Regarding set up of system landscape

We want to have only a 2 system landscape for our SAP deployment i.e. Within the development server, we shall have development client and quality client and then just have another production server.
Since we have confirmed that this is possible, please let me know the disadvantages in doing so and also if we need to anticipate for trouble shooting.
Thanks & regards,
Tommy.

HI,
1.Small and simple R/3 installation for up to 50 users and 2-system might beadequetly administrated with 2 system managers doing most of the tasks and external resources for occasional help.
2.A Two system landscape is not optimal because development and quality assurance testing both occur in the development system.since no separate quality assurance system is available,all objects transported to the consolidation system immediately become part of production.
Mainly Disadvantages:
1. Development quality assurance are perfomed in the same R/3 system.
2. Unable to fully test Repository objects and cross client customizing before these are transported to production.
3. No verification of transports before delivery to production.
Feel free to revert back.
Please provide points if u get the answer.
---venkat.

Similar Messages

  • APO - Basic settings for setting up the system landscape

    Hi,
    I have a, hopefully small, issue regarding setting up the system landscape for our APO - R/3 environment.
    In our test system in R/3 I need to specify the APO release, which is not a problem. The issue I have in R/3 is when I try to save the new setting. The system asks for a workbench request even if the test system has been "opened" by the Basis resource.
    I would like to avoid creating a workbench request as we are using an external tool ( HP PPM ) for transport management and I believe I will get into trouble since this workbench request should not be transported further into our production environment. As I have understood from our APO experts the settings must be maintained per R/3 system (development - test/quality - production) as it is pointing to corresponding systems in the APO landscape.
    The question is, does anyone know how we can maintain these settings without any workbench request being created?
    This is perhaps not a APO question, but I'm not sure in what other forum I should post it.
    Thanks for any feedback
    Br,
    Lars

    Lars,
    I have difficulty envisioning any situation when you would wish to make any transportable change (workbench or otherwise) in a test system.  The normal path would be to transport the change from the dev system into the test system.  I am unfamiliar with the third party software (HP PPM) about which you speak.  However, the standard controls currently used in your transport process (third party or otherwise) should limit which transports do and which transports do not get moved into your prod system.
    I can think of several ways to approach this problem.  I think you should consult with your supervisor before attempting such changes, to ensure that you are complying with all policies and procedures that exist for your company.  In my company, this type of exception would require creation of special change management docs, and appropriate signoffs by management.
    You are right this is not an APO question, it is a Basis question.  For advice on the technical aspect of your question, try one of the Basis forums.  Pick the one that is for the DBM you are using.
    http://forums.sdn.sap.com/index.jspa?categoryID=1#34
    Best Regards,
    DB49

  • Transport target group and routes setting for 2 system landscape

    Hi!
    I have 2 system landscape (DEV with 2 Clients, 100 CUST and 200 TEST and PRD with productvie client 100).
    Currently I have the standard TMS configuration for 2 systems (with tranport layers/routes ZDEV and SAP) .
    Now I  have to set up my TMS settings client specific
    (Development in DEV 100 and transport to the DE 200 TEST and PRD 100).
    I have created tranport target group /B-DEV/ with both target goals:
    DEV 200 and PRD 100.
    <b>What are the further settings for transport routes?
    I assume, I have to delete the existing routes ZDEV and SAP?
    what are the next steps? </b>
    Thank you very much
    regards

    Ok, I have in DEV system:
    Client 100 (Customizing)
    Client 200 (Test) (it can be considered as replacement of QAS-system, because we only have 2 systems)
    PRD system
    Client 100 (Productive client)
    So we would like to set up the transport management system client specific, in order to develop in DEV 100 to test in DEV 200 and to use the transports in PRD 100.
    Thank you very for your help
    regards

  • How to set up the System Landscape Directory

    Hello Forum,
    I have installed Netweaver sneek preview - Java version.( on Windows box)
    I want to configure SLD on this how to go ahed ???? My other systems are
    1. R/3 4.6C on Unix box
    2. Netweaver (BW 3.5, EP 6.0) on Unix box
    I want to make Netweaver sneek preview  as SLD Server.
    Thanks a lot
    Ravish

    Hi Ravish,
    Please have a look in https://websmp204.sap-ag.de/sld. Then navigate to
    Solution Life-Cycle Management ->
      System Landscape Directory ->
        Media Library
    And choose the document "SLD Getting Started - Check List".
    Best regards,
    Amit

  • Setting Up the System Landscape for ESS

    Hello Experts,
    I am implementing ESS in portal.
    I am in step of defining systems in portal for ESS/MSS.
    Below is link I am following from help.sap.com
    [Link|http://help.sap.com/erp2005_ehp_04/helpdata/en/5b/76a6d7fd3a4e91bfb422405bf3e04d/frameset.htm]
    In above link it is mentioned that we have to define following systems :
    SAP_WebDynpro_XSS
    SAP_ECC_HumanResources
    SAP_ECC_Travel
    SAP_ITS_XSS
    SAP_BSP_EREC
    Additionaly according to below Article in SDN :
    [Link|http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/21eb036a-0a01-0010-25a3-b2224432640a?quicklink=index&overridelayout=true]
    Following additional systems must be created :
    SAP_ITS_EBU Looks similar to SAP_ITS_XSS above 
    SAP_R3_Financials
    Now the basis person in my project has handed over to me following systems :
    SAP_BSP_EREC
    SAP_ITS_FND Name mismatch as FND is used in place of XSS or EBU
    SAP_R3_Financials
    SAP_WebDynpro_ESS Name mismatch as ESS is used in place of XSS
    Now below two systems are altogether missing as per first link on help.sap.com
    SAP_ECC_HumanResources
    SAP_ECC_Travel
    Please explain if it requires to be corrected or name mismatch and missing ststems would do.
    Thanking you in anticipation.

    All the above names that you are referring to are not necessarily separate systems.
    These are system aliases for a system object created in your portal via System Administration - System landscape.
    So, if you have HR and Finance on the same backend server, then you need only one system with the related system aliases.
    You will need SAP_BSP_EREC only if you are planning on using E-recruitment.
    Similarly, you will need SAP_ITS_XSS  only if you are planning on using any ITS applications.
    It is pretty straight forward to change/correct the names of your system aliases instead of changing the usage of these aliases every where else.
    SAP_ECC_HumanResources is absolutely necessary.
    SAP_ECC_Travel is required if you are planning on using travel and expense related applications.
    Also, note that SAP_WebDynpro_XSS should be the alias of the system where your webdynpro applications are deployed (typically the same portal server)
    - Shanti

  • System Landscape for ESS/MSS in EP60 SP2

    I have installed EP60 SP2 on J2EE 6.20 and MSSQL. I have imported business packages ESS 50-4 and MSS 60-1-5. I have created the folder Systems in Portal Content and created a system SAP_R3 with aliases SAP_R3_HumanResources, SAP_R3_Cross, SAP_R3_Travel, and SAP_R3_Financials.
    My 4.7 R/3 system is app server R3DEV02.domain.com, system id DEV, sysno 01, client 100.  My ITS server is http://itsdev01.domain.com:71/scripts/wgate/webgui/! using client 100.  My EP path is http://sapport01.domain.com:50000/irj/.
    Given this information, can anyone tell me exactly what parameters I must set in the system landscape for system SAP_R3 and what the values should be for ESS and MSS to work properly?  If I go to the System Landscape Cockpit, system SAP_R3 fails all tests.
    Any and all help is certainly appreciated.

    Hello Gary,
    WRT SAP_R3 system landscape test failure, I ran into the same issue earlier, for a SAP_R3_Dedicated system. Keep the same setting values, but leave the system id (DEV) Blank, then test.
    Your definition of (Application Server Host Address + System Number) should be sufficient for a SAP_R3_Dedicated connection.
    I hope this will resolve your system TEST problem.
    Regards,
    AAAttar

  • System Landscape for ESS/MSS

    Hi Experts,
    I am on ERP2004, EP 6.0 SP20. I am trying to create a system landscape for the ESS/MSS Applications. ALways the connection test fails. This is the landscape I am trying to create:
    1. One SAP Dedicated Application Server: for SAP_WebDynpro_XSS
    <b>    Connector Details:</b>
    Application Host: <host>.<company.com>
    SAP CLient: 010
    SAP System Number: 00
    Server Port: 3200    (Using Dedicated Application Server)
    <b>WAS Details:</b>
              Host:               <hostname>.<company.com>:50000
              Path:           /webdynpro/dispatcher/
           System Alias: SAP_WebDynpro_XSS
    System Aliases:
    SAP_WebDynpro_XSS.
    SAP_ITS_XSS
    SAP_ITS_EBU
    User Management;
    Logon Method: SAPLOGONTICKET
    User Mapping Type: admin,user.
    When I am testing the
    <b>Connector Details:</b>
    I am getting the following errors:
    1. Retrieval of default alias successful
    2. Connection failed. Make sure user mapping is set correctly and all connection properties are correct.
    <b>WAS Connection Tests:</b>
    1. The system ID is valid
    2. The system was retrieved.
    3. The system object represents an SAP system
    4. The following parameters are valid: Web AS Protocol (http) Web AS Host Name (<J2EE Engine Host>.<company.com>:50000)
    5. The host name <J2EE Engine Host>.<company.com> was resolved successfully.
    6. The server <J2EE Engine Host>.<company.com>:50000 could not be pinged successfully.
    SSO is not set up yet. I do not understand why the details of J2EE Engine under WAS details in a system type : SAP Dedicated Application Server? Please help me. I am missing something.
    I appreciate your help.
    Regards,

    Single Sign On set up and every application is working on portal.
    But the ping always fails.
    I do not understand one more thing from help.sap.com on System Landscape for ESS.
    Documentation says:
    Set up your system landscape. To do this, set up the following systems:
    what kind of system this is: SAP_R3 or SAP_BW/SAP_CRM. In standard portal system template, there is no system like "J2EE engine".

  • Trouble accessing System Landscape directory

    Dear Gurus,
    I am currently setting up the System Landscape Directory (SLD) on the Solution Manager 4.0 system. I have managed to access the main SLD page using http://server:8000/sld, however when I click on the Adminstrator link, and then eg. 'log'. I will get this message:
    500 Internal Server Error                        SAP J2EE Engine/7.00
    Application error occurred during the request procession.
      Details:      
      com.sap.engine.services.servlets_jsp.server.exceptions.WebIOException:
      Error compiling [/admin/log.jsp] of alias [sld] of J2EE application [sap.com/com.sap.lcr].
    Exception id: [000C29B5E9430058000000320000226800045399F55C32B9]
    There are several other links in the SLD Administration that does not work and will incur the same error message as above:
    details.jsp
    systemmessage.jsp
    and many others. I have checked in visual admin and all application s are up. Please advise on my current situation.
    With Many Thanks and Best Regards.

    Hi,
    You dont have to create this user in the system.This is the defualt user created during installation. You will find this in the
    001 client. Also to change the password u can use visual admin
    or http://ip:5xx00/nwa use j2ee_admin here and login then change the password for the sld user.
    Regards,
    Vamshi.

  • ChaRM in two system landscape

    Hello Everyone,
    I want to implement ChaRM for BIW systems which is a two system landscape: BIWDEV and BIWLIVE . Is it posible to implement ChaRm in a two system landscape /we need three system landscape only for it.I started the ChaRM configuration work but faced certain issues over which i was told tat Charm needs three systems for implementation. Kindly plz suggest and confirm.
    Regards,
    Somya

    Hey Somya,
    2 system landscape will also work with CHARM.
    CHARM can also be configured in single system landscape.
    But the bottomline is you require in all 3 clients to realize charm.
    These three clients can belong to same or diffrent systems altogether.
    For you i would say, u will require 2 clients in BIWDEV system ( Say BIWDEV:100 as development cleint and BIWDEV:200 as Test client ).
    Now you have BIWLIVE system which is our production system, so you require 1 client BIWLIVE system..
    So your 3 clients are ready and Change Request management can be realized..
    Please Reward with points if this postv was usefull..
    Revert For ne clarifications ..
    Regards,
    Suzzane

  • Set up TMS for 2 system landscape

    Hi!
    I have 2 systems (DEV and PRD) with:
    2 Clients in DEV system and one productive Client in PRD-system.
    Client 100 DEV (Customizing DEV-System)
    Client 200 DEV (Test Client DEV-System)
    Client 100 PRD (Productive Client PRD-System).
    <b>What are the settings in STMS (transporte routes, delivery, consolidation) I should apply in order to set up my TMS-landscape?
    Should I apply target group?</b>
    <b>What are the settings/changes in profiles?</b>
    Thank you very much!!
    regards

    Ok, how do I set up this issue from Tx. STMS, from which Client in DEV-system (000, 100, 200)?
    Should I apply extended transport management, define client dependent tranport routes?
    Which parameters should be edited? (e.g. CTC)
    Please describe in detail how to proceed...
    Thank you!
    regards

  • ChaRM: 4-System-Landscape possible?

    Hello,
    regarding our system landscape we have no clue how ChaRM will handle following situation
    DEV-System: Development-System were the developments should be done.
    QAS-System: Test-System were the tests should be done.
    FNC-System: nothing to do here, just for functional tests
    PRD-System: Production System
    Transport routes are DEV -> transport group which deliveres QAS and FNC, and from QAS -> PRD.
    What needs to be done to set this up correctly for ChaRM (e.g.: SMSY-logical components)?
    Thanks in advance.

    Hi
    You have two options:
    1) assign FNC to task list: you can start the import to this system in the task list manually
    2) or task list without FNC: you can schedule a job 'import all' at FNC or import manually via STMS
    Confiiguration:
    1) One log. component with D-Q-FNC-P (Q and FNC are of role target systems)
    2) One log. component with D-Q-P
    regards
    Andy

  • System Landscape directory not available error,

    I am still a beginner, and I am having some slight trouble understanding, what tools would be needed, and how to install. I am using the forums.
    We have the MII Discovery Server up and running.
    NWDS Server installation is done.
    We have the MII track ready to be used for Development(SLD URL is available) , Userid and password available
    I am working on installing the NWDS 7.3 Developer Workspace.
    Would I also need to do NWDS Server install on my laptop?
    Would these steps be sufficient?
    1. Download and install JDK 1.6
    2. Copy the file nwds-extsoa-7.3-SP00-PAT0000-win32.zip from:
    <your download location>\51039309\DATA_UNITS\JAVA_IDE\distros\com.sap.netweaver.developerstudio.distribution.complete.extsoa\8.30.0.101020102100
    to a convenient folder.
    3. Extract the content and you will have a folder with name eclipse.
    4. Launch the Netweaver Developer Studio from folder eclipse, you may want to create a shortcut on the Desktop.
    5. If you haven't maintained JAVA_HOME property or if it's pointing to some other java version, eclipse will complain about it. In the dialog window locate the JDK 1.6 installation. Path to JDK 1.6  should be something like
    C:\Program Files\Java\jdk1.6.0_25\bin
    6. Restart the NWDS after this and select a suitable workspace.
    7. Set the run time engine in NWDS, by going through the menu path:
    Window->Preferences->SAP AS JAVA
    Question:
    1. I am unable to Set the run time engine in NWDS, please could  you give me details steps with what I would need to enter for Instance Hostname and Instance Number...etc
    2. As part of Development installation do I have to Modifying the Logon Page? Do I have to go thru the Server installation in order to start developing on eclipse environment?
    I do not have the war file. How do i  Copy the war file tcsecumelogonui.war from
    <Installation drive>:\usr\sap\<SID>\J00\j2ee\cluster\apps\sap.com\com.sap.security.core.logon\servlet_jsp\logon_ui_resources\tcsecumelogonui.war
    3. System Landscape directory not available error,
        In the Component Browser when I right click and select New u2013 Development Configuration u2013 Import From System Landscape Directory (SLD) u2013 Next (Enter UserID and Password)
    Thank you

    Hello,
    For the SLD error, please,  configure SLD following as per this docuemtnation:
    http://help.sap.com/saphelp_nw04/helpdata/EN/bb/c2b6421a75da11e10000000a155106/frameset.htm
    Regarding the settings to enter NWDS to connect to AS Java, you have to enter the java instance data so that NWDS can connect to it in order to make deployments, etc....
    Please, see also the following documentation that explains stp by step how to work with NWDS.
    http://help.sap.com/saphelp_nw04/helpdata/en/fe/a3996fa314f94f8a0c3475b08636d0/frameset.htm
    I hope this helps you.
    Regards,
    Blanca

  • System Landscape : Corresponding Integration server not maintained

    Hi Guys,
    In ECC, SXMB_ADM - > Integration Engine Configuration
    Edit ->Change Global Configuration data
    System Landscape tab...
    It shows  System Landscape : Corresponding Integration server not maintained
    I have maintained the corresponding integration server in the SLD where in the business I created for ECC,
    I put the business system that I have created for Integration server
    Yet The error persists...any idea?
    Regards,
    Teja

    Hi Guys,
    I have done all the setting suggested,,
    then came across a thread on the forum
    Unable to load Integration Server data from SLD
    Regarding the System Landscape button in transaction sxmb_adm -> Integration Engine Configuration,
    this button is obsolete and no longer works correctly. You can ignore the error message you get.
    Thanks,
    Teja

  • Client Roles in a Three System Landscape

    I initially post this Question in other forum:
    Hi all,
    We have a three system landscape. In the Development client, we have the Customizing Client, the Sandbox Cliet and a Training client. I have some questions about this configuration:
    Acording to System and Client Settings - System Administration Assistant (BC-RRR) - SAP Library, Training client must be in Quality Assurance System, and it must be created by client copy from client QTST (it gets the transports from Custimizing). In this Training System we must create users for all our key-users to training. We must not create any user for key-users in sandbox client (this client is for the DEV team). is that ok?
    What are the downsides of having out TRAINING client in the Development System?
    Now, a consultant is asking me to open some modifications in the TRAINING client: He needs to load Exchange rates (OB08) in that client, but he is getting "Client is not modifiable". They are asking me to create users for key-users in the sandbox client and the training client.
    I need to know if they are using the system in the right way. I dont want the system to become a mess.
    I been reading this notes: SAP Note 356483. I don´t know what this means: "Now the corresponding Customizing object is no longer subject to the transport connection and is excluded from the changeability check. The change is active in all clients of the system. You can also change the Customizing object in a locked client (independent of the client role). However, now it is also no longer possible to manually transport entries of the view or table."
    Aditional notes:
    SAP Note 78329,  sap kb 356483
    Thanks for your help!
    One person answere me this:
    Hi
    You should create your question in the appropriate area :
    Software Logistics
    The drawback of having training client in dev system is that it could be negatively impacted by ongoing changes performed in that system (custom program that are changed, not working...)
    Some specific customizing changes can be set as current setting and thus can be modified without needing to open customizing but only if the client is set as productive.
    There is also a way do deactivate modification recording of objects (aka deactivating the transport connection) but, if you apply this change for this activity/object, you won't be able any more to record change into transport orders
    Regards
    356483 - Customizing: Current settings in the test system
    77430 - Customizing: Current settings

    Hi Andres
    I do not really now the exact impact, it might prevent some business data from being mass processed or overwritten...
    I did had to deactivate the transport connection on specific objects/activities for some customers.
    It depends on the frequency of that activity. I don't like to open the client to modification as you can sometime forget to close it back, and sometime also it gave the opportunity to other consultants to make changes that would create inconsistency among envt in the whole landscape.
    At least activating the recording of changes could help in tracking the source of modifications
    RZ10 => rec/client=ALL
    STMS => RECCLIENT=ALL
    Regards

  • ChaRM - Mainenance Cycle in two system landscape - possible?

    Hi Experts,
    we are trying to create a maintenace cycle with two systems.
    We have a system defined as "Evaluation System" and the second is defined as "Production System".
    Generally Question
    Is it possible to create a maintenace cycle for a two-system-scenario?
    Specific Question - Erorrs/Warnings
    While checking the project we got several errors/problems:
    1 Differences between BC Set SOLMAN40_CHARM_BASICFUNC_001 and database
    2 Differences between BC Set SOLMAN40_SDESK_BASICFUNC_000 and database
    3 No consolidation system found for EID-800 (project Z_CRM_T)
    4 No track for project Z_CRM_T with log. system EID/800
    5 Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for CBI-001
    CTS
    The transport system is configured correct - Check in STMS is OK
    Question:
    The comparison checks seem to be OK - is it necessary to reactivate the BC Sets?
    Kind regards
    Tom

    Hi,
    the system role for your client/systems in the logical component is very important:
      - The development system needs to be defined as a Source System.
      - If you don't have a QA, leave all target systems empty. If there are one or more consolidation/integration/regression systems, assign them to system role Target System.
      - Your production system uses system role Production System.
    The defined Development client needs a client dependent (TMS parameter CTC=1) consolidation track to the QA, or in a 2 Tier landscape to the production system. In a 3 Tier landscape you need a delivery track from QAS client to your production client. But as you wrote, TMS has been set up already. I just would like to mention all steps....
    Check that all RFC connections have been set up correctly. Especially the Trusted RFC. Don't forget the Trusted RFC to client 000 ot the TMs domain controller.
    In tab Systems ( transaction code SOLAR_PROJECT_ADMIN => System Landscape ):
    Make sure you see all clients of your logical component. If not hit button System Role Assignment and add your System role.
    Then still in the same tab: Hit button Shipment Routes and make sure, you see the complete transport track and only this track here!
    After correct setup of TMS, RFCs, logical components and assignment of LC to your project:
    First perform a Refresh and a Check in transaction code SOLAR_PROJECT_ADMIN => System Landscape => Change Requests. Then please recreate the maintenance cycle (and task list).
    Regards,
    Holger

Maybe you are looking for

  • Why can't I create a new folder on an external hard rive

    I have two external hardrives that are self powered and require no outlet.  I've begun to use all of the memory on one and want to use another.  I plug in the second and creating a folder isn't an option.  I set up the first hard drive through my mac

  • User-exit or badi for partners check in Purchase order

    hello all is there a user exit or badi i can use in order to perform a check on the partners in a PO? I want it to perform the check also if I change any of the partners at a later stage. thanks Alisa

  • Unable to add content to Tab Panel when set in Master

    I am using the trial version at this time.... and want to confirm whether this is a bug or a purposeful limitation of the trial version beofre I consider buying. So I created a master page with a tabbed panel. However for each individual page I would

  • Unable to post asset in F-90

    Hi Experts, we have implemented asset accounting i.e. the basic asset accounting configurations are done in the year 2008 and there are no legacy assets to take in to SAP in FY 2008.  Since there were no assets we did not perform any deprecition run

  • Aperture 2.1.1 / Vault Icons