Profit center linked to SD

hai,
In sales order there is a option to select profit center. we don't want to select the option. it should come automatically like how the business area linked with sales area. (Assign business area to plant & division)
Like the way profit center also to be linked with SD. Because sales area declared by SD  the same branch also declared as profit center in CO.
govind.

hai,
whatever cost elements created in CO, is it all should be assigned through OKB9.
we have 4 cost centers and 9 profit centers. is it possible to assign the cost element to 4 cost center as well as 9 profit center. expecting your suggestions.
govind.

Similar Messages

  • Cost center and profit center linked to GL account

    Hi All
    I am obtaining the carry forward balance for the fiscal year from the table
    GLT0 but I also need the cost center and profit center details for the GL account,
    which I am unable to get from either GLT0 or GLTPC or GLT1 tables.
    Is there any other way out. Please suggest!
    Regards
    Ankit

    Hi,
    Hope OKB9-Account Assignment will resolve this issue.
    There you have the assignments.
    Regards
    A
    Assign points if useful

  • Profit Center - Cost Center link

    Given the Profit Center, is there a table I can check to find which Cost Centers are linked to it?

    since we assign the profit center in the cost center master data, go by the cost center.
    use table CSKS for cost center > profit center link, then sort on profit center.

  • Materials management small differences - DIF - Profit Center assignment.

    Hi,
    We have created one G/L for posting the u201CMaterials management small differencesu201D at the time of generating MIRO document via transaction u201CDIFu201D in Tcode - OBYC.
    For e.g. if the GR amount is 90 and IR (Invoice received from party) is of Rs. 91/- or vice-versa then for posting the difference of Rs. 1/- we have made the above assignment.
    System is generating the line item for the u201CSmall Diff -Invoice Verificationu201D but posting automatically to a "Dummy Profit Center u201C in the absence of any other data.
    Our point is that we want to change the profit center to the related Business area, which is there in the line item of u201CSmall Diff -Invoice Verificationu201D account.
    We tried the FI substitution (Tcode u2013 GGB1/ OBBH) for the Profit Center derivation on the basis of Business Area but that is working with the FI documents (Manual FI entry) only and not with the automatic line generation like MIRO in the above case.
    Later on I tried Tcode u2013 OKB9, but in that case after giving business area wise cost center substitution, system is correctly showing the entry (in simulation mode of MIRO transaction) in the required Cost Center & on that basis in the Profit Center, but still system requires u201CCO-Objectu201D
    Initially we tried other way of creating a Cost Element under the category of u201C11 u2013 Revenueu201D to maintain Business Area u2013 Profit Center link but still in that case also it requires co-object hence turned to changing the Cost Element Category to u201C1 u2013 Primary Costu201D for capturing Profit center on the basis of Business Area u2013 Cost Center link since basically G/L u2013 u201Csmall Diff -Invoice Verificationu201D we have created under u201CExpense Groupu201D.
    Our requirement is to post the entry in related profit center per Business Area in the line item of "Small Diff -Invoice Verification" since there are 6 to 7 business areas, which are active in system.
    Regards,
    Shridhar

    Hi,
    Thanks for the reply. But I would like to correct you. I have mentioned in my subject line - "DIF" i.e the Transaction Key maintained in Transaction Code - OBYC for posting the small difference (Between GR and IR values) arriving at the time of MIRO transaction posting.
    Now meanwhile I have come across u201CSAP Note : 32654u201D which mentioned that "Account assignment for the transaction (KDR, DIF, UPF) on the highest level i.e. the 1st screen where we set the Cost Center or Profit Center assignment to Cost Element with Acct Assignment details (1 or 2 or 3) is possible.
    Same is not possible on details level means Acct Assignment details level per Valuation Area or Business Area for Cost Center or Profit Center linkage (2nd screen of OKB9).
    Please do correct me if I am making any wrong statement.
    Now would like to have an advise about the transaction Code - OKC9 with the scenario (MIRO document u2013 Dummy Profit center linkage) that I have mentioned above.
    Do I require to maintain OKB9 (At highest level) and then need to work out CO- Substitution via OKC9 ? Or OKC9 is enough to cover my scenario ?
    Do any body have a knowledge about that? Points will be assigned.
    Regards,
    Shridhar

  • Link between G/L Account and profit center

    Hello dear all,
    I have an issue in Intra-company process.
    I made 2 customer payment for 2 different company code:
    1/ Company 1000: i have 2 line items posted (in G/L View)
    2/ Company 2000: For the same Cash account and the same customer account used in my first case (with company 1000) i have 4 line item posted in the G/L view and with different " PARTNER PROFIT CENTER"
    I do not know wher can i find in customizing the link between G/L Account and Profit center ?
    Thank you in advance

    The document splitting is active in your company, at the same time, the "zero balance" for profit center is activated in your doc split characteristics. In order to balance the profit center in General View, it creates another line item for balancing it which is the zero balancing account or split the cash account according to profit center assignment. For some cases, they are split equally that is why it is best that you assign the profit center in the cash account upfront and create line item for each payment with different profit center assignment.
    For instance, there are two customer line items with different profit center assignment
    Customer Line Item 1 = Assigned to Profit Center 2000 amount 500
    Customer Line Item 2 = Assigned to Profit Center 3000 amount 500
    When I post a payment of 1000, the Entry View is
    Cash                 1000
        Customer                1000
    GL View
    Cash       PC 2000       500
         Customer PC 2000         500
    Cash      PC 3000        500
         Customer PC 3000          500

  • Link between profitability segment and profit center

    Hi
    Could you please let me know where we link the profit center to profitability segment. Please let me know the path and complete steps
    Regards,
    Krishna

    Hi,
    These two are independent entities; there is no link between them.
    Regards,
    Eli

  • PP Production orders link with Profit Center

    hi experts
    we are working on Projects based scenario and Production is doing in the same way, we mentioned profit center in Project WBS element, but my requirement same profit profit center should be link to production order.
    what are the settings need to be done please help
    thanks in advance
    Sing

    Dear Slng,
    In my understanding if you have assigned a profit center in the material master under Costing1 view then it get's copied
    automatically into the production order which can be seen under Assignment tab page of the production order.
    This is the process when you create a production order from a planned order using CO41/CO41 or by creating a production
    order manually using CO01.
    Check and revert back.
    Regards
    Mangalraj.S

  • Link material to profit center at storage location level

    Hello,
    I have one plant 0001,  two storage location assigned to this plant (MAG1, MAG2).
    In " MAG1", I am keeping the consignment stock (stock blongs to my vendor), hence when I create the material at the storage location I need that profit center be set to PF1
    "MAG2" is my own stock location, so when I create material at MAG2 level, I need that profit center be set as PF2.
    Does standard SAP allows such scenario.
    Is there any possibility to map this scenario
    Many thanks for your help
    Meher Souayeh

    Dear,
    Basically GUIXT script work mainly from Technical point of view..
    Here they can write codes accordinly so that if you want to make any sort of changes in the application or if you want to put some restriction parameters then by writing codes, it is very much possible to get the desired output.
    Hope this clears your doubt.
    Utsav

  • Linking profit center and plant

    Hi
    I have two profit centers (1000 and 2000) and two plants (1001 and 2001). Each profit center represents each plant.
    Now when i am creating material master or post any FI entry, I am able to put profit center 1000 and plant 2001. SAP is allowing this combination.
    I want to restrict this combination. I want that if i use profit center 1000 then it should not allow plant other than 1001 or vice a versa (i.e. when i create any material in 1001, it should only allow profit center 1000).
    How bring this restriction. Is there any plant to profit center linkage in Standard SAP.

    Hi,
    it's a standard setting that profit center is company code dependent. You assign it to specific company code ( or more of them).
    Additionally you assign plants to company code and system is doing the check for you. You cannot put a profit center which not belongs to specific company code so indirectly to specific plant.
    Regards

  • Link between Plant and Profit Center

    Hi,
    Can any one let me know how to derive profit center for a plant or where this info is stored.
    thanks,
    preetham s

    Hi
    There is no direct relationship between a plant and profit center. Based on your configuration in the system, however, you can have various relationships. For eg, if your plant is one valuation arrea, there is a relationship for various cost center and cost elements at the valuation area level in T Code OKB9. In such a case, every valuation area relates to a plant and profit center derives the data for a plant from the cost center and cost element combination. Another way could be through the material master, where, for every plant view, you can assign a profit center. Another way of looking things could be a scenario, where every plant is also a profit center. In such a scenario, in EEC 6.0, you can draw Financial Statements also at Profit center level.
    Thanks & Best Regards
    Sanil K Bhandari

  • Link between BSAK and Profit Center

    Hi Alll,
                        I want relation between profit center (PRCTR) and accounting documents tables. I know bseg consist of prctr field,but I  canu2019t use this table  because of performance issue in my report.
                                          So tell me any other accounting document table like BSAK, BSIK which consist of that field PRCTR.
    Thanx advance,,,,,

    Go to table DD03L and put field name-> execute
    you can follow this also
    Tcode SE84
    ABAP Dictionary -> Fields -> Table Fields --> field name = <your field name->Execute.

  • Error in Creation of Profit Center

    Hi Experts,
    When  I am trying to activate Dummy Profit Center I am getting this error
    "A profit center scenario is active in new General Ledger Accounting
    Message no. FAGL_LEDGER_CUST155".
    anyone pl assist me reg this..
    Thanks in advance,
    Regards,
    Balaji Bhonsle

    Please, follow this link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/47/fc23f9a0af6673e10000000a42189c/frameset.htm

  • Profit center line items are not displaying in KE5Z

    HI Eperts,
    we are executing tcode KE5Z. System is not displaying any line items. because we have missed out in configuration updation of line items and on line transfer check boxes activation in 1KEF.
    please advise how we have to retreive whole data posted up to now under this controlling area..
    Regards
    vekat....

    Hi Venkat,
    Please check the following link.
    [http://help.sap.com/saphelp_45b/helpdata/en/eb/1370e343c411d1896f0000e8322d00/frameset.htm]
    Also check the tcodes 1KE8 (Transfer FI Actual Data), 1KEC (Transfer MM Actual Data) and 1KE9 (Transfer SD Billing Documents)
    The path for these tcode is as under:
    Controlling --> Profit Center Accounting --> Tools --> Prepare Production Startup --> Data Transfer.
    Please check in your test system first.
    Regards,
    Sameer

  • Vendor aging report profit center vise

    Hi,
    The requirement is client wants to have profit center vise due date analyses (0-30,31-60,...).I tried standard reports S_ALR_87013344 profit center payables.But 'no records' message is coming.In Table BSIK field for profit center is not getting updated.
    Any suggestions??
    Thanks,
    Anitha

    Hi
    From NEW GL onwards the reports to view open items asper Profit centre should be seen from the following:
    S_AC0_52000887 - Receivables: Profit Center
    S_AC0_52000888 - Payables: Profit Center
    You can use the same logic used in the above programs for the report:
    S_ALR_87012085 - Vendor Payment History with OI Sorted List .
    Otherwise, you can develop a standalone report using the tables BSIK and FAGLFLEXA by linking these two tables with a common parameter of Document number and the fiscal year. Once you get the details of the document number and fiscal year into FAGLFLEXA, then you can search for the offsetting entry of the vendor line item and fetch profit centre.
    And after getting profit centre, i think you can fetch up the data from BSIK.
    I suggest to try to see how best you can modify the standard report with the same logic as given in the start.
    Reg
    Bharathi

  • Profit Center Report issue

    Dear Experts,
    We have activated NEW GL Functionality and Classical PCA is switched off (i.e. no dummy pc is created)
    and client's Profit Center report requirement is as following.
    Under Profit Center,client wants to view the costs -Cost elements wise (BOTH THE REVENUE & COSTS) and Cost Center wise.
    We have searched all the standard reports,but there is no such report to meet the client's requirement.
    So we have decided to go with the development.Can any body share the table name ,by which we can develop a report to meet the client requirement.
    Note that Table :COEP is tried ,but cost center field is not available in this table .
    Regards
    Su

    Hi
    You should use the library 0FS or 0FL to write your own report as per the format required. Standard Reports will not have the layout required. The link below will guide you on the steps to write a report in Report Painter. You need to down load the PPT
    http://www.erpdb.info/report-painter-step-by-step-guide/
    Regards
    Sanil Bhandari

Maybe you are looking for

  • How to share content across a whole family?

    I know there are other threads related to this, but I'm really trying to understand how to manage iTunes DRM, Home Sharing, Match, etc., across my family's ecosystem of Macs, iPhones, iPods and iPads. I seem to think the following apply: - up to 5 "c

  • [HELP] [BPEL 11g] Customized BPEL worklist app could not work on JBoss

    Dear all, We are developing the customized Human Worklist app based on BPEL HW API 11g. The application (some jsp pages) works fine in JDeveloper 11g. However, after deploy to JBoss, it always prompt with "NoClassDefFoundError" exception, although we

  • List problem while calling report from froms

    forms 6i i am using. i am passing parameters to report from my form. in report i have company parameter. user select ALL/Specific i populate list for specific on run time like with this query. Populate_Group_With_Query(rg_id,'select sym_code,sym_code

  • Failover Cluster Wizard Fails

    I am trying to create a cluster with two Windows Server 2012 nodes on an existing domain where the domain controller is Windows 2003, and the wizard fails with the message: Set password on (ClusterName). There are currently no logon servers available

  • Very slow mac after installing yosemite

    I have already tried all the online tips (like turning off transparency etc) but nothing works. I have also run Etrecheck and will include the report: Problem description: Mac very slow after installing yosemite EtreCheck version: 2.1.8 (121) Report