Product hierarchy IN MATERIAL MASTER ?

Hi experts
Can some body explain me about the Product hierarchy in material master under basic data view .??
Explain me about the purpose of Product hierarchy??
Which ind of industries will do with Product hierarchy??
And What the configuration has to done and where ??
What are the tyransaction in front to maintain the Product hierarchy??
In short without any links can some body explain ../
Many Thanks

Implement the Product Allocation Functionality
We are required to implement product allocation functionality in SAP R/3 (Enterprise Version). 
We tried to do the elaborate steps as per the implementation guide but are not successful. Can you kindly help by giving the simple steps for implementation. 
Please see if the following helps: 
Configuration Overview; Allocation Specific Usage 
1.Allocation Procedure (OV1Z) The product allocation procedure is the parent of the entire allocation process. All materials that are to be included in the allocation scheme are required to have an allocation procedure assigned to it in the material master. In addition, as of release 4.0, it is in the procedure that the method of allocation is defined. The user has the opportunity to set an indicator to identify their choice of two different methods (discrete and cumulative allocation) to evaluate the quantities to be considered for product allocation. 
2.Allocation Object (OV2Z) The allocation object is the root level of the allocation process where actual data is entered and planned in LIS. The object allows the user to further break down a procedure into smaller parts for future validation of components comprising a specific material 
3.Allocation Hierarchy Mapping (OV3Z) Primarily, this transaction permits the assignment of an allocation procedure to an LIS information structure. Secondly, a character is assigned to the information structure to permit collective planning. Finally, the user can assign a step level to the procedure and information structure to sequence the order in which allocation quantities are checked. This functionality allows the user the opportunity to check product allocation against several product allocation scenarios, before the required quantity is confirmed 
4.Define Consumption Periods (OV5Z) The allocation consumption periods functionality is only valid if the allocation method flag has been set (OV1Z). If you have de-selected the method field, this functionality is not available. The consumption window indicates the number of past and future periods to be used in the allocation check. 
5.Control Product Allocation (OV4Z) In order for the allocation process to function properly, allocation control records are created primarily to map allocation procedure steps to their corresponding objects so that the allocation data records can be located for validation. Secondly, validity periods must be established to indicate when the allocation control records are active. Finally, the user has the option of establishing a conversion factor per allocation control record to accommodate BOM listings of constrained materials 
6.Activate Allocation for Requirement Class (OVZ0) In order to turn on allocation in the standard order processing functionality, the requirements class must have a flag indicating that allocation is relevant. 
7.Activate Allocation for Schedule Line Category (OVZ8) In order to turn on allocation in the standard order processing functionality, the schedule line must have a flag indicating that allocation is relevant 
8.Create Planning Hierarchy (MC61) In order to adequately establish allocation quantities, the user must initially determine the level at which the allocation is to take place and the aggregation factor of the allocation quantities. In this step, the levels for the collective allocation search procedure are also identified. 
9.Generate Masking Character (OV7Z) Upon completion of the level determination for the planning hierarchy, the collective allocation masking character must be generated to allow aggregation indicators to be established. This transaction simply reads the hierarchy established in the planning table and then generates a collective mask character for each level of the hierarchy 
10.Modify Planning Hierarchy (MC62) This step is a repeat of MC61 where the initial hierarchy was established. In order to complete the hierarchical set up, the collective allocation (mask character) hierarchy must now be maintained with the appropriate aggregation factors 
11.Allocation Procedure Assignment to Material Master (MM02) At the root level of the allocation process are the materials. Each material that is to be considered in allocation scenario must be mapped to an allocation procedure. In order entry, then, when a material is entered with a valid allocation procedure in the material master, the allocation data is verified prior to confirming the line item ordered 
12.List of Suitable Structures (OV9Z) This report is used to identify potential LIS information structures that can be used in the product allocation process. This report simply reads through the data dictionary and selects all the active information structures that contain the field product allocation object (KONOB) as the first field. This data can then be utilized in the mapping transaction (OV3Z) to link the allocation procedure step to an information structure (previous step).

Similar Messages

  • Mass change in In house Production Time in Material master

    Hello Frinds,
    I am dooing mass change in Inhouse Production time in material master By using MM17
    field is MARC-DZEIT
    i am putting Material ,Plant & in house Production time & after execution it shows following MSG.
    No data meet the selection criteria
    Message no. M&107
    Where i m wrong weather my Varient is not created Properly  ,Pour some light on it ,if i m wrong tell me the way of dooing mass change in ECC6.0 ,LSMW & DBC is next Option ,i want to do it with MM17
    Regards ,
    Girish

    Dear Girish,
    Goto MM17--->click on Fields tab page,select the field MARC-DZEIT and then clcik on execute button.
    In the next screen,either input the material ,plant combination or else input the plant and click on
    execute button.
    Now enter the inhouse production time in the new values say 2 days,Either select the materials for
    which this new change has to be made or else select all the list of materials and click on mass change
    icon and check the results and save the datas.
    Regards
    Mangalraj.S

  • 3 level of Material Hierarchy in Material Master in SAP R/3

    Hi,
    We have a requirement wherein we require 3 level hierarchy in all materials created. We have taken Material Type as the 1st Hierarchy. Now we are left with material group which can be the second hierarchy.
    I looked into the possibility of material classification but it was not solving our purpose as there is no standard SAP reports for inventory which takes material classification as an input.
    For your reference I will give an example.
    1st hierarchy = Food ( Material Type )
    2nd hierarchy = Dry Foods ( Material Groups )
    3rd hierarchy = Bread
    I am not being able to accommodate the third level in my material master. I know we can use product hierarchy but there are no inventory reports based on product hierarchy. We also don't have IS Retail.
    Please suggest what can be done about the solution.
    Thanks

    Many different suggestions, however I cannot imagine how those suggestions can help to get an inventory report.
    check the availabe inventory reports and see what selection criteria they have, e.g. MB52
    I think you just have to develope an own report to get what you want.
    And when you do this, then you can use classification for your hierarchy or product hierarchy, which is just one field instead of 3 different fields.
    The classification is the only option that is considered in F4 search help without any modification.
    And using multiple selection button for material number  in the inventory reports may enable you to select all materials of a hierarchy based classification

  • In house production time in material master .

    Dear All ,
    What will happen if i do not enter ( keep blank ) the inhouse production time in MRP 2 view ?
    Where i am using routing for all inhouse produced material . all the scheduling parameter are correct as per routing considered .
    i have checked the scheduling in routing for these material , scheduling appearing correctly . So this is supposed to be copied as it is in the planned order --> prodn order ( it is happening ) .
    So if i do not use in house production time field in MRP2 what will happen ?
    Pl guide

    Hi,
    It is the time to produce a product in a plant in no.of days.
    In-house production time:
    Specifies the time in workdays needed to produce the material in-house.
    In-house production time is independent of the order quantity.
    Use:
    The system requires the in-house production time to determine the planned dates for planned orders in materials planning.
    Procedure
    You can define work scheduling times in the material master record in one of two ways:
    Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
    Or you enter the setup, tear down, processing, and inter operation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
    Production Planning and Control (PP)
    The time required to produce the material in your plant.
    You can enter the in-house production time depending on the order quantity or independent of the order quantity. It is calculated by adding the lead times of all operations, the float before production, and the float after production.
    I hope it helps you. Any queries please revert me back.
    Regards,
    Madhu.G

  • In house production time: Routing/ Material Master.

    Hello All,
    For a semifinished product with procurement type as "E", thr is a tab for entering in house production time (lot size independent). While creating the material master, i leave it blank. Also, i create a routing for the material.
    Please tell me how can i get the in house production time in work scheduling view, updated from Routing.?
    Regards,
    Chetan.

    hi chetan,
        if you want to update the lotsize dependent inhouse production times, below is the steps for execution.
    1. Maintain Processing time in Routing Operation details screen.
    2. Then go to Operation overview screen in Routing, In menu go to Extras -- >Scheduling ---> Choose Schedule. Scheduling
    pop up screen will appear.
    3.Enter the scheduling type, lot size and dates for the corresponding scheduling type.choose continue, on the next pop up
    enter the overview variant and choose continue.
    4. In scheduling Overview screen choose the operation and select Scheduling result tab on the next pop up choose Update
    material master tab.
    5. Choose continue and save the routing.
    6.Then go to CA96 enter the plant and choose continue, on the next screen select the scheduling result and choose Update
    material master tab.
    7. Go to Material master ---> Work scheduling view you can see the In house production is updated.
    regards,
    sree

  • Error in making production version in material master..

    the error is: to date is in the past.
    Scenario: i am trying to maintain production version in the material master for finished material. this error is coming for each material. Pls help. points on the helpful answers..

    Dear,
    Go to the MM02-MRP 4view clik on production version her you need to maintain the validity from From-To date as toadys date say11/11/2008 to 31/12/999 then double click on it then maintain the details like routing, bom and do the consistancy check if green light appear it means your PV is correct.
    Regards,
    R.Brahmankar

  • Production Version in Material Master

    Hi,
    I am having problems with this.
    I need to either change date on a production version or
    delete the product version.
    I have tried using a batch input sequence from my program both for changing the date
    and for deleting the production version and this all works well.
    Now this isn't good enough since there can be multiple production versions on a material
    and I don't know which line to change or delete in the batch run.
    Is there a good FM or BAPI to handle this?
    I don't want to change the MKAL table directly since there is a history table
    connected to this also (MKAL_AEND).
    What is the best approach?
    Rgds,
    /Fredrik.

    How can I use this to achieve what I want to do, either
    change the production version date or delete the production version?
    I have tried C223, but this is not good enough, nor is batch run in MM02.
    I can have multiple production versions and can not pick the correct line
    in batch run to change or delete.

  • Product Hierarchy Derivation in COPA

    Hi Gurus,
    We have 6 levels of Product hierarchy defined in the system and I am able to include it in the data structure. The related Characteristics are PAPH1,PAPH2,PAPH3,PAPH4,PAPH5,PAPH6 included in my operating concern. Level 1 has 1 character in number and rest of the levels has 3 characters each in number as follows.
    Level 1--1 Number of Character
    Level 2--3 Number of Characters
    Level 3--3 Number of Characters
    Level 4--3 Number of Characters
    Level 5--3 Number of Characters
    Level 6--3 Number of Characters
    Hence all together the total number/length is 16.
    Now, when I generated the operating concern,the derivation rules for product hierarchy are created automatically as follows.
    Following is the screen shot for source field if I open step number 22
    The corresponding screen shot for Target field is as follows
    For step 23 , the source field details are same as step 22 but target field details are as follows
    We have assigned Product hierarchy in Material master in tab Sales:Sales Org 2 which is 16 digits.
    Now when I try to test the derivation rule for step 22, system gives me following error
    =================================================================================
    Characteristic value   010 does not exist for characteristic PAPH2 (ProdHier01-2)
    Message no. KE0C133
    Diagnosis
    The characteristic "PAPH2" ("ProdHier01-2") should be posted to Profitability Analysis (CO-PA). When the system checked the entries, it was established that the transferred characteristic value ("  010") is not valid in CO-PA.
    System Response
    The data is not consistent and therefore cannot be transferred to CO-PA.
    Procedure
    With the function Maintain Characteristic Values, you can add characteristic values to those that are valid.
    ==================================================================================
    I am getting the same error for all steps in test mode. How to fix this error? Do I need delete the PAPH1--PAPH6 characteristics and use the user defined characteristics and write derivation rule again? Also I want to know the use of steps 28 to 31 (clear) in this regard.
    I have not included characteristic PRODH in my data structure. Do I require to include it in my Operating concern?
    Regards,
    makrand

    Dear Ajay,
    Hearty Thanks for the solution. As suggested by you, I removed "move" steps and defined the Table Lookup" steps.
    There are two target entries i.e MVKE (Origin) table and the field name is PRODH (Product Hierarchy) which is equivalent to second target entry COPA (Origin) field (PAPH1 -----to PAPH6) in the same line.
    In field PRODH,I used offset position. I selected "Entire Field Contents" and kept character position as 0 and kept total characters as 16 in each table lookup entry.
    Again I have to make offset settings in PAPH1---PAPH6 fields. I selected "Entire Field Contents" tab and system automatically changed the field length for PAPH1 to PAPH6. Now the results are correct.
    I arrived at solution after making some combinations in offset. Thought, this may be useful for somebody facing the similar issue.
    What's the use of "Clear" steps which are generated by system?
    Thanks and regards,
    makrand

  • Maintain product hierarchy

    Hi Expert,
    How do i maintain product hierarchy in material master? Our product hierarchy has few categories, i want to maintain the last node.How will i do that? Can anyone please guide me?
    Thanks

    Hi,
    Go to T-Code V/76 to maintain Product Hierarchy.
    Also refer following links;
    [How To Configure Product Hierarchy|http://www.sap-basis-abap.com/sd/how-to-configure-product-hierarchy.htm]
    [Define Product Hierarchies|http://help.sap.com/saphelp_46c/helpdata/en/77/1a39516e36d1118b3f0060b03ca329/content.htm]

  • Customer Hierarchy and product Hierarchy

    Hi friends what is customer Hierarchy and what is product hierarchy?
    please explain step by step with examples.
    mail id: [email protected]
    Thanx.

    Hi Sirivas,
    CUSTOMER HIERARCHY:
    Customer hierarchies are available in Sales and Distribution, so that you can create flexible hierarchies to reflect the structure of customer organizations. If your customer base includes multi-level buying groups, cooperatives, or chains of retail outlets, for example, you can create hierarchies to reflect the structure of these groups. Use customer hierarchies during sales order processing and billing for determining pricing and running statistics.
     A customer hierarchy consists of nodes.
     To create a customer hierarchy:
    1. Create master records for each node.
    2. Assign the nodes to each other.
    3. Assign the customer master records to the relevant nodes.
     Hierarchy nodes are only valid for a certain period of time. They may also be moved. If a node is moved, the system automatically reassigns all related nodes and customer master records.
    With customer hierarchies, you can assign price or rebate agreements to a higher level node. The agreements are then valid for customer’s at all subordinate levels to this node. You can create pricing condition records for each node indicated as relevant for pricing. If one or more nodes in the hierarchy path of a sales order contain pricing information, the system takes them into account automatically during pricing.
    'How to check'
    All the customizing is in SD/Master Data/Business Partner/Customers/Customers hierarchy
    All the customizing is in SD/Master Data/Business Partner/Customers/Customers hierarchy
    1) Define hierarchy type: just put and ID and a name to the new hierarchy.
    2) Set partner determination: if you want to user the hierarchy in price determination, then, in the orders, at the header level, you have to have a Partner Procedure with a partner function for each level. In the partner procedure, in each partner function you must indicate the source partner function. With this information, in the order, you obtain the business partner for each partner function.
    3) Assign account groups: you indicate which accounts groups are allowed for being part or your hierarchy.
    4) Assign sales areas: simple you indicate which sales areas are allowed in your hierarchy. (Here you can customize common sales areas, just for not having to build de hierarchy in all the different sales areas).
    5) Assigning hierarchy type for pricing: you indicate which classes of documents uses hierarchy in pricing determination.
    It is possible to maintain so called customer hierarchies. This might be useful when for example you create a condition discount for a customer that is part of such a hierarchy structure. All subnodes in the hierarchy below that customer, will thus receive the same discount.
    Customer hierarchy setup, firstly decide the hierarchy type to be used.
    The standard is type A.
    You can also assign a partner function to the customer so that the higher level customer in the hierarchy is copied into a sales order as a partner function - but you don't need that right?
    Next assign your customer account group to the hierarchy type. And enter the combinations that will be allowed for creating the hierarchy.
    You want to assign a ship-to to a payer. So enter the ship to account group and enter the payer account group as the higher level.
    You must also make an entry for permitted sales area assignments. So if you want to a hierarchy for customers in the same sales area then enter the sales area and enter the same one as the higher level sales area.
    All these settings can be found in the IMG. Under SD - master data - business partners - customers - customer hierarchy
    You use for example customer hierarchy when you have an company like Unilever and you agree both on a discount. Unilever does have different locations / businesses and you have to maintain the discount for all customers. If you use a customer hierarchy you can maintain the discount for the partner in the top of the hierarchy and in this way it will be valid for all customers in the hierarchy.
    Product Hierarchy:
    The product hierarchy on the Basic Data screen is used to depict the competitive materials of competitor 1 in relation to those of competitor 2. Here, your own company and its materials are also regarded as a competitor and as competitive materials respectively. You can use this representation as a basis for market analyses.
    Normally we enter competitive materials using material type WETT. When entering your own materials as competitive materials, you can, however, display the product hierarchy on the Basic Data screen for other material types too.
    Requirement type determination is based on the "Origin of requirement type in requirement type determination"
    In this field you can select an alternative search strategy (source):
    Source 0 = Material master strategy, then item category and MRP type
    Source 1 = Item type and MRP type strategy
    Source 2 = Item type and MRP type strategy (as for source 1) with additional check of the allowed requirements type
    e.g. If you set value "0" system will first strategy group in material master based on that it will determine requirement type and no value found then it will determine requirement type based on item category and MRP type.
    Above settings can be found at SD --> Basic Functions --> Availability Check and transfer of requirement --> Transfer of Requirement --> Determination of Requirement type using Transaction
    For make to order std strategy group 20 is used to which req type KE is assigned.
    Check
    Check in Tcode OVZH, what requirement class is assigned to your requirement type
    Check in Tcode OVZG, what value is assigned to field "Consumption" in requirement class because that determines consumption posting.
    The product hierarchy is used to group materials by combining different features. It is used for analyses and pricing. A product hierarchy can consist of up to Eighteen characters. Its features can be combined in various ways.
    Example: A dishwasher can be described by product hierarchy 000010000200000002. This series of characters states that dishwashers belong to the category electrical appliances (series of characters 00001, position 1-5), and also to wet appliances (series of characters 00002, position 6-10) and, finally, to dishwashers (series of characters 00000002, position 11-18).
    One can maintain the product hierarchy via transaction "OVSV" and "V/76.
    Path = IMG-Logistics General-Material master-Setting for Key fields-Data relevant to SD-Define Product hierarchy.
    The product hierarchy is maintained in the Basic Data view of the material master record, and is used for evaluation as well as price determination in materials management.
    The standard SAP allows only 3 levels, but you can go up to 6 levels, for additional 3 levels u will have to take abapper help and add 3 more fields and corresponding data element into structure. So that in material master drop down you will see 6 levels.
    The transaction which will be useful to change product hierarchies for material master will be V/76.
    Yes, You can print the levels of the product hierarchy through a report.
    Use the view SE16 - V_T179 (Table Name) to display Product hierarchy with level numbers.
    Field Name is PRODH
    Please Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Error MM335 when trying to change profit center on material master record

    We are trying to change the profit center that is assigned on the u201CSales: general/plantu201D tab in the material master (same as what shows on the u201CCosting1u201D tab of the material master).
    The following error message appears:  u201CYou want to change the profit center but there are still material stocks u2013 Message no. MM335.u201D
    Our SAP version is SAP ECC 5.0 with support pack 19.
    This particular material that we are trying to change only exists within one plant and one storage location in SAP.
    I have done the following in order to try and resolve this issue:
    1. Removed all inventory from the inventory management and warehouse management side for the material.
    2. Closed all open purchase orders and process orders for the material.
    3. Looked at the MD04 screen to verify there are no outstanding documents for this material.
    I also searched for OSS notes and found note #1249513 which was applied to our sandbox environment.  This note did not fix our problem.
    I had a developer to debug the code that is being triggered upon making a profit center change.  Two important pieces of information he found is that the SAP code is:
    1. Looking to see if the u2018New G/Lu2019 is turned on and u2018profit centeru2019 is active in the new G/L.
    2. Looking to see if previous period stock exists for the material.
    The code is then setting a flag which causes the error message to appear.
    I have found other comments in the forum stating to change the error to a warning for message MM335.  I believe this is not the correct solution; as this would allow a change to a profit center even if stock exists, open orders exist, etc.  I also know we could trick the system by temporarily changing the message to a warning and sending that through to production, changing the material master and following up with a transport to change the message back to an error.  This would work, but we want a final resolution to this problem.
    I believe that 2 OSS notes that were included in our latest support pack upgrade has caused this problem.  Those notes are: 1057674 and 1106510.
    I plan on opening a note with SAP, but was wondering if any users have experienced this same problem after a recent support pack upgrade.
    Regards,
    JH

    Following is additional information regarding this problem.  We were able to successfully change the profit center on some of our materials by making sure there was no stock in previous period and current period (and no open sales orders, purchase orders, etc.).
    - JH

  • Updating in-house production time in mat master

    Hi, we have not maintained in-house prod days in material master for all materiasl. pls advise do we need to run ca97 t-code after uploading all fert materials in production server? is there any other method.

    Hi,
      For updating in house production time in material master you have to follow the procedure,
    1. Maintain Processing time in Routing Operation details screen.
    2. Then go to Operation overview screen in Routing, In menu go to Extras -- >Scheduling ---> Choose Schedule. Scheduling   
        pop up screen will appear.
    3.Enter the scheduling type, lot size and dates for the corresponding scheduling type.choose continue, on the next pop up 
         enter the overview variant and choose continue.
    4. In scheduling Overview screen choose the operation and select Scheduling result tab on the next pop up choose Update
         material master tab.
    5. Choose continue and save the routing.
    6.Then go to CA96 enter the plant and choose continue, on the next screen select the scheduling result and choose Update
       material master tab.
    7. Go to Material master ---> Work scheduling view you can see the In house production is updated.
    Regards,
    Muthamil

  • Product hierarchy in the material master record

    Hi,
    I am handig Data migration project.
    This is related to Product Hirerarchy.
    I one business Product Hirerarchy have been configured. But in another buisiness, Product Hirerarchy has not been configured.
    There are some common materials using by both business processes.
    For coomon mateials  if I am maintaining Product Hirerarchy value in the material master record, is there any impact on business which is not being used Product Hirerarchy. Whether it will stop / impact on business processes.
    Can you explain plz
    Thanks in advance
    Regards

    Hi karthink,
    Thanks for your inputs.
    we are meging two servers. In that in one server, product highrechy have been configuredand in another server not configured.
    There are some materials with the numbers calling as a common parts exists in both servers.
    ex: plat 0001 in one server 1         &          plant 0002 in server2
    Common part is : m1
    plant 0001  not using product hierarchy and plant 0002 not using product hierarchy,.
    After golive, all the common parts are being used by both plants and same basic data 1 view.
    If we are maintaing product hierarchy in the basic data 1 view, it will flow into sales view as well.
    Then what about impact on the plant 0001 business since it is not using product hierarchy.
    In the configuration, is there any settings to activate / deactive product hierarchy at sales area level.
    Is there any impact on MM / FICO side.
    Please explain.
    THANKS IN ADVANCE.
    Regards
    KRK

  • Product  Hierarchy Levels in the material Master.

    Plz let me know the Levels to which product hierarchy can be maintained for a Finished good in its Material Master.
    What I know it is 9 and is limited to 18 characters.
    The T- code for it is v/76, and is maintained thru it, but while I am trying to maintain 4th level it is automatically taking 3rd Level. please point out the mistake which i must be doing.

    Hi
    As per standard SAP allowed up to 3 steps only
    Here i am furnishing small example
    1 step allowed 5 digits - 00001-  Electronics
    2  Step allowed 5 digits-  00001 - Home Appliances  
    3 step allowed 8 digits- 00000001- Steam iron
    The above hierarchy can be assigned in material master as 000010000100000001

  • How to extend material master product Hierarchy

    Hi,
    How to extend material master product Hierarchy
    Define Product Hierarchies (SAP Library - Material Master)
    In SAP help, the procedure is given, But in procedure we need to change standard structures and data elements.
    Need to know, This is only the possibilty?
    Need to change structure and data elements by Access key only or there is some other way.
    Regards
    Sukumar

    Hi,
    Use t.code:MM01 and in Copy From Field Give Material No ( u wan to copy) and in Next Screen Give Extending Plant & Storage Location and in Copy From Fields give Reference Plant & Storage Location.
    For more check the links for material extension.
    http://www.copacustomhelp.state.pa.us/infopak/nav/procurement/pr%20master%20data/file1434/index.htm
    http://www.copacustomhelp.state.pa.us/infopak/standard/fastpaths/mm01_content.htm
    Regards,
    Biju K

Maybe you are looking for

  • Safari doesn't load pages, Not able to quit Mail.

    Hi, I'm having real troubles with my Safari an Mail. Hope that there is anyone out there knowing what is going on. safari always starts to load the page but then freezes and stays like that forever. there is no colored ball circling around and it doe

  • Report the latest  event (record) for a device

    I could have sworn I had this one working before but for the life of me I cant remember how I did it and I cant seem to figure it out anew. I'm tracking events per device. A device may have any number of events in a given time period. I need to track

  • Moving rented movies to Apple TV

    I rented a movie on my IMac but when I tried to watch on my Apple tv it doen't appear. i can see the ones I've bought but not the ones I rent. How can I watch rented movies on apple tv?

  • Please help me my iPad freezes all the tine.

    O.K. so my iPad is cracked, but that can't be the reason why my screen completly freezes. I don't know why it does this. If you could tell me how to prevent this from happening or how to fix it without having to restore my iPad on the computer everyt

  • Apps starting at login always start offline?

    Hi there, I have a couple of apps that are starting at login. Although every time I start my Mac, the apps start, they always display a notification that there is no internet connectivity. Is there any way to make the apps start only when there is in