Hi,
My client is a trading organisation. In order to do product costing, at which point in sourcing we need to enter the cost center.
M.K

Hi MK,
In a trading organization, usually you do not need product costing as you are not manufacturing the product in-house.
You can value your Inventory at MAP and when you do MIGO, the MAP will get adjusted itself with different p.O.rates that you purchase.
And, even if you go for Product costing, you won't need Cost Center at any point of time for sourcing.
Regards,
Kavita

Similar Messages

  • Material Ledger,Revaluation Production Cost Center ,Standard Cost

    Hi, I have a problem with  revaluation of production cost centers.
    Firstly,  production cost center expenses are settled via activity types onto the production order at the end of the period. However,  CKMLCP revaluate cost centers after the settlement because of using standard price. So cost centers at the end of the period have some amount.
    As a result we can not find  actual price for production orders.
    If I use standard cost in order to consume on cost centers, material ledger revaluates again this cost centers. I dont want this condition. Because this cost center is settled to other cost object before closing.  
    Thanks.
    Message was edited by:
            Ergul Taslacioglu

    Hi
    Go to the following path in SPRO:
    Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Actual Costing -> Activate Actual  Costing. Double-click on "Actiavte Actual Costing" and change the indicator from "2" to "1".

  • Transfer price (Internal Reveue to be allocated to Production cost Center)

    Hi  Sap Gurus.
    My cleint using tranfer price without activiation material Ledger. The internal revenue should not reflect in Fi.  For that we have created ztable and we will be able to transfer the stock between profit center and we are getting internal reveue to the sending profit sender and expenses to the receiving profit center finaally  balance become a zero,(we are maintaing same gl account while doing transfer price). Now expense in receving profit center should consider as part of produt costing. how to allocate this expense to the production cost center when there is no balance.
    Example
    SENDING              PLANT 1                  MATERIAL  123456         MM PRICE (10)   TP   15
    RECEIVNING        Plant    2                  Material      123456         MM PRICE (10)   TP   15
    While taking STO system is posting with material master price 10, but in the production if they are using that material system should take 5 also . 10 is the cost and 5 is overhead.
    help me out?

    These are some few things I found out. Below is the result of a test I carried out when I tried to create a Settlement Rule for a statistical order.
    Statistical order may not contain a settlement rule
    Message no. KO188
    Diagnosis
    Order 12770, for which you are trying to create a settlement rule, is statistical.
    System Response
    Statistical orders cannot have a settlement rule because they cannot be settled.
    Procedure
    You could possibly remove the statistics indicator from the order (only if nothing has been posted to it yet).
    I may be wrong but I have determined that, for production orders, you will have to use Standard Production Order Type and not a statistical order. The object class has to be production as well.
    You will only be able to create a settlement rule if it is not a statistical order with the assignment category as ORD. Also, in your order type: Internal Order - Production, under general parameters, you will have to assign settlement profile 30 which is production order.
    You may have to define planning profiles for co production orders, costing variant, valuation types.  Maintain order types using KOT2.  Example:
    Order Type:  PP01 Standard Production Order
    Order Category: 10 PP Production Order
    Number Range Interval: 1000000000--19999999999
    Settlement Profile: abc
    CO Partner Update: Semi-Active
    Check of Classification
    Next Maintain Settlement Profile: ABC Standard Production Order
    Check off "To be Settled in Full
    Default Allocation Structure: E.G: EB
    Indicators: check off: 100% Validation. % settlement, equivalent numbers
    Valid Receivers: 1 for most
    Document Type: OS Order Settlement
    Create Allocation etc.
    Hope this gives you some pointers as to how to proceed.
    Elias

  • Over Absorption in Production Cost Center.

    Dears,
    We are getting the over absorption in cost center after doing of actual price calculation settlement. we have done the following transactions at month end. eventhough we are getting over absorption (i.e., credits are more than debits) Credits are activity costs are transferred from production cost center to production/process orders or product collectors.
    KO8G settlement of internal orders to cost centers.
    KSV5 execution of distribution cycle.
    KSII  execution of actual price calculation.
    CON2 revaluation at actual prices.
    CO88 Settlement of Production/Process Orders.
    Even after doing of the above trnasactions we are getting over absorption.
    kindly advise me in order to resolve this issue.

    Hi Divraj,
    The same issue i am replicating in the development server i created one assessment cycle i gave one service cost center as sender and one cost element group, the group contains 10 primary cost elements(GL's), i done postings with 10 gl's respect to this service cost center, in my assessment cycle i gave one assessment cost element in segment header the sender rule is posted amounts, the receiver tracing factor contains variable portions, actual activity and no scaling, in receiver i gave cost center group contains 4 production cost centers, sender values is share in 100%, version is zero the receiver tracing factor tab contains variable portions as actual activity and one activity i maintained, the receiver weighting factor contains 4 production cost centers and factor percentage is 100%.
    Now i execute the assessment cycle in KSU5 i am getting senders in cycle but receivers i am getting zero, when i took the actual activity, variable portions and no scaling i have to maintain activity price in KP26 and this cost center i have to maintain in process order that is fine please explain me how the cost will distributed to production cost center please explain the procedure in detailed.
    Hopefully i will get clarity on the concept................

  • Allocation of cost from service cost center  to production cost center

    Dear sir ,
    Will I use to distribute the cost from service department to production department  and that cost centers also using for activity planing will get currect result in product costing ?

    Hello,
    Can you clarify what you want to do ?
    Allocation of cost from service cost centers to production cost centers can be done with the help of Assessment / Distribution cycles and you can do a activity planning using the same costs as well. The steps for activity planning would be as under:
    1. Create primary cost planning in the service and production cost centers (KP06)
    2. Create activity planning in the production cost centers (KP26) without any rate
    3. Run assessment / distribution cycles to transfer cost from the service cost centers to production cost centers (KSUB / KSVB), in case you are not transferring based on activity quantity then also do SKF planning in KP46
    4. Run plan cost splitting in case you have more then one activity type (do config for splitting structure beforehand) (KSS4)
    5.  Calculate Plan price for the production cost center activity types (KSPI)
    BR // SG

  • Please use production cost center!

    Hi Experts,
    I am trying to raise a vendor invoice via FB60. After giving all the inputs like vendor, Amount, GL account, cost center. I am saving the document in ECC6. I get the error as below:
    Please use production cost center! could i know why i am getting this error

    Hi Umesh,
    I request you to check if there is any validation in place as this is not a standard message.'
    You can take help of a Abaper and get it debugged and find out of the soure.
    Regards,
    Andy

  • Reporting Direct Production Cost Center Over/Under Absorption

    Hi,
    I am trying to find a way to report Manufacturing Cost Center Over/Under Absorption in a similar way COGS are reported in CO-PA. I mean - I would like to breakdown Direct Manufacturing Cost Center Over/Under Absorption into cost elements (just like COGS are broken down in COPA when invoice is posted).
    I wonder if this is possible in SAP without Material Ledger implemented. If yes - can it be achieved by using a standard functionality or does it require an additional development?
    Thank you,
    K

    Thanky you for your reply Ranjan,
    My intention was to show Cost center over/underabsorption broken down by cost componets (activity Labour, Machine, Overhead). Currently it is shown as a balance on cost center. I would like to be able to recognize which part of Direct manufacturing CC balance refers to Labour, which to Machine and which to Overhead. Is it possible to achieve in sandard report or additional settings/development is required.
    Regards,
    Karol

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar

  • S_ALR_87013643 Cost Center Report - Range Orders

    Hi,
    I am executing T Code S_ALR_87013643, which is based on Cost Center, Cost Element and Order. I am restricting the selection for 1 Production cost center and 1 Production Order.
    The cost center section of the report is displaying costs against the particular cost center. However, If I see the credit given to the cost center, the credit values include all production orders against the cost center.
    If I see the Order section of the report, I am able to see the debit and credit only to the extent of the relevant production order.
    So the credit in the Cost center and the debit in the Production Order does not match.
    Please let me know if I need to do something to arrive at the correct display in the report for better analysis..

    Hi gay
    Why don't you display the costcent report and product order report one by one?
    BR
    Thomas

  • Separate gl account for cost center for movement type 201

    HI Guys,
    I have a the following problem:
    There are three main functional areas i.g
    Production - (Cost Center 10001)
    Sales - (Cost Center 10002)
    Admin - (Cost Center 10003)
    In obyc we use 5 types of valuation classes like three sets different for production, Sales and Admin
    Production
    P-Electrical (GL Account 50001)
    P-Tools (GL Account 50002)
    P-Oil Lubes (GL Account 50003)
    P-Bearing (GL Account 50004)
    P-Belts (GL Account 50005)
    Sales
    S-Electrical (GL Account 60001)
    S-Tools (GL Account 60002)
    S-Oil Lubes (GL Account 60003)
    S-Bearing (GL Account 60004)
    S-Belts (GL Account 60005)
    Admin
    A-Electrical (GL Account 70001)
    A-Tools (GL Account 70002)
    A-Oil Lubes (GL Account 70003)
    A-Bearing (GL Account 70004)
    A-Belts (GL Account 70005)
    I want use 5 series gl when I use Production valuation classes, 6 series when I use Sales valuation classes and 7 series when I use Admin valuation classes in VBR general modification but system allows me to use standard valuation classes.
    please how I can get this problem get solved that the concerned GL accounts must be hit for proper allocation of expenses by areas.
    Thanks
    Ahmed

    Hi
    I think i have to rephrase the question .
    When you do a goods issue via migo and movement type 201 the user should not be allowed to input the GL account as it should be automatically determined through valn class setting in GBB-VBR.
    But in my case the system is also giving the GL account field as available to user for input .This is wrong .
    How to make this field suppress / greyed out is the problem ?

  • Cost center catogery

    why we are giving cost center catogory at the time of cost center creation. what are the impact will come due to assigning cost center category. now we have give Categary T for all cost center. now we anted to create cost center for each and every department to see indivudial expenses. for that what categary i have to give from the following and what is the use to give catergory
    9     Allocation
    A     Administration
    G     Logistics
    L     Management
    M     Material
    P     Production
    S     Service
    T     Sales

    Hi Laxmi,
    The master data of an activity type includes one or more cost center categories. The activity type may be used only by cost centers of the appropriate categories (for all those cost centers with that Cost Center Category)
    For example, you created two Cost Centers A and B. In A's master data, Cost Center category is "P"(Production) and B's master data, Cost Center Category is "M"( Maintenance).
    Now, you are creating the master data for Activity Type "labour Hr". In that master data, you need to mention the Cost Center Category. If you give "P" there, that means that Activity Type can be linked (planning in KP26) to Cost Center "A" only....
    We define categories in Customizing. For each category, we can define default values for the "Lock" and "Record quantity" indicators, for transfer to cost center master data. We need to maintain these indicators only if the entry diverges from the default cost center category.
    In addition, we may use the categories for reports and evaluations.
    Examples
    Production cost center
    Service cost center
    Administration cost center
    Pls revert back for further explanation...
    Srikanth Munnaluri
    Edited by: Srikanth Munnaluri on Feb 25, 2009 6:46 PM

  • Production cost in SAP

    Hi,
    i have calculated the standard price of product in SAP. but at the end my production cost seems very high and i don't understand why
    this is what i did:
    first i upload the budget in the system in KP06 for the full year
    i upload the quantities of activities in KP26 for the full year also
    then i run the assessment cycle to bring the budget at the level of the "production cost center"
    then i splitted the budget per activity in KSS4, to get the budget of each activity/cost center.
    i calculated the price of activities in KSPI.
    then i run CK40N, to calculate the standard price of the different product.
    but my problem is that:
    why when i make the sum of all the production cost for all the product, i don't find again the initial budget i put in the system?
    thanks for your comments

    Hi SAPXPT,
    Try transaction RKACSHOW, see note 28145. RKACSHOW shows all the tables that are updated on an order.
    Regards,Declan

  • Cost Center overlapping

    Hi,
    We have created one Cost Center AAA under production group. Before post the documents we have deleted AAA cost center. It is showing Red Mark symbol in OKEON(Cost Center Standard Heirarchy). After we have created AAA(same code deleted cost center) cost center under Research Group. When we save the cost center master data, it is showing under Production group and Research group in activation mode of OKEON(CCH). We have posted some documents to this cost center.
    Now we want to create the new group under CCH. But the system showing the below error
    Inserting of the object (Cost Center Group: HOLDINGS) is not possible
         Message no. OH021
    Diagnosis
         Inserting object (Cost Center Group: HOLDINGS) is not possible. The
         object contains values/intervals that would lead to overlaps with
         already existing values/intervals.
    Procedure
         If you still want to insert the object, you have to make sure that the
         join of sets of the values/intervals is unique. Before you insert,
         change object HOLDINGS or the object you are processing.

    Holding CC group not created. When we open the OKEON in Extras option and select the Ambiguity check. The following message showing.
    Values occuring more than once:
    Overlapping area>Included in Group>Row>Description
    ATR - ATR>RODUCTION> <003> > Production Cost center Group
                      RESEARCH > <001>  >Research Cost center Group

  • Material Issue to cost center which are not allocated to ML

    Dear Experts,
    We have a senario, Material issue to the cost center and through activity type the cost updated in production order, Client wants when reu  CKMLCP the same should  be updated in ML, and also revaluate actual activity price and updated in cost center.
    Please help to solve the issue.
    Thank you

    Hi Nuki
    I hope this material is not price control = 3/S (standard) and also the cost center is not productive type.
    If you consume material with standard price to production cost center it will start a looping in activity calculation and at month end there will balance in this cost center.
    Well I hope I helped you.
    Regards

  • External Service Order PO in Product Costing

    Hi,
    We have Sales Order Costing process which is done on Sales Order level. During Sales order creation and save, costing is calculated automatically. Based on Sales Order MRP Run is generated and Production Order is made on the basis of Sales Order. We have requirement of External Service Purchase Order need to be flow in product costing. Already we have done external service order purchase order through production cost center and it has done GRN and vendor invoice. GRN value has flown to production cost center. next step I have doubt. In Costing variant under valuation variant - External Processing strategy sequence is done as "Net Purchase Order Price". What are the other settings are required ?
    So I would request you, please guide me how external service order purchase Order can be shown to product costing ? If I want to show this external po value to costing sheet during sales order costing how it can be introduced ?
    Best Regards.
    Samrat Roy

    Hi,
    I am able to resolve this issue by myself.
    Thanks,
    Prithwiraj.

  • Assessment Cost Center ??

    hi all,
    In controlling what is the meaning of assessment cost center... Mainly in internal activity allocation why the need of this cost element arises ?? (we include the secondary cost expence in Internal activity allocation)... at thye time of distribution why the need of this assessment cost element seperately ???
    thank you...
    Padmini

    Assessment functionality is used for transferring cost from one cost center to another cost center, say service cost center to production cost center. Also for transferring the cost one is not interested in having the break up of cost transferred i.e. individual cost element wise transfer is not required and the same can be combined while transferring.
    Assessment cost elements also helps in having identification of own and apportioned cost on the cost center.
    Hope this helps.
    Regards
    Rakesh Pawaskar

Maybe you are looking for

  • Difference between  exists and in operators in oracle?

    what is difference between exists and in operators in oracle? what is faster and why?

  • 16GB HYNIX for my MacBook Pro late 2011

    It is taking me so long to find a 16GB memory by hynix (8X2) to install in my Macbook Pro late 2011 . 2.4 GHz Intel Core i7 . 1333MHz DDR3 . Need a to upgrade and i think that i need a 204PINN SODIMM DDR#-PC3-10600 .cl9 Unbeffered.NON - ECC 1.35V.102

  • MacBook Pro and Dell N5010 Ram Swap?

    Hi guys I don't know much about this subject so any help would be great. I have a Macbook Pro 13 inch with Lion, 4GB of Ram which is basically the early 2011 model and my mom wanted to buy a laptop so she bought a Dell N5010 with Windows 7 and 8GB of

  • Photoshop 9 stopped working properly. Need help

    Several features on Photoshop 9 have stopped working. The program will not update. Basically, can't use the program. What would be my next step?

  • Infinity blade 2 progress lost

    My infinity blade 2 progress was saved on my i cloud. I updated my ipad to a newer version all apps were deleted and reinstalled ,i backed it up to.now the game wont continue from where i left,i have to start a new game,can somebody help me please wi