Hi Arun Kumar,
Reprocessing
Use
In the area of confirmation, you can separate confirmation entry from processing. As a result, errors may occur when confirmations, or the processes that follow them, are posted. You can eliminate these errors by reprocessing them. The following reprocessing functions are available:
Confirmations
Actual costs
Goods movements
Reprocessing Confirmations :
Use
You use this function to process confirmations for which errors occurred as they were being automatically processed. With this function, you can either delete or, if possible, eliminate the errors and post the confirmations again.
Confirmations with errors can arise if they were entered in one of the following ways:
Upload from a PDC system (see Upload)
Online entry ( Fast Entry or Mass Processing)
Entry via BAPI interface
Possible errors include:
Order does not exist (for entry via PDC system, BAPI interface)
Order was locked
Sequence of time events incorrect
Individual capacity does not exist
Work center or personnel number does not exist
Features
Reprocessing has the following advantages:
Selection
On the initial screen, you can enter your selection criteria for selecting the confirmations that you want to reprocess. Possible selection criteria are: Production order, plant, confirmation, WBS element, sales order, MRP controller, work center, created by, created on.
Navigation
The screen for reprocessing confirmations is split into two areas:
Overview list of the confirmations
Detail screen for the selected confirmation
In the standard setting, the overview list is on the left and the detail display of the confirmation is on the right. To change the position of the overview list, choose  (move the list in an anti-clockwise direction, select the position of the overview list). This last setting is saved for the particular user who created it and is used again the next time the function is called up.
Reprocessing
The confirmation that you have chosen from the overview (cursor position) is displayed in the detail screen. In the detail screen, you can remove the error in the confirmation.
The following confirmations can be reprocessed:
Order confirmation
Operation confirmation
Time event confirmation
Activity confirmation
The layout of the detail screen is determined by the confirmation that you are currently processing. The layout can be set up flexibly for an operation confirmation (see Single Screen Entry).
Display error
To display a long text about the error for each confirmation, position the cursor on the confirmation and choose .
Check confirmation
You can check one or more confirmations. To check confirmations, select them and choose . In the Status field on the overview list, the result of the check is displayed with a symbol.
Delete confirmation
If a confirmation is not to be posted because, for example, it has entered the SAP System by mistake, you can delete it. To do this, select the confirmation and choose . The confirmation is flagged for deletion and is deleted when you save.
Delete a line
To delete confirmations from the overview that you do not want to process at the moment, choose . The confirmation is, however, retained for reprocessing at a later stage.
2.Cost Determination Error Processing
Use
You use this function to gather information about errors in cost determination and if necessary to repeat it.
If errors occurred when determining actual costs online, you can decide whether or not the confirmation and the error records are saved. If you are using Decoupling Confirmation Processes, the errors are recorded during the execution of the background job or during updating.
Features
This function includes:
An error log which displays the cost determination errors in detail
Errors are, for example: missing activity prices, invalid cost centers or incorrect assignment of an activity type to a cost center.
Rerunning cost determination
Starting a New Costing Run
       1.      Choose either
¡        Production orders: Logistics ® Production ®  Shop Floor Control ® Confirmation ® Reprocessing ® Actual Costs
¡        Process orders: Logistics ® Production u2013 Process ® Process Order ® Confirmation ® Recalculate Actual Costs
       2.      Enter your selection criteria.
       3.      Choose  (Execute).
       4.      Select the confirmation in question and choose  (Error Log).
Analyze the errors.
       5.      If necessary remove the errors.
To remove the errors, you have to exit the reprocessing function.
       6.      Choose Production ® Shop Floor Control ® Confirmation ® Reprocessing ® Actual Costs or Production u2013 Process ® Process Order ® Confirmation ® Recalculate Actual Costs or open a new session.
       7.      Enter selection criteria for the confirmations for which you want to restart the actual cost calculation.
       8.      Choose  (Execute).
       9.      Select the confirmation and choose  (Save).
Failed Goods Movements Processing :
Use
This function allows you to process goods movements that failed when posting confirmations. After correcting any errors that occurred, you can then post the goods movements a second time.
Features
This function includes:
Detailed display of errors
Errors can be caused by insufficient information such as missing storage locations or missing batch numbers. Errors can also include locked material data, insufficient stock, or attempts to post goods movements in the wrong accounting period.
Opportunity to correct failed goods movements
Option of posting goods movements a second time
Reprocessing Goods Movements
       1.      Choose either
¡        Production orders: Logistics ® Production ®  Shop Floor Control ® Confirmation ® Reprocessing ® Goods Movements
¡        Process orders: Logistics ® Production - Process ® Process Order ® Environment ® Material Movement ® Failed Goods Movements.
       2.      Enter your selection criteria:
       3.      Choose  (Execute).
       4.      Select the goods movement that you want to reprocess.
       5.      Choose  (Display Errors) to display the errors that have arisen, in detail. To leave the message, choose  (Continue).
       6.      Select the required goods movements and make the necessary changes (for example, Edit ® Replace ® Storage location).
For example, you can delete incorrect goods movements.
When incorrect goods movements are deleted, the system does not carry out an automatic adjustment of reservations.
       7.      Choose  (Save) to restart the execution of goods movements.
When you are reprocessing the goods movements for the confirmation, you can go to the goods movements overview.  Choose  Change Details, to change the goods movements.
Hope this details is enough for clearing your doubt.
Revert if any doubt and reward if useful.
Regards,
Tejas

Similar Messages

  • Change in Production order/ process order

    Can anyone tell me where are the changes being stored  for the Production order/ process order? I mean in what table?
    Regards,
    Subhasish

    Hey,
    Any change made to the order data is logged using change documents. These changes are recorded in the tables CDHDR and CDPOS. The change document object for orders is ORDER.
    For information on change documents click this link
    <a href="http://help.sap.com/saphelp_47x200/helpdata/en/2a/fa0175493111d182b70000e829fbfe/content.htm">Overview</a>
    To read the change documents use functions CHANGEDOCUMENT_READ_HEADERS and CHANGEDOCUMENT_READ_POSITIONS.
    You can find the change document objects using transaction SCD0.
    -Kiran

  • Product Costing - Process Order Confirmation

    Dear Experts,
    We are facing a situation with our Product Costing Scenario :
    Under SFG Process Order Confirmation, there are Ten Phases to finally confirm the order. First Phase is for Raw Material Issuance. From Second Phase to Ninth Phase are relevant to Activity Types. Tenth Phase which is final phase, in this point Goods Receipt posting is generated.
    At first phase, system posts Raw Materials Goods Issue (Movt Type 261) to Process Order:
    Entry : RM (Cr), Consumption (Dr).
    Client needs the system to post one more entry at the same time by : WIP (Dr), Inv Change (Cr).
    Reason:
    According to client, they have made consumption entry in finance but what if all raw materials are not consumed as yet and factory comes under fire, then how can they claim insurance on those Raw Materials which are not consumed and are still in the IN PROCESSING Stage?
    My Answer was:
    - They can find all material costs in Process Order as Debit Item.
    - They can also calculate WIP but cannot post WIP in Finance unless the order is settled.
    Ultimately, as per my knowledge client cannot check the unprocessed Raw Materials report in FI but they can check in CO. And this is the point of reservation from client.
    They need an entry in Finance for WIP to claim insurance in case of fire and therefore they need a posting of  WIP entry immediately after Goods Issue of Raw Materials to Order.
    Can anyone please guide me further regarding this scenario and if any one can suggest any work around then it would be highly appreciated!
    Regards,
    Zain Bashir 

    Hi Zain
    This is a very unusual question
    Buddy, there is something in accounting called as "Going Concern Concept" which we all were taught in our accounting days.. That means when you do business, do it with a mindset that you are goinig to do it for long / for ever.. Accidents dont happen every day and you cant build a system around such things
    Assume there is a fire (God forbid).. After the accident, you wont even know how much was  lying there unconsumed which got gutted in the fire..
    And insurances not just covers the stock lying consumed, but also stock manufactured and stock in the process of manufacturing (WIP)
    And most importantly, dont expect SAP to throw up a figure at the click of a button.. Does your client really think that they will simply submit the report generated from SAP as-is to Insurance people?? SAP is just a technology enablement, which requires human intervention at various places
    My opinion - Dont build system for such requirements
    Br. Ajay M

  • Returns from production against Process order

    Hai
    Can anyone suggest, how to intimate to stores department from  production to receive the shop floor returns when any process order is cancelled.
    Note: Here stores department should know through wich process order/reservation the material to be received. based on the reservation / intimation, stores department shall receive the material. (This transaction can be done in two steps)
    Regards/Ramu

    Hi Ramakrishna,
    You can have a cancel form which contains the Process / Production Order nos. In this form you can intimate your store whether to receive back the entire components or only selected components.
    The store can then post a reversal for this using MB1A, cancel w.r.t the order specified in the form.
    I hope this meets your requirement, if not revert.
    If helpful award points
    Regards,
    Vivek

  • Changes in production order/Process order

    Hi Experts,
    Very much hopeful that I will get solutuion of below:
    How or where to see changes done in production / process order.
    e.g Suppose I have created one production order. Then release it in CO02. Then I changed order quantity from 100 to 200 ( Earlier it was 100 ). Then I delete one BOM component from order. Then I changed finish date of order.
    Pls tell me how to track these changes. What configuration need to track these changes. Please tell me step by step procedure.
    I have read related thread in sdn itself but not satisfied.
    Please help.
    Regards,
    Vipul

    Hi,
    For tracking in changes of Production / Process Order, you need to activate Order Change Management (OCM). After activating the same, you can view changes of Production  order in CO02 / CO03.
    for more details of OCM go through following link :
    [Order Change Management (OCM)|http://help.sap.com/saphelp_erp60_sp/helpdata/en/a5/63198843a211d189410000e829fbbd/frameset.htm]
    Hope this helps.
    Regards,
    Tejas

  • No 101 for Co-products in Process order confirmation

    Hi All
    I have a problem in Process Order Confirmation.
    I have a order with Co-products.  When I do confirmation, 101 Mvt type is not happeneing for all the co-products along with the main product.
    The configs looks fine
    1.  Control key has "Automatic GR"
    2.  Confirmation parameters have "GR Co-products"
    What else could be the problem?

    Hi Jack,
    I'm not sure how it works with process orders but in case of production orders is it not possible to do auto GR for co-products - according to my best knowledge.
    Please check:
    http://help.sap.com/saphelp_erp2004/helpdata/en/b1/c04d01439a11d189410000e829fbbd/content.htm
    You can use MB31 + PrdOrd reference to book the co-products by mvt 101.
    (You can also search in this forum to find threads in connection with this.)
    BR
    Csaba

  • BAdI / User exit to remove GR indicator on co-product in process order

    Dear PP Guru's,
    Is there a BAdI or user exit that can automatically uncheck the GR boxes on the process order items ?
    We need to clear the GR indicator AFPOD-WEPOS and may be to set AFPOD-WEAED (indicator that allows changes on GR indicator) for co-products (not header material) that have the same material number as header material.
    In our process we need to manage more than one goods receipt batch in one process order. The batches are to be specified/generated in advance (at release, for example). We use co-product functionality for that. All batches are for the same header material. So, planning, goods movements and costing are to be done for the header material only. That's why we need to remove GR indicator from co-products (or some of them).

    Hi,
    Try this code..I have used memory pointers....
    In the userexit <b>EXIT_SAPMM06E_012</b>
    DATA lwa_ekpo LIKE bekpo.
    data lw_field(50).
    FIELD-SYMBOLS <t_xekpo> TYPE STANDARD TABLE.
    IF sy-tcode = 'ME21'.
    lw_field = '(SAPLMEPO)POT[]'.
    ASSIGN (lw_field) TO <t_xekpo>.
    if sy-subrc ne 0.
    lw_field = '(SAPMM06E)POT[]'.
    ASSIGN (lw_field) TO <t_xekpo>.
    if sy-subrc <> 0.
    message e208(00) 'Couldn't find POT'.
    endif.
    endif.
    loop at <t_xekpo> into lwa_ekpo.
    Check the conditions..
    example..
    if ......
    Check the GR indicator..
    lwa_ekpo-WEBRE = 'X'.
    <b>MODIFY <t_xekpo> from lwa_ekpo transporting WEBRE.</b>
    endif.
    endloop.
    ENDIF.
    Hope this helps..
    Thanks,
    Naren

  • Issue in Sales Order & Process Order interface

    Hi,
    Issue:
    In case of Assemble to Order scenario, Process order is created automatically when SO  is created.
    Process order will have Sales order number  under General data tab ( COR3)
    When sales order is  created with respect to Inquiry, Inquiry number is displayed in process order instead of Sales order number.
    Also when process order is confirmed, stocks are posted to Inquiry number stock i.e in MMBE Inquiry number is displayed against stock ( sales order stock)
    since stock are not posted to sales order stock, schedule line is not confirmed.
    As a result sales order cannot be delivered.
    Query
    1) please let me know the customizing settings  done for automatic creation of process order WRT sales order( Both SD and PP if possible)
    2) Customizing setting which controls the sales order field in Process order. so that stocks are posted to sales order stocks and not Inquiry or Qutation stock even if they are present.

    Where you checking these details.Are you seeing the print preview If yes then it seems the changes not captured into print preview.Check with your ABAPer why system is not getting right weights.

  • U00A7ECH Engineering Change with Purchase Order, Process Order and Sales Order

    Hello All,
    Can someone kindly explain me the integration points of Engineering Change with
    1. Purchase Order
    2. Process Order
    3. Sales Order
    I know we can see the Rev Letter in the first two. Is there a 'refresh' function inside the  PO, Process Order, Sales Order by which we can get the latest and greatest revision, incase the material rev is updated/changed after the PO, Proc Order, SO is already created. Also if yes,after what status in PO, Process Order or Sales Order we cannot use the 'Refresh' button, and than what needs to be done to fix this situation.
    Thanks in advance,
    Sachin

    Hi,
    really, this depends on several factors, especially the valid from date of the ECM and its impact on changes on a BOM (which I suppose is the use case you are looking at? Or just a change on the material revision of the BOM header material?
    Interesting for you should also be Order Change Management, although not applicable to process orders as far as I know:
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/41/3699761bc211d2b62b0000e8359890/frameset.htm]
    Regards, Ulf.

  • Goods Receipt Printout for an Order (Process Order)

    Hello all,
    The order was confirmed in parts (partial quantities) , the ones that were confirmed yesterday had the GR Label printed immediately whereas the quantities confirmed today had no print output. Why is it so ? Could you please help me out ?
    Output type used: Customized to project.
    Note: This seemed more of an Inventory - output Determination stuff. That's why had it raised here.
    Thanks in advance.
    Regards,
    Rahul

    compare your settings with
    Output Determination in Inventory Management (IM) - ERP SCM - SCN Wiki

  • Purchase order vs planned order vs process order vs production order

    Hi,
    Kinldy explain difference between the  Purchase order,  planned order,  process order and production order?
    Thanks & Regards
    Ravi kumar

    Hi Ravi,
    In simple terms:
    planned order - A procurement proposal generated by the system to meet a need, this can then be converted to a production / process order (for internal procurement) or into a purchase reqn & in-turn to Purchase order (for external procurement)
    Purchase order - A firmed procurement proposal which is sent to your vendor (external procurement) to supply the items as per your order
    process order - A firmed procurment proposal which is used for in-house procurement, this is used in process industries eg: chemicals, oil & gas etc 
    production order - A firmed procurment proposal which is used for in-house procurement, this is used in discrete production industries
    Based on the above am quite sure you should be able to figure out the differenced. If any doubts revert.
    Regards,
    Vivek

  • Distribution Function - To split Planned/Process orders into 10

    Have you used, or tried to use Distribution Function?
    It is assigned to the Production version and we assumed that it would divide the Planned order/Process order by the %  we have in customizing.
    We have created a distribution function DV10 and assigned to our plant. This uses the standard function S30 which has 10, 20, 30, 40, 50, 60, 70, 90, 100 in % dur and % cap fields. So you would think the planned/process order would be divided into 10 parts
    Reason u2013 if an order goes over multiple days we want the order to be broken down by day.
    Why? So that Deployment, when looking at an ATP report in R3 for multiple materials in 1 location, by day or period of days,  can see how much will be available each day
    Problem with GLEI (equal distribution) is that if an order starts today at 22:00 then we have equal distribution, we then have 25,000 PAL available today and 25,000 tomorrow, which is not a fair proportion according to the time available. Therefore, we thought that dividing by 10, for example, we would have a more accurate proportion each day
    Many thanks for any input, even if "tried and failed :("
    Cheers, Paul

    Hi Mario,
    Thanks for your input. Today we use GLEI which equally splits the same planned or process order into equally daily quantities for ATP purposes. We also have created STRT which drops the Planned/process order quantity onto the first day of the order.
    Regarding daily lot sizes this could be an option but I suppose you would then get individual orders, which the business may prefer not to do.
    Cheers, Paul

  • Not able to see the Cost analysis in the Process order (T-Code COR2).

    Hi SAP Guru's
    Csoting in the Process order Configuration.
    I have done the Config setting related to the Product Costing Controlling with regard to the
    Cost Sheet, Cost Componet Structure.Overheads, asssigning the Cost elements in the Costing sheet.
    assigned the same in the Process order.
    And also the Costing variant options seen in OPL1 t-code can not be displayed in the Process order Csoting Variant selection.
    where as the in the Costing variant for the cost component structure, i can see  the Xompany code with required plant details.
    looking  the costing alanysis data in Process order, unable to see

    Hi,
    If you are looking at cost analysis.  You will get this only some you do confirmations to the production or process Order.
    I hope you did confirmation of material and quantities to the Process Order
    Best Regards
    Surya

  • Settlement of process order

    In PP-PI  We want to use active ingredient for scenario:
    Our Raw material is MINING ORE which will have varying proportion of COPPER & COBALT.
    Valuation of ORE is based on itu2019s content of COPPER & COBALT content. So we will use active ingredient to capture value of this raw material based on it content of CU & CO.
    Now when we issue this material for production to process order, our semi finished output ( Say SFG1) will also have varying content of COPPER & COBALT based on kind of input quality. There will several process orders doing diff. processe.
    Now my query is
    1)     Can we settle the process order variance to COPPER & COBALT content of SFG1 instead of normal settlement to SFG1?
    2)     Can I maintain my valuation of SFG1 based on COPPER & COBALT content?
    3)     Do we have any user exit or BADI available to replace SFG1 with CO& CU in process order settlement rule?
    4)     In standard cost estimate can we capture COPPER & COBALT characteristics?
    Ultimately COPPER & COBALT are our finished goods.
    I try to search sap help but not much info to help me on this.
    Your input will be highly appreciated.
    Nitesh

    Hi,
    The concept explained is typically a co-product scenario:
    Ore produces SEMI COPPER and SEMI COBALT.  SEMI COPPER and SEMI COBALT produce FIN COPPER and FIN COBALT.
    This scenario is covered under u2018CO-PROUDUCTu2019 concept.  Here Ore is Raw Material, SEMI COPPER and SEMI COBALT are SEMI-PRODUCT and finally COPPER and COBALT are Finished Product.
    Now estimate the standard cost for your SEMI-PRODUCTS and FINISHED PRODUCTS using integrated BOM.  Sit with your PP Consultant who can give you good input for costing the products whether based on quanity yield or quality yield.
    Once this is tested and found the results are expected, the solution can be freezed.
    Please let me know your feed back.
    Regards,
    Ashok

  • Differemce between  PROCESS ORDER,PLANNED ORDER AND PURCHASE ORDER??

    what is th edifference between PROCESS ORDER,PLANNED ORDER AND PURCHASE ORDER ??? can any one explain with some examples?
    n.bhardwaj
    [email protected]

    Process Order:
    Process order / Production order are activities within a business, where the production planning team team creates to absorb costs / evaluate costs / and check against planned figures. There would integration between MM/FI/PP to create such orders and process.
    Planned Order:
    A request created in the planning run for a plant to trigger the procurement of a plant material for a certain quantity for a specific date.
    Purchase Order:
    A request or instruction from a purchasing organization to a vendor (external supplier) or a plant to deliver a quantity of material or to perform services at a certain point in time.
    Regards
    AK

Maybe you are looking for

  • Goods Receipt And Goods issued

    When i made a goods Receipt document then Stock Account D Stock difference Gain Account C it is clear but one more account also Credit(Material Variance  C) Stock Account D Stock difference Gain Account C Material Variance  C why this ladger post ent

  • Acrobat 9/9.1  - Coruption when export to Word

    Hi, I have been using Adobe Acrobat 9 for a few months now, both in version 9 and 9.1 I have recently been asked to utilise the export to Word feature, which from experience in version 8, has and should be a relatively painless process. However, to m

  • What Are the Differences Among Mobile Printing Solutions Supported by HP?

    Some good information in the link below.... http://h10025.www1.hp.com/ewfrf/wc/document?cc=us&lc=en&docname=c02759940 Although I am an HP employee, I am speaking for myself and not for HP. Twitter: @Ciara_B_HP

  • How do I remove Bonjour so I can reinstall itunes?

    I want to reinstall itunes on my Windows 7 OS computer.  I tried to uninstall but apparently some file called Bonjour still exists.  I can't find it to delete it.  What do I do?

  • Nikon D7000 raw files will not open using PSE 11

    I am unable to open Nikon D7000 raw files(NEF) using PSE 11 When I use the program's "Update "function I just get an error message. Can anyone advise? Thanks