Release strategy tab is not coming in SES

Hi All,
I am facing a issue where I have created an SES, and release strategy is assigned to this SES. Problem is somehow the user is not able to see the release tab when he go wants to release the SES. The release tab is missing from the SES.
  Am sure somebody has faced this kind of issue and have any idea how to correct this.
Thanks

Hi,
The direct reason that there is no release icon available in ML81N           
is inconsistency in the field ESSR-FRGRL for affected SES's.                                                                               
This field should be filled with 'X' as all those SES are subject            
for release.                                                                               
Have you changed customizing for involved release strategy recently ?        
If a relase strategy is created with a certain name and documents are          
created with respect to it afterwards, this release strategy should be         
changed then IF AND ONLY IF a NEW name is assigned to it as well. In           
other words, if such a strategy is already use, it should be RENAMED           
before applying the desired changes.                                                                               
Otherwise you will run into the observed inconsistencies when trying to        
edit documents which were created BEFORE the strategy was changed              
(since the system at some point always checks the NAME of the strategy         
to be changed, NOT the content).                                                                               
So if this case happens only for already created SES a good solution           
for it is to delete affected SES and create a new one with changed             
release strategy.                                                              
I would delete affected SES and create it again.           
It seems to be the fastest way to resolve this issue.      
If you need a correction for this inconsistency issue, please open a SAP ticket for your problem.
Regards,
Edit

Similar Messages

  • Release Strategy for PO not kicking in

    Hello SAP Experts,
    I have gone through all the steps of configuring release strategy for PO. I checked at the end with the transaction code OMGSCK and everything is good with no error. But when I test the strategy by creating a PO, the 'Release Strategy' tab does not come on in the PO Header. This means that the Release Strategy did not work. I have troubleshot over and over again right from the Characteristics/Class, all the way to the Release Strategy, but no breakthrough.
    I will appreciate and award points for helpful hints.
    Thank you in advance.
    Joel.

    Please list all your char you have created and the value of char.
    Than please tell the PO details.
    once i got this info than only i can see the problems.
    you can do one more thing
    goto CL30n and enter the class and class type 032
    than hit enter and enter the value of char which you have used in the PO and then hit find initial class button from top menu
    see if any release strategy is pulled or not?
    if it is determine morethan one that means you have same value exist in more than one release strategy

  • PR Release Strategy tab processor field is not getting displayed

    Hi Experts,
    While creating Purchase Requisition, In the Release Strategy tab processor field is not getting displayed which should be showing the name of the user id which has been configured in the SPRO.
    SPRO--> Rel Proc for PR > Rel Group> Rel Code--> Object type (US) and --> Agent (User id who has to approve the PR).
    release strategy - Release code  -work flow 1
    That processer name is not displaying
    Thanks
    chandoo

    This is the workflow forum.

  • Not able to view release strategy tab in pr(change mode)

    Hi,
    i have created a pr at DEV and i am not able to view release strategy tab in change mode at DEV. please help???

    Hi,
    Please check if you activated the user exit EXIT_SAPLEBND_004
    (Include ZXM06U31) This exit is relevant for the overall release.
    If you activating the userexit, please ensure that you implement
    the coding line E_CEBAN = I_CEBAN. in the include
    . Please refer to point 3) of the attached note 365604.
    BR
    Nadia Orlandi

  • Release strategy  tab not appearing in purchase order

    Hi Experts,
    I have customized release strategy for purchase order that is created characteristic  value & pur organization , created class ,assigned char to class , define rel grp, rel codes , rel strategy and checked everthing is showing in Green  in developent client , then i  Transported  to testing client , here I have created same char & class , assigned & also i have checked in Cl24 N
    Now i when i create Purchase order& save it  in testing client , Release strategt tab is not appraring in PO
    Please help me in thids regardby your valuable suggestions

    Hi,
    Please check carefully note 365604 on release strategies in purchasing
    which includes some common problems with release strategies.
    If the trx CL30N is ok,  It could be that the release strategy was not determined due
    to missing code in the user exit EXIT_SAPLEBND_002 in the include
    MM06EF0S_STRATEGIE_CEKKO.
    In this case the code e_cekko = i_cekko should be missing  Please
    include this line in your user exit and then retest your scenario.
    I hope this helps you
    BR
    Nadia Orlandi

  • Release Strategy Processor Names under Release Strategy tab for a PReq

    Hello Experts,
    We have situation in Release Strategy for Purchase Requsitions in which we need to display all approvers names under the Release strategy tab for a Purchase Requisition.
    Senerio work as follows.
    Based on the Release strategy customization settings,Purchase Requisition subjected to release strategy selects the approver names from a custom table.
    In the Custom table we have names of the approvers with release codes.
    Purchase Requisition displaying the names of the approvers according to alphabetical order.Hence it displays First one user or approver name under the release strategy according to the approver alphabetical order from the custom table.
    Can we display name of all approvers in one line according to initial investigation there is room for 40 characters under the release strategy tab.
    Let me know if any Standarad OSS notes available for this.
    Amogh

    Hi amogh if you configure with workflow the strategy and the name of the persons are in transaction SU01, you don´t need to put nothing. The release strategy shows the names of the persons that release the document, but if you change one person in the release strategy, the system don´t save history for this, all old documents that have been released for this person, release strategy is blank. You have to do a non standard report that shows what person releases what document.
    I hope that this information help you
    Rose

  • Purchase requisition release strategy tab missing

    Hi all
    I configured purchase requisition release strategy and ME51N is working issuing no error but it is not displaying Release Strategy Tab , please help me where i am wrong.

    hi,
    check few reasons:
    1. There might be more than 1 release strategy using the same class, due to which it is not possible for sap system to determine the unique rel. strategy..this normally happens when you copy the exsisting class and assign it to own new one...
    2. check the release strategy OMGSCK, is there any problem with your release strategy...
    3. Check whether you have maintained all the classified field in the document or not..
    4. check whether the release is assigned to any workflow...if so, then check the inbox pls...
    regards
    Priyanka.P

  • Preq release strategy tab disappears

    We are having an issue where a few odd times, we will find that a Preq is missing its Release Strategy Tab. Here is an example, and my findings so far below the image.
    Checking the Workflow, I see there was a workflow started, so I know the release strategy must have kicked in.
    I see that the workflow went to error, with the error saying "No Authorization to Release"
    However I checked the user, and they do have the correct Release Level Role.
    So I'm not sure where to check next?

    Our release strategies are just on PR value, see screens below.

  • Missing Release Strategy Tab in PO

    Dear All,
    I am using EXIT_SAPMM06E_006 exit and added a new field using SAPLXM06 0101 ( ME21N ).
    Here i am able to see my custom field but unfortunately release strategy tab is missing.
    Can anyone help in this please....
    Thanks in Advance..

    Dear Faheem,
    Thank you very much.
    Your suggestion helped me a lot.
    One more doubt i am having.
    Here i want to use only SAPLXM06    0101.
    But i dont want to use other screens in that exit ( Screen numbers 0111, 0201, 0211, 0301, 0311 ).
    Because of these screens i am getting run time error as  "  The system attempted to use dynpro 0301 in program "SAPLXM06".
    *This dynpro does not exist. " while using RFQ or Quotation transactions.
    How can i deactivate or remove these screens from my exit MM06E005.
    please help me in this.
    Edited by: kalyan varma on Jan 5, 2011 6:17 AM

  • ME29N - Release Strategy tab

    Hi people! I need help.
    When I have an Purchase Order released with 1 message green status and add 1 new message copyng from other and save, the release strategy tab dissapear...somebody can help me?
    thanks a lot!

    Please see the charecteristics in the release strategy if your have User ID or roles defined for the change. If the PO is changed by a user who is not defined as values then the problem occurs.
    Please advise how is your design of the release strategy
    Thanks

  • Resp Person Tab is not coming in CJ20N for a particular project type

    Hi All,
    I am unaware of the standard SAP screen in CJ20N but we have a screen in CJ20n wherein we can assign a person / link a person this particular tab is not coming at all for a particular project type (Resp Person) rather a different tab (cust enhancement) is coming but our problem is we have a mass program which works on BDC and hence if the required screens are not there it fails.
    Can someone please tell me if there is come config i can check/ maintain for this resp person tab so that it starts coming for all project types.
    Regards
    Anmol Pareek

    Hey Sarang,
    Thanks a lot, it was helpful, one more thing though, In Resp Persons tab there is something called Link Employees and my problem is that i have a mass linking program (using BDC) which cannot work if i dont see that screen in my BDC (without changing BDC). The way you have told is in OPUK/ OPUJ check for proj type and see if person responsible is hidden or not. I dont think that is what i am asking because no matter what this person responsible is hidden, but for certain project types Resp Person tab itself is not coming and that is the problem.
    Regards
    anmol

  • Cancelling the GR the excise item tab is not coming after flagging the OK

    Hi SAP Experts,
    there is one subcon PO for excisable material for depot, after its GR it have been posted from j1iex.
    Now there is a requirement to cancel the excise posting for which first of all its GRN should be cancel.
    But while cancelling the GR the excise item tab is not coming after flagging the OK.
    This problem is there only for the depot, for other plant Im able to cancel for subcon PO.
    Thanks & Regards,
    Anisha Sinha

    still not cleared

  • In QM view Inspection Setup data tab is not coming

    Hi Friends
    I want to assign inspection type to a material, plant combination but in QM view Inspection Setup data tab is not coming
    Thanks & Regards
    Gajendranath

    Hi gajendra,
    Inspection set up data in QM view will appear only when you select quality view & maintain any plant releted data at the time of material creation .If you dont maintain any plant releted data then QM view then insp set up data will not appear. so please o through mm01 once again select QM view & maintain plant data, then next time insp set up data will appear.

  • Autorization of release and derelease in ME29N  in release strategy tab.

    Hello Experts,
    I have a requirement where the authorization has to be given to a list of user maintained in my ztable for  RELEASE CODE (T16FS-FRGCO =  01).
    For rest of the release codes in release strategy it should work as the standard process. if the processor in  release stategy tab and sy-uname are same then the  system should allow to relase or derealse the PO and save it.
    But for RELEASE C ODE 01 i'm maintaing the ztable and checking that if user name maintained in my ztable and sy-uname are same then system should allow to realse, derelase and save the PO.
    I'm writing my code  in EXIT_SAPMM06E_006  -- Include ZXM06U36 for this check but it is not working for me.
    Please let me know the EXIT or the correct way of doing it.
    Thanks,
    Naveen

    Hi Jai,
    Try this exist:
    Enhancement   M06B0002       EXIT_SAPLEBND_001  ZXM06U13  Changes to comm. structure for purchase requisition release                    
    Sample code:
    *Check the authorization.
    * This is to set the  e_cekko-usrc1 = 'Y'  be excluded from the Release Strategy check.
    IF SY-SUBRC = 0.
       e_cekko = i_cekko.  
       e_cekko-usrc1 = 'Y'.
    ENDIF.
    Some alternative Exits:
    Enhancement     M06B0005     Changes to comm. structure for overall release of requisn.                    
    Enhancement     M06B0001     Role determination for purchase requisition release                    
    i hope this may helpfull.
    Thank you,
    Thanks,
    AMS

  • Cusotm data tab In ME52n, copy release strategy tab details in custom tab

    I have created a custom data tab in Me52n using exit mereq001, and I need to get purchase requisition number, releasegroup, release code and release strategy values in the custom data tab screen in order to fulfill my requirement.
    I am using the screen exit and trying to code in the include (PBO), But in the include I am not able to get the required data as afore said.
    Can you please tell me the procedure for getting the global structure that I can use in the include to get these values?
    *Please give me the solution ASAP.

    HI,
    Use the fm  EXIT_SAPLMEREQ_001 and get the data ..............
    data : wa type mereq_item .
    call method im_req_item->get_data
      receiving
        re_data = wa
    the structure wa will contain the data .....
    Thanks,
    Shailaja Ainala.

Maybe you are looking for

  • Stepper Pulse Voltage Level in Open Collector

    I am using the PXI-7344 Motion Controller to drive three stepper motors and 5 servos. I am running into unexpected problems with PXI-7344 Motion Controllers to drive stepper motors. Steppers are configured as CW & CCW and open loop. At first,I starte

  • Why has mozilla decided to fix what wasn't broke?

    After trying 4.0 I have reverted back to 3.6. The user interface has been changed for the worse in 4.0, i hardly know where to start. The forward and back buttons no longer have an drop down menu next to them. The title bar is no more, instead it's r

  • WebService databinding not proper

    Hi, I'm totally new to Flashbuilder so bare with me. It seems this is not working properly. If the webservice returns more than one field the results will not display in a datagrid, its blank. If I change the webservice to only return one field that

  • When I download CC it comes in the Dutch version not in English

    Even though I have selected English as my preferred language when I try and download CC it comes in Dutch! What is going on?

  • Encrypting Work Folders Sync Share on the Server

    Dear Community Members, I have an issue about "work folders" feature and I wish to share it with you, with the hope of a lead to resolution. I setup work folders using this guide:  http://technet.microsoft.com/en-us/library/dn528861.aspx everything i