Release Demand Planning to Supply Network Planning

1. /SAPAPO/MC90 - Release Demand Planning to Supply Network Planning
In the above t.code i am not able to change the target planning area- it has greyed out
2. I need thisto be changed becuase i have defined my own snp planning area.
any clues how to do this >
reg
dsk

hi dsk
Dont worry about the greyed out target planning area in the "release :extended" option. It is the default. In general if you release the forecast from a demand planning book , it means that you are releasing the foreacast values from the time series live cache to order live cache. That is the forecast value which was just a quantity value in the time series live cache will now be associated to a specific category.
Once you release the forecast from DP to SNP you should be able to see the forecast value in all the SNP planning books that have forecast key figure. The forecast is not released to a specific planning book, it is released to the order network and will be available to view in all SNP planning books. So just go ahead and execute MC90 . After that you can make sure if the values are reflecting in SNP by going to /n/sapapo/rrp3 and checking the material . You should be able to see values under cateogry "FC Req". After this you can try loading the material in planning book and u must be able to view the results.
Thanks
Saradha

Similar Messages

  • Releasing demand plan from DP into custom categories in SNP.

    Hi Gurus,
    I need to release the demand plan from DP into SNP custom categories Z1 thru Z4. The key figures that I mapped to these custom categories are created in a non-standard planning area (copied from 9ASNP02).
    I am able to release the demand plan using category FA only. Can anyone help me in releasing demand plan into these custom categories in SNP.
    Thanks,
    Shiv.

    Shiv
    I did a F1 help on target category  field in tcode /n/sapapo/mc90 and this is what i found
    For the release of the demand plan to Supply Network Planning, you can specify a category that tells the system which category of orders to release to. An entry in this field is optional, but if you do enter a category it must be a category that represents sales orders or forecasts, such as FA or FB.
    You can also release to categories you have created yourself. This allows you to distinguish, for example, between different forecast priorities.
    The system proceeds as follows:
    1. Has a category been entered in the release profile? If yes, this category is used.
    2. If no, has a category been set in the definition of the requirements strategy in Customizing? (You define the product's strategy in the Proposed strategy field on the Demand tab of the product master record.) If yes, this category is used.
    3. If no, category FA (forecasts) is used.
    So as the F1 help says in the release transaction /n/sapapo/mc90  did you try giving the custom categories ? Also i have one more idea - after the forecast gets released to category FA , copy it to a key figure that is assigned custom cateogries Z1 to Z4.
    But just want to understand something . Why do you want to release it to a custom cateory instead of FA ? How are you going to handle the consumption of forecasts by sales orders if you release it to custom category. I think releasing it to a custom category will make your process more complicated since you are altering the standard SAP functionality.
    Thanks
    Aparna

  • Can i get a social networking plan with an iphone?

    i have the choice to get a new phone, iphone or blackberry. but i want twitter and facebook when i am not in a wifi area.
    can i get a social networking plan like i canw ith a blackberry?

    I live in New Zealand, so don't know.... but
    Data plans (and a social networking plan is essentially a data plan limited to a few services) are run by phone networks, not handset manufacturers.
    So there is no reason that there would not be a data plan, or social network plan that could be available.
    My phone company gives free data to facebook, so it may be possible.
    You shoudl contact the phone company who sells the iPhone.
    Or buy an unlocked iPhone (not sure if you can in Canada, here we can), and then choose a phone company seperatly.
    This is what I did.

  • Demand Plan and Supply commit

    The forecast or demand plan from Demantra (monthly bucket) is sent to suppliers by Collaboration planning Via ASCP (broken to weekly bucket). The supply commit will be received through CP (wkly bucket) to ASCP (wkly bucket) to Demantra (aggregated to monthly).
    The reason being demantra values are in montly bucket and we want weekly break up and thats why we are thinking to use ASCP.
    Is this true?
    View Plan vs. commit by month in Demantra
    View Plan vs. commit by week in ASCP
    CP is a portal for file exchange
    Or supply commit is visible only in CP?
    Please explain and suggest alternate design if possible?
    Thanks

    Hi,
    You need to define the SNP Demand Profile and SNP Supply Profile in the Product Location master data.
    Goto -> /n/SAPAPO/MAT1 -> On the selection screen below the Product / location fields, you see the fields for 
    - Lot Size Profile
    - Demand Profile
    - SNP: Demand Profile
    - SNP: Supply Profile
    - Deplloyment Profile.
    Here you can enter the name of any profile you want to create and use the 'Create' button to create your profile. This will be then available for selection when you create your Product Location master.
    Hope this helps. Let us know if you still have any doubts.
    Cheers,
    Srinidhi
    Hope this helps.

  • Error during Network Planning (SAPSQL_INVALID_FIELDNAME)

    Hi,
    During Interactive planning in SNP when releasing the forecast to network (thru transacction /sapapo/snp01) we are getting an runtime error "SAPSQL_INVALID_FIELDNAME"
    Please help. Error analysis appearing in dump is mentioned below
    An exception occurred that is explained in detail below.                                      
        The exception, which is assigned to class 'CX_SY_DYNAMIC_OSQL_SEMANTICS', was                 
         not caught in                                                                               
    procedure "SELID_GET" "(FORM)", nor was it propagated by a RAISING clause.                    
        Since the caller of the procedure could not have anticipated that the                         
        exception would occur, the current program is terminated.                                     
        The reason for the exception is:                                                              
        An Open SQL clause was specified dynamically. The contained field name                        
        "SEL_9AACTNAME" does not exist in any of the database tables from the FROM                    
         clause.

    Hi Aparna,
    Yes you are right. The forecast is already released to SNP and the team is now doing network planning. We are facing the error here.
    Our technical person has done the analysis and it seems that its due to some Local objectcs that are implemented in system.
    Will update once the issue is resolved.
    Thanks

  • Launch Supply Chain Plan

    Hi All:
    I am using Advanced Supply Chain Planning tool in conjunction with Oracle Process Manufacturing for material & resource level planning. As part of the process I did all the needed setups and got to the point of Running the Supply Chain Planning Process. However After I launch the process, the parent process has triggered a bunch of child concurrent requests in the background. And I have been stuck with the concurrent requests running forever in the last 8 hours without completion. The status is "normal" and "running" for all concurrent requests..
    Navigation:
    Advanced Supply Chain Planner
    Navigate: Supply Chain Plan - Workbench
    Any idea why ?
    Thans
    Sandeep Penumalli

    Hi,
    for what I saw many reasons can cause this kind of stuck.
    1) Check if there are some locks on the MSC tables, maybe is the reason why it does not go through.
    Usually the concurrent (I suppose you are stuck at the memory based snapshot) creates a BIG log file. Check if the log file goes on.
    2) Once the Snapshot was incredibly slow due to some loop in the BOM. Since you are working on process manufacturing the loop should be in the recipe. You should see if there is a loop in the log.
    3) Stop the concurrent if he goes beyond any acceptable time and try to create a very small plan, with just few item, a week of planning time and one demand. Try to use some dummy supersimple data. If the plan goes fine it means that probably you have some issues on the data you feed the system. (i.e. Loop or too much things).
    4) I am not sure if this apply but maybe you have some sort of limitation on the maximum number of concurrent that can run simultaneously. We had something similar and if I well remember some concurrents where waiting for other to finish but the others could not start do to a limitation on the maximum concurrent. (check in sysadmin for this).
    Hope it helps
    Francesco

  • How to check plan line items for plan cost at network activity level?

    Dear all,
    How to check plan line items for plan cost at network activity level? The plan cost is done in network activity in CJ20N.
    I am not able to check using CJI4 or CJI9 report.
    Kindly advise.
    Thanks and regards,
    Jessie

    Hi Jess,
    Have you checked the navigation part which is being displayed on left hand side of report S_ALR_87013565 and S_ALR_87013533.? There you have option to check transaction currency and object currency when you double click on it.
    In case if it is not being displayed under navigation. Then you can bring them on from transaction code CJE2. For eg: Report group for S_ALR_87013533 is 12KST1C. Double click on it and it will open up to do changes in report layout and many more. There you also have options to bring on transaction currency too. Similarly, you can check for other report groups as well just by checking the report description.
    But I am not sure if suits your requirements. Wait for other experts to comment on this.
    Regards,
    Amit

  • Custom program to insert and firm new planned order supply

    Hello,
    Can anyone point me to the Oracle package/procedure that is used in ASCP workbench to insert and firm a new planned order supply? Would like to call this proceudre from a custom program.
    Cheers!

    There is no api to insert data into a given plan but Oracle allows you to use the "Legacy Collections" to import/create various data elements (such as Reqs, PO, Planned orders etc.)
    See "Legacy Collections" sections in http://download.oracle.com/docs/cd/E18727_01/doc.121/e13358/T309464T309470.htm#T309821
    Keep in mind that this takes time to setup. So make ensure that this is the right solution before proposing it.
    Sandeep Gandhi

  • Where to specify source of supply in planning version

    how to specify source of supply in planning version In the planning version, you can define for PP/DS whether the system may create a procurement proposal if no valid sources of supply are available.
    I want to create procurement proposal without source of supply  .where i need to specify in planning version.please help me
    Thanks in advance

    Dear Marius
    Generally i am getting these warning msg in log.when i am triggering for GATP
    For other materials i  am not getting these msgs( /sapapo/rrp518)I am able to trigger gatp.
    Do you think any other settings at material level are missing .please suggest
    Secondly i am also getting warning msg as component  bjac905(material)  can not be planned for second time cycle msg (/sapapo/rrp322)
    Thanks in advance

  • I made a pre-booking for ipad2 wifi cellular, i would like to know whether i can upgrade it to IOS6 n IOS7? and i want to know whether can i use 2G network instead of 3G as the 3G network plan is expensive??? and i want to know whether i can access siri ?

    i made a pre-booking for ipad2 wifi cellular, i would like to know whether i can upgrade it to IOS6 n IOS7? and i want to know whether can i use 2G network instead of 3G as the 3G network plan is expensive??? and i want to know whether i can access siri ?

    Siri does Not work on the iPad 2.  iOS 7 is not even out yet, so we have no way of knowing if you'll be able to upgrade to it.

  • Supply Parts Planning and CRM

    Hello All ,
    I need to identify which are the standard extractors (BI content ) for pulling Supply Parts Planning (SPP) data from SAP CRM into SAP BI . Please let me know if anybody has information on the same asap.
    Thanks .

    Hi Riddhi.  Did you mean to ask what are the standard extractors, if any, for pulling Service Parts Planning data from SCM, as opposed to CRM, mentioned in your original post?

  • QOS Network Planning - TCP/UDP Ports used in CWMS 2.5 MDC deployment

    Does anyone know if there is documentation that describes the WAN traffic in CWMS 2.5 MDC?  I'm looking for the TCP/UDP ports that must be prioritized on the WAN to properly class our traffic between the two data centers.  I can't find any such document.  
    Thanks,
    Matt 

    HI Matt,
    All the network requirements are listed in the CWMS 2.5 Planning Guide in Networking Checklist: http://www.cisco.com/c/en/us/td/docs/collaboration/CWMS/2_5/Planning_Guide/Planning_Guide/Planning_Guide_chapter_0100.html
    I hope this is what you are looking for.
    -Dejan

  • DP - Sales and Demand Forecast values in the Planning book were increased.

    Dear DP Experts,
    The Sales and Demand Forecast values in the Planning book were increased.  Is there a way to tract who user could have made the changes?  Can we view the last change like in the document flows?
    Thanks,
    Glason

    hi Glason
    if the values have been changed by the user community, I am not sure if there is a way to find out. However if there is technical flaw in data processing, you can check for the steps as posted in the above post.
    We faced a similar issue in our project. We were not able to trace the user ids under which the values were changed. However since we retain the 15 days of back up, we were able to check that the values were changed on a certain date but not the user ids. but we were still able to restore the original values.
    As an additional step, we also developed macros to store (in the form of alerts) the exisitng value and the updated value incase the there was a manual change in the Sales forecast and other editable key figures.  This ensured that there was a check if there was a manul change. we also ensured that these macros were not executed during the background jobs.
    SAP also provides a standard SAP APO Change Monitor add-on which can be used to track chnages to the key figures. Please refer to note 1308968 for further information on the add on.
    let me know if this helps.
    Rgds, Sandeep

  • Mobile supply chain planning

    Where can i get details about oracle mobile supply chain planning?
    Thanks in advance.
    G.R.RAMESH

    Dear Amr,
    When dealing with Oracle concerning the planing process, we can use one of the following methods:
    1- Traditional Planning (Forecast>MDS>MPS>MRP); this is the favor method when you have one organization setup in the system.
    2- Oracle Supply Chain Planning method; this is used if you have more than one organization setup in the system; i.e. if you have distribution inventory organization, raw material inventory organization, and finished good inventory organization separates from each others.
    3- Advanced Supply Chain Planning.
    My question is how to setup the second type (Supply Chain Planning)? , any body has an idea?

  • ORACLE ADVANCE SUPPLY CHAIN PLANNING

    where can i find the installation
    and configuration technical manuals
    for the product ORACLE ADVANCE SUPPLY
    CHAIN PLANNING 11i in HP 'V' AND 'N'
    class servers in HP-UX ver.11.0.
    HAS ANYBODY DONE IT, LET ME KNOW

    <BLOCKQUOTE><font size="1" face="Verdana, Arial">quote:</font><HR>Originally posted by Mike Kupetis ([email protected]):
    I can send you the Implemntation Guide...if you wish?<HR></BLOCKQUOTE>
    yes, please do send me the Implementation
    guide for product ORACLE ADVANCE SUPPLY
    CHAIN PLANNING 11i in HP 'V' AND 'N'
    class servers in HP-UX ver.11.0.
    Thanks
    null