I have the following issue, we need a Reporting to show at material level (The report, has to see like /SAPTRX/EE_OVD_LIST, i mean a list), the quantity pending for Goods receipt, by example in the case of a procurement scenario, and the quantity (at material level) pending for Departure in the case of a delivery in a transportation scenario .
I mena by example, the material 1234ABC has pending for GR 400 Units from P.O. 4500100 and GR 300 Units from P.O. 4500250.
I analyzed the following transactions without obtaining the expected result:
u2022     /SAPTRX/EH_LIST.
u2022     /SAPTRX/EH_SET.
u2022     /SAPTRX/EH_LIST_STAT.
u2022     /SAPTRX/EH_LAST_EVT.
u2022     /SAPTRX/EE_OVD_LIST.
u2022     /SAPTRX/EE_MON.
u2022     /SAPTRX/EVM_STATUS.
u2022     /SAPTRX/ER_MS_LIST.
u2022     /SAPTRX/LOCKED_PROC.
u2022     /SAPTRX/LOCKED_PSET.
u2022     /SAPTRX/EMJOBS.
u2022     /SAPTRX/ASAPLOG.
u2022     /SAPTRX/CONS_CHECK.
Which transaction can be used to achieve this goal?
Thanks and best regards,
Juliá

Hi Mahantesh ,
Try this:
Take two more KFs in the cube.
1) Creation Date as KF
Type: Date
Exception aggregation : First value
Aggregation reference : 0material.
2) Issue Date as KF
Type: Date
Exception aggregation : Last value
Aggregation reference : 0material.
In the query take 0material in rows and above 2 KF in the columns (May be , here , you need restriction also. 'Creation Date as Characterstic' > 01.01.1000 ,Issue Date as characterstic' < 31.12.9999 )
With rgds,
Anil Kumar Sharma .P

Similar Messages

  • Report at Material level(for all the plants)?

    Hi Experts,
    We have simple query which gives following output.
    &Plant&Material No&Creation Date&Issue date&QTY issued&
    P1      M1         01/10/2004    01/01/2005        10
    P2      M1         01/12/2004    15/12/2004        20
    P3      M1         01/01/2005    15/01/2005        30
    Actually I want to report at material level  ( for all plants in one shot ) , additionaly I want to show the minimum creation date for that material and minimum issue date  and sum of all 3 qty issued.
    The output should look like
    &Material No&Creation Date&Issue date&QTY issued
    M1           01/10/2004    15/12/2004       60
    Can any body suggest how do i get the date fields with the above condition
    Thanks in advance.
    Regs,
    Mahantesh

    Hi Mahantesh ,
    Try this:
    Take two more KFs in the cube.
    1) Creation Date as KF
    Type: Date
    Exception aggregation : First value
    Aggregation reference : 0material.
    2) Issue Date as KF
    Type: Date
    Exception aggregation : Last value
    Aggregation reference : 0material.
    In the query take 0material in rows and above 2 KF in the columns (May be , here , you need restriction also. 'Creation Date as Characterstic' > 01.01.1000 ,Issue Date as characterstic' < 31.12.9999 )
    With rgds,
    Anil Kumar Sharma .P

  • Want to see combination of Purchase Order and A/P report at material level

    Hello,
    Anyone familiar with an InfoProvider that will show a combination of Purchase Order and A/P data combined?
    I'm specifically looking for a source that includes the PO information at the <b>Vendor / Material</b> level with order value and quantity at the time the PO was created AND accounts payable data at the <b>Vendor / Materia</b>l level with the invoiced amount and quantity (which may vary for the PO amounts).<b></b>
    Thank you,
    Jim

    Hi
    Have you seen all of the follwoing datasources......
    http://help.sap.com/saphelp_nw04/helpdata/en/df/fbb0d62f3a794d98d23609d17e1610/frameset.htm
    Hope this helps
    Regards
    N Ganesh

  • SAP Report for Material purchased from Vendors

    Can anyone tell me if there is a report in SAP that we can use to list all suppliers for a given material?   We are operating in SAP ECC6.0 and need a report that will list all  vendors that the company has used for a given part.   Is there a standard report in SAP that pulls information from purchasing info records?
    Also does anybody know of any SAP consultants that can help us create custom reports?
    Edited by: TonyMart on Oct 20, 2011 2:46 PM
    Edited by: TonyMart on Oct 20, 2011 2:47 PM

    Hi,
         There is not standard report for ageing... You have to develop a custom one if you are talking in terms of GR/IR...
    Raghav

  • Report for material moved from blocked stock to unrestricted stock

    Hi,
    Is there a standard report in WM showing list and qty of materials moved from blocked stock to unrestricted stock.
    Regards,
    Pratap

    It would have been easy if there was a specific WM movement type for such transfer but due to the reason that the WM 309 is connected to various IM movement types, there is no direct report to get this information.
    Conversely, you may use MB51 with the combination of the WM managed storage location and movement type for your purpose. If there are multiple storage locations assinged to the same warehouse then you may put a range in the selection criteria.

  • Changing Batch Management Level from Material to Plant

    Hi all,
    We are investigating changing our batch management level from material to plant to meet business requirements.
    SAP has pointed us to a note with a program to reset the batch level, as well as highlighting some things to look out for.
    I've conducted the change in a playpen system and so far it looks relatively straightforward, with complexities arising only when characteristics exist, or when a batch exists in multiple plants.
    Seems that batch master data is moved from MCH1 to MCHA, including the object link number to classification. Unfortunately it seems a limitation of the conversion is that the batch master data is copied to ONE plant only in MCHA, no doubt due to the fact the object number link to classification must be unique.
    My question is this: has anyone performed this change before, and if so can you offer me any advice on what to look out for, or potential problems that arose after the change?
    Any help or comments are appreciated.
    Mark.

    hi..
    first of all try this simple one...
    You will have to delete all the materials, remove stock and then switch the batch management flag.
    Or
    To convert the batch from plant level to material there is Conversion Program defind by the SAP...
    1. For all releases lower than Release 4.5B, implement the corrections and the modification in the report RM07CHDX as described in the correction instructions.
    2. Create the report ZCHTCUCH, which is specified in the attachment.
    3. Run this report in the clients for which you want to reset batch level to plant level.
    4. Call transaction OMCT.
    5. Check whether the batch level for "Batch unique at plant level" is set.
    6. Implement Notes 821891, 944278, 950540 and 1091613 if you have not already done so (or you have not imported the corresponding Support Package).
    7. Execute the function "Batch Level -> Conversion".
    8. Define a plant for a plant view that may be missing.
    9. Always execute the report in the test mode first. Analyze the error log.
    10. If no errors occur, you can execute the report in production mode.
    11. If you are working with batch long texts, first execute the report ZM07CHDX_TEXT in test mode.
    try this out..hope is works,,
    Thanks..

  • MM01 material copy from at plant levele

    Hi,
    I have a simple but very important question to ask about MM01 material "copy from" function.
    When you copy a material at an organisational level other than general data (at plant level for exemple), SAP copies some data and left some others blank
    For exemple, in "Work Scheduling" material views, it copies "Prod.Sched.Profile" data but not "Unit of issue" nor "Prod.stor.loc."  data.
    What make the difference between these data ? Why all isn't copied ?
    Thanks for help
    regards
    Morgan

    storage locations are plant specific customizing.
    SAP cannot assume that the second plant would use the same keys like the first plant.
    If SAP would copy the storage location, then it would result in an error if it is not customized for the target plant - better not to copy it.

  • Changing Batch Level from Material Level to Plant Level.

    I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
    Kindly suggest.

    Hi, Thanks for ur reply.
    I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
    What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide.

  • Batch level settings conversion from plant-to-plant to material-level

    If someone has worked on conversion of Batch level settings within SAP from plant-to-plant to material-level batch management, please let me know what are the challenges involved in doing this. Thanks.

    Check help !!!
    To change the batch level, you have to start a conversion program. This program first checks whether conversion is possible and outputs an error log containing all batch numbers that occur more than once at the new level. Now you need to manually transfer these batch records to batch numbers within Inventory Management using a transfer posting 'material to material'.
    If you change the level from plant level to a higher level, it is possible that batches with the same batch numbers in different plants are actually identical.  In this case, all you have to do is remove stocks (including previous period stocks) so that all batches with the same batch numbers, except one, can be reorganized.
    When you convert from plant level to material level, the material is then to be handled in batches in all plants in which it is defined.
    Standard settings
    In the standard delivery batches are uniquely defined at material level.
    Activities
    To change the batch level, proceed as follows:
    1. Choose the level at which you want your batches to be unique.
    2. Save the new settings and choose Back.
    3. Choose Batch level -> Conversion.
    4. If necessary, carry out the conversion in test mode first.
    Further notes
    Note that you cannot reset conversion from plant level to a higher level in the standard.
    If you create a client by copying an existing client, initially, there are no settings in the target client at batch level. The system makes the settings in the target client only when you have carried out an activity (maintaining master data or posting a goods movement, for example). The client level is not transported. If you copy a client with client level, you have to manually set the client level in the target system.

  • How to transfer Shelf Expired Material from QC Pending Location

    Dear Sap Experts,
    Scenario
    Currently the stock is lying in Quality Pending Location with Inspection Lot
    Against Inspection lot, MIC recorded;
    But system not allowing Usage Decision because shelf life is expired
    Now the Questions are
    1. How to make Usage Decision or
    2. How to Transfer "Shelf Expired Material" from QC Pending Location without changing Expiry Date.

    Dear ramana
    Please try with QA07 with intial run in days as 1and also the reason code
    If the materials are not batch managed the material will be transfered to Block or if it is batch managed it will make restricted.
    Please try and let me know
    Regards
    gajesh

  • Read Combination segments for material account from item level

    Dear Value Consultant,
    Read Combination segments for material account from item level
    "For any inventory transactions"
    Is there is away to read the material account from item level , to affect the real combination segments not general combinations segments from item master or organization
    Business Impacts :
    All inventory transaction for all item will affect the same combination segments for material accounts
    After I transfer to GL, This not helps me to differentiate the balance for material value is related to any item category
    Also for Budget Wise , I want to map the budget on combination level for materials accounts , and this not actualize without affect the real combination for material accounts in subledger ,
    Thanks

    I have not seen any client asking for this, but you can consider Costing Hooks to create your own accounting engine for inventory transactions. Hope you are taalking about standard costing. In such case, costing hooks are available in Oracle for you to write your own accounting.
    Even better in R12, you can do this with setup in SLA.
    Thanks
    Nagamohan

  • Change batch level from plant to material

    Hi,
    is there any possibility to change the batch level from Plant to Material level. system has now changed the table in material master from MARA to MARC.
    Regards,
    Ali

    Hi,
    please check the below link.
    http://help.sap.com/saphelp_45b/helpdata/en/25/2838714f7811d18a150000e816ae6e/content.htm

  • Report for Material Cost Estimate

    Hi Everyone,
    Is there any way that I could download a report from the SAP showing all the material cost estimates? Hope someone could help me. When I try using CK11n, there is no tab there for report downloads and it only shows one material.
    Thank you in advance
    Jahziel

    Dear Jahziel,
    In standard SAP the following reports are available:
    T Code : CK84_99 : COST_ELEMENT - Cost Elements
                 CK80_99 - Cost Components
                 CK84_99 - Itemization
    These reports will provide you the information at individual material level.
    Regards,
    Pavan Kumar Arvapally

  • Vendor evaluation at material level

    Hi friends,
    I have one requirement from client. A vendor supplies many materials. My client want to get report of vendor rating of the vendor for each material and material groupwise.
    Can this objective can be achieved?
    Please suggest.
    Regards

    Hi,
    When you run Vendor Evaluation (for all criteria), sysytem keeps log of all material level points the Vendor has achieved. You can view the same in transaction ME64.
    Regards,
    Prashant

  • In J1IFR-List subcontracting challans, system showing Zero Quantity pending although Qty is pending

    In J1IFR-List subcontracting challans, system showing Zero Quantity pending although Qty is pending at MASOP vendor. After reconciliation of challan, the Qty sent=250 , Qty received= 113. system must show Qty pending = 137. But when we check in J1IF12, Qty sent=250 and Qty received=113. Why J1IFR report is showing incorrect output.
    I am facing this problem after Ehp7 upgrade in SAP ECC 6.0 version.
    Thanks & Regards,
    Neeraj.

    Are you using the same number ranges for different series group. This can cause inconsistency. Also check table J_1IGRXSUB whether right material documents are attached to your Challan.
    Also refer to these notes which is only applicable for EHP6.
    1753000 - Wrong output displayed for status in report selection-
    J1IFR
    and
    1674607 - Duplicate entries while displaying Annexure IV in
    J1IFR
    Regards
    Binoy

Maybe you are looking for

  • Two remote objects calls on the same php class

    Hi to all,        I've encountered a strange issue while developing with remote objects. I've a mxml component with an init() method inside which is called by a menu. When the init() method is called it makes 7 remote object calls which are bound to

  • Is Elements 8 a true 64 bit Windows 7 product?

    Having just two months ago bought the upgrade to Elements 7, I was very unhappy to find that it is not listed by Microsoft as being compatible with Windows 7 in either 32 bit or 64 bit mode (http://www.microsoft.com/windows/compatibility/windows-7/en

  • Docking station for iPhone?

    I've been trying to find one, but I can't. Regular docking stations for iPods don't work. Any advice?

  • Like a fortress

    Contacting ATT requires something like having the keys to the city before you can even get the time of day. I suppose this comment will just wander off into the ether, but I wanted to say . . . every time I see the U-Verse ads touting internet servic

  • Retrospect - backup to disk?

    My disk space needing backup has grown to the point where it is no longer practical to backup to tape (5 GB per tape) or ZIP-style disks . So I figured I would tell Retrospect (v4) to backup to some spare fixed disk space I have. That simple concept