Production plannning forcast report

Hi All,
I would like to know if we have any standard report related to production plannning for cast.
Is there any  cube or report which might touch the below mentioned requirement.
This report is basically an operational report which is used for daily production planning activities and gives an overall picture of the total production process to be carried out during the remaining period of the month/quarter considering the total demand for the month with the safety stock calculations, Quantity sold during the period, current  stocks in hand ,Available no. of days , total quantity to be produced per day for the remaining period.
Thanks in advance.
Regards
Rahul Bindroo

Hello Rahul,
the <a href="http://help.sap.com/saphelp_nw70/helpdata/en/44/5f757e492b3675e10000000a114a6b/frameset.htm">Sales & Operations Planning (S&OP)</a> content offers the following queries:
<a href="http://help.sap.com/saphelp_nw70/helpdata/en/f6/4deac42a194eb796ea386a8fafd63a/content.htm">Demand Key Figures</a>, <a href="http://help.sap.com/saphelp_nw70/helpdata/en/44/7ac37f164c44ada2865e2f47062a62/content.htm">Supply Key Figures</a>, <a href="http://help.sap.com/saphelp_nw70/helpdata/en/f3/392b0345d3453da97b64eb763d5375/content.htm">Inventory Key Figures</a> and <a href="http://help.sap.com/saphelp_nw70/helpdata/en/98/cb0095d7d2415b8aca915475d14762/content.htm">Budget-Related Key Figures</a>.
Hope this helps,
regards M.L

Similar Messages

  • Production order wise report  of  all component.

    dear all
    I want production order wise report  of  all component.
    1) quantity required 2)issue quantity3)currect stock
    I got  quantity required and issue quantity field in co24 but i didnt get currect stock field(unrestricted stock) in that t-code
    Is any t-code is available ?
    rgds
    Surendra

    Hy Surendra,
    In any of the standard SAP reports you will not find the Goods Movements of Particular order along with available Component stock.
    Goods movements report of the Production / Process order is static report once the order is close.While Stock report is variable report and may be change Time to Time.
    I think if you wish such kind of report then you have to go for Z reorts.
    You can find all the Goods Movements of Order in COOISPI/COOIS/IW3M but there is not available stock report.
    Regards,
    Dhaval

  • Vendor wise product wise details report

    Dear all,
    please give me any standard report for vendorwise product wise details. and also  customer wise and product wise details report.

    Pls have a look on the blw link which is the std sap reports, its provided by sap.. hope it will be helpful for u.
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/erplo/sapStandardReports

  • About planner profile report

    hi all
    do any one about (planner profile report) and  (price activity variance report) 
    can any one explain me about these two reports.
    Thanks and regards,
    kiran.

    Hi Venkat,
    Check this Thread
    Re: Creating Aging Report and Counting report
    Please search the Forum, you will get lot of more information.
    Thanks
    CK

  • Production order eff report

    Dear experts,
    I want make a production order effciency report. for that the formula is
    efficiency = Actual exe.time / planned exe. time .
    We get planned exe. time from AFKO table.
    While calculating actual exec. time I have a problem.
    I have 3 operations
    10, 20, 30.
    Operation 10 starts at 7 am, 20 at 8 am and 30 at 9 am.
    From 9 am to 3 pm all three operations r under execution.
    At 4 pm operation 10 completes, at 5 pm oper. 20 completes, at 6 pm oper. 30 completes.
    Now I want to calculate the total exec time of an order, i.e. from 7 am to 6 pm but time betwen 9 am to 3 pm is to be considered only once as it overlapping time.
    How to map this?
    thanks
    sanket

    Hi Sanket,
    Just a quick thought:
    I guess your working on a Z report. You can calculate the efficiency of each operation i.e. actual vis a vis planned & then cummulate the % across to get overall efficiency.
    Hope the above helps.
    Regards,
    Vivek

  • Production order efficiency report

    Dear experts,
    I want make a production order effciency report. for that the formula is
    efficiency = Actual exe.time / planned exe. time .
    We get planned exe. time from AFKO table.
    While calculating actual exec. time I have a problem.
    I have 3 operations
    10, 20, 30.
    Operation 10 starts at 7 am, 20 at 8 am and 30 at 9 am.
    From 9 am to  3 pm all three operations r under execution.
    At 4 pm operation 10 completes, at 5 pm oper. 20 completes, at 6 pm oper. 30 completes.
    Now I want to calculate the total exec time of an order, i.e. from 7 am to 6 pm but time betwen 9 am to 3 pm is to be considered only once as it overlapping time.
    How to map this?
    thanks
    sanket

    Hi Sanket,
    Just a quick thought:
    I guess your working on a Z report. You can calculate the efficiency of each operation i.e. actual vis a vis planned & then cummulate the % across to get overall efficiency.
    Hope the above helps.
    Regards,
    Vivek

  • MRP controller to APO product planner

    Hi,
    I want to use product planner as MRP controller to run PP heuristics.
    What I have done is as follows:
    1. I create planner in APO: Advanced Planning & Optimization->Supply Chain Planning->Specify Person Responsible(Planner)
    2. In ECC, I use exit CIFMAT01 to change CT_CIF_MATLOC-PLANNR_PPS according to IT_MARC-DISPO.
    But after CFM2, the product planner in /SAPAPO/MAT1 is still null.
    Is there anything wrong?
    Best Regards
    Rui

    Rui, This is what we did to accomplish this:
    In the R/3 User exit include ZXCIFUSERU08,
      Loop at IT_MATLOC where METHOD = ‘N’ (For each new product location),
      Read IT_MARC with key Material, Plant.
      If not IT_MARC-DISPO IS INITIAL.
      Set IT_MATLOC-PLANNR_PPS = IT_MARC-DISPO
    (Copy MRP Controller on to APO Production Planner)
      Update the change table (IT_MATLOCX)
      Endloop.

  • How to Capturing depreciation to Products for COPA reports

    Hi SAP Gurus,
    My user requirement is capturing depreciation or Charge production machinery related Depreciation to respective products for COPA reporting. As currently all this depreciation is taken to excel sheet from the depreciation posted to asset.
    Outside the system user prepare the allocation cycle and then post the same to the respective cost centers and value fields through COPA & CO assessment and Distribution cycles.
    Now client find this allo/dist process is lengthy for COPA reports. Is it there any other criteria to post this dep. directly to COPA value fields.
    Thank & Regards
    Sagar

    Hello
    In the costing sheet you may define one overhead for depreciation albeit this not being a standard practice. In the cost component structure also define on cost component assign the secondary cost element depreciation overhead. Change the COPA valuation to assign a value field for the cost component depreciation.
    Alternatively in the COPA report itself you can show this depreciation as a formula column which will be at some percentage of RM and/or labour.
    My 2 cents please.
    Sangram

  • Reg :Production order cost  report day wise.

    Dear Expert,
    1.We want a report for a particular Production order cost  day wise.
    The scenario is like this Production order is Released for 100 Qty.
    Today they confirmed only 50 Qty.
    Tomorrow they will confirm 50 qty.
    Now they want to see the cost for today confirmation and tomorrows confirmation.
    Reason being daily the Raw Material cost is changed and they want to track the variance.
    Is there any standard report we can achieve this or do we have go for development
    2. And also i need to know daily how many production orders have been released.
    Thank u in advance.

    A day is not a controlled cost object. You could write a report to look at costs gathered in a day (by reporting date), but I strongly suggest that if you need to analyze costs per day you switch to daily orders.
    You'll find then that all the standard processes work for you.

  • Work center wise production order infomation report

    Hi all,
    i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
    Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
          i have three operation in production order.
          my order scheduled start date - todays date.
    In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
    Clent want like that (with quantity break) report..
    Any standard report ???
    If customization.... How it can be mapped in SAP.??
    Thanks in advance

    Hi,
    You can use the FM COIS_SELECT_ORDER_DATA_READ.
    CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
          EXPORTING
            iv_prod_order_sel       = lv_prod_order_sel
            iv_proc_order_sel       = lv_proc_order_sel
            iv_planned_order_sel    = lv_planned_order_sel
            iv_rem_objects_only_sel = lv_rem_objects_only_sel
            is_objects_to_read      = ls_objects_to_read
            it_parameter            = lt_parameter  "General Structure for PARAMETERS and SELECT-OPTIONS
            it_status_hdr           = lt_status_hdr
            it_status_opr           = lt_status_opr
            it_status_cmp           = lt_status_cmp
          TABLES
            ct_ioheader             = lt_ioheader
            ct_ioitem               = lt_ioitem
            ct_iodocl               = lt_iodocl
            ct_ioopdocl             = lt_ioopdocl
            ct_iomamo               = lt_iomamo
            ct_ioconf               = lt_ioconf
            ct_ioopconf             = lt_ioopconf
            ct_iosoconf             = lt_iosoconf
            ct_iogomo               = lt_iogomo
            ct_ioopgomo             = lt_ioopgomo
            ct_iosogomo             = lt_iosogomo
            ct_iogmer               = lt_iogmer
            ct_ioopgmer             = lt_ioopgmer
            ct_iosogmer             = lt_iosogmer
            ct_iosequen             = lt_iosequen
            ct_iooper               = lt_iooper
            ct_iosoper              = lt_iosoper
            ct_ioopcomp             = lt_ioopcomp
            ct_iooppreq             = lt_iooppreq
            ct_iosopreq             = lt_iosopreq
            ct_iooppord             = lt_iooppord
            ct_iosopord             = lt_iosopord
            ct_ioopmst              = lt_ioopmst
            ct_ioopprt              = lt_ioopprt
            ct_ioopcap              = lt_ioopcap
            ct_ioopscap             = lt_ioopscap
            ct_iosocap              = lt_iosocap
            ct_iososcap             = lt_iososcap
            ct_ioopsccf             = lt_ioopsccf
            ct_iososccf             = lt_iososccf
            ct_ioprodlist           = lt_ioprodlist
            ct_iomatver             = lt_iomatver.
    This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
    Thanks and regards,
    Pradip
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:27 AM

  • How to get components inforation of production order in report?

    Hi,
       I am writing a report which needs get ordered components information of production orders. But, the difficult is when any one delete one component after release, the deletion indicator in reservation will be marked. And if user make the order TECO, all components will be marked as deleted. So, how can I tell which was deleted by user indeed (not caused by TECO). Thanks.

    Can you please advise exactly where or what you found
    Thanks
    Kristen

  • Product wise sales report

    hi ,
    we are having sales gl accounts on domestic and export now we want to know the products wise report
    please tell me if any standard t-code

    u can find copa line item report (ke24)

  • Product wise Profitability Report

    Hello,
    Currently we are using F.01 for profitability report.
    However, the report for profitablility as available here is on Business Area wise.
    We need the same kind of report but Product wise profitability.
    Is there any standard report available for the requirement ?
    Currently we are extracting data from MB5B and KE5Z and preparing the report manually in excel.
    Many Thanks in advance.
    Regards,
    Nirav

    Hi Nirav
    If you have COPA implemented - Create a "report form" from KE34 and report from KE31 and execute from KE30
    If you dont have COPA, then what you are doing is the only solution.. At best, you can create an ABAP report to extract the data you are manually extracting as of now
    br, Ajay M

  • GATP Product allocation status report and backorder processing

    Dear Experts,
    We are using product allocation as the first and only step in GATP check.
    The scenario is like this:
    Sales order total quantity = 200
    Planned allocation quantity=150
    Thus
    Confirmed sales order quantity=150
    Questions:
    1.Now how can see the confirmed/unconfirmed situation for all sales orders.
    Is there any standard report.
    I understand that this report need to show the planned allocation quantity,total sales order quantity and the confirmed sales order quantity may be bucket wise.Also this report can show the details of all sales orders in the bucket.
    The GATP planning book only shows confirmed sales orders in the "sales order" keyfigure until you have introduced another order series key figure for sales order(not related to GATP) which has sales order/scheduling agreement category group assigned to it.
    2.Can I do backorder processing of sales orders assuming that after the above report is run,I have changed the planned allocation quantity from 150 to 200 and I need that the sales order can be confirmed now by this program rather than by going into ECC and triggering the GATP check again.
    Note that the stock availability situation may remain the same.
    Request you to kindly suggest if this is possible in backorder processing.If yes,then what are the settings and the transactions to execute this.
    Thanks,
    Chandan

    Thanks so much Michael for a prompt reply.
    Couple of points.
    1./sapapo/ac42-This report is helpful but this has 2 issues.
                                                 It has to be run at individual CVC level.Thus it is not a comprehensive report.
                                                 It does not provide sales order original quantity.It just provides the planned allocation quantity,confirmed sales order quantity and the remaining quantity.This is normally already available in interactive planning of GATP planning area.
    What we need is a report which must say what is the original sales order quantity and how much has been confirmed and how much is the bucket planned allocation quantity.
    2.Running ATP in product view or interactive backorder processing view may not help as they seem to be working with ATP group and not with check mode.Note that product allocation gets triggered when check mode comes into play.
    Do you know if we can make it work with check mode.
    3.The batch backorder processing is working when I am using the "update changes" option.I am still evaluating the results as I don't understand many settings here.It will be nice if you can elaborate on some of the settings used in this transaction please.
    Thanks again.
    Regards,
    Chandan

  • Production lead time report

    Hi,
    Given below mateiral with their lead time activity
    Material A- Finish (in house prodn)
    100 qty = 10 days
    Low level in BOM
    X- Halb (2 days)
    Y-Roh (10 days)
    Z-Traded goods (2 days)
    Is there any report available which provide the information, if i want to plan mateiral (finish) with what period it is possible to fulfill the customer requirement. Considering all procurement and production activity.
    Regards,
    Rajesh

    Hi Rajesh,
    There is no standard report available for the leading time of FG with BOM multi levels. You can go for a Z report.
    thanks and regards
    Murugesan

Maybe you are looking for

  • How can I print a document from "workspace?"

    How can I print a document from "workspace?"

  • IPod not syncing since installing Windows 8.1

    I've just installed Windows 8.1 (jumping up from Windows 7) on my PC.  Installed iTunes, then plugged in my iPod.  Sync never even started up, though iTunes did open when I plugged in the iPod.  I checked under Devices and Printers and I see that the

  • Problem in executing statement

    Hi, I have table EMP which has a primary key on EMPNO column. I want to drop the primary key with the below statement: "alter table emp drop primary key" It's showing error as "ORA-06502: PL/SQL: numeric or value error: character string buffer too sm

  • Execution problem

    Wrote a very basic program that just prints a message on the console. Compilation was successful but keep getting this error during execution: Exception in thread "main" java.lang.NoClassDefFoundError: [class name]/class It will be great if someone c

  • Auto Extend is on , but maximum file size is 3276MB

    Dear Experts, small Doubt , Auto Extend is on in my DB . it is automaticaly extending the table space when datafile is full , increment size is 10240 KB. but my doubt is what is maximum file size it is showing 3276MB . what happend if we reach there?