Hi Experts,
when i send an equipment( ex: vernier) for a third party vendor for calibration, in purchase order, there is no material displayed since the item category is " D"(service).  Now i have one doubt.
How to send the equipment for calibration and at the same time in sap, there should be some transaction/document so as to send/receive the equipment for calibration. Any suggestions .

Hi Nandi,
               Being from the business side I would suggest that rather then considering this process as the Calibration Process, please consider it as a Simple Sub-Contracting Process.
in which the material that you are sending, will be coming back to you, That is the Re-Work Material.
You can issue the Serialized Material(With Equipment) to the vendor via 541 Mvt Type and do simple GR with 101 Mvt type and pay the vendor for the services.
You can generate the Sub-Contracting PR from the Maintenance order Only, and then create the PO for the PR.
Hope it helps you.
Rgeards,
yawar Khan

Similar Messages

  • Process for sending equipment for Repair to the vendor

    Hi,
    My scenario is as below:
    1) Equipment is created without Material / Serial no.
    2) Equipment has to be sent for repair to the same vendor from whom it has been procured.
    Please let me know the standard process followed in this case. Need process for both indegeneous material and Imported material.
    Please check and suggest.
    Regards,
    Deepa

    deepa the process for sending equipment (material) to vendor in foreign country
    follow the below step
    Refurbishment order (standard order type PM04) and process it as an external service using Operations control key PM02. Here is the process
    1. Create Refurbishment order for the material
    2. Create operations (PM02) for external processing. PReq will be generated once the order is released
    3. Send out the material to vendor for repair
    4. GR/IR upon receipt of the material from vendor
    5. Receive material back to storeroom (IW8W)
    6. Order settlement to material

  • Maximum number of dialog processes for sending data

    Hello All,
    How to change the Maximum number of dialog processes for sending data from default value ?
    I see this infopackage->Scheduler->Settings for Sending Data--
    >Maximum size of a data packet  as 3 .....Can we increase this setting  to 5 for faster extraction?
    if yes,,,please let me know how & where we can change this...
    Thanks,

    Hi,
    in the source system table:table ROIDOCPRMS
    change these:
    MAXSIZE
    MAXPROCS
    STATFRQU
    thnks.

  • Procedure for sending equipment in an Exibition

    Dear Sir,
    We are manufacturer of machines . We have a scenario where we need to send  out 1  Machine to some exibition for 15 days and subsequently this machine will come back to us .
    The machine can be sent out only against the Excise Invoice .
    Kindly guide us as what steps need to be followed to address this scenario pl .
    Rgds
    Sonia

    Check this WIKI
    [Consignment Process |http://wiki.sdn.sap.com/wiki/display/ERPLO/Consignment+Process]
    thanks
    G. Lakshmipathi

  • BW 3.x : Increase Background processes for one loading

    Hello,
    in BW 3.x, I must load cube1 into cube2 (cube2 is a cube1's copy). => During loading, time process is due to writing fact table.
    I decrease parameter (infopackage parameter), in order to increase performance :
    Maximum size of a data packet in kByte
    I want to increase parallel processes in order to increase performance again (Data volume is so important). But How to increase this parameter : "Maximum number of dialog processes for sending data".
    Thanks in advance for your help.
    Best Regards,

    See note 631710.
    Or you can increase it at system source level (transaction SBIW/Main settings).
    Regards,
    Fred
    Edited by: FCI on Apr 28, 2009 6:02 PM

  • Sending equipment for calibration

    Dear all,
    what is the process to send test equipment for calibration.
    ours is external calibration:
    as per QM they are running the scheduling for calibration so system automatically creating one purchase requisition .
    so then how to send that equipment through MM .
    please give step by step
    regards,
    prasad

    Hi,
    Generally, Repair of Materials are handled via concept of Gate Pass (Returnable & Non-Returnable). But, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Try the below suggested procedure as a work around process;
    Repair Process via Returnable Gate Pass: -
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    It's not necessary to have materials as Non-Valuated always, it depends on your requirement.
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511) - Only if Stock of Material is not available.
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Note: - If PM Module is implemented then use PM Order as origin of the Repair Process. If it is not then follow the above process.
    Else if you don't want to track the material stock then follow the Service Process Cycle
    1. ME21N - Create Service PO (With Item Category D and Account Assignment Category K )
    2. ML81N - Create Service Entry Sheet w.r.t. Service PO
    3. MIRO - LIV for Service Charges w.r.t. Service PO or Service Entry Sheet
    For Service Process, refer following link;
    [SAP External Service Management|http://www.sap123.com/showthread.php?t=52]

  • Material consumption by Equip during outside repair process

    Hi All,
    if I send one equipment for repair outside(eg. Telephone), first time during repair process he replaced Wire, next time
    after few month suppose he replaced Keypad. the both materials he(third party) changed are not maintained in our material
    master. At the end of the year suppose I wish to know which r the repair processes happened for this equipment
    (ie. Telephone) & which r the materials changed/consumed by this equipment during this year.
    How could I come to know these details?
    plz revert with your suggestions.
    Regards,
    Amol.

    Hi YK,
    plz let us know that, is it possible to get outside material consumption details without maintaining those materials in our master?
    Amol.
    Thik...Thikkkkkkkkkkk....
    Hi Gurus,
    Plz put ur suggestions on this post...
    Regards,
    Amol.
    Edited by: PMAmol on Apr 20, 2010 8:21 AM

  • Send notifications during R12 Payment process

    Hello,
    Does anyone know how to send notifications during the Payment process in R12. For example, I would like to send a mail to the Treasury department after the Payables department is done with invoice selection and confirmation of payments. This email notification would let them know that there are checks to be printed.
    Is there any Out-of-box functionality in R12 which can send mail/alert/notifications? Also after Payment Register report is generated the related parties need to be notified.
    Has anybody worked on this before?
    Hoping for some real quick help on this.
    Thanks!
    Ramya

    I discovered my error, I was looking at the wrong concurrent program's XML. I need to look at the XML from program: Format Payment Instruction with Text Output (IBY_FD_PAYMENT_FORMAT_TEXT). The XML from this program contains the items matching the XSL stylesheet.
    Edited by: user961956 on Dec 14, 2010 8:53 AM
    Edited by: user961956 on Dec 14, 2010 8:58 AM

  • Error occurred during WM processing for posting change delivery

    Hi Experts,
    I am getting the following error when i try to create Outbound delivery aginst PO.
    "L9 612 Error occurred during WM processing for posting change delivery"
    Diagnosis
        The indicator AUFER from the delivery type contradicts the
        storage location constellation that was determined by the
        WM system.
        TVLK-AUFER = '<VAR2>'
        WM = '<VAR1>'
    1.Purchase order is Stock transport order ME21N ( UB)
    2.Try to create Outbound using VL10B and i am getting the above error,
    Thanks in advance.
    Cheers...Gopi

    Hi Gopi,
    Looking at problem you discribed, I am assuming you are using the delivery type other than "NL".
    The reason for this error is the indicator "order required" in delivery type defination set to 'X : sales order required' and you have assigned this delivery type to the purshasing document UB in STO customising. So the requirement of delivery defination of having prior document as sales order is conflicting.. so the error is there.
    Resolution:
    Please change the assigned delivery type to NL to purchasing document type UB in SPRO> MM> Purchase order>set up for STO>assign delivery type and checking rule.
    If you have custome delivery type the go to spro> LE> shipping>deliveries>define delivery type
    change the order required from X to "B".
    Hope this will help.
    Regards,
    Sudhir

  • Processing log not getting updated for send immediatly

    Hi,
    I have a custom output type and a Custom function module for issueing the output for delivery, my prob is that it processing log is getting updated for the send in batch and other options but it is not getting updated for the SEND IMMEDIATLY, I am using the same FM for the Output issue I am checking if they have selected output type as 4 if yes, I am calling a FM in perform by saying
    PERFORM xxxxxxxx ON COMMIT
    and in the perform I am calling a FM
    CALL FUNCTION  xxxxxxxxx in BACKGROUND TASK  AS A SEPARATE TASK,
    the functioanlity of issueing the output is working but the Processing log is not getting updated.
    What might be the problem ? it is getting updated for  Send in batch but not for except 4.

    I am updating Log using this form
    at every step I am collecting the messages and passing them to this form.
    FORM update_nast_log  USING   p_msgid
                                  p_msgnr
                                  p_msgty
                                  p_msgv1
                                  p_msgv2
                                  p_msgv3
                                  p_msgv4.
    * Local data declaration
      DATA: lv_msgid LIKE sy-msgid,
            lv_msgnr LIKE sy-msgno,
            lv_msgty LIKE sy-msgty,
            lv_msgv1 LIKE sy-msgv1,
            lv_msgv2 LIKE sy-msgv2,
            lv_msgv3 LIKE sy-msgv3,
            lv_msgv4 LIKE sy-msgv4.
    * clear all the local variables
      CLEAR:lv_msgid,
            lv_msgnr,
            lv_msgty,
            lv_msgv1,
            lv_msgv2,
            lv_msgv3,
            lv_msgv4.
    * move message ID,number,msg type and the messsages
    *     to local variables
      MOVE: p_msgid TO lv_msgid,
            p_msgnr TO lv_msgnr,
            p_msgty TO lv_msgty,
            p_msgv1 TO lv_msgv1,
            p_msgv2 TO lv_msgv2,
            p_msgv3 TO lv_msgv3,
            p_msgv4 TO lv_msgv4.
    * Update nast table using nast protocol update
      CALL FUNCTION 'NAST_PROTOCOL_UPDATE'
        EXPORTING
          msg_arbgb = lv_msgid
          msg_nr    = lv_msgnr
          msg_ty    = lv_msgty
          msg_v1    = lv_msgv1
          msg_v2    = lv_msgv2
          msg_v3    = lv_msgv3
          msg_v4    = lv_msgv4.
    ENDFORM.                    " UPDATE_NAST_LOG

  • Looking to stop sending IDOC if output has been already processed for PO

    Hi,
    I am using the Message type ORDERS to trigger the IDOC for the purchase order based on the output type. But my requirment is that if the output is already processed for a  specfic purchase order then it should not allow to process the output again for that purchase order. So i am writing a logic in user exit that if NAST table entry is already exist and proccessed for the output type for specfic purchase order then i want to stop sending the idoc.  As NAST entries doesn't contains any segment data due to that i am unable to set the ALE filter in BD64 transtaction .So could you please anyone give me any suggestion how can i stop sending the IDOC if output has been already proceessed  so that it will helpful for me.
    Thanks in advance for your help .
    Regards,
    Kiran

    >
    divyesh vasani wrote:
    > Hi Shabarish,
    > Thanks for your reply.
    > I was working on solution proposed by  NALLAM GUNA RANJAN.
    > But as you and Jai mentioned, but I think Maintain Order At Runtime option is available with Interface determination not with Receiver determination.
    > In my case, From same Input file(from which Text file is generated) mail report has to be generated but after creation of text file only.
    >
    > Thanks
    > Best Regards,
    > Divyesh
    1. In case you intend to use maintain runtime then use a single receiver and add multiple inbound interfaces. This is the easiest solution
    2. use a BPM. use send steps in serial. First send step should be File (request for acknowledgment) and then followed by send step for mail.
    Do not go for scripts etc unless no other solution persists since maintenance and support in the future will always be an issue.
    let me know if u still have issues.

  • Plz send step by step process  for Outlook integration with SAP

    Hi Basis experts
    Plz send step by step process  for Outlookexpress  integration with SAP.
    plz send if anybody have at the earliest.
    advance Thanks& regards to all
    Supriya

    Dear Supriya,
    If it is in SAP then please go through the below mentioed site
    http://www.duet.com/
    please tell me where in you want to integrate?
    Outlook Configuration with SAP-EP is a PPT file.
    please mail me your id i will send it accross.

  • Error during usage decision for Test Equipment

    Hi,
    I have completed results recording  for Test Equipment using QE51N (results closed and confirmation completed). When I tried to make usage decision (QA11) for the lot the pop-up message shows as "Not all equipment is valuated! Do you want to force inspection completion. I also noticed that in equipment tab of qa11 code valuation column shows as Not  Valuated.
    I request you to help me to solve this problem.
    Thanks & Regards
    V.Devaraj

    HI,
    You may try changing the valuation mode in IA06. In the inspection characteristic overivew, click on details -> operation, scroll down, you will find Quality management inspection points  -> maintain automatic valuation based on inspection points.
    The changes if made will be effective only for the next inspeciton lots.
    Regards,
    M.M

  • On iPad in iTunes purchased tv show during download its been processing for days, how do I delete or stop it

    In iTunes on my iPad I'm downloading a tv show, it's been processing for days, I can't delete or stop it. Which is blocking anything else from downloading. I've turn shutting off but that doesn't work. It wouldn't let me tap it to stop it,

    •  Log out of your iTunes store account.  Go to Settings > Store > Sign Out Then press the Home button.
    • Then press and hold the Home and Sleep buttons simultaneously and don't release them when it brings up the Turn Off screen; keep holding them until the Apple logo appears.
    • After restart, the Waiting should be gone.
     Cheers, Tom

  • Regarding Goods Reversal & Goods Issue Process for PO

    Hi Experts,
               Could you any one tel me what is Goods Reversal and Goods Issue process for PO...
    How to create the FM & detailed Procedure Pls?....
    Please any one tel me.......
    Thanks & Reagards
    HB

    Hi Hans,
    SOURCE : HELP.SAP
    Purpose
    Inventory Management uses this process in such a way that the goods issue posting is divided into two parts that run in separate systems. Posting the GI document in the supplying plant results in a message to the receiving plant. The receiving plant then performs a complementary posting. The physical goods receipt takes place as usual.
    Prerequisites
    When using batch processing, the following prerequisites must be fulfilled:
    Both the original and target systems have the same batch definition level.
    The batch definition level is either the material or the client.
    An ALE scenario exists for materials and classes (characteristics).
    Unique batch numbers exist cross-system.
    Batches can only be changed in their original system when they are not decoupled. From an organizational point of view, this must also lead to the batch status being changeable in a local SAP R/3 system. For example, this is impossible when transfer posting to a new batch and results in further actions, for example, relabeling containers, palettes and so on.
    Characteristics
    As for the purchase order in a one-system situation, the system should automatically post the material into the stock in transit at the receiving profit center and the corresponding Profit Center Accounting using intra-CC transfer prices at goods issue for the purchase order and the unchecked delivery. This requirement is valid for one-system situations as well as for two-system situations where there is an ALE interface. No internal billing document should be created.
    In a two-system case, the receiving profit center should be derived at goods issue from the unchecked delivery. Profit Center Accounting then takes place with
    Stock change transfer price to stock
    Internal expense to internal sales
    Internal clearing account to stock change transfer price.
    Account determination in a purchase order for an intra-company-code transaction must be different from account determination in external transactions. Automatic GR/IR account clearing is required in both one-system and two-system situations.
    The stock in transit must be visible in the receiving profit center.
    The system must send a shipping notification at goods issue in one-system and two-system situations.
    You need to create an invoice document for the internal and external trading statistics for cross-boundary deliveries as well as for customs purposes.
    GR/GI slips are created.
    Process Flow
    Goods Issue Posting for Stock Transfers
    The delivery triggers the goods issue in the issuing system.
    The call contains the stock transport order data known in the delivery, including the PO item and the logical system of the recipient.
    The transaction (quantity and value updates) is selected using the movement type:
    Movement Type     
    Function
    641     
    Goods issue with UB logic (Creation of stock in transit at recipient, immediate value posting).
    647     
    As 641, however the goods receipt line (movement type 101) is added automatically, so that the goods receipt is posted at the same time as the goods issue (one-step procedure).
    You determine the movement type according to the schedule line category in Sales and Distribution. The goods issue for a cross-system stock transfer must be different from the integrated transaction. This is achieved by adding a new movement type.
    You post quantities and values at goods issue in the same way as a goods issue for a sales order. That is to say, the quantity is posted in the supplying plant and the value is adjusted to that of the stock account. The offsetting posting is made to a clearing account. The known data from the delivery is copied to Accounting to balance the account where necessary.
    The system creates a message to the appropriate receiving system for all items with reference to a cross-system purchase order. The system does not perform any validity checks on the recipient’s data before posting begins. Incorrect Customizing results in the update being terminated.
    If a goods issue has receiving plants in different logical systems, an IDoc is sent for each system.
    In order that the goods receipt is able to use the values on the receiver side, you must add the values used to post the goods movement, in particular the transfer prices, to the IDoc.
    The logic for recognizing the profit center switch functions as follows: At goods issue, the system recognizes that the profit center of the issuing plant is different from the profit center of the receiving plant. The system derives the profit center node from the relevant profit center.
    Data Transfer
    The IDocs sent by the issuing plant trigger the goods issue postings in the receiving plant.
    Background Posting in the Receiving System
    The goods receipt is posted in the receiving system using the IDoc. The interface receives the data from the goods issue in the supplying plant. The following processes now run at the recipient:
    The system finds the update control for the GR part of the posting.
    The goods movement is posted with the new movement type.
    During valuation of the goods receipt, the system might, where necessary (UB logic), refer to the values (legal value and the value from the parallel valuation type, if you are using the transfer price function) from the IDoc.
    The PO history is updated. The PO history is updated with the material document number from the second part of the GI posting. The GI document number is not stored in the supplying plant, because there is no way to display this document.
    In two-step procedures the goods receipt is posted to the stock in transit.
    Reversal
    You can only reverse this goods issue for the PO using the cancellation transaction in SD. You cannot reverse the GI in Inventory Management.
    The material document that is automatically created in the receiving system cannot be canceled. This reversal is triggered by the sending system (the actual reversal of the GI document takes place there) and transmits the data, including the reversal movement type, to the receiving system. No actual reversal is posted in the receiving system, because the material document number of the original document does not exist in this system. This scenario is applicable for cases where you use the two-step procedure (with stock in transit).
    Distribution of Batch Master Data and Characteristics
    The batch information is transported using the message category BATMAS.
    When you create a cross-system goods issue, the system creates the corresponding IDoc using the message category BATMAS.
    When the delivery arrives in the target system, the batch and all the information is already present in the system.
    Changes to the batch data are also distributed using the message category BATMAS.
    The batch can be decoupled in the receiving SAP R/3 system. This means that the batch can have a different status in the receiving system than in the original system. By setting an indicator at material level, you decide whether the batch can be decoupled or whether the batch and all its attributes are copied from the original system. "Decoupled" i.e. "locally independent" batches are no longer distributed from its own system.
    The batch data does not need to be available before the physical goods receipt takes place. The goods receipt into the stock in transit does not usually refer to the batch unless you are working with batches with assigned active ingredient values.
    If the GI cannot be posted for organizational reasons, for example because the goods cannot be loaded onto a truck until 10pm, then you can post the goods into the GR blocked stock. This stock is also non-batch-specific.
    In cases where the GI IDoc arrives before the batch IDoc, then the GI IDoc can be subsequently posted by a periodically scheduled report (transaction BD87). A program like this exists in the SAP standard system. In Customizing for MM Inventory Management (activity Copy, Change Movement Types), you should make settings to define that manual creation of batches at goods receipt is not allowed.
    Shipping Notification
    The shipping notification is required in the receiving system due to its relevance for MRP. In this way, for example, a change in delivery date determined at goods issue is sent to the receiving system using the shipping notification. The shipping notification can also be used when posting the GR batches.
    Reward if found helpfull,
    Cheers,
    Chaitanya.

Maybe you are looking for

  • How to use Notes in Mail?

    .. e.g. 1. Where are Notes saved on a MacBook after File > New Note ... write note ... File > Save? 2. Can you write a Note in OS X Lion Mail / MacBook, and end up with it in Notes on an iPad/iPhone? The above covers it, the rest is a rant. First, wh

  • Windows 7 64-bit and need to install both 32bit and 64bit Oracle 11g client

    Hello First I am sorry for asking what is probably a common knowledge answer from most in the forum. I just cannot find a straight forward answer searching these forums or via google. We have Windows 7 64-bit planned as our next desktop upgrade. We h

  • Time Machine failing to back up

    Hello Apple Community! I've got a brand new MacBook pro 13" 2.3GHz i5 model. This is my first Mac and I would just like to say I absolutely love them and can never ever see myself going back to Windows ever again Well I wanted to set up the TimeMachi

  • How to install Oracle on NON FILE SYSTEM platform(UNIX OR NT)

    Anyone tell me

  • Oracle Text contain query limit with 9i

    The Oracle Text contain query is defined as this: CONTAINS( [schema.]column, text_query VARCHAR2 [,label NUMBER]) RETURN NUMBER; Is the size limit of text_query 4000 bytes with 9i? Is it increased with 10g or is it accepting CLOB in 10g? I always got