is there an existing report where I can enter forecast data by cost center??  Or an existing GR55 report that could do the same?
Thank you in advance

You are working on OLTP system which has certain limitations.
What forecast data you would like to enter.
Brief your requirement with example, you would get better replies.
You can upload plan data through excel, that has been addressed already number of times.

Similar Messages

  • Block payroll data from cost center for all users except HR team

    Hello Expect,
    Could any body please advise me  how can I restrict some HR data  in cost center view from FICO,CRM,SRM and other team,
    Now when other team see cost centers it display all data booked there but my client want to restrict some HR data from them
    In my project there are 151 roles that can display cost center dat including HR data,
    Now my requirment is how can I restrict only HR data belongs to a cost center
    I mean to say they should be able to see all cost center data exept a cost center containing HR data.
    Please advise how to get solution
    Thanks and Regards

    Hi,
    in  T.code PFCG do to the role of the appropriate usr to whom u want restrict cost center.
    Hope this helps.
    Reagrds
    S.Ravi

  • Substitution for deriving Profitcenter from Cost center

    Hi SAP Gurus,
    I want a detail substitution steps for deriving the profit center for cost centeres. One PC is assigned to more than one cost center.
    Thanks In Advance.
    CHEERS

    I am talking about the cost center in settelment rule.
    my problem is while setteling the order in ko88
    --- for some order , for manual input of cost center system is capturing profit center automatically
    --- for some order, system is not deriving the profit center automatically.
    all cost center master data is having profit centers.
    for the second case system is not allowing me to settele the order in ko88.
    Edited by: NITIN on Mar 26, 2009 1:42 PM

  • Can we change the date of cost center

    Can we change the date of cost center with we have already created????????

    Hi Shivika
    Changing a date can mean many things.. Example - You created a CC from 01.01.2014 to 31.12.2015
    If you want to have the Validity from 01.01.2013 now, create the CC from 01.01.2013 to 31,.12.2013 from KS01
    If you want to extend the validity till 31.12.9999, again do the same.. KS01 -> Create from 01.01.2016 to 31.12.9999
    If you want to shorten the validity i.e. say, You want the CC to be valid from 01.01.2015 instead of 2014, then you can delete the CC from KS04 for 2014 provided no data is posted (plan or actual)
    Br., Ajay M

  • I need the Log Report for the Data which i am uploading from SAP R/3.

    Hi All,
    I am BI 7.0 Platform with Support Patch 20.
    I need the Log Report for the Data which i am uploading from SAP R/3.
    I extract the DATA from R/3 into BI 7.0 DSO where I am mapping the GL Accounts with the FS Item.   In the Transformation i have return a routine on the FS Item InfObject . I am checking the Gl code into Z table for the FS Item .
    I capture the FS item from the Z table then update this FS item to Infobject FS item.
    Now i  need to stop the Data upload if i do not find the GL code in the Z table, and generate report for all GL code for which the FS item is not maintained in the Z table.
    Please suggest.
    Regards
    nilesh

    Hi.
    Add a field that you will use to identify if the GL account of the record was found in the Z table or not. Fx, create ZFOUND with length 1 and no text.
    In your routine, when you do the lookup, populate ZFOUND with X when you found a match (sy-subrc = 0) and leave it blank if you don't find a match. Now create a report filtering on ZFOUND = <blank> and output the GL accounts. Those will be the ones not existing in the Z table, but coming in from your transactions.
    Regards
    Jacob

  • AP Invoice Aging Report for past date

    hi guys,
    I am running R12.
    my requirement is to run AP invoice aging report for past dates (same like AP Trial Balance Report), but the seeded invoice aging report has no option to do so.
    would appreciate some help
    thanks in advance
    Ravi

    Hi Senthil,
    I am running R12.
    my requirement is to run AP invoice aging report for past dates (same like AP Trial Balance Report
    if u have any solution to this , please suggest me how to resolve this requierement.
    thanks in advance
    Ravi
    mail:[email protected]

  • Want to schedule WebI report for End date of Prior Month

    Hello Experts,
    We have WebI report created on top of Bex Query, We have key date as prompt for the report. Can we schedule the webi report for key date as last date of prior month, so if current month is February, my key date should be Jan 30 2011. I am not sure if this is possible?
    Thanks,
    Ravi

    You need to apply two FM to get the end day of the month.
    First you need to apply FM MONTHS_PLUS_DETERMINE. This will give you the date after 3 months.
                CALL FUNCTION 'MONTH_PLUS_DETERMINE'
                  EXPORTING
                    MONTHS        = 3   " << for 3 months
                    OLDDATE       = l_start_Date   " << 12/01/2007
                 IMPORTING
                   NEWDATE       = l_3_Date. " << 02/01/2008
    Then call the FM RP_LAST_DAY_OF_MONTHS . this will give you the end date of the month
      CALL FUNCTION 'RP_LAST_DAY_OF_MONTHS'
        EXPORTING
          day_in            = l_3_Date  " << 02/01/2008
        IMPORTING
          last_day_of_month = l_3_Date  " < 02/29/2008
        EXCEPTIONS
          day_in_no_date    = 1
          OTHERS            = 2.
    Call both FMs again to get your another date(after 4 months).
    Regards,
    Naimesh Patel

  • How to take unreconcilled transactions report for a date range ?

    hi all,
    How to take unreconcilled transactions report for a
    data range ?
    we have taken unreconcilled transactons from
    external reconcillation using filter option mentioning
    range of dates,But when we take print out using PLD,
    it showing unreconcilled transactions for all dates.
    But our client requires it as a standard report from SAP ?
    Our client is using SAP B1 2005B PL39.
    Jeyakanthan

    Hi
    Financials -> Financial Reports -> Accounting -> General Ledger.
    In the 'Display' dropdown select, 'Unreconciled' .
    Hope this should help you.

  • Transporting Control Parameters for Actual Data in Profit Center Accounting

    Hi Friends
    Transport type of control parameters for actual data in Profit Center Accounting has been mentioned as Manual, when I try to manually create the Transport Request the Transport option in the Menu is disabled.  Is there any other way to transport this configuration.
    Regards
    P Rajan

    Hi
    I think the settings that you are mentioning is through transaction 1KEF please clarify. Else elaborate where you have set the transport type manual.
    Transport request are the domain of Basis people and is meant for transport from one client to another like quality to production.
    Anand

  • Configuring reports for express data(2)

    We are in the process of configuring reports for express data.
    In this regard we have done the following steps:
    1.In the machine A reports 9i developer suite release 2 has been installed on Windows 2000
    Professional Edition with the following utilities - (a) Oracle Reports Builder and runtime
    support,(b) Oracle Express Connection Editor and (c) Oracle SNAPI are installed.
    2.Express Server 6.3.4 has been installed on Windows 2000 Professional Edition in machine
    B with Remote Operation SNAPI 6.3.4.0.
    3.Oracle 8i has been installed on Solaris and the Express Support Administrator and User
    Accounts have created and the xrb_admin.sql and xrb_user.sql have been run through the
    respective accounts.
    Queries
    1.We have still not run the Express Oracle8 External Procedures on the Oracle8
    gateway. Should we run this in order to get Express Data in Reports9i incase of the General
    Maintenance where the Express data fetches the data from the Oracle8 gateway on the fly
    ?We are also not able find the Express Oracle8 External Procedures downloads after
    extensive search on OTN.Please guide as to where can we find the downloads.
    2.What are the configurations settings that have to be done in the tnsnames.ora,sqlnet.ora
    and listener.ora ?

    Ramakrishnan,
    Express connectivity for Oracle9i Reports is installed by default as one of your pluggable data sources and it communicated directly with Express, which is a large change over Reports 6i in which you needed an Oracle8i database to talk to the Express database.
    For Oracle9i Reports, you need to have:
    1 - Express installed 6.3 or later.
    2 - Oracle9i Reports
    3 - The connection dialog (which is documented in the release notes if you need to set this up)
    That's it. When you click on the Express PDS to access the data, it will read the connection dialog information and you need to supply the logon information to the Express database.
    You should also look at the help topic for Express and you will find all the necessary documentation on configuring Reports and how to connect.
    Regards,
    The Oracle Reports Team jls

  • Configuring reports for express data

    I am trying to configure reports for express data and in this regard I have done the following :
    1.Machine A having reports 9i Developer suite Release 2 and Pluggable Express Connection Editor
    installed on Windows 2000 professional.
    2.Machine B having which Express Server 6.3.4 installed on Windows 2000 professional.
    3.In Machine A created user OESDBA with Administrator privilige.
    In the reports I am able to connect to the Express Server and attach the database and choose the
    measure.Once all the other steps are done I am able to print the data on the reports.
    But if I use a parameter form in which I give the HOST,USER and PASSWORD then substitute the
    same in the express_server parameter value in the AFTER PARAMETER FORM trigger block then
    the report gives an error saying that
    Express query contains incorrect,missing or damaged information.
    How to solve this error ?
    Can any one help me out.

    Ramakrishnan,
    Express connectivity for Oracle9i Reports is installed by default as one of your pluggable data sources and it communicated directly with Express, which is a large change over Reports 6i in which you needed an Oracle8i database to talk to the Express database.
    For Oracle9i Reports, you need to have:
    1 - Express installed 6.3 or later.
    2 - Oracle9i Reports
    3 - The connection dialog (which is documented in the release notes if you need to set this up)
    That's it. When you click on the Express PDS to access the data, it will read the connection dialog information and you need to supply the logon information to the Express database.
    You should also look at the help topic for Express and you will find all the necessary documentation on configuring Reports and how to connect.
    Regards,
    The Oracle Reports Team jls

  • Report Painter- How to make cost center report for Jun07-Jul08 ?

    Hi Experts,
    I need to make a P&L (Actual/ Plan) report for Jun 07 - Jul 08 by using Report Painter, but I'm having difficulty to make column for the next year period (2008) and some other things.
    We are using K4 Fiscal Year Variant in ECC 6.0.
    The layout is somehow like this:
    Header : Cost Center
                 Actual/Plan Report
                 June 2007 to July 2008
    Body:
    Cost Element     |   Total Actual   |   Total Plan |  Actual  June | Plan June .................Actual July | Plan July    
    xxxx       
    xxxx
    Account Group (total)
    xxxx
    xxxx
    Account Group (total)
    Grand Total  
    How to:
    a. make the header "June 2007 to July 2008" ?
    b. make the selection screen to provide parameter for June 2007 to July 2008? (e.g.: period 6 fiscal year 2007 to period 7 fiscal year 2008)
    c. provide layout (rows and columns) as described above? it should provide detail cost elements and also calculate it as the total per account group, then finally the Grand Total for all of account groups. 
    Thank you before,
    -=Meila.S=-

    Hi,
    1. Put Year and Month as your General Selection parameters
    2. In the label of the fields, if you put the parameter name with & before, it will display the value
    3. If you put cost element in General selection, it will come with a group, and when you selecting the group, the report does the sub-totals automatically.
    Regards,
    Eli

  • ALE for G/L and Cost Center Master Data

    Dear Expert,
    I am a fresher in ALE  and want to distribute G/L and Cost Center Master Data from our production system to Development and Q/A system. Can you give some guidances? and how to configure ALE for this purpose?
    Regards,
    MAL

    hi,
    steps to configure ALE :
    1.first u hav to create 2 logical systems for ur 2 clients in BD54.
    2.then assign thm in SCC4 for both clients.
    3.thn crete rfc destination in SM59.create in client from which u want to send only.
    4.create port in WE21 for sender.
    5.create partner profiles in We20 for both clients,outbound for sender and inbound for reciever.
    6.now create distribution model in BD64.
    generate partner profiles and distribute.
    now ur ale configration to send data frm 1 clnt to other is ready.
    u hav diff methods like master data,change pointers,idoc extensions,idoc reductions,...... to send data .
    hope this helps.
    reward points if helpful.

  • BAPI/Function Module for posting internal order + cost center plan

    Hi Guru:
    Is there any function module/BAPI, which could be used to post internal order + cost center( both of them )plan data?
    Like post a record:
    internal order = 10000
    cost center = C1000
    amount = 1000$
    for plann version 30?
    It seems the BAPI could only contain 1 cost object, either cost center or internal order.
    Thanks.
    Eric

    Hi again,
    I think you may have missed something important here. In R/3 there can only be a single "real" cost object for any one posting. If not then the whole SAP financail model would collapse as there would be "double postings" and that is certainly not wanted.
    If there is a need to post to two cost objects, like in your case, then one of the cost objects MUST be statistical.
    In your scenario SAP has thought of a solution that might be of help for you. An internal order can be set to be statistical in master data. When posting to both the cost center and the internal order then you will get a real posting for the CC and a statisitical posting for the IO. Reporting does work with this as per your requirement.
    Hope this gives you some hints for how to proceed.
    Regards, Johan
    Aaaaah. Noted that this was only plan data. Sorry. But the same still applies for plan data postings as well as for actual data postings. If there should be just one posting that could be "drilled down" from IO to CC -> If you post twice then, when doing "Grand total" for instance, double values would appear. So, still IO should be statistical. //Johan
    Message was edited by: Johan von Reedtz

  • Datasource for plan value in cost center accounting

    Hi
    I would like to create query for plan value that maintain in source system via tcode KP06
    (Controlling > Cost center accounting > Planning > Cost and activity inputs). Can experts please share with me which datasource to turn on in order to send the data to BI for reporting?
    Thanks
    Kang Ring

    Hi,
    Try 0CO_OM_CCA_1.

Maybe you are looking for

  • How to setup Oracle 10g grid on a node other than SERVER

    Hi, We are in a process of moving the database residing on Windows servers to IBM AIX5L servers. For this purpose I came up with an idea of installing database on AIX and operate it remotely on Windows platform using 10g Grid Control and 10g Client.

  • BPM 7.3 - Adobe Lifecycle Designer 9.0

    Hi guys, I`m a PI developer and quite new to SAP BPM, only took part in the SAP training several months ago. Now my colleague installed a BPM 7.3 system and I`m trying to implement some processes starting with the sample of the training. At the momen

  • Iexpense Report Creation

    HHi all, I need to know where the reason code field  can be found  while creating an iexpense report in Oracle. Allso if there is any lookup involved  and where that lookup can be found . Many thanks in advance

  • LSMW  ERROR LOG

    Hi All, I am working on error log created by LSMW, my work is to develop a program which can convert that error log to more user friendly log so that end user can easily identify the error....... The input parameter can be log id or queue id. If any

  • No surround 5.1