In house production time in material master .

Dear All ,
What will happen if i do not enter ( keep blank ) the inhouse production time in MRP 2 view ?
Where i am using routing for all inhouse produced material . all the scheduling parameter are correct as per routing considered .
i have checked the scheduling in routing for these material , scheduling appearing correctly . So this is supposed to be copied as it is in the planned order --> prodn order ( it is happening ) .
So if i do not use in house production time field in MRP2 what will happen ?
Pl guide

Hi,
It is the time to produce a product in a plant in no.of days.
In-house production time:
Specifies the time in workdays needed to produce the material in-house.
In-house production time is independent of the order quantity.
Use:
The system requires the in-house production time to determine the planned dates for planned orders in materials planning.
Procedure
You can define work scheduling times in the material master record in one of two ways:
Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
Or you enter the setup, tear down, processing, and inter operation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
Production Planning and Control (PP)
The time required to produce the material in your plant.
You can enter the in-house production time depending on the order quantity or independent of the order quantity. It is calculated by adding the lead times of all operations, the float before production, and the float after production.
I hope it helps you. Any queries please revert me back.
Regards,
Madhu.G

Similar Messages

  • Mass change in In house Production Time in Material master

    Hello Frinds,
    I am dooing mass change in Inhouse Production time in material master By using MM17
    field is MARC-DZEIT
    i am putting Material ,Plant & in house Production time & after execution it shows following MSG.
    No data meet the selection criteria
    Message no. M&107
    Where i m wrong weather my Varient is not created Properly  ,Pour some light on it ,if i m wrong tell me the way of dooing mass change in ECC6.0 ,LSMW & DBC is next Option ,i want to do it with MM17
    Regards ,
    Girish

    Dear Girish,
    Goto MM17--->click on Fields tab page,select the field MARC-DZEIT and then clcik on execute button.
    In the next screen,either input the material ,plant combination or else input the plant and click on
    execute button.
    Now enter the inhouse production time in the new values say 2 days,Either select the materials for
    which this new change has to be made or else select all the list of materials and click on mass change
    icon and check the results and save the datas.
    Regards
    Mangalraj.S

  • In house production time: Routing/ Material Master.

    Hello All,
    For a semifinished product with procurement type as "E", thr is a tab for entering in house production time (lot size independent). While creating the material master, i leave it blank. Also, i create a routing for the material.
    Please tell me how can i get the in house production time in work scheduling view, updated from Routing.?
    Regards,
    Chetan.

    hi chetan,
        if you want to update the lotsize dependent inhouse production times, below is the steps for execution.
    1. Maintain Processing time in Routing Operation details screen.
    2. Then go to Operation overview screen in Routing, In menu go to Extras -- >Scheduling ---> Choose Schedule. Scheduling
    pop up screen will appear.
    3.Enter the scheduling type, lot size and dates for the corresponding scheduling type.choose continue, on the next pop up
    enter the overview variant and choose continue.
    4. In scheduling Overview screen choose the operation and select Scheduling result tab on the next pop up choose Update
    material master tab.
    5. Choose continue and save the routing.
    6.Then go to CA96 enter the plant and choose continue, on the next screen select the scheduling result and choose Update
    material master tab.
    7. Go to Material master ---> Work scheduling view you can see the In house production is updated.
    regards,
    sree

  • Updating in-house production time in mat master

    Hi, we have not maintained in-house prod days in material master for all materiasl. pls advise do we need to run ca97 t-code after uploading all fert materials in production server? is there any other method.

    Hi,
      For updating in house production time in material master you have to follow the procedure,
    1. Maintain Processing time in Routing Operation details screen.
    2. Then go to Operation overview screen in Routing, In menu go to Extras -- >Scheduling ---> Choose Schedule. Scheduling   
        pop up screen will appear.
    3.Enter the scheduling type, lot size and dates for the corresponding scheduling type.choose continue, on the next pop up 
         enter the overview variant and choose continue.
    4. In scheduling Overview screen choose the operation and select Scheduling result tab on the next pop up choose Update
         material master tab.
    5. Choose continue and save the routing.
    6.Then go to CA96 enter the plant and choose continue, on the next screen select the scheduling result and choose Update
       material master tab.
    7. Go to Material master ---> Work scheduling view you can see the In house production is updated.
    Regards,
    Muthamil

  • Process order scheduling based on in-house production time.

    Hello!
    I have following problem. My SAP system is configured in that way that process oedrs are schedulled based on times saved in master recipies. When I input data to in-house production time in master data for materials and make new process order, this time is not
    taken into account.
    Where I have to change configuration to use in-house production time from material master data to make scheduling process orders.
    Regards
    Bogdan

    Dear
    Process Order /Production Order scheduling ( Lead Time Scheduling )  based on the Operation timings in the routing not based on the Material Master In house Production Time in Work Scheduling View .
    If you are loking for Basic Date Scheduling then it will happend based on material master , scheduling margin key  at material master level .
    It depends the selection of Schedueling indicator while excetion of MRP in MD02 .
    In case of Process order specifically , you need  to schedule the Master Recipe and check whether operations are getting scheduled, if it is not then you need to first the problem, which may be because of wrong "Forumla" or paramater assigned in resource or the resource is not maintained for Finite scheduling (capacity header).
    Master reciepe can be schedule in the change transaction C202, and from menu you would find the option to schedule the recipe .
    Also  check the OPU3/OPU5-Define scheduling parametres wether scheuling , adjust scheduling , scheuling type , logs all are in place .
    Check and revert
    Regards
    JH

  • CA96 update of in-house production time

    Dear PP Gurus ,
    I want to update material master for in-house production time with Routings lead times.
    The system update processing time (lot dependent) but I want to update the in-house production time (MRP2 view).
    Can you help me ?
    Thanks in advance

    I am confused.
    Routing is required for production order right. Why do you need this data for reorder point planning?\
    Are you producing this material depending on the reorder point planning?
    If so whether your production rate is independent of lot size? like you need 100 to or 1000 to, the time taken is same? is it true?
    Kinldy let us know your business scenario...looks to be intersting.

  • Planned delivery time in material master

    Is planned delivery time in material master considering holidays ? I mean when I say 7 days, is it one week and 2 days or only one week ?

    Dear Balaji,
    If you push F1 when your mouse is set on that field you will see that help says that PDT is defined as calendar days. However, you can carry out some changes:
    http://www.sap-img.com/materials/planned-delivery-time-as-workdays.htm
    About meaning of PDT:
    http://www.sap-img.com/production/calculation-to-determine-the-delivery-date-and-release-date.htm
    In addition to that link, you can use safety time as well (with this setting you can pull back in time the requested availabilty date during MRP run). You can also use PDT in info records if you have several source of supple for one material.
    BR
    Csaba

  • In house production time and delivery date on PO

    Hi Gurus,
    Can anybody please calrify the following for me? Plant A is procuring material X from PlantB via STO. The planned delivery time for the material in plant A is 21 days. The in house production time of the material in plant B is 3 days. When the STO is created, with a delivery date of 04/26/2010, based on the planned delivery time of 21 days, the material has to leave the plant B by 04/05/2010. But what what about the considertation of 3 days of inhouse production tiume in plantB. How does the inhouse production time play in picture?
    Thanks
    Anusha

    Hi
    Inhouse production time in Plant B is considered if there is a planned order or production order is created for material in plant B. If a STO is created in plant A, then system will check only planned delivery time in Plant A only. If you want some buffer, you need to use GR processing time in plant B.
    Regards
    Antony

  • In-house production time not considered in scheduling

    i have a material, with an in-house production time of 7. requirements date is today, May 23. as a sap standard, using backward scheduling, it shall see that the start day lies in the past, and should switch to forward scheduling, with May 23 as the start date, and may 30 as the finish date. however, the system only proposes a finish date of may 27. why is the system behaving this way?

    Hi,
    Please let us explain, where u have carried out  scheduling  ie  during the MRP or in Production order.
    I hope ur asking about Production order scheduling , inthat case system will not consider the Inhouse production time. Because lead time scheduling is carried in production order.
    Scheduling will be done for routing times not for In-house  production time.
    Pradeep

  • In house production time & MRP

    Dear All,
    What is in house production time? How it function during MRP run?
    Please provide some example against explanation.

    Hi,
    In house production time is a time in workdays (maintained in MRP2 view of MMR)  needed to produce the material in house. This time is either dependent / independent of the order quantity / lot size. This time is used to determine the planned dates of the planned orders in material planning. 
    The basic dates are determined only by the lot size independent in-house production time and independently from the order quantity.
    The floats are not included in the calculation of in house production time but actually form the part of in house production time.(The total floats are maintained through the inter operation time).
    Hope this will clear your doubt.
    Pavan

  • Product hierarchy IN MATERIAL MASTER ?

    Hi experts
    Can some body explain me about the Product hierarchy in material master under basic data view .??
    Explain me about the purpose of Product hierarchy??
    Which ind of industries will do with Product hierarchy??
    And What the configuration has to done and where ??
    What are the tyransaction in front to maintain the Product hierarchy??
    In short without any links can some body explain ../
    Many Thanks

    Implement the Product Allocation Functionality
    We are required to implement product allocation functionality in SAP R/3 (Enterprise Version). 
    We tried to do the elaborate steps as per the implementation guide but are not successful. Can you kindly help by giving the simple steps for implementation. 
    Please see if the following helps: 
    Configuration Overview; Allocation Specific Usage 
    1.Allocation Procedure (OV1Z) The product allocation procedure is the parent of the entire allocation process. All materials that are to be included in the allocation scheme are required to have an allocation procedure assigned to it in the material master. In addition, as of release 4.0, it is in the procedure that the method of allocation is defined. The user has the opportunity to set an indicator to identify their choice of two different methods (discrete and cumulative allocation) to evaluate the quantities to be considered for product allocation. 
    2.Allocation Object (OV2Z) The allocation object is the root level of the allocation process where actual data is entered and planned in LIS. The object allows the user to further break down a procedure into smaller parts for future validation of components comprising a specific material 
    3.Allocation Hierarchy Mapping (OV3Z) Primarily, this transaction permits the assignment of an allocation procedure to an LIS information structure. Secondly, a character is assigned to the information structure to permit collective planning. Finally, the user can assign a step level to the procedure and information structure to sequence the order in which allocation quantities are checked. This functionality allows the user the opportunity to check product allocation against several product allocation scenarios, before the required quantity is confirmed 
    4.Define Consumption Periods (OV5Z) The allocation consumption periods functionality is only valid if the allocation method flag has been set (OV1Z). If you have de-selected the method field, this functionality is not available. The consumption window indicates the number of past and future periods to be used in the allocation check. 
    5.Control Product Allocation (OV4Z) In order for the allocation process to function properly, allocation control records are created primarily to map allocation procedure steps to their corresponding objects so that the allocation data records can be located for validation. Secondly, validity periods must be established to indicate when the allocation control records are active. Finally, the user has the option of establishing a conversion factor per allocation control record to accommodate BOM listings of constrained materials 
    6.Activate Allocation for Requirement Class (OVZ0) In order to turn on allocation in the standard order processing functionality, the requirements class must have a flag indicating that allocation is relevant. 
    7.Activate Allocation for Schedule Line Category (OVZ8) In order to turn on allocation in the standard order processing functionality, the schedule line must have a flag indicating that allocation is relevant 
    8.Create Planning Hierarchy (MC61) In order to adequately establish allocation quantities, the user must initially determine the level at which the allocation is to take place and the aggregation factor of the allocation quantities. In this step, the levels for the collective allocation search procedure are also identified. 
    9.Generate Masking Character (OV7Z) Upon completion of the level determination for the planning hierarchy, the collective allocation masking character must be generated to allow aggregation indicators to be established. This transaction simply reads the hierarchy established in the planning table and then generates a collective mask character for each level of the hierarchy 
    10.Modify Planning Hierarchy (MC62) This step is a repeat of MC61 where the initial hierarchy was established. In order to complete the hierarchical set up, the collective allocation (mask character) hierarchy must now be maintained with the appropriate aggregation factors 
    11.Allocation Procedure Assignment to Material Master (MM02) At the root level of the allocation process are the materials. Each material that is to be considered in allocation scenario must be mapped to an allocation procedure. In order entry, then, when a material is entered with a valid allocation procedure in the material master, the allocation data is verified prior to confirming the line item ordered 
    12.List of Suitable Structures (OV9Z) This report is used to identify potential LIS information structures that can be used in the product allocation process. This report simply reads through the data dictionary and selects all the active information structures that contain the field product allocation object (KONOB) as the first field. This data can then be utilized in the mapping transaction (OV3Z) to link the allocation procedure step to an information structure (previous step).

  • Need info about Safety lead time in material master

    Hi,
    Safety lead time in material master is used to bring requirements forward.
    we define this time in terms of days.
    I tried to use this field, but system is not bringing the requirements forward.
    System is planning material as other raw materials.
    The requirement dates for raw materials without safety lead time and with safety lead time are same.
    Can anybody explain, how it works and how we can alalyze the results with example.
    Is there other settings we need to do ?
    Regards,
    Mahesh

    Hi James,
    Thanks for reply.
    I have defined safety lead time, in the MRP 2 view. But still, sytem is not bringing the requirements forward.
    Can you please tell me, is there any other setting I need to do ?
    Regards,
    Mahesh

  • In-house production time in MRP2 View

    Hi, Please advise what to mention in in-house production days field in mrp2 view, whether we need to mention the time required to  produce 1 part or any qty? please advise.

    Hi,
    Nice qns... but the answer would be a simple computation from the system. When it is lot-size independent, system just reads the value from IHPT, there is no calculation as such.
    But when it is lot size dependent, the system will compute the IHPT based on the values populated in the Lot-size dependent section of work-scheduling view.
    I would suggest instead of me writing a whole lot of stuff, take a material in your sandbox & do a simple test with a single operation routing. In the work center maintain formulas for Setup, Operation & in your routing maintain the hours for activities setup & machine. Now in the routing itself click on Extras - Scheduling - Schedule & do the scheduling. Click on Scheduling results you will get the details. Now update the material master.
    Now create the production order for different quantity & notice the difference in dates. This will clarify your doubt as to how system would know.
    Revert if you face any issues.
    Regards,
    Vivek

  • Automatic updation of planned delivery time in material master.

    Dear all,
    Is it possible to update the Planned delivery time in the material master automatically by the system based on goods receipt date.
    what customisation needs to be done.
    Regards,
    Dayanand

    It is not dynamic field so you  can't retrive automatically.

  • Time dependent material master data

    Hello,
    Would you please explain me how to make Material master data time dependent?
    Points will be rewarded!!
    Best Regards,
    Adeel

    Hello Siggi,
    Thanks for your respond.
    I am using BW3.5 and for 0materia there are lots of attributes and for every attributes there is a "time dependent" click. Do I have to click all of them? Can you explain the theory behind that?
    Mater data will be maintained respectively if I can change it to time- dependent.
    Thank you very much,
    Adeel