've changed from the default.
If that still doesn't work, try this:
Bugie: Perform a Thorough & Complete Uninstall and Reinstall of iTunes/QuickTime.
Hope this helps. -
Good receipt problem for subcontracting purchase order
Good receipt problem for subcontracting purchase order
with account assignment type E.
After update to ECC 6.0. Do good receipt for subcontracting purchase order with account assigment 'E'.The system show the error message(KI235)----Two cost elements (Change in Stock (Subcontracting)&Outside processed fee) haven't CO account assignment.but the field status for sale order is option entry , when I default cost center for the cost element in OKB9.the system post the material document and generate the following accounting document.
Doc.Type : WE ( Goods receipt ) Normal document
Doc. Number 5000056065 Company code 1000 Fiscal year 2007
Doc. date 2007.12.04 Posting date 2007.12.04 Period 12
Calculate Tax
Doc.currency HKD
tm PK Account Account short text Tx Cost Ctr SaleOrder Amount
1 89 13500000 Stock-Work in proces 1007823 10 274.4
2 96 21210010 GR/IR Clearing 1007823 10 205
3 91 41010102 Chg in Stock(Subcon) 10901099 1007823 10 274.4
4 86 41031000 Outside processed fe 10901099 1007823 10 205
5 99 13500000 Stock-Work in proces 1007823 10 69.4
6 81 41010101 Cost of Prod (Subco) 1007823 10 69.40
My problem is:
When use MIGO to do good receipt for subcontracting Purchase order, for consumption account((Change in Stock (Subcontracting)-41010102&Outside processed fee--41031000) ,why the system dont recognize the sale order filled as CO account assignment?Dear fanny chen
Did you get a solution for your open question?
I`m facing the same problem, so any help yould be appreciated.
Regards -
When I access the itunes store I get an error message saying that Itunes has detected a problem and has to be closed. The rest of Itunes is working fine... Any help?
There could be any number of items causing this. First off is do you have an active internet connection? If so have you tried rebooting you computer?
-
I am trying to download iTunes and am getting an error message: "MobileMe Services encountered a problem and need to be closed"
Hello dananbar,
Thank you for the details of the issue you are experiencing when installing iTunes. I recommend following the steps in the article below when getting an error message trying to install iTunes:
Issues installing iTunes or QuickTime for Windows
http://support.apple.com/kb/HT1926
Thank you for using Apple Support Communities.
Best,
Sheila M. -
Install 10g R2 Win XP,P4,The oui.exe found a problem and need to be closed
Oracle Database 10g Release 2 10.2.0.1.0 Win32Bit
On my computer the Universal Installer that comes with the 10201_database_win32.zip Download fails at startup.
I try the the setup.exe and the oui.exe in the "install" subdirectory, but i get the same error message.
Oracle Database 10g Release 2 (10.2.0.1.0)
Enterprise/Standard Edition for Microsoft Windows (32-bit)
Oracle® Universal Installer 10g Release 2 (10.2) for Windows
System:
Microsoft Windows XP Professional Version 2002 Service Pack 2
Intel Pentium 4 CPU 3.00 GHz
2.99 GHz, 0,99 GB RAM
Firewall disabled.
No logfile is created.
Error message:
oui.exe hat ein Problem festgestellt u. muss beendet werden.
The oui.exe found a problem and need to be closed
And then I get the windows message "The oui.exe found a problem and need to be closed."
(Followed by the offer to send a report about the problem to Microsoft.)
Someone knows this problem and could help me?
Thank you
DenI got it going.
This was the 10.2 download from OTN installing to MS Windows XP SP2.
Turns out that OUI won't start if the total length of the full directory path string is too long (to setup.exe or oui.exe). Solution was to move it closer to the base directory ("\") or to rename directories to make them shorter.
Den -
Problem in Subcontracting Challan
Hi,
I have given material to vendor in subcontracting on 20th April 2009 i.e. Yesterday
But today i.e. 21th April 2009 when i make subcontracting challan with J1IF01.
System Gives me Error " Document already exists for material document 4900001305 2009"
But when i do above procedure with same that system process without any error.
Regards,
Pardeep MalikDear Sir,
I make a subcontrcating PO yesterday and material given to vender with
material Doc Number 4900001305 on the same day.
But today when i m creating subcontracting challan with that PO system gave me Error
"" Document already exists for material document 4900001305 2009"
But when i try with a PO of today and creating challan also same day . system create challan without Error.
Hope u understand !
Regards,
Pardeep Malik -
Problem while subcontracting with acct assgt category 'Q'
Hi,
We have a Subcontracting PO with item
category 'L' and account assignment
category 'Q'. While goods reciept
against PO, for 543 it is taking project
stock(Q) from storage location instead
of vendor stock(O).Please provide the
solution(with CIN details, 57F4 challan creation and reconcillation)
or is there any other process to handle this?
Regards,
ShivDear
you kept account assignment catagory blank & process ahead.
may ur problem saolved
Amin -
PROBLEM IN SUBCONTRACTING P.O
DEAR CONS
I CREATED A SUBCONTACTING P.O & IN THE COMPONENTS I entered the components & as well as the scrap from vendor (free item) . The system does not post it. gives a message Update control of movement type is incorrect (entry 101 _ X Q B _ V)
Message no. M7226
Diagnosis
The system could not find entry 101 _ X Q B _ V in any of the movement type control tables.
Procedure
Cancel current processing.
Contact your system administrator.
Action to be taken by the system administrator
Check in Customizing for Inventory Management under Copy, Change Movement Types whether the entry is contained in the Update control view for the movement type.
If the entry is missing, proceed as follows:
For standard movement types, this means that the given process is not supported using the present data combination. Do not create any entries without prior arrangement with your SAP consultant. Otherwise, incorrect postings may result.
For customer-defined movement types (beginning with 9, X, Y, or Z), this may mean that they have not been fully defined. Delete the movement type and re-create it by copying a standard movement type.
pl.solve this problem & gives step by step by which i can make setting.
thanking you
nirupamaDear Nirupama Swain,
Frist check ur Stock overview Child material stocks to issue the material to subcontracting vendor.
Maintain the BOM with T.code <b>CS01</b>
Pls follow the steps for Subcontracting cycle:(without payment of Excise Duty)
1. A Subcontracting Purchase Order is raised on the Vendor with Item Categery 'L'
2. The Materials are transferred to the Vendor through a <b>541</b> Movement Type with <b>T.Code MB1B</b>
3. A Subcontracting Challan is created.
4 The Semi finished Material is received from the Vendor through <b>101</b> movement. A <b>543</b> movement occurs for the components
5. The subcontracting challan is reconciled.
6. The challan completion process is carried out.
7. Invoice Verification for the vendors invoice occurs
With regards,
B.Ravindranath -
Problem in calculating opeing and closing balance in fi report
Hi all,
I am developing customised FBL3N report as per our client requirement.I searched standard function module for calculating opeing balance for given gl account but didn't find it. so, for calculating opening balance we are using following logic.
SELECT
A~BUKRS
A~HKONT
A~AUGDT
A~AUGBL
A~ZUONR
A~GJAHR
A~BELNR
A~BUZEI
A~BUDAT
A~BLDAT
A~WAERS
A~XBLNR
A~BLART
A~SHKZG
A~DMBTR
A~WRBTR
A~SGTXT
FROM BSIS AS A INNER JOIN SKA1 AS B
ON AHKONT = BSAKNR
INTO TABLE IT_BSIS1
WHERE A~BUKRS IN SO_BUKRS
AND A~HKONT IN SO_HKONT
AND A~BUDAT < SO_BUDAT-LOW
AND A~BLART IN SO_BLART
AND A~GSBER IN SO_GSBER
AND B~KTOKS IN SO_KTOKS.
I am using following code for getting accounting documents for given gl account.
SELECT
A~BUKRS
A~HKONT
A~AUGDT
A~AUGBL
A~ZUONR
A~GJAHR
A~BELNR
A~BUZEI
A~BUDAT
A~BLDAT
A~WAERS
A~XBLNR
A~BLART
A~SHKZG
A~DMBTR
A~WRBTR
A~SGTXT
FROM BSIS AS A INNER JOIN SKA1 AS B
ON AHKONT = BSAKNR
INTO TABLE IT_BSIS
WHERE A~BUKRS IN SO_BUKRS
AND A~HKONT IN SO_HKONT
AND A~BUDAT IN SO_BUDAT
AND A~BLART IN SO_BLART
AND A~GSBER IN SO_GSBER
AND B~KTOKS IN SO_KTOKS.
For closing balance I am doing sum of opening balance and amounts of accounting documents for given gl account.
the problem we are facing is they want output in following format.I am not able to club all this data as per desired output.
please help me to achieve this.
01.06.2011 01.06.2011 Op.Bal. 0835810021 0.00 13,258.00 0.00 13,258.00
30.05.2011 03.06.2011 0008000005 001 0835810021 24,500.00 0.00 24,500.00 0.00
0 0.00 25,000.00- 0.00 25,000.00-
003 500.00 0.00 500.00 0.00
01.06.2011 01.06.2011 Op.Bal. 0835810021 0.00 13,258.00 0.00 13,258.00
30.05.2011 03.06.2011 0030000072 001 0835810021 72,141.72- 0.00 72,141.72- 0.00
0 0.00 73,614.00 0.00 73,614.00
003 1,472.28- 0.00 1,472.28- 0.00
01.06.2011 01.06.2011 Op.Bal. 0835810021 0.00 13,258.00 0.00 13,258.00
04.06.2011 04.06.2011 0030000084 001 0835810021 25,000.00- 0.00 25,000.00- 0.00
0 0.00 24,038.46 0.00 24,038.46
003 961.54 0.00 961.54 0.00
01.06.2011 01.06.2011 Op.Bal. 0835810021 0.00 13,258.00 0.00 13,258.00
23.06.2011 23.06.2011 0012000089 0 0835810021 0.00 10,000.00 0.00 10,000.00
002 10,000.00- 0.00 10,000.00- 0.00
30.06.2011 30.06.2011 Cl.Bal. 999 0835810021 0.00 82,652.46 0.00 82,652.46
Thanks in advance.
Regatds,
Sheela Patil
Edited by: Sheela Patil on Nov 1, 2011 8:42 AMHi,
As far as i know, you must be getting all required data to be displayed in an internal table.
What you need to do is just loop on it and use WRITE statement appropriately.
Please see sample code below : This code is adding 1,2,3.... no before data in work area.. simily, you can add Opn Bal and Cl Bal etc appropriately.
REPORT ZTEST_RAHUL.
DATA : i_no TYPE n.
TYPES : BEGIN OF t_temp,
name TYPE char20,
roll TYPE numc10,
END OF t_temp.
DATA : i_temp TYPE STANDARD TABLE OF t_temp,
wa_temp LIKE LINE OF i_temp.
CLEAR wa_temp.
wa_temp-name = 'Rahul'.
wa_temp-roll = 26.
APPEND wa_temp TO i_temp.
CLEAR wa_temp.
wa_temp-name = 'Mahajan'.
wa_temp-roll = 27.
APPEND wa_temp TO i_temp.
i_no = '1'.
LOOP AT i_temp INTO wa_temp.
WRITE : i_no , ',' , wa_temp.
NEW-LINE.
i_no = i_no + 1.
ENDLOOP.
I know this may not be favourite answer to your question but can be used.
Also, there is 1 more way to write a custom report and that is by writting a Wrapper report which will be just copying the selection screen from STANDARD CODE and then submitting standard code from wrapper code and return back.
I hope this will help you.
Regards,
Rahul Mahajan -
Problem with billing date at closed period
Hi
We have a problem with billing date in transaction . Previously we could set up different (earlier) billing date than the actual posting period and now it is not working. We receive an error message that the posting period is closed ) .
I attached an example invoice which we managed to post and where you can see what Iu2019m thinking about, parking number: 1024337, BILLING DOCUMENT: 841835. In this case the billing date was at 30.11.2007, but the posting in 15.07.2008 and we managed to post.
Pls help that issue
ypshi,
it is due to posting period closed for the month of 07/2008.
u need to open posting during that period.
Regards,
Greeshma -
Adobe Flash CS3 detected a problem and has to be closed.
Hello,
I'm using Flash CS3 for a month, but the problem is that
since a week ago, flash CS3 stops working after 5 minutes of use.
So today I've downloaded the test version (30 days) in
another PC, but even with this other computer the software doesn't
works and has to be closed.
So that's not because of my computer. It's a more general
problem.
Did it happened to one of you? DO you know if flash CS3
doesn't work for everyone right now?
Do you know how to repair this kind of problem? I'm very
desperate and I really need to use flash. I don't know what to do.
Thank you very muchThere could be any number of items causing this. First off is do you have an active internet connection? If so have you tried rebooting you computer?
-
Hi gurus,
I want to process some material fromsubcontractor. Problem is that material is going 2 subcontractor in Tons and coming in pieces and scrap is also returning to company. . So what process shud I follow so that all material which I sent to him shud be reconciled. e.g. I m preparing subcontracting PO for SF1111 with 1000 quantity. In BOM of SF1111, for one piece it requires suppose 3kg raw mat. So system will ask me to send 3000 KG, but physically it requires 3300 kg (considering scrap), so I made changes in PO, (component provided, I made it to 3300). So now system can transfer 3300 to vendor. Can u guide me for the rest of the process while receiving material so that all material shud be reconciled. Shall I hav to maintain alternate unit for SF1111?
ThanksHi Sarang,
Go through the following steps.
1. Create a Material master for Scrap material say XXXX.
2. In BOM, maintain the Material XXXX in negative quantity,
3. Now follow the regular process of subcontrating.
4. When you want to inward the scrap material from the subcontractor end, first receive the material XXXX with the movement type 545 ( This will make the material available in material provided to vendor stock ).
5. Then do a GR with 542 movement type to get the scrap material in to plant stock ( ie reversal of 541- Goods issue movement type)
Regards,
Nani. -
Hello,
I have a problem with
ExchangeServiceBinding.CreateAttachment(...) method (EWS with Office 365)
When I try to add a small attachment (e.g. 5 MB), then the method works fine.
When I try to add a big attachment (e.g.
12 MB), then the following exception is thrown:
System.Net.WebException
The underlying connection was closed: An unexpected error occurred on a send.
at System.Web.Services.Protocols.WebClientProtocol.GetWebResponse(WebRequest request)
at System.Web.Services.Protocols.HttpWebClientProtocol.GetWebResponse(WebRequest request)
at System.Web.Services.Protocols.SoapHttpClientProtocol.Invoke(String methodName, Object[] parameters)
at C2EWS.Proxy.ExchangeServiceBinding.CreateAttachment(CreateAttachmentType CreateAttachment1) in d:\source\EWSProxyClasses.cs:line 1471
at EWSRequest.Program.UploadAttachment(ExchangeServiceBinding esb, ItemIdType parentItemIdType) in d:\source\EWSRequest\Program.cs:line 90
at EWSRequest.Program.Main(String[] args) in d:\source\EWSRequest\Program.cs:line 59
Inner exception:
System.IO.IOException
Unable to write data to the transport connection: An existing connection was forcibly closed by the remote host.
at System.Net.Sockets.NetworkStream.MultipleWrite(BufferOffsetSize[] buffers)
at System.Net.Security._SslStream.StartWriting(SplitWritesState splitWrite, SplitWriteAsyncProtocolRequest asyncRequest)
at System.Net.Security._SslStream.ProcessWrite(BufferOffsetSize[] buffers, SplitWriteAsyncProtocolRequest asyncRequest)
at System.Net.TlsStream.MultipleWrite(BufferOffsetSize[] buffers)
at System.Net.Connection.Write(ScatterGatherBuffers writeBuffer)
at System.Net.ConnectStream.ResubmitWrite(ConnectStream oldStream, Boolean suppressWrite)
Inner exception:
System.Net.Sockets.SocketException
An existing connection was forcibly closed by the remote host
at System.Net.Sockets.Socket.MultipleSend(BufferOffsetSize[] buffers, SocketFlags socketFlags)
at System.Net.Sockets.NetworkStream.MultipleWrite(BufferOffsetSize[] buffers)
The C# code is the following:
private void UploadAttachment(ExchangeServiceBinding esb, ItemIdType parentItemIdType, string attachmentPath)
// File Attachment
FileAttachmentType fileAttach = new FileAttachmentType();
// Attachment details
byte[] bytes = System.IO.File.ReadAllBytes(attachmentPath);
fileAttach.Content = bytes;
fileAttach.IsInlineSpecified = false;
fileAttach.LastModifiedTimeSpecified = false;
fileAttach.Name = System.IO.Path.GetFileName(attachmentPath);
// Create Attachment
CreateAttachmentType reqCreateAttach = new CreateAttachmentType();
// Add parent Id
reqCreateAttach.ParentItemId = parentItemIdType;
// Add attachment to the query
reqCreateAttach.Attachments = new AttachmentType[1];
reqCreateAttach.Attachments[0] = fileAttach;
// Upload attachment
CreateAttachmentResponseType resp = esb.CreateAttachment(reqCreateAttach);
// Check response errors
CheckErrors(resp);
Could you advise a solution, please?
RobertHello,
The maximum size is rather not the problem in this case. As mentioned in my question above, I have a problem uploading messages with 12MB attachments to Office 365 via EWS. According
to the documentation you provided a link to, the message size limit in all plans of Office 365 is 25MB.
When we try the same request using slow network connection (1Mbit/s) there IS problem - we are NOT able to upload 12 MB attachments.
When we try the same request using faster network connection (10Mbit/s) there is NO problem - we are able to upload 12 MB attachments.
It seems like a kind of timeout - probably from Office365.
Is there a possibility to upload attachment in chunks?
Robert
Maybe you are looking for
-
iMessage is not working.... Jabber has disappeared from bottom left corner....
-
Rewrite update query to improve performance - sql attached
Hi , The following query(pasted below) is taking 4 hours to compelete, table ef is having 10 crore records, and I have 3 binary indexes defined on ef on columns as_at_date, cc and fid (these are individual indexes), just want to know if there is any
-
In Basic plan, can I do it? or If I want to attach more than 2 files at a attachment article, I have to upgrade to "Plus"? I cannot select "enable to attach several files". It does not working.
-
I cant'open it.After I click the program automatically looks for a missing file and can't find it and then i get the following message: Adobe met a problem and must close, error code c0000005, address 39e 22109. Before it happen i was unable to recon
-
I just updated my iphone to 3.1 and i tried to purchase DLC in flick fishing, tap tap 3 and ramp champ but everytime i enter my itunes password it says something like "This is not a test user account please create a new account in the sandbox environ