Removing a plant to its current company code

Hello Gurus,
I am working on this request that the old plant will be removed to its current company code and assigned it to new company code. SAP has been using for couple of years already so many data has been created and documents processed. I am aware of the plants set up configuration and OX18 but I think it will not be good removing the old plant in 0X18 and just assigned it to the new company code requested. I am thinking that create a  new plant exactly the same with the old plant settings then assign it to requested company code. However, how about the existing data from the old plant? Are there any programs that can be used to copy the existing data of plant configuration?
Please advice!
Thanks!

Dear Sidarth,
Make sure that the plant has nil transaction both quantity wise and value wise. ie MM and FI.
Then you can reassign the same plant to your new company code.
Check the use of the Conversion Workbench (CWB), special tool like the
Migration Workbench, especially developed for this kind of tasks.
regards
anand

Similar Messages

  • Moving a Plant to a new company code

    Hi,
    Does anyone have experience of moving a Plant from one company code to another in a "live" syste.
    We are about to make some major changes to certain company codes and so new company codes will be required.
    We have two options
    The safe option - to create new plants and do all of the configuration and master data extensions etc. (a HUGE task)
    The easy option - Unlink the Plant from the current company code and link it to the new company code (a HUGE risk)
    The safe option is not realy available to us in the timescales we have and so I need to know if anyone has tried the other option in a live system?
    I know that there are lots of things to consider (such as stocks and open POs etc.)  but these things can be handled and probably a lot easier than configuring new plants etc.
    Thanks
    Steve B

    Hello,
    This may be useful for you.
    http://sap.ittoolbox.com/groups/strategy-planning/sap-projectmanagement/moving-a-plant-to-a-different-company-code-1229588#
    Kedar

  • Creating a central DC for plants that have mutliple company codes

    Hi,
    We are looking to consolidate all of our distribution from 5 manufacturing plants (which all have different company codes) to one central distribution center in a single company code.   Has anyone had any experience with this scenario?  We will need to turn on warehouse management at the central DC and have been told that any plants connected to a warehouse in WM, have to be all in the same company code.

    Karen,
    We are looking to consolidate all of our distribution from 5 manufacturing plants (which all have different company codes) to one central distribution center in a single company code. Has anyone had any experience with this scenario?
    Yes
    We will need to turn on warehouse management at the central DC
    Presumably this is for reasons other than the consolidation.  Using or not using WM will have no impact on company codes.  From what little I know about your business model change, there is no reason for you to use WM (other than the additional functionality, which will intrinsically improve warehouse efficiency).
    and have been told that any plants connected to a warehouse in WM, have to be all in the same company code.
    This is not a SAP limitation!  There may, however, be business reasons why you need to do this.
    A Distribution Center is not the same as a Warehouse in SAP.  A DC is a special kind of plant.  Plants are assigned to company codes, and the ownership of the goods in this plant are generally held by that one company code.
    As Jurgen mentioned, a SAP Warehouse can encompass many plants, with many storage locations, each of which may belong to several company codes.  WM doesn't care. 
    Storage locations are members (subsets) of plants.  A given storage location will always be connected to a single plant, and the inventory of all storage locations in a given plant will be owned by the company that owns the plant.
    From your short list of requirements, I believe that your logistics model should be to ship the product from your originating plant(s) to the DC (plant).  The traditional way to do this is via Stock Transport orders.  STOs can be intercompany or intracompany, required financial documents and postings can be configured to meet your company's needs.  Other methods are also possible.
    You mentioned that your DC would be one company code.  Therefore, the sales orders will be placed against one plant (the DC).  Delivery splitting would not be an issue.
    Now, I notice in subsequent responses you seem to be thinking that you will ship from multiple company codes (plants).  This is contrary to your original requirement list.   As asked by Jurgen, where do you wish to consolidate your stock and where do you wish to consolidate your shipments?
    Best Regards,
    DB49

  • Remove assignment of profit centers to company codes

    Dear all,
    I have to remove assignment of profit centers to company codes, we have about 300 profit centers which need to be corrected, is there any easier way to correct the profit center master data other than manually uncheck the assignment using KE56. your advaices will be greatly apprectiated.

    See if you have access to SE38 and enter the program RCOPCA60_2
    I want to highlight the text that goes like
    "To create the report proceed as follows:
    1. Create report RCOPCA60_2 using Transaction SE38.
                  Enter the following for the program attributes:
                  Title:        Mass change of company code assignment SAPNet 316440
                  Type:         Executable program
                  Status:       SAP standard production program
                  Application:  Cost accounting
                  In the 'Display Object Directory Entry' dialog box enter KE1 as a development class.
    2. Implement the attached source code into the newly created report and activate it.
    3. Enter the following entries via the menu path 'Goto -> Text elements -> Selection texts'"

  • MM STO between Plants under the same company code

    Hi experts,
    Please guide on the configuration steps for doing STO between Plants unders the same company code.
    We have company code 100 in that Plants A B & C are theie. Each Plant can do STO to other Plant.
    How to configure this scenario?

    Dear,
    Please follow bellow path
    1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data creation.
    Stock transfer between two plants in different company codes is known as inter company stock transfer.
    Material should be maintained in both supplying and receiving plant MM01
    Stock should maintain only in supplying plant MB1C
    Create receiving plant as a customer in supplying plants company code and sales area XD01
    Assign this customer number in receiving plant details OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery type NB for in combination of supplying/ receiving plants.
    Create STO ME21N
    As it is normal there in the item details we should get shipping date i.e. customer number
    Go for Delivery VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy number generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock transfers that include deliveries and billing documents/invoices are only possible between plants belonging to different company codes.
    If you want to carry out a cross-company-code stock transport order with delivery but without a billing document, you must set the Relevant for Billing (data element FKREL) indicator in Customizing of the item type to "blank" (Not relevant for billing).
    The following applications are involved in this type of stock transfer:
    ? Purchasing (MM-PUR) in entering the order
    ? Shipping (LE-SHP) in making the delivery from the issuing plant
    ? Billing (SD-BIL) in creating the billing document for the delivery
    ? Inventory Management (MM-IM) at goods receipt in the receiving plant
    Invoice Verification (MM-IV) at invoice receipt in the receiving
    Transfer of goods from one location to another location, it may be between plants within the same company code or in different company code's plants.
    within the company code, but plants,
    receiving plant will raise the STO in Supplying/issuing plant-ME21n,
    Supplying plant will deliver the goods to receiving plants ,
    then we need to pick n post the Goods Issue-VL02n,
    now when we can observe that the STO qty will be added into receiving plant and reduced in Delivering plant,
    To do this, we need do prior customization in SPRO-IMG,-
    material should be created in both plants( receiving & Supplying)
    -maintain the stock only in supplying plant
    -create a dummy customer in supplying plant's sales area(if u have one sales area, create in tat comp code n sales area)
    -assign this customer number to receiving plant's details along with the sales area,
    -Assign the STO doc type(UB) to Supplying plant, along with checking rule
    -Assign the Del type (NL/NLCC) to Supplying n receiving plant.
    Stock Transport Order:
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b911d43ad11d189410000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b917843ad11d189410000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b918543ad11d189410000e829fbbd/content.htm
    u can also use the SAP building block
    with delivery
    http://help.sap.com/bestpractices/BBLibrary/html/P36_IntStockTransDel_EN_IN.htm
    without delivery
    http://help.sap.com/bestpractices/BBLibrary/html/P38_IntStockTransWithoutDel_EN_IN.htm
    Regards,
    Mahesh Wagh

  • Can a plant material valuated from company code to other company code ???

    we have a lot of ships(plants) and the ship here defined as a plant with it own storage locations .
    we have three company codes some ships are assigned to one company code and after a period of time it rented to other company code with its storage location........and the inventory go from one with its plant from company to another....
    can i handle this case ?

    we can transfer material from one company code to other company code, One Plant to other Plant & one storage Location to other storage location . if material is valuated then accounting document will get generated while GR . material l price will get updated for new plant/ company code
    Depends on your valuation type whether it is company code or plant
    Regards,
    Jyoti

  • Billing in Stock Transfer between two plants of two different company codes

    Hi Friends,
    I am doing the scenario of stock transfer between two plants of different  company codes.
    I have some issues in Billing for this..
    What are the settings do i need to to for Pricing in SD point of view.
    Ex:
    Supplying         /         Receiving
    Com.Code:2000     /        CompanyCode:1000
    Plant:2100              /         Plant:1100
    SA:2000/10/00      /          SA:1000/10/00
    I created Customer 5555 w.r.t sales area of supplying company code (2000/10/00)
    I created Vendor  7777 and assigned Supplying Plant 2100 in add purchasing data.
    In IMG Settings:
    Define Shipping Data for Plants: In Receving Plant i assigned customer 5555 and sales area blank
                                                        In Supplying Plant i assigned customer blank and sales area as 2000/10/00
    Create Checking Rule: Standard(B SD Delivery)
    Define Checking Rule: Standard(Avallability-01assigned to checking rule B)
    Assign Delivery Type and Checking rule: Document type(NB)-Supplying Plant(2100)-Delivery Type(NLCC)-Checking Rule-(B)
    Assign Doc Type:Supplying Plant(2100)-Receving Plant(1100)-Doc type(NB)
    What are Pricing settings in SD i have to do?????????
    Process:
    ME21N->VL10B->VL02N(PGI)->VF01(IV)->MIGO->MIRO
    I have gone through many threads in Forum but confusion in Pricing Part..
    Some are mixing with the inter company sales proces..
    Pls guide me..
    With Regards

    Do the following steps for STO Customizing:-
    1. Create a customer master record for the issuing plant.
    2. Create a vendor master record for the issuing plant, and enter customer account number in the Customer field on the Control screen.
    3. Repeat steps 1 and 2 for the receiving plant.
    4. Assign the plants to the customer master record in Customizing for Materials Management (MM), by choosing Purchasing <Purchase Order < Set Up Stock Transport Order< Plants.
    The Process Flow would be as follows :-
    Create a stock transport order, following the standard procedure, and send the order to the issuing plant.
    Issuing plant has processes your order, and when it is ready to ship,the storeperson at the issuing plant issues the goods using a transfer posting. The excise clerk there creates an excise invoice.The excise supervisor verifies and posts the excise invoice.It then sends the goods to you, together with the excise invoice.
    Once the goods arrive, you follow the standard procedure for incoming excise invoices:
    The excise clerk captures the excise invoice, using the stock transport order as the reference document. The storeperson enters the goods receipt, again using the stock transport order as the reference document.Alternatively, you can first enter the goods receipt and then capture the excise invoice.
    The excise supervisor then posts the excise invoice.
    Best Regards,
    Ankur

  • Plant to plant subcontracting(Under one company code)

    Hi,
    I need a help on one issue.
    We are having multiple plants under one company code.
    Material goes with 57F4 challan for subcontracting plant to plant.
    How to do the subcontracting process for plant to plant.
    Please explain step by step.
    I know the normal process (with vendor)
    Also, if I have create a subcontracting PO, how the receiving plant will come to know about this?
    How will he receive the material which I have send?
    How the production activities at their end?
    Do I need to do the MIRO?
    Please thrwo some light.
    Thanks in advance,
    Piyush

    1)  Create Subcontracting Purchase Order with `0` Cost
    2) Transfer of Components to Subcontractor
    3) Create Subcontracting Challan
       a)Receive the Components as non valuated Materials
       b)Process the Materials to get the SF Product
       c)Create the Outbound Delivery without Ref. To Sales Order
       d)Endorse the Subcontract Challan Manually
    4) Post Goods Receipt
    5) Reconcile Subcontracting Challan
    6) Complete / Reversal / Re-credit SubcontractingChallan
    During Reconcile the Subcontract Challan - J1IFQ,Enter Manually into the Assigned Quantity Field the Components that are actually assigned for this Subcontracting Process.
    Regards,
    eswarmanu...

  • FM to get Plants assigned to a company code

    Hello All,
    Can you please give me the Function Module name where I can give the Comapny code as input and output should be the plants assinged to the given company code.
    Ofcourse, I have the table V_T001K_ASSIGN but i want FM.
    Thanks in advance.
    Best Regards,
    Sasidhar Reddy Matli.

    Hi,
    Use the FM K_WERKS_OF_BUKRS_FIND.
    Regards,
    Smart

  • Reg    plant related to a company code

    hi,
    i need small code for a sigle delivery number related to a copmpany code and related a plant data.for retreiving data select statement should validate company code and delivery no,delivery date also

    u have to get the data from LIKP+LIPS.
    Regards
    Prabhu

  • Stock transfer between two plants under the same company code at profit

    Hello,
    Hello,
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Hi
    To map this scenario, you should use Profit Centre Accounting.
    Example
    Matl XYZ is to be transferred from Plant 1000 to Plant 2000 at a profit.
    Value of Matl XYZ in Plant 1000 is $100
    Transfer Price: $120
    From FI view point, there would not be any Accounting document as both Plants belong to the same Company Code.
    From PCA view:
    Plant 1000:
    Internal Revenues Dr.  120
    Stock                  Cr.  100
    Profit Margin        Cr.    20
    Plant 2000:
    Stock                                 Dr. 120
    Delivery from Profit Centre    Cr. 120
    Effectively, the value of Matl XYZ in Plant 1000 remains at $100 and in Plant 2000, it is $120.
    Hope this clarifies.
    Thanks

  • Is it possible to assign existing plant to different new company code

    Hello,
    we have created one company code  and two plants A001 and A002 plants.  Both plants are having some entries.(created So. PO. scheduling agreements )
    Now business decided that ,they want to assign A002 plant to another company code. Is it possible to add this to new company code.
    Before   A000 company code was having two plants A001 and A002.
    Is it possible to Add A002 plant to Different company code?
    Regards
    sapman

    Hi,
    If u assign the same existing plant to another company code then it will lead to inconsistencies since there will be old and new purchasing documents created for that plant even after " clearing" your open  pur documents like PO,GR,IR sched agmt etc
    so I think the best way is to
    1. close all existing open entries in that plant
    2. create a new plant in other company code by copying the old one
    3. Assign new plant to diff co code
    4. To stop further transactions in it just De activate old plant  and also by doing this previous  "Transaction History remains intact" -
    5. Extend required Material Masters for this new plant in diff co code
    Hope this helps u !
    Regards,
    Uzair Hussain

  • Reassign Plants from one company code to another company code

    Hi Gurus,
    We need to move plants from the current company code to a new company code. I know this is possible in configurartion, however, I not sure on what implications this may cause to the new company code. We are looking for a way to not creating new plants under the company code, and we believe reassign plants to the new company is the best way.
    Could you please let me know what might be the impact on this? on Finance? etc...
    Thanks in advance,
    Richard

    To me, it is something alarming!!!
    You are trying to assign the plants to new company codes after removing the assignment from the other company code. In my opinion you need to first consult a MM and a FI specialist and not a SD specialist.
    In the old assignment, there might be transactions done (for example goods movement, different material documents etc..). If you assign the plant to new company code, then how will you retrieve the old historical documents? I don't think even if you archive the documents,  you could retrieve after assigning the plant to new company code.
    I would suggest, think twice before you do anything/do enough testing in development system, or consult with MM/FI personnel or consult SAP before reassigning the plant.
    Regards,

  • Avaiability check across All Plants for all company codes

    Hi
    How to Check ATP in Availability Check in Sales Order across plants in all the company codes.
    Currently its showing me only one company code plants when i click on other Plants Button in Availability control
    Reg.
    Amol

    Hello Amol,
    In sales orders, when you write a item material SAP makes it an automatic determination for the plant who belongs to master data information. The first step for SAP search strategy is find over the Customer Material Information, if it does not have information it makes the second step and search information over the Ship-to party, and the third step its search in the master material. If it does not find information, SAP does not propose a plant for that item material.
    Taken this process in consideration and for this reason, the item material made the Availability Check for one particular plant.
    If do you like to know more about your material stocks, one option its search the quantity available for sales in the plants using the MB52 transaction; and other option could be over your sales order, in the Availability Control, go in the menu to u201CGo tou201D, u201COthers Plantsu201D; or if your prefer you can use u201CShift+F5u201D.
    Regards

  • Plant to Plant STO with excise invoice and taxes in one company code

    Hi,
    I have a new business requirement, we want to create only one company code and 12 plants in different states,  each plant will have separate purchasing and sales activity this is ok this can be done with separate excise and series group as ther will not be any issue for purchsing and saling of materisl with exice in each plant , but how we can transfer the material plant to plant  if the plant is in different states we want that the material should be transfer from palnt to plant  with excise invoice only,  as we have the company code common,  how to create the billing document for this, and how to pass the duty from the saling plant and capture the same in the recieving plant. with proper tax entry. Can we do the STO with biiling if the two plants are in single compnay code.
    regards,
    zafar

    hi,
    I am trying to create a Stock Transport Order (STO) with document type UB and item category U. My objective is to transfer material from Plant (supplying plant) 100 to Plant (receiving plant) 1100 within one company code (1000) with STO.
    For this purpose I created a raw material 1434 in plant 1000 with sales org 1 view and in that view entered in delivering plant field 1000 as delivery plant. After that I extended material 1434 to plant 1100 without changing anything what I did while creating the material first in Plant 1000 except in organizational level I entered 1100 in the plant field. I entered Sales org 1000 and distribution channel 10 in organization level for both plant while creating and extending the material. In me21n I chose Stock Transport Order with document type UB and item category as U also receiving Plant as 1100. With this when I tried to save the STO the message, I am getting an error,  Cannot determine shipping data for the material 1434? 
    I am doing solely mm function why I need to create Customer master? In this case plant 1100 is the customer right? 
    Solution:
    1. Mat.(1434) should be maintained in both the plants. (1000&1100).
    2. Should have enough stock in supplying plant(1000).
    3. Make its supplying plant as a vendor in vendor master record in receiving plant(1100).
    4. Make it receiving plant as a customer in customization.  
        Create customer (xd01) & and define the shipping data for plants in both the plants.
        Path: spro u2013 img u2013 m.mgmt u2013 purchasing u2013 po u2013 set up STO u2013 define shipping data (1 by1 )
        In Receiving plant (1100)                         In Supplying plant (1000)
        Customer num.  123345 (for ex.)              Customer num.  -
    (don't fill) 
        Sales org.yyy                                                  
        Dist. Channel                                                              
        Sales div.  y   
    5. Assign doc. Type is "NL" for intra company STO. If  STO is inter company, Assign doc. Type is "NLCC".
        Position doc type is "UB"
        Enter supplying plant(1000) & doc type (NL) & checking rule (ex:01)
    6. Assign doc. Type is "UB" to u'r plants.(PO)
        Go for new entries 
        Enter supplying plant(1000) & Receiving plant (1100) & doc type (UB).
    7. Create a PO, choose the doc type is `UB' & item cat.'U', Enter supplying plant as a vendor in PO  of the receiving plant(1100).
    8. Provide this num (PO) to SD people, they will do the delivery by using transactional code is VL10B.
    9. Sales people they will provide "out bound delivery num".
    10. Do the GR. In GR the second tab 05 out bound delivery instead of PO mov.type 101.
    11. See the stock over view in the receiving & supplying plants.  
    thanking you

Maybe you are looking for

  • NameSpace not recognized in Call-template

    I have declared name space xmlns:StringUtils="http://www.oracle.com/XSL/Transform/java/com.xyz.xyz.utils.StringUtils" as part of the stylesheet element. When I use this name space in calculating a variables value XSLT processor picks up properly. But

  • Video Controller (VGA Compatible): Code 1

    Help me! I am having "Video Controller (VGA Compatible): Code 1" It says I'm missing "Intel HD Graphics 3000", but when I downloaded it, it says my computer isn't compatible with it. What do I have to do? *This all happened when I got Windows 8.1* My

  • Manual Clearing

    Dear all, After creating a customer invoice, I want to clear it. I call transaction F-32, specify company code 1000, account number of customer 108 and click "Process Open Items", but it raise an error: "The entry 1000 is missing in table T043G". Do

  • RAID disappearing after binding to Directory Service

    We have an Xserve (late 2006) with Leopard Server. I built and RAID 1. After binding this server to a directory service, master running on a 10.7.5 server (Mac mini) the RAID is disappearing. If I click on the volume I get an error -1407. After unbin

  • Binding an object to Listbox.SelectedItem

    I have this code: Binding ContactBinding = new Binding("Conversation");         ContactBinding.Source = lstContacts.SelectedItem;         BindingOperations.SetBinding(txtRecieve, TextBlock.TextProperty, ContactBinding); Is there a way to set the Cont