Project Server 2010 categories and group permissions

Hi, I have reason to suspect that permissions have been varied on categories and are different for differing users requiring the same categories. Are there any tools I can use to quickly look at the current permissions compared to the default permissions?
thanks
Steve

Steve,
This is one of the reasons why we always suggest that the default categories/groups be left intact and new elements be created for security.
You do have some options though:
1)
Here is an excellent quick reference set up by Guillaume, that will give you links to the default security as defined out of the box.
2) You could simply create a blank PWA instance and see the permission settings.
3) For the Category Specific permissions for groups, you could create new groups and set up permissions with templates.
4) I think the Orange book by Gary Chefetz and Dale Howard also details out all the permissions.
At least these are the few things that I can think of the top of my head.
Cheers,
Prasanna Adavi, Project MVP
Blog:
  Podcast:
   Twitter:   
LinkedIn:
  

Similar Messages

  • Project Server 2010 - Different Schedule Dates for Different Users -- Same File

    We have an issue regarding users viewing the same schedule, different machines.
    The PMs have a schedule that was built in 2007 by the offshore team.  We are running Project Server 2010 corporate, and they the PMs here on site have Project Professional 2010.  Within the last couple of weeks, the PMs have noticed changes in
    the dates.
    When I open the schedule, I see the expected dates rendered in both PWA and Project Professional.  Both draft and published versions are the same regardless of where the schedule is opened for editing.  There are two PMs managing the schedules. 
    One sees what I see--the expected dates.  The other sees differences in dates--months, in fact.  Scheduled end date is 10/22/2013.   When the second PM opens the schedule, he sees a scheduled end date of 2/17/2014.
    I advised them that the offshore team needed to upgrade to 2010 due to the differences between 2007 and 2010.  Additionally, and I could be wrong, having the server run in compability mode for so long (the upgrade was done in May 2013), is not ideal. 
    (Offshore team has since updated to 2010.)
    Any thoughts on what could be causing this issue?  Corrupt version of Professional?  Settings askew?
    Thank you,
    L.D.

    My bad, I didn't know that you were not using Project Server.
    Then the file might be corrupted.
    Try the
    XML export and the
    save for sharing method to repair it.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Do I *really* need a Service Connection Point in AD to complete a Project Server 2010 SP2 installation?

    Hi all,
    I have installed Project Server 2010 SP2 and run psconfig.exe
    PSCONFIG is failing because it cannot set up a Service Connection Point in AD. I've checked in AD and the contains 'Microsoft SharePoint Products' does not exist. All the resolutions I can find suggest adding the container into AD.
    The issue I have is that I have no control of the AD, and adding containers will take lengthily negotiation.
    Is there any way of completing the installation and getting my site back without adding the container into AD?
    Thanks in advance.

    other solutions
    1) check timer service see if it is running
    http://www.jonthenerd.com/2011/06/30/sharepoint-2010-sp1-upgrade-error-unable-to-create-a-service-connection-point-in-the-current-active-directory-domain/
    2) check UAC (and the rest of the technet answers - some are listed below)
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    3) My workaround:I
    run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent -install -cmd installfeatures“  in
    the “Bin” Folder as an administrator console session.In the moment I saw the staus “Configurationtask 5 of 6 is executed”
    I start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a parallel administrator console session and after that the configuration task finished successfully.
    http://social.technet.microsoft.com/Forums/en-US/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/psconfig-fails-failed-to-upgrade-sharepoint-products
    4) Try running the psconfig.exe command a second time
    5) had the same issue and called Microsoft support.  Here is the fix:
    Stop the "SharePoint 2010 Timer" service
    Delete ONLY the xml files from C:\ProgramData\Microsoft\SharePoint\Config\216f8013-b78b-4e5b-8631-3a5f4c7277e8
    Note: Do NOT delete the cache.ini file in this folder
    Edit cache.ini and change to "1"
    Start "SharePoint
    2010 Timer" service
    Run psconfig again:  PSConfig.exe -cmd upgrade -inplace b2b -wait -force
    6) Initially I tried http://support.microsoft.com/kb/2009272 but
    it did not help (I re-implemented later).
    I re-registered the DLL’s as perhttp://social.technet.microsoft.com/Forums/da/winservergen/thread/b4bd0deb-45d0-4661-8c50-a2b45db41103 from
    NareshD.  I do not believe this is necessary unless there is a corruption in the system but I am noting here just
    in case.
    I tried to run The PSConfig but it was failing:  I
    had to do the following in order to make it finish successfully:
    (from same page at http://social.technet.microsoft.com/Forums/en-US/smallbusinessserver/thread/94a8bb64-e0ea-493f-8e29-01347b1fc6c7/)
    On the migrated SBS2011 PSCDiagnostic Log I found no entry to detect or start the services SPWriterServiceInstance and SPTimerServiceInstance.
    I run once again the command „PSConfig.exe -cmd upgrade -inplace b2b -force -cmd applicationcontent
    -install -cmd installfeatures“ in the “Bin” Folder as an administrator console session.
    In
    the moment I saw the status “Configuration task 5 of 6 is executed” I
    start to run the command “net start SPTraceV4 & net start SPWriterV4 & net start SPAdminV4 & net start SPSearch4 & net start SPTimerV4” in a
    parallel administrator console session and after that, the configuration task finished successfully.  (I
    just opened another cmd window and copy/paste the sequence below when I saw the status “Configuration Task x of y” on the screen:
    net start SPTraceV4 
    net start SPWriterV4 
    net start SPAdminV4 
    net start SPSearch4 
    net start SPTimerV4
    -Note SPSearch4 is disabled in our system…
    Very awkward but it worked…
    I implemented http://support.microsoft.com/kb/2009272 again.
    Backup started working with no errors.

  • I want to break inheritence and create unique permissions in a Project Server 2010 project site list/library.

    Some Project Managers want to restrict permissions on certain lists or libraries in their Project Server 2010 project site. However, when I have done this for them, by breaking inheritence to the parent site and then removing/adding users with unique
    sharepoint permissions, it seems that when the project schedule is published, some of the newly created permissions are lost.
    I have tried creating a SharePoint group at the project site level and then applied it with specific permissions (eg. Contribute) to the list/library and this seems to work better but I haven't been able to confirm yet if this will work in the
    longer term.
    Does anyone know what is the best method to break inheritence and set up unique permissions on a list in a Project Server 2010 project site that will not be lost when the project schedule is published?
    Thanks
    Peter

    Thanks Lynda
    I am aware that I can disengage the entire permissions sychronisation using that setting but that is not what I want to do.  I just want to be able to break the inherited permissions on individual document libraries or lists on specific Project Sites
    so that I can restrict access to nominated people.
    My issue is that when I do this, I find that some of the amended permissions disappear from time to time.  It seems to be related to when the schedule is published.  They
    don't revert to the inherited permissions, just some of the people who I have given direct access to no longer have access.
    Im just trying to find out the best way to manage setting non-automated permissions on a single list or library in a Project Server project sites so the changes stick.
    Peter

  • Project Server 2010: PWA Removing Default Project Site Security Groups When Creating a New Project

    I looked for this specific issue with Project Server 2010/PWA/SharePoint and could not find an exact answer... hopefully someone can help.
    We are currently using Project Server 2010 and have a number of project site templates that are used dependent upon the enterprise project type selected. Each of these project site templates have unique permissions which should create the default security
    groups on the project site upon publishing/syncing:
    <Project Name> Members
    <Project Name> Owners
    <Project Name> Visitors
    <Project Name> Project Managers (Project Web App Synchronized)
    <Project Name> Team Members (Project Web App Synchronized)
    Web Administrators (Project Web App Synchronized)
    Whether a user creates a project through PWA or Project Pro 2010 and imports the project into PWA, we get a weird result in the Site Permissions of the newly created project site. PWA will remove all default security groups from the project site template
    and add a whole list of users in the Site Permissions list without groups. 
    Once the project is published and the project site is created, we can then go back and add those default security groups back in the project Site Permissions and even add a couple of custom groups without them being removed on all subsequent project syncs
    or publishing. 
    How do we get PWA to not overwrite the project site templates' security groups and place each user in the proper default security groups? At the same time, how is PWA adding a number of users into the Project Site Permissions?
    Thanks in advance.

    Paul,
    Thanks for that information. Right now we are using the Test environment to turn the Auto-sync feature back on. I suspect that the reason this is happening is due to PWA groups/categories/security templates. There may be more than one PWA group that is "overwriting"
    the default project site groups upon initial creation of the project. We will look further into the security settings to tighten up the policies. 

  • Project Server 2010 / Sharepoint 2010 Permissions not syncing to Project Site

    Project Permissions not syncing to Project Site
    Project Manager Group
    New project is created and published project server sends permissions to Sharepoint which puts users into the following groups:
    <dir><dir></dir></dir><dir><dir>
    Web Administrator (Microsoft Project Server)
    Project Managers (Microsoft Project Server)
    Team members (Microsoft Project Server)
    Readers (Microsoft Project Server)
    At this time the creator/owner, owner’s management, portfolio managers, and executives should all have Project Manager rights on the sharepoint site, and Admins will have Web Admin permissions.
    Issue #1: Only the Web Admin permissions and creator/owner permissions are being added to the Sharepoint permission groups
    Workaround #1: Going into the project site permissions and adding the
    Project Managers (Microsoft Project Server) group manually and the sync will keep the permissions
    Workaround #2: Going into the Server Settings, Manager Groups then removing or add all users to the No Permission Group, which forces an sync to all workspaces. Con: This workaround can only be down at night when users are not active since it will
    block the queue for at least an hour.
    Project Owner Transfer
    Previously created project has owner change, once saved and published project server sends permissions to update user’s permission to
    Project Managers (Microsoft Project Server) on Sharepoint project site.
    Issue #2: When Project owner is changed and project is published the owner is not getting permissions to the Sharepoint project site. However, if owner is also added to the team using the Build Team Feature the sync will give the owner Project
    Manager permissions on the Project Site.
    Workaround #1: Going into Server Settings, Project Sites, select project and Synchronize. Once this is done, the owner will have Project Manager Permissions without being added to the team.
    Users who have been added to this project in Project Server 2010, but not assigned to tasks. Users who have assignments in this project in Project Server 2010 and are contributors to the project workspace site,
    meaning that they can create and edit documents, issues, and risks. Users who have published this project or who have
    Save Project permission in Project Web App and are contributors to the project workspace site, meaning that they can create and edit documents, issues, and risks. Users who have
    Manage SharePoint Foundation permission in Project Web App and are contributors to the project workspace site, meaning that they can create and edit documents, issues, and risks.</dir></dir>

    By default when you create project build team add users in the task and publish the project plan then All the User which are available in the project plan including Project owner will go to below mentioned group in project site:
    1. creator/owner, owner’s management, portfolio managers, and executives should all have Project Manager will get access to Project Managers (Microsoft Project Server)
    2. User who are having team member access to PWA will get Team members (Microsoft Project Server) access if they are assigned to the project task.
    3. User who are having team member access to PWA will get Readers (Microsoft Project Server) access if they are not assigned to the project task.
    4. Only PWA Administrator will get the access to Web Administrator (Microsoft Project Server)
    Sharepoint permission you have to use when you want to give permission manually to users on project site  
    In the Project Site provisioning setting under Server setting if you have Check to automatically synchronize Project Web App users with Project Sites when they are created, when project managers publish projects, and when user permissions change in Project
    Server.
    Then all the user get access as per describe above and if you will give access manually to any of the user either in project server group or in Sharepoint group once you will publish the project next time all the manually given permission will go away.
    IF you want to give permission to user manually to sharepoint group or project server group then uncheck automatically synchronize Project Web App users with Project Sites when they are created, when project managers publish projects, and when user permissions
    change in Project Server.
    You check PWA site setting --> Site permission then member of Sharepoint group user who will have access to sharepoint group in PWA site setting site permission will have access to all the project site sharepoint group as Project site inherit permission
    from PWA root site.
    Both the issue which you have described is behavior of project site.
    For issue 2 when first time project owner create and publish the project and projectsite is getting created then porject owner name gets access  in the porject manager (project server group) nect time if you will change the owner and publish the project
    until he will not present in the project plan will not get the permission.
    If you want to give sharepoint permission to users then uncheck automatically synchronize Project Web App users with Project Sites when they are created, when project managers publish projects, and when user permissions change in Project Server and give
    the permission manually. 
    Project site in 2010 has some issue and not full filling customer need some time ,Ms has came up with 2013 which is having tight integration with project sites .
    Project workspace security groups are equal to the SharePoint Server 2010 security groups.
    Web Administrator equals Full Control
    Project Managers equals Design
    Team members equals Contribute
    Readers equals Read
    Users who have Manage
    SharePoint Foundation permission in Project Web App and are contributors to the project workspace site, meaning that they can
    create and edit documents, issues, and risks will get access to Web Administrator (Microsoft Project Server)
    http://technet.microsoft.com/en-us/library/cc197668(v=office.14).aspx
    kirtesh

  • Project Server 2010 permissions granted through RBS are not flowing through to Project Sites.

    Hi,
    I have configured RBS as "The Project Owner is a descendant of the user via RBS"  its working fine for Projects.
    But users are  facing access denied issue when working with project sites RBS is not working for project sites.
    Can any  one Help me How can i grant permissions Automatically for project sites also as same like projects is it possible ?
    The Members in  Executives group can see all projects in organization but same like can they see all project sites ? 
    I have found one blog of
    RaymondRis he is recommending to do it manually as its not possible to grant Project site permissions Automatically.
    http://blogs.technet.com/b/raymond_ris/archive/2013/05/09/project-server-2010-permissions-granted-through-rbs-are-not-flowing-through-to-project-sites.aspx
    Thank You, Kumar KSV

    Kumar,
    The permissions to project sites is not cotrolled by the RBS, as you have discovered. It is controlled by the Security Category permisisons, and the settings if the permssions are auto synced. The permissions work like this:
    Project managers who have published a project or who have Save Project permissions on a project are added to the Project Managers (Microsoft Project Server) site group.
    Team members with assignments in a project are added to the Team members (Microsoft Project Server) site group.
    Other Project Server users who have View Project Site permission on a project are added to the Readers (Microsoft Project Server) site group. 
    As long as you use the Auto Sync of permisisons for project sites, i do not think there is any work around.
    Cheers,
    Prasanna Adavi, Project MVP
    Blog:
      Podcast:
       Twitter:   
    LinkedIn:
      

  • MS Project Pro file on Project Server 2010 does not accept [No Group] selection when clicking on Group view

    MS Project Server 2010 gives me the following error when I try to click on the [No Group] group:
    Error message:
    The group "" cannot be found. You tried to display a view that references a group that is not available.
    Specify a different group for the view."
    Note: When I look at the drop downlist for the Group on the View Ribbon, [No Group] appears in the Built-in section of the list. It also appears on the Organizer.

    Michael W --
    I have seen this error message several times when the project got corrupted due to drops in my network connection while the enterprise project was open.  If memory serves me correctly, the method for resolving this problem is to use the Save For
    Sharing feature.  To do this, complete the following steps:
    Add the Save for Sharing button to your Quick Access Toolbar, if you have not already done so previously.  Use the Project Options dialog for this.
    Open the project in question and click the Save for Sharing button.
    In the Save for Sharing dialog, save the MPP file in a location where you can find it easily, such as your Desktop.
    Close the MPP file and then reopen it.
    Click File > Save As and then click the Save button.
    Using this process, Microsoft Project will resolve the corruption in your project.  Please let us know if this process works for you.
    Dale A. Howard [MVP]

  • Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication

    Hi,
    Here is the situation :
    One master project with three sub projects.
    Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
    Sub projects got no sub projects nor links between projects.
    The owner of the master project got read rights through projects permissions on sub projects.
    Sub projects are link in "read only".
    We applied Project Server 2010 SP2 last week end and the issue appeared monday.
    Here are the symptoms :
    When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
    With 2 sub projects, the error may occur.
    With 3 sub projects, the error always occurs.
    With admin rights, the error doesn't occur.
    Here is the error :
    ID : 20010 (0x4E2A)
    Description : You don't have required permissions to perform the action (Average traduction)
    Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
    I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
    Thanks for your time !

    Fylim --
    If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects.  Because you said that the PM needs to set links in all three projects, this means that
    the PM will be editing all three projects.  In order to edit the three projects, the PM must have Read/Write access to all three.  Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission. 
    Make sense?
    Regarding SP2, I am not aware that this would change anything, but I could be wrong.  The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
    projects that he/she needs to edit with cross-project links.  Hope this helps.
    Dale A. Howard [MVP]

  • How to sync Projects between Sharepoint and Project server 2010.

    Hello,
    My project is saved in SharePoint and I am trying to save and link my project from Sharepoint to Project server 2010 so that they will be saved in Sharepoint and Project Serverwill both and synced.Users can edit or update from Sharepoint
    and Project server.
    Any help or suggestions would be greatly appreciated!
    Thanks,
    Prashant
    Thanks, Prashant

    Hi Prashant,
    It is a bit unclear how you have a project in Sharepoint AND a project in Project Server 2010.
    The basic process is :
    you have EPT, associated with a Sharepoint template
    You create from Project Server 2010 (project center) a project choosing an EPT
    a project plan (mpp) will be created, editable from PWA or MS Project Pro2010
    a Sharepoint site associated with the project plan will be created, based on the EPT WSS template
    In server settings, you can sync permissions between the project plan and the sharepoint site, and also check for the url and eventually update them.
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Project Server 2010 - Modification date and name of the person who made the last change in the project

    Hello everybody
    I'm with a doubt.
    I got in the business
    environment Project Server 2010 and
    would like to get the publication date,modification
    date and name
    of the person who made
    the last change in
    the project. It is possible
    to doby the native
    resources or is
    there any query in
    SQL Server to perform a
    query of this information.
    Thank you.
    Obrigado por contactar o fórum Microsoft Technet!

    Hi Hezequias,
    You can get the ProjectModifiedDate column in MSP_EPMProject_userView in the Reporting DB where you can
    get the data based on the projectUID. 
    The "last saved" date in the draft DB (be aware that querying in the draft DB is not supported by MS).
    For the "last modified by", I think it is not stored in any place.
    But you can develop custom code upon publishing the project (Event BeforePublish), writing the current
    date and username automatically into a custom enterprise field.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • How to change the look and feel for Heading of quick launch menu in project server 2010

    Hi
    can someone tell me how to change the look and feel of Header names in quick launch.
    I want the header to be displayed in Bold with Underline to it.
    could this be possible for just header in quick launch in project server 2010. 

    Hi Rohan
    It does not work this way. You have to use a content editor webpart.
    See references below that might help you starting with this customisation:
    Http://go4answers.webhost4life.com/Example/sharepoint-2010-quick-launch-look-feel-78379.aspx
    Http://m.sharepointpromag.com/sharepoint/four-ways-add-or-remove-quick-launch-menu-control
    Hope this helps.
    Guillaume Rouyre - MBA, MCP, MCTS

  • Project server 2010 What are the number of Custom fields and views allowed?

    How many customizations are permitted in Project Server 2010?
    Thanks in advance

    Hi
    new findings on that issue...
    There is an article for Project Online that speaks about limits for reporting: https://support.office.com/en-US/Article/Project-Online-software-boundaries-and-limits-5a09dbce-1e68-4a7b-b099-d5f1b21ba489?ui=en-US&rs=en-US&ad=US
    Apart from that you will have an issue if you like to upgrade to Project Server 2013. When trying to convert the 2010 databases to a 2013 database a SQL stored procedure will fail if you have more custom fields than fit into the UserViews.
    Error message will be something like this:
    System.Data.SqlClient.SqlException (0x80131904): INIT METADATA ERROR!  At least one mismatch found between SQL schema for view MSP_EpmProject_UserView and reporting metadata.  Call to MSP_Epm_CheckIntrinsicAttributes failed for Projects  INIT
    METADATA ERROR.    
     at System.Data.SqlClient.SqlConnection.OnError(SqlException exception, Boolean breakConnection, Action`1 wrapCloseInAction)    
     at System.Data.SqlClient.TdsParser.ThrowExceptionAndWarning(TdsParserStateObject stateObj, Boolean callerHasConnectionLock, Boolean asyncClose)    
     at System.Data.SqlClient.TdsParser.TryRun(RunBehavior runBehavior, SqlCommand cmdHandler, SqlDataReader dataStream, BulkCopySimpleResultSet bulkCopyHandler, TdsParserStateObject stateObj, Boolean& dataReady)    
     at System.Data.SqlClient.SqlCommand.FinishExecuteReader(SqlDataReader ds, RunBehavior runBehavior, String resetOptionsString)    
     at System.Data.SqlClient.SqlCommand.RunExecuteReaderTds(CommandBehavior cmdBehavior, RunBehavior runBehavior, Boolean returnStream, Boolean async, Int32 timeout, Task& task, Boolean asyncWrite)    
     at System.Data.SqlClient.SqlCommand.RunExecuteReader(CommandBehavior cmdBehavior, RunBehavior runBehavior, Boolean returnStream, String method, TaskCompletionSource`1 completion, Int32 timeout, Task& task, Boolean asyncWrite)    
     at System.Data.SqlClient.SqlCommand.InternalExecuteNonQuery(TaskCompletionSource`1 completion, String methodName, Boolean sendToPipe, Int32 timeout, Boolean asyncWrite)    
     at System.Data.SqlClient.SqlCommand.ExecuteNonQuery()    
     at Microsoft.Office.Project.Server.Data.SqlSession.ExecuteNonQuery(SqlCommand command)  ClientConnectionId:21f11abd-7388-48a0-a029-b5161fcb2dc8
    Workaround for the issue (UNSUPPORTED !!!!!!)
    Execute the Convertto-SPProjectDatabase script. Now you need to be fast or well prepared. You need to find the MSP_Epm_CheckIntrinsicAttributes stored procedure. Execute an ALTER statement for it and change the last lines of code to something like this:
    LblError:
       PRINT @ErrorMessage
        --changed RETURN code if an error occurs to be able to proceed with migration 
        --RETURN 1
         RETURN 0
    END
    I hope that helps someone out there - when I came across the issue last night, a google query returned nothing for INIT METADATA ERROR....
    Regards
    Christoph
    Christoph Muelder | Senior Consultant, MCTS, MCSE | SOLVIN information management GmbH, Germany

  • Project Server 2010 compatibility with IE11 and Windows 8.1

    Hi All!
    Maybe a silly question since compatibility is always asked about older versions, but here is my question:
    Is Project Server 2010 compatible with IE11 and Windows 8.1?
    I personnaly tested with IE11 and it seems to be ok. All views and pages can be opened with IE11.
    But what about windows 8.1? 
    Has Microsoft done any communication about this?
    Thanks in advance for your helps.
    Guillaume.
    Guillaume Rouyre - MBA, MCP, MCTS

    I am seeing a minor issue with the timesheet grid after users are upgraded from IE8 to IE11.
    We are using Project Server 2010 with SP1 and Oct 2013 CU.
    When some users (using IE11) switches between filters or views in the Timesheet page, the grid shrinks making to content un readable.  The only way to get it back is to refresh the page. After a refresh, the grid returns to normal size, but the pane
    divider is too far to the left and always must be dragged to the right in order to see the task names in the left grid. 

  • Error Project Server 2010, % Complete, Work and Actual Work

    Hi Everyone
    I have a Project Server 2010 SP2 Environment, The farm contains 3 Servers.
    1 WFE, 1WebApp, 1 BD. All servers in the farm are Windows Server 2008 R2 and the Data Base Server is SQL Server 2008 R2
    The Context:
    The Project Managers create the Project in Project Professional 2010 SP2 for support Annual Maintenance about a software, then the team members go to my tasks in PWA to create the task inside the stage in the project, then they put the actual work, then they
    send the progress to his project manager.
    So, the project manager goes to the approval page to approve two times, one, the task creation and two, the progress.
    So far all ok but when the project manager open the Gantt in Project Professional 2010 SP2 , the task that the team member has sent appear with a 100 percent complete, but the work with 0 hours and the actual work with 0 hours too, being that should appear
    with the hours the team member has sent, that is my problem.
    This occur only with this project manger and his team member, all of others project managers in the platform don't report this issue.
    I already have  re open the project and re publish too
    So , let me know if you have some idea about this issue.
    Erick Gutiérrez PMI Membership #ID 2089740 MTCS - Microsoft Project Server Managing Projects

    Only other ideas is to make sure the duration isn't 0, which would make it a milestone.
    Have the resources, recall the timesheets and resubmit.  Run it thru cycle again and see if they actual show up.
    Finally, you can run SQL query and see where the data may be. 
    1) Check if status manager is who you think it is
    2) Check if project shows actuals in sql.  Doesn't explain why not showing in schedule.
    cheers!
    Michael Wharton, MVP, MBA, PMP, MCT, MCTS, MCSD, MCSE+I, MCDBA
    Website http://www.WhartonComputer.com
    Blog http://MyProjectExpert.com contains my field notes and SQL queries

Maybe you are looking for

  • I cannot connect to a Deskjet 3070A from Ubuntu 1204 or Ubuntu 10.10

    I have been trying to set up a wireless printer. I can print to the printer when it is attached via the USB cable but it loses all connection as soon as the cable is unplugged. I installed the latest version of HPLIP 3.12.4 on both PCs but it is unab

  • Reading Dynamic Configuration information in side adapter module.

    Hi All, We are writing an adapter module for one of our receiver adapter. On the Sender side we have a file adapter whose adapter specific properties are checked. So the message has the file name in the Dynamic configuration. Now we need to read this

  • Java ide's

    ı think the best way of learning the core java is to write code in a simple editor. using an ide generally cause novice programmers to feel confused and. writing codes by an ide is like singing a song playback. you know what you are doing but dont kn

  • Trusted certificates from your previous version of Adobe Reader were found.

    After upgrading Adobe Reader from 10 to 11, some users are getting "Adobe Reader Security - Trusted certificates from your previous version of Adobe Reader were found.  Would you like to import them."  I need to know what registry settings we can mod

  • Maintain lookup/hierarchy tables from Netweaver Portal

    How do we maintain loopup/ hiearchy tables from SAP Portal instead of data manager?  Is this part of standard delivered portal content iviews or we need to create custom code to perform this? Any pointer or guidance or best practice would be greatly