Dear All,
I have two plants (Plan A & Plant B)
From one plant (Plant A) I sending few material to processing in another plant (Plant B).
It come back after processing/assembling as single component from plant B to plant A.
How I  should map this requirement SAP.
Prashant Salvi

Hi,
If you are satisfied with this answer give some points
1) suppose you are transferring  say material "X" from Plant A to Plant B
Create material in Plant A  and Plant B
In plant a for material consider special procurement key=40
now using mb1b with   301 movement transfer material from Plant A to Plant B
After you are processing you assume u will get another material say "Y"
Now  transfer material from Plant B to Plant A using the same MB1B transaction
Regards,
Raj

Similar Messages

  • Refurbishment process - want to repair material from another plant

    Hello All,
    In a Refurbishment process, we can do repair either Internal resource(control key PM01) or with External resource(control key PM02) by sending out material to vendor with material outward slip. But in my case, i have to send material to my another plant(2222) for refurbishment & after repair want to take it back to my plant(1111).
    Can you plz guide me over here, how i can achieve this? which are the things need to be taken care? whether any other process(SD-Shipment process) need to involve here?
    Thanks to all in advance.

    Hi,
    you can use standard refurbishment orders and defining your plants and relevent storage locations at header level. just take care of following points:
    - Valuation types are defined for the equipment/ material.
    - movements of material from one plant/Sloc to other plant/ Sloc.
    - operations defined correctly in terms of internal/ external.
    - capture all labour costs in your plant (1111) cost centre related to carrying material from your plant to another plant and back  to your plant.
    - cost centre distribution rules maintained correctly.
    Ragards,
    Lucky.

  • External processing in the plant as vendor under same company code

    Hi friends,
    In our project under implementation we have following scenario.
    we have 4 plants under one company code. one of the plant does powder coating as manufacturing activity. Other 3 plants sends components to the powder coating plant for coating purpose.
    In IDES Standard scenario of external processing, a purchase requisition is raised thro info record maintained for the external operation. This scenarion works if the vendor is external.
    In our case, the vendor is one of the other plant under same company code/client. Also the powder coating needs to be done without any profit margin for internal customers.
    Our FICO guys have the opinion that, intra plant can't be a vendor; because raising invoices among plants under the same company codes is against accounting standars.
    If anybody has faced this type of scenario nd found the solution, Please share it here.
    Thanx in advance

    Hi Shiva
    STO scenario
    You can not create only STO as you need to send the unpainted components to another plant through SAP & have them painted back with only payment of paining charges without margin.
    Subcontracting scenario
    You can not create the Subcontracting PO as this is not your external vendor.
    Does this involves excise?
    Then the PR/PO ctreated should be of combination of STO and subcontracting. If so this is not possible, as item category is the only field in PR/PO that identifies it as STO and subcontracting. obiviously it cann't have 2 values.
    My suggesion on this as...
    Create a BOM for painted component with sp procurement key as produced in another plant(paining plant). this will have STO cretaed for paining plant. This will inturn cretae a production order in painitng plant.
    The BOM in painting plant will have the unpainted component with sp procurement key as produced in another plant ( fabricated plant) this will have STO created for unpainted components.
    I hope I am clear & not confused you much.
    Regards
    Mahesh
    Regards
    Mahesh

  • Particular operation to be done in another plant-Req to let me know how to do step by step

    Dear all,
    Kindly find below image
    Customer required 0020 operation,this production has to be done in another plant of the same company not by other vendors.
    I.E first operation production will be done in same plant(Plant 1)
    Second operation production will be done in another plant of samy company(Plant 2)
    Third operation production will be done in first plant(Plant 1)
    Requesting you all to tell me how to process this scenario step by step.
    For your information Fg material is 2244EH    Raw material is 3322WR
    Regards
    Rajasekaran

    Hi Raja,
    Two ways you can handle this process.
    Process 1:
    In Routing define operation 0020 as subcontracting
    Create other plant as Vendor and assign the same along with revelent cost element and convertion rate(Net price) per unit.
    If any raw material needs to be issued for this external operation then assign the material for the operation in routing.
    When order is created system will generate Purchase requsition for the external operation which subseqently needs to be converted to purchase order.
    Goods issue to purchase order using MB1B - 541 Movement type if raw material needs to be issued.
    Once external operation is completed then do GR against the PO.
    PO conversion cost and material issue cost will hit on to the production order.
    Do confirmation of the external operation in Plant1.
    Advantages : Proper tracking of external operation and cost accounting on production order
    Process 2:
    In Routing screen as displayed below for operation 0020 maintain the work center and plant2, provided this work center to be created in plant2
    As like operation 0010, confirm operation 0020. In system it will display that operation is done in Plant2 work center. According to the activity rates maintained in KP26 for the combination of cost center and activity, cost will hit onto the order
    In COOIS -Operation reports system will display that operation in done in plant 2.
    Advantage: Simple process as suggested by experts. You will not have any tracking mechanism like process 1.
    Now decide based on client business requirement which process to be followed.
    Thanks & Regards,
    Ramagiri

  • Consignment stock transfer to another plant

    Hi all,
    As per consignment fill up system create the consignment stock from unrestricted stock in the same plant, But as per our need we want to transfer unrestricted stock of one plant to another plant as Consignment stock, So kindly suggest me how can i achieve it with consignment process. How can i achieve it through consignment Fill up.
    Thanks in advance
    Shambhu

    Hi,
    You can do this through consignment cycle.
    Create the plant(Receiving) as a customer in the system.
    Then do the fillup and other things as per consignment process(631) mov type.
    Here u will get two entries 631-W(+) and 631(-) for delivering plant.
    But from the receiving plant side u need to take GRN through MB01 then only goods can be delivered from the receiving plant.
    Two entries 632(+) for receiving plant and 632(W)(-) for delivering plant so that the qty will get knocked off.
    Regards,
    Gopal.

  • SAP MRP ConRel from another plant

    Hi there,
    I am thinking about setting up this process and need advise on few things.
    1. I have plant A creating Purchase Orders to ship from Plant B - For Eg - 100 Ltr.
    2. We auto convert PO to SO for Plant B
    3. MRP runs and creates Planned order into customer stock for 100 Ltr
    4. Planned order is converted into Production Order
    5. GR done against Production Order and inventory is received into Customer stock for that SO.
    6. Delivery done and inventory sent to Plant A.
    The problem with the above process is, when Plant A is creating Purchase Order for Plant B, ConRel entry is made into MD04 for Plant B. Now when I run MRP for Plant B. It creates another planned order for 100 Ltr along with SO referenced planned order for 100 Ltr.
    So I have two planned orders, what is it that I am missing ? Please advise. thank you

    Hello,
    Your ConRel should get deleted after creating the delivery.
    Check delivery table LIPS has Requirements class transfer of requirement set in OVZG for your requirement class.
    In SM30 table V_161V you can use the "ATP Conf. MRP" checkbox to define that the material requirements planning (MRP) is to refer to confirmation schedule lines only.
    The quantities that are available in the supplying plant, and that were confirmed by the ATP check are considered as receipt in the receiving plant at the confirmed date.
    Please refer KABA  1621912 - Transaction MD04: Requirements of stock transport orders are deleted after delivery is created
    and consulting note 207942 - MRP: Problems with requirements from sales order/delivery
    Best Regards,
    R.Brahmankar

  • COB1 Batch Search Startegy for Component in another plant

    Is there a way to build Batch Search Strategy (COB1) for components in another plant?  We use Batch Search Strategy in PP-PI process orders. If so, what is the configuration?

    Resolved in EAM forum

  • Withdrawal from another plant

    Dear Experts,
    there is an SAP standard process in ECC defiend as withdrawal from another plant, when for example creating a planned order in ECC, the dependant demand of the component product is placed on the plant assigned e.g the alternative plant.   We are using SCM7.0 and SNP as part of our supply chain solution.  Can someone advise how and if it is possible to replicate the standard process of withdrawal from another plant in APO SNP?, what settings are essential etc?
    Basics of withdrawal from another plant are as follows:-
    - create a special procuremnt key and populate the  flag withdrawal from another plant, assign to the material master in ECC.
    Cheers
    Paul Martens

    Nandha,
    thank you for the OSS note reference.  Very useful.  One more question, from this note it suggests that the functionality of withdrawing from another plant is only designed to work with PPDS, is this correct?
    Cheers
    Paul

  • How to call a bpel process in another

    can anyone tell me how to call a bpel process in another bpel process?
    thanks in advance.

    Hi-
    this might help
    Re: Call a BPEL process from another BPEL process
    Let us know if you need any more info..

  • Invoking bpel process from another bpel process in same app server

    Hi,
    When I invoke a bpel process from another bpel process in the same oracle AS
    1. Is it a SOAP call or is there any optimization?
    2. If there is some optimization where can I configure this?
    3. Is there any similar optimizations if I invoke a bpel process from a
    java application deployed in the same server? If so can you please provide
    a sample?
    Thanks for your help
    Raj

    By default the BPEL 10.1.2, it will do a local call to the process. It will not execute a SOAP request, no network access is done.
    It can be configured at domain level:
    Parameter: optSoapShortcut (SOAP local optimization)
    Turns on "short-cut" for local SOAP request; local SOAP calls are normally done via an internal call instead of sending a message through the SOAP stack.
    The default behavior for the engine is to optimize all. To disable optimization specify a value other than "true" or "yes".

  • Transfer posting from one plant to another plant

    Friends i want to transfer goods from one plant to another plant of same company code and iam trying this one in transaction migo if post for this it gives an error
          "posting only possible in periods 2006/05 and 2006/04 in company code" what error it is

    Hi,
    Use the MMPV to open the new posting period date.
    here you have to use your company code & Current date , then execute to open the new posting period.
    while running this transaction you ensure that GR open screen should be closed.
    hope it helps....
    manoj Singh

  • BAPI_GOODSMVT_CREATE-Goods receipt in with sd-delivery in another plant?

    Hello to all.
    I have a strange situation.
    We use the mentioned bapi to post goods-receipts.
    In this case we use  the movement type 101.
    Inside sap-standard , inside the migo, there is a possibility to do the same, online.
    And also, if a sd-delivery from another plant is present.
    The posting initiated by the migo is more complete as it fills the entire document flow properly.
    I would like to trigger exactly this behaviour in the background, via RFC-call.
    As I now use the BAPI_GOODSMVT_CREATE, the documentary told me, that this is not possible.
    How else can I achieve this ?
    Does anybody know the solution ?
    Will I have to do it via WS_DELIVERY_UPDATE_2 instead ?
    Best regards
    Robert.
    Edited by: Robert Dornfeld on Nov 11, 2011 12:04 PM

    Refer Note 424014 - BAPI: Goods receipt for the outbound delivery
    When you post a goods receipt for an outbound delivery (with reference to a stock transport order) with Bapi BAPI_GOODSMVT_CREATE, you must fill the following fields so that the purchase order as well as the delivery are updated correctly:
        GOODSMVT_ITEM-MOVE_TYPE (Movement type): generally movement type '101'
        GOODSMVT_ITEM-DELIV_NUMB (Delivery)
        GOODSMVT_ITEM-DELIV_ITEM (Delivery item)
        GOODSMVT_ITEM-PLANT      (Plant)
        GOODSMVT_ITEM-STGE_LOC   (Storage location)
        GOODSMVT_ITEM-ENTRY_QNT  (Quantity)
        GOODSMVT_ITEM-ENTRY_UOM  (Unit of measure)
        GOODSMVT_ITEM-PO_NUMBER  (Purchase order)
        GOODSMVT_ITEM-PO_ITEM    (Purch. order item)
        GOODSMVT_ITEM-MVT_IND    (Movement indicator) = 'B'
    Now the order history and the document flow of the delivery are updated. In order to use fields DELIV_NUMB and DELIV_ITEM, you must implement the enhancements of Note 356665.
    If the delivery note number / delivery (field MKPF-XBLNR) is supposed to be updated in the material document header, field GOODSMVT_HEADER-REF_DOC_NO must be filled with the delivery number when you call the Bapi BAPI_GOODSMVT_CREATE.
    The field should only be filled if the delivery number is unique.The delivery is transferred at item level (table GOODSMVT_ITEM, field DELIV_NUMB) so that different delivery numbers can occur in a material document.In this case, there is no unique delivery so that a blank field GOODSMVT_HEADER-REF_DOC_NO would be useful.

  • Goods receipt from process Order, different plants same warehouse

    Hi All,
    Would really apreciate guidence on my issue below.
    We plane to implement the following Org Structure:
    Plant A                 Plant B
        Warehouse 0001
    warehouse 001 shared by both plants
    I execute a process order in plant A, when I perform Goods Receipt against the process order will it show under Plant A or both Plants A & B.
    Plant A executes for Plant B as Plant B is new and all master data is set up in Plant A.
    My hope is to get the business to execute Plant B process orders in Plant B but this will require huge effort I think as masetr data will need changing etc.
    Thanks
    Stuart

    Hi,
    If you post GR in Plant - A, then the stocks in the warehouse will reflect for Plant - A & not in Plant - B.
    Although the warehouse is the same, it is linked to the combination of Plant & Storage location. You can check the warehouse stocks using LS26, just specify the warehouse number & material number.
    But there is also a concept of planning plant & production plant, so Plant A can be where the planning takes place, while Plant B is where the actual production takes place. In this case, although you produce in Plant B, the GR will be done in Plant A.
    Hope the above clarifies.
    Regards,
    Vivek

  • Extending Materials one plant to another plant

    Dear Friends
    while extending material through LSMW to another plant  we facing problem :
    Sales : Sales Org 1 showing more fields mandatory like  1,valid from;  2. X-distr Chain Status  3. Sales Unit of Mesasure etc.  LSMW programme was OK   i did more times through this programme to extended. i maintained the below fields only in LSMW.  BUT while i extending material through MM01 there is no problems showing.  please advice how to solve this.  i want to extend more than 10K material in to new plants.
    TABNAME     Table Name
    TCODE     Transaction Code
    MATNR     Material
    MBRSH     Industry sector
    MTART     Material Type
    WERKS     Plant
    LGORT     Storage Location
    VKORG     Sales Organization
    VTWEG     Distribution Channel
    MAKTX     Material Description (Short Text)
    SKTOF     Cash discount indicator
    MTPOS     Item category group from material master
    MTVFP     Checking Group for Availability Check
    LADGR     Loading Group
    PRCTR     Profit Center
    DISGR     MRP Group
    DISMM     MRP Type
    DISLS     Lot size (materials planning)
    PERKZ     Period Indicator
    BKLAS     Valuation Class
    PEINH     Price Unit
    VERPR     Moving Average Price/Periodic Unit Price
    EKALR     Material Is Costed with Quantity Structur
    HKMAT     Material-related origin
    LOSGR     Lot Size for Product Costing

    if you used this program successfully before, and now it is complaining about new mandatory fields, then I would say that someone has changed the field selection for your material masters.
    Try to extend one material (that making problems in LSMW) using the manual way with MM01. LSMW does not really do anything different, so I expect that you face the problems with MM01.
    Then you either need to ask to the person who changed the settings  to reset them or you need to extend your LSMW  so that it can run with the new settings.

  • Configure a sales orginazation as a customer for another plant..

    Hi ,
    How can we configure a sales orginazation as a customer for another plant?? This configuration is requiresd for intercompany  scenerio.
    PLZ give me the exact steps.
    Also I want to know how to configure a plant as a vendor to another plant in case of STO b/w different companies.
    Points assured for suitable answers.
    THNX n Regards,
    Subbz..

    Intercompany Scenario:
    Go to Sales & Distribution >Billing> Intercompany Billing
    Here there is an option to maintain internal customer number for a sales organization. Now the customer that you define here should be created in sales org on which the Intercompany Billing invoice is raised ( or the sales org for which the sales order is created )
    Cross Company Scenario:
    In Cross Comapany scenario, you shall have two plants in the PO created. One would be supplying Plant and the other would be receiving plant.
    You have create a Vendor Master Record for the Supplying Plant. For this, follow the below :
    XK01 is the tcode for creation of Vendor master data
    Remember in this XK01 screen, the company code details to be given shall be the other company code ( that is the company code to which the receiving plant is configured ).
    In the same screen, the Account Group has to be selected 0007.
    So go ahead and create the vendor through the above transaction. Be careful to maintain as and when the field details you come across during vendor creation;
    Supplying Plant ---> as Delivering Plant ( DP)
    Supplying Plant as Vendor and VB(companycode ) as DI --> Invoice Presented by.
    Hope the above helps.