Production module process

good evening
just want to know the flow from bill of materials to production of sap b1
any suggestions on where to find specific samples on how to transact in this module am not familiar with manufacturing/production processes.
thank you.

Hi.......
Go through the following process:
4.Prepare BOM for a Finished Goods. Production--> Bill Of Material
5.Based on the requirement Production dept will plan the production. (Productioon> production Order>Planned)
6.User will have to select the FG planned for production and its BOM components will come automatically along with its ratio defined into the Bill of Material.
7.Initially Production Order will be into the Planned Stage.
8.Once planned the status will have to be changed to Released. (Productioon> production Order>Released)
9.After release, the commitment for the RM and Order for the FG will be created towards Production Order that can be viewed in inventory status of the item.
10.On the basis of inventory status raw material has to be issued and that should be done through Issue for Production. ( (Productioon--> Issue for Production)
11.Once the testing done FG has to be received through Receipt from Production where user has to enter the total approved quantity and total rejected quantity.  (Productioon-->Receipt From production)
12.Once Production completed, the status of production has to be changed to closed and ready for dispatch. (Productioon> production Order>Planned)
Regards,
Rahul

Similar Messages

  • Sizing Product Module

    I've created a page in DW with a DIV to insert a product module. I upload the page to BC and insert the {module,product,mypart,mypart}.  How can I size the product module to fit within my DIV?  Also, can I insert product modules in DW locally and, if so,  which is best process?  Basic stuff, but I'm just getting started and struggling.

    Hi Liam.  Thanks for your reply.  All of this is completly new to me so I'm struggling with it.  We sell to the fire service and our products have different degrees of explanation depending on the item.  I built the existing site with Yahoo site builder years ago and am trying to get away from them and go to the Adobe products.  The current web site layout has been very good for us and I'm trying to replicate it with some changes.  I don't know how to get to the css for the product modules to modify them.  I did pick up a good bit today from different help videos and am going to try something a little different tonight.  I know how to affect what gets displayed in each module, so I'm going to try posting my pictures and descriptions on a page for each product and strip everyting from the product_module except for the price and order qty and plae those in a DIV adjacent to the descrition DIV.  I know this is an off the wall way to do it but I don't know if I will ever learn enough BC and DW to ro it the "right" way.  This is our existing site I'm trying to rebuild with DW & BC.   Thanks again for your reply.   www.my-lor.com

  • Convertion an inventory to other inventory without use Production module

    We are going to register all tarnsaction about converting A product to B product but we dont want to use production module(BOM and Prodcution report) .
    how should we manage this process in SAP by consider the inventory and Financial principles?

    No , I want to have all transaction about these items, I want to issue A item and then receive B item from mayeb virtual warehouse, Because I want to know the consumption of Item A and also the quantity and Cost of Item B, the Cost of B will be calculate manually but I want to recorde all data about Item A and B

  • Help Needed in blocing excess quantity in production module

    Dear All,
    My client wants to block excess issue of raw materials or excess receipt of finished goods in the Production module.
    Can someone suggest me a solution for this?
    Regards,
    Bharath S
    Edited by: Bharath Kumar on Nov 4, 2010 11:04 AM

    Dear Mr. Jimmy,
    Thanks for the reply. I tried writing the query in the stored procedure but its not working.
    It would be grateful if someone can send me the query for this to put in the Transaction Notification.
    Regards,
    Bharath S

  • Confirmation of by-product via process message

    Hi All,
           what are the parameters  - characteristic values that needs to be passed for confirmation of the by product via process message ?
    Regards,
    PSS

    Hi,
    531 Goods receipt from by-product from the order
    The goods receipt of a by-product usually refers to an order, but it can be entered without a reference.
    If a component is entered with a negative quantity in the order, a reservation item is created with
    531 (instead of 261 ). The receipt of a by-product can be entered when the component for the order is withdrawn from stock or it can be entered as an 'other goods receipt'.
    Possible special stock indicators:
    E, Q
    Thnaks,
    Vinodh

  • Unable To Receive Finished Goods in production module

    Hi Experts,
                        I am unable to receive some finished goods  in production module through Receipt from production form  and it will not through any exception. The problem occurs only for few production rest of production is received with out any problem.
    Regards

    hi parminder
    there has to be ceratin message as somethimes we overlook and there is the message being displayed that is hidden below the status bar .
    One thing is are u able to add the document receipt from production . is there a message " done successfully"
    Regards,
    Manish
    Edited by: manish.malik on Apr 30, 2010 4:53 PM

  • Adapter Module Processing

    I have a file to file scenario. The incoming file contains Employee Details and I need to validate each record and need to reject them if they are invalid as per the business rules.
    For this I know I need to create the Adapter Module Processing.
    I am following the below mentioned document.
    https://websmp209.sap-ag.de/~sapdownload/011000358700003237612005E/HowToCreateAdapterModules.pdf
    I dont have an NWDS installed, but I want to develop my java program in Eclipse? Whether it is OK to do it in Eclipse? Once I develop my Java program what exactly I need to do? How to create a Jar file in Eclipse? How to import that in XI?
    Thanks.
    [email protected]

    Hi Jenni,
    This topic has been already discussed in the below thread:-
    Creating Adapter Modules
    In general, I will explain how to create .JAR file:-
    Creating a .JAR file is easy. Go to the directory where your classes are stored and type :-
    jar -cf myfile.jar *.class
    (jar is the command to run the jar utility. -cf are options, where c create arhive and f specify archive file name)
    Now, if you have an existing JAR file, and want to extract it, you'd type:-
    jar -xf myfile.jar
    Also go thro' this link for step by step procedure on simple Module Processing:-
    https://websmp201.sap-ag.de/~sapdownload/011000358700003237612005E/HowToCreateAdapterModules.pdf
    I hope this provides you a solution.
    Regards.
    Praveen

  • Reprocessing of Production order/Process order

    Hi friends,
    Can anybody explain me what is reprocessing of production order.
    Plz explain me in a step by step manner.
    Thanks very much.
    Kind Regards

    Hi Arun Kumar,
    Reprocessing
    Use
    In the area of confirmation, you can separate confirmation entry from processing. As a result, errors may occur when confirmations, or the processes that follow them, are posted. You can eliminate these errors by reprocessing them. The following reprocessing functions are available:
    Confirmations
    Actual costs
    Goods movements
    Reprocessing Confirmations :
    Use
    You use this function to process confirmations for which errors occurred as they were being automatically processed. With this function, you can either delete or, if possible, eliminate the errors and post the confirmations again.
    Confirmations with errors can arise if they were entered in one of the following ways:
    Upload from a PDC system (see Upload)
    Online entry ( Fast Entry or Mass Processing)
    Entry via BAPI interface
    Possible errors include:
    Order does not exist (for entry via PDC system, BAPI interface)
    Order was locked
    Sequence of time events incorrect
    Individual capacity does not exist
    Work center or personnel number does not exist
    Features
    Reprocessing has the following advantages:
    Selection
    On the initial screen, you can enter your selection criteria for selecting the confirmations that you want to reprocess. Possible selection criteria are: Production order, plant, confirmation, WBS element, sales order, MRP controller, work center, created by, created on.
    Navigation
    The screen for reprocessing confirmations is split into two areas:
    Overview list of the confirmations
    Detail screen for the selected confirmation
    In the standard setting, the overview list is on the left and the detail display of the confirmation is on the right. To change the position of the overview list, choose  (move the list in an anti-clockwise direction, select the position of the overview list). This last setting is saved for the particular user who created it and is used again the next time the function is called up.
    Reprocessing
    The confirmation that you have chosen from the overview (cursor position) is displayed in the detail screen. In the detail screen, you can remove the error in the confirmation.
    The following confirmations can be reprocessed:
    Order confirmation
    Operation confirmation
    Time event confirmation
    Activity confirmation
    The layout of the detail screen is determined by the confirmation that you are currently processing. The layout can be set up flexibly for an operation confirmation (see Single Screen Entry).
    Display error
    To display a long text about the error for each confirmation, position the cursor on the confirmation and choose .
    Check confirmation
    You can check one or more confirmations. To check confirmations, select them and choose . In the Status field on the overview list, the result of the check is displayed with a symbol.
    Delete confirmation
    If a confirmation is not to be posted because, for example, it has entered the SAP System by mistake, you can delete it. To do this, select the confirmation and choose . The confirmation is flagged for deletion and is deleted when you save.
    Delete a line
    To delete confirmations from the overview that you do not want to process at the moment, choose . The confirmation is, however, retained for reprocessing at a later stage.
    2.Cost Determination Error Processing
    Use
    You use this function to gather information about errors in cost determination and if necessary to repeat it.
    If errors occurred when determining actual costs online, you can decide whether or not the confirmation and the error records are saved. If you are using Decoupling Confirmation Processes, the errors are recorded during the execution of the background job or during updating.
    Features
    This function includes:
    An error log which displays the cost determination errors in detail
    Errors are, for example: missing activity prices, invalid cost centers or incorrect assignment of an activity type to a cost center.
    Rerunning cost determination
    Starting a New Costing Run
           1.      Choose either
    ¡        Production orders: Logistics ® Production ®  Shop Floor Control ® Confirmation ® Reprocessing ® Actual Costs
    ¡        Process orders: Logistics ® Production u2013 Process ® Process Order ® Confirmation ® Recalculate Actual Costs
           2.      Enter your selection criteria.
           3.      Choose  (Execute).
           4.      Select the confirmation in question and choose  (Error Log).
    Analyze the errors.
           5.      If necessary remove the errors.
    To remove the errors, you have to exit the reprocessing function.
           6.      Choose Production ® Shop Floor Control ® Confirmation ® Reprocessing ® Actual Costs or Production u2013 Process ® Process Order ® Confirmation ® Recalculate Actual Costs or open a new session.
           7.      Enter selection criteria for the confirmations for which you want to restart the actual cost calculation.
           8.      Choose  (Execute).
           9.      Select the confirmation and choose  (Save).
    Failed Goods Movements Processing :
    Use
    This function allows you to process goods movements that failed when posting confirmations. After correcting any errors that occurred, you can then post the goods movements a second time.
    Features
    This function includes:
    Detailed display of errors
    Errors can be caused by insufficient information such as missing storage locations or missing batch numbers. Errors can also include locked material data, insufficient stock, or attempts to post goods movements in the wrong accounting period.
    Opportunity to correct failed goods movements
    Option of posting goods movements a second time
    Reprocessing Goods Movements
           1.      Choose either
    ¡        Production orders: Logistics ® Production ®  Shop Floor Control ® Confirmation ® Reprocessing ® Goods Movements
    ¡        Process orders: Logistics ® Production - Process ® Process Order ® Environment ® Material Movement ® Failed Goods Movements.
           2.      Enter your selection criteria:
           3.      Choose  (Execute).
           4.      Select the goods movement that you want to reprocess.
           5.      Choose  (Display Errors) to display the errors that have arisen, in detail. To leave the message, choose  (Continue).
           6.      Select the required goods movements and make the necessary changes (for example, Edit ® Replace ® Storage location).
    For example, you can delete incorrect goods movements.
    When incorrect goods movements are deleted, the system does not carry out an automatic adjustment of reservations.
           7.      Choose  (Save) to restart the execution of goods movements.
    When you are reprocessing the goods movements for the confirmation, you can go to the goods movements overview.  Choose  Change Details, to change the goods movements.
    Hope this details is enough for clearing your doubt.
    Revert if any doubt and reward if useful.
    Regards,
    Tejas

  • Microsoft Operations Manager Condolidator Module processing thread failed

    Hello,
    I got the error: The Microsoft Operations Manager Condolidator Module processing thread failed with an internal error and must be unload.
    with event ID 11105 & 11108 but not the one in the article is it the same issue or more ...
    I could not find any WMI issue as stated in http://thoughtsonopsmgr.blogspot.com/2011/01/error-consolidator-module-failed.html
    Any idea?
    Thanks,
    Dom
    System Center Operations Manager 2007 / System Center Configuration Manager 2007 R2 / Forefront Client Security / Forefront Identity Manager

    try clearing the health service cache on the agents and restart the health service to reload that workflow.
    Juke Chou
    TechNet Community Support
    I did already twice and this did not fix the issue.
    Thanks,
    Dom
    System Center Operations Manager 2007 / System Center Configuration Manager 2007 R2 / Forefront Client Security / Forefront Identity Manager

  • Large Product Module

    How do I call a large product module onto the page? Here's the format for my small product module:
    {module_product,31999,5038261}. Where can I check?
    Thanks.

    Using KB Instructions:
    I tried:
    {module_product,31999,5038262, template = "/Layouts/OnlineShop/large_product.html"}
    {module_product,31999,5038262, /Layouts/OnlineShop/large_product.html}
    {module_product prodcutId="{{5038262}}" catalogID="{{31999}}" template="/_System/ModuleTemplates/Shop/productLarge.html"}
    {module_product prodcutId="{{5038262}}" catalogID="{{31999}}" template="/Layouts/OnlineShop/large_product.html}
    I'm using a directory to hold all my landing pages called /books. Do I need to type in the full URL of the large product template to call it up? How do I do that?

  • User Defined Module Processing

    Could some one send me the User Defined Module Processing Step By Step guide to
    [email protected]
    Thanks for your help.

    Hi,
    Are you talking about Adpter Modules ?
    If so , here is a guide from service.sap.com-
    https://websmp202.sap-ag.de/~form/sapnet?_SHORTKEY=01200252310000071155&_SCENARIO=01100035870000000202
    Regards,
    Moorthy

  • Production release process using headstart.

    Hello,
    I am completley new to headstart. I have been given a new project to work on which has forms 9i, desginer 9i, oracle 9i AS and headstart 6.5.3.0 for 9i.
    I would like to know how do I go about using headstart to generate forms. Specifically, I would like to know how do I develop using headstart and then deploy them to test and production environment. Do I need to install headstart( Middle tier and database objects ) in my production setup ?
    I would highly appreciate if anybody can me a brief overview of development and production release process using headstart.
    Many thanks,

    Hi,
    The headstart user guide probably has all the info you need. Specifically Part VI, Deploying your Applications, is just what you're looking for. You can find the user guide (along with other useful documentation in the <hsd65_home>\docs directory.
    Grtz
    Bram Schiltmans

  • Subscription Service Product Activation Process

    If the subscription service for Adobe InDesign CS5.5 is purchased how often does the product activation process occur, every time the application is launched, or once a month after the subscription payment has been processed? In other words, if I am running on a laptop and I wish to run the application even during the rare occasion that I don't have an internet connection, would I still be able to run the application? If the activation occurs every time the application is launched, I would assume no. I don't want to subscribe to the application if I will have occassions that I am unable to run the application just because I am not connected to the internet.

    If activation verification fails, you have a 7 day grace period. Not sure about the rest. I'm sure there is some deeper logic there, but actually the serial number is timestamped and in an ideal world, it should only try to verify activation if it times out...
    Mylenium

  • Production Module Doubt

    Hello,
              Can any one guide me In SAP B1 Production Module after preparing Production order shall we proceed to  <b>Issue for Production</b> or <b>Receipt from Production.</b>
    Also when I am preparing Production In screen it needs Product no.----
    How can I go furthur.
    Regards
    P.Narender

    Hello,
    It is depend of the type of your Production Order (type.OWOR).
    If the Production Order is standard, (Type = A), you need to do a Receipt from production (button Production Order) to get final goods and consume raw materials
    If the Production Order is disassembly (Type = D) you need to do an issue for production (button Disassembly Order) to get initial raw materials and dissassemble the final goods
    Regards,
    Sébastien

  • UOM Conversion in Production Module

    Dear All
    I  am using SAP B1 9.0 PL4
    For the below scenario i need your  help in the production module
    I raise a Production Order for a S/F goods with UOM as 'NOS'
    When i receive back the S/F in the following ways:
    1) UOM will be in 'Containers" (for ex.. 100 boxes with 60 pieces in each box)
          OR
    2) UOM will be in "NOS" as well (99 boxes will be received and remaining in pieces (ex 20 nos)
    I would like to know whether this scenario  can be mapped using the Multiple UOM in sap B1 9.0
    thanks  & regards
    L.Sriram

    Hi Sri,
    You have to use your Basic unit of measurement means in your case 'NOS'
    How to Implement Production in Default SAP Business one
    Thanks
    Mohammad Imran

Maybe you are looking for