Report for WIP

Hi freinds,
   I am looking for a report that will display the WIP.
   I tried thru CO and KB reports but those are not working at my side.
   if any1 knows about it or any1 has developed such a report and is able to send me, i'll b so thankful to him.
   or u can mail me @ [email protected]
points rewd for sure.
Regards
Snehal.

Karthik,
Try to explore the option of using Storage location resource, and still I think you need to have a Custom report to get the data required by you.
<b>
<a href="http://help.sap.com/saphelp_47x200/helpdata/en/8b/d7ef02d08711d2b4c0006094b94273/frameset.htm">Link to Storage Location Resource</a></b>
Regards,
Prasobh

Similar Messages

  • Report for WIP stock

    Hi Friends
    The requirement is to generate a report showing the stock of the components in the semifinished stage.  
    For eg to manufacture a component "X" there are some 6 operations 0010,0020,.......0060(total lead time is around 3months).  Since the lead time is long & the mfg of this component may be halted at any operation (eg after completing operation 0010,0020,0030) & kept in store because of some capacity constraints and the balance operation 0040 to 0060 may be done at a later point
    of time to get the finished component "X".  
    The client needs to know the stock of this semifinished component "X'  like
    Material  PrOrNo  PrOrdqty Op0010  Op0020  Op0030  Op0040  Op0050  Op0060
      X       10000010      10           -             5            3           -            2
      X       10000055        5          2             -             -           -            3
    Pls suggest the best method to achieve this.
    Thanks in advance
    Karthik

    Karthik,
    Try to explore the option of using Storage location resource, and still I think you need to have a Custom report to get the data required by you.
    <b>
    <a href="http://help.sap.com/saphelp_47x200/helpdata/en/8b/d7ef02d08711d2b4c0006094b94273/frameset.htm">Link to Storage Location Resource</a></b>
    Regards,
    Prasobh

  • WIP QTY. AND VALUE IN SINGLE REPORT FOR A PARTICULAR PERIOD

    Is there any report for a particular period that we can get the WIP qty. and value in single report. If there what the fileds we have to select.
    Ex. We want what is the consumption qty. and value and what is the GR qty. and value for the period ending June 08.

    Hi,
    You can use the T-Code KKAS to get the WIP Qty against a given plant/material combination.
    some of the other supporting t-codes are:
    KKAO                 WIP Calc.: Collective Processing
    KKAQ                 Display WIP - Collective Processing
    KKAT                 WIP Display for Product Cost Coll.
    KKAV                 WIP Calculation for Cost Object Hier
    KKAW                 WIP Display Cost Object Hierarchy
    KKAX                 WIP Calculation for Order
    KKAY                 WIP Display for Order
    Regards,
    JLN

  • Can using query create aging report for GL Account

    Hi all expert,
    I have a challenge scenario which customer request print out aging report for the following GL Account.
    This is not a business partner account. However, customer want display like aging report.
    30 days aging report for the following GL accounts by projects:-
         i)     WIP (Work In Progress) account
         ii)     Accrued Revenue account
         iii)     Accrued Cost account
    Examples:
                            Current Balance       30 day   60 day  90 day   120 day
    Account  WIP         10000               2000        3000      5000     0
    Any idea or example given? If yes, can you provide a query here?
    Regards,
    Eric Tan

    Hi Eric
    In standard SAP Business One this is difficult as the reports are 2 dimensional. To achieve this you will need to write multiple select statements into a temporary table and then select the final result from the temp table. Here is a sample for you to test:
    USE [*DATABASE_NAME*]
    GO
    /****** Object:  StoredProcedure [dbo].[REPORT_NAME]    Script Date: 04/24/2009 13:17:21 ******/
    SET ANSI_NULLS ON
    GO
    SET QUOTED_IDENTIFIER ON
    GO
    CREATE proc [dbo].[*REPORT_NAME*]
    as
    set nocount on
    begin
    DECLARE @Day_no varchar(2)
    DECLARE @Month_no varchar(2)
    DECLARE @Year_no varchar(4)
    DECLARE @Start_Date Datetime
    SET @Day_no = DAY(GetDate())
    SET @Month_no = MONTH(GetDate())
    SET @Year_no = YEAR(GetDate())
    SET @Start_Date = @Year_No + '/' + @Month_no + '/' + @Day_no --  + '/' + @Year_No
    IF OBJECT_ID(N'tempdb..#CRDAGEING', N'U') IS NOT NULL
    drop table #CRDAGEING
    SELECT T0.[CardCode] AS [CardCode], T0.[CardName] AS [CardName], -T0.[Balance] AS [Balance], CAST(0 AS MONEY) AS [Current], CAST(0 AS MONEY) AS [1Week], CAST(0 AS MONEY) AS [2Weeks], CAST(0 AS MONEY) AS [3Weeks], CAST(0 AS MONEY) AS [4Weeks], CAST(0 AS MONEY) AS [5Weeks], CAST(0 AS MONEY) AS [6Weeks], CAST(0 AS MONEY) AS [Over6Weeks], CAST(0 AS MONEY) AS [Avg3Months], CAST (0 AS MONEY) AS [Onhand] INTO #CRDAGEING FROM OCRD T0 WHERE T0.[CardType] = 'S' -- and T0.[CardCode] <> '' --and T0.[DocDate] >= @FromDate AND T0.[DocDate] <= @ToDate
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] <= @Start_Date GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] >= DATEADD(DAY,1,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,8,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,8,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,15,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,15,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,22,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,22,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,29,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,29,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,36,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,36,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,43,@Start_Date) GROUP BY T1.[ShortName]
    INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,43,@Start_Date)  GROUP BY T1.[ShortName]
    SELECT SR.[CardCode], MAX(SR.[CardName]), SUM(SR.[Balance]) AS [BalanceOwing], SUM(SR.[Current]) AS [Current], SUM(SR.[1Week]) AS [1Week], SUM(SR.[2Weeks]) AS [2Weeks], SUM(SR.[3Weeks]) AS [3Weeks], SUM(SR.[4Weeks]) AS [4Weeks], SUM(SR.[5Weeks]) AS [5Weeks], SUM(SR.[6Weeks]) AS [6Weeks], SUM(SR.[Over6Weeks]) AS [Over6Weeks] FROM dbo.#CRDAGEING SR GROUP BY SR.[CardCode] ORDER BY SR.[CardCode]
    END
    Go to Microsoft SQL Studio manager and select your company database. Then expand the list and select Programmability > Stored Procedures. Right click on Stored Procedures and select New Stored Procedure. Copy the above code over the code in the edit window and change the database name as well as report name. Then select Execute to create the stored procedure. If you make changes, remember to change the word CREATE to ALTER (with other words CREATE for the first execute, and ALTER thereafter). Then in SAP Business One create a new query and leave everything blank. Click on execute and select the pencil to change to edit mode. Remove the words SELECT and type in EXEC REPORT_NAME (change the REPORT_NAME to the name you used in SQL). Then execute again and the results will be displayed in SAP Business One.
    Let me know if you get stuck. Remember the above is an example and will need to be changed to use your tables and fields as required. The basic idea is to move across by one column with each select statement. So for example the first select statement does the CURRENT column, the second one the 30DAYS column, and so on.
    Kind regards
    Peter Juby

  • Time Out error problem when i run the report for the whole plant

    Dear all,
    pls find the below coding, when i execute this report for the whole plant , it gives me time out error since it has to process huge database. pls suggest me in which part of my below coding i can improvise or any other better way to fetch the same result.
    pls note that
    i m using Views for querying.pls also note the comments given in Bold to understand the reason behind the coding.
    Views used in are - ZVPOD and ZVPRDCONF.
    START-OF-SELECTION.
      Data: zstat type jest-stat.
      data: stklocaf type mska-lgort.
      data: stklocas type mska-lgort.
    <u><b>To collect the status of the production order by joining the ZVPOD and JEST table.</b></u>
      CLEAR it_ZVPRODDET.
      SELECT DISTINCT ZVPOD~bukrs ZVPOD~aufnr ZVPOD~objnr
      jest~stat ZVPOD~werks ZVPOD~arbpl ZVPOD~J_3AKORD2
      FROM  ZVPOD
      INNER JOIN jest ON ZVPOD~objnr = jest~objnr
      INTO CORRESPONDING FIELDS OF wa_ZVPRODDET where
      plnbez in FGM and arbpl in wc and werks in plant
      and SSAVD in eldate
      and J_3AKORD2 in cups and jest~inact ne 'X'.
        APPEND wa_ZVPRODDET TO it_ZVPRODDET.
      ENDSELECT.
      SORT it_ZVPRODDET BY aufnr stat.
    <u><b>Loop thru Itab to check and delete the records from itab for the specified status.</b></u>
      LOOP AT it_ZVPRODDET INTO wa_ZVPRODDET.
        IF wa_ZVPRODDET-stat = 'I0045' .  " TECO - compl
          DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
        ELSEIF wa_ZVPRODDET-stat = 'I0009' .  " CNF - Confirmed
          DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
        ELSEIF wa_ZVPRODDET-stat = 'I0012' .  " DLV - Delivered
          DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
        ELSEIF wa_ZVPRODDET-stat = 'I0046' .  " CLSD - Closed
          DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
        ELSEIF wa_ZVPRODDET-stat = 'I0076' .  " DLFL - Del Flag
          DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
        ELSEIF wa_ZVPRODDET-stat = 'E0003' .  " SCLS - Short Close
          CLEAR tj30t.
          SELECT SINGLE txt04
          FROM tj30t INTO tj30t-txt04
          WHERE stsma = 'PRDHOLD' AND
                estat = 'E0003' AND
                txt04 = 'SCLS' AND
                spras = 'EN'.
          IF sy-subrc = 0.
            DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
          ENDIF.
        ENDIF.
    *      Condition for Prod Order released - REL
        IF wa_ZVPRODDET-stat = 'I0002'.
          mreleased = 'Y'.
        else.
          mreleased = 'N'.
        endif.
        zstat = wa_ZVPRODDET-stat.
        IF mreleased = 'N'.
          DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr
          and stat = zstat.
        ENDIF.
      ENDLOOP.
    <u><b>Loop thru the filtered ITAB to get all the production order details for the production order number specified in the where clause( zaufnr ) and populate another internal table.</b></u>
          LOOP AT it_ZVPRODDET INTO wa_ZVPRODDET.
            zaufnr = wa_zvproddet-aufnr.
            zarbid = wa_zvproddet-arbid.
            at new aufnr.
              SELECT DISTINCT * INTO CORRESPONDING FIELDS OF  walnpln
              FROM zvpod where plnbez in FGM and arbpl in wc and SSAVD in
             eldate and werks in plant and J_3AKORD2 in cups and aufnr = zaufnr.
                APPEND walnpln TO itablnpln.
              endselect.
            endat.
          endloop.
          clear walnpln.
    <u><b>
    Looping thru Internal table and performs all the following calculations and inner loop
    and also relevant querying.</b></u>
    <u><b>Assume that ITABLNPLN holds appox. 8000 records.</b></u>
    LOOP AT itablnpln  INTO walnpln.
            contot = 0.
            SELECT distinct * INTO CORRESPONDING FIELDS OF TABLE itablnp
            FROM zvprdconf where aufnr = walnpln-aufnr and
            j_3asize = walnpln-j_3akordx and stzhl ne '2' and stokz ne 'X'.
            clear zvprdconf.
            SELECT single isdd
            FROM zvprdconf into  zvprdconf-isdd
            where aufnr = walnpln-aufnr and
            j_3asize = walnpln-j_3akordx and stzhl ne '2' and stokz ne 'X'.
            SELECT single isdz
            FROM zvprdconf into  zvprdconf-isdz
            where aufnr = walnpln-aufnr and
            j_3asize = walnpln-j_3akordx and stzhl ne '2' and stokz ne 'X'.
            IF sy-subrc EQ 0.
              <u><b>Assume that ITABLNP  holds appox. 30 records.</b></u>
              loop at itablnp into walnp.
                contot = contot + walnp-J_3ALMNGA.
                move walnp-J_3ASIZE to walnpln-J_3ASIZE.
                move zvprdconf-isdd to walnpln-zdate.
                move zvprdconf-isdz to walnpln-ztime.
              endloop.
              walnpln-output = contot.
            endif.
            walnpln-wip = walnpln-menge - contot.
            if walnpln-werks = '1000'.
              stklocaf = '1050'.
              stklocas = '1060'.
            elseif walnpln-werks = '2000'.
              stklocaf = '2150'.
              stklocas = '2160'.
            endif.
           select single kunnr into walnpln-ship from vbpa where
           vbeln = walnpln-KDAUF and PARVW = 'WE'.
            zship = walnpln-ship.
            move zship to walnpln-ship.
            select  single kalab into walnpln-zactqty from mska
            where matnr = walnpln-plnbez
            and j_3asize = walnpln-J_3AKORDX and LGORT = stklocaf.
            condense walnpln-kdauf.
            zsales = walnpln-kdauf.
            concatenate zsales 'S' into zso.
            select single kalab into walnpln-zsndqty from mska
            where matnr = walnpln-plnbez
            and j_3asize = walnpln-J_3AKORDX and LGORT = stklocas
            and J_4KSCAT = zso.
            zmatn = walnpln-plnbez.
            zsale = walnpln-KDAUF.
            walnpln-kdauf = zsale.
            walnpln-plnbez = zmatn.
            zcust = walnpln-kunnr.
            walnpln-kunnr = zcust.
            select single bezei into walnpln-season from TVV2T where
            kvgr2 = walnpln-kvgr2 and SPRAS = 'E'.
            select single bezei into walnpln-shipmode from T173T where
            vsart = walnpln-vsart and SPRAS = 'E'.
            STRL = strlen( walnpln-j_3akord2 ).
            if  strl = 4.
              move walnpln-j_3akord2 to walnpln-j_3akord3.
              clear walnpln-j_3akord2.
            endif.
            move zremk to walnpln-remk.
            MODIFY itablnpln FROM  walnpln.
            contot = 0.
            clear itablnp.
          ENDLOOP.
          PERFORM build_fieldcatalog.
          PERFORM build_layout.
          PERFORM display_alv_report.

    Hi raja,
    Plese go through the suggessitions.
    1.avoide the select ...endselect. write the below select
    CLEAR IT_ZVPRODDET.
    SELECT DISTINCT
         ZVPOD~BUKRS
         ZVPOD~AUFNR
         ZVPOD~OBJNR
         JEST~STAT
         ZVPOD~WERKS
         ZVPOD~ARBPL
         ZVPOD~J_3AKORD2
      FROM ZVPOD
      INNER JOIN JEST ON ZVPOD~OBJNR = JEST~OBJNR
      INTO CORRESPONDING FIELDS TABLE  IT_ZVPRODDET
      WHERE PLNBEZ IN FGM AND
            ARBPL IN WC AND
            WERKS IN PLANT AND
            SSAVD IN ELDATE AND
            J_3AKORD2 IN CUPS AND
            JEST~INACT NE 'X'.
      IF SY-SUBRC = 0.
        SORT TABLE IT_ZVPRODDET.
      ENDIF.
    2..first of all dont delete a record inside the loop. instead use the Field symobols.
    have u obsereved you code in the loop!!!!. wht u r doing..
    u r removing the same record which u in the loop..
    If u wanto delete the entires with check to<b> stat</b>... <b>then.. why dont u put the STAT field in Wher e condition..?</b> by this you reduce the data base select time..
    Now the select query is like the below....
    CLEAR IT_ZVPRODDET.
    SELECT DISTINCT
         ZVPOD~BUKRS
         ZVPOD~AUFNR
         ZVPOD~OBJNR
         JEST~STAT
         ZVPOD~WERKS
         ZVPOD~ARBPL
         ZVPOD~J_3AKORD2
      FROM ZVPOD
      INNER JOIN JEST ON ZVPOD~OBJNR = JEST~OBJNR
      INTO CORRESPONDING FIELDS TABLE  IT_ZVPRODDET
      WHERE PLNBEZ IN FGM AND
            ARBPL IN WC AND
            WERKS IN PLANT AND
            SSAVD IN ELDATE AND
            J_3AKORD2 IN CUPS AND
            JEST~INACT NE 'X' AND
            ( STAT <> 'I0045' AND
              STAT <> 'I0045' AND
              STAT <> 'I0009' AND
              STAT <> 'I0012' AND
              STAT <> 'I0046' AND
              STAT <> 'I0076' AND
              STAT <> 'E0003' ).
      IF SY-SUBRC = 0.
        SORT TABLE IT_ZVPRODDET.
      ENDIF.
    <b>3.</b> WHT IS MEANING OF THE SELECT
    <b>  CLEAR TJ30T.
      SELECT SINGLE TXT04
      FROM TJ30T INTO TJ30T-TXT04
      WHERE STSMA = 'PRDHOLD' AND
            ESTAT = 'E0003' AND
            TXT04 = 'SCLS' AND
            SPRAS = 'EN'.
      IF SY-SUBRC = 0.
        DELETE IT_ZVPRODDET WHERE AUFNR = WA_ZVPRODDET-AUFNR.
      ENDIF.</b>....... IN WHERE CONDION U R GIven all are constant values right?..
    why u need select it inside the loop.. u can write before the SELECT from ZVPOD..
    that why first checke this field then go for fur thure selects..
    <b>now u r code looks like this....</b>
    CLEAR TJ30T.
    SELECT SINGLE TXT04
      FROM TJ30T INTO TJ30T-TXT04
    WHERE STSMA = 'PRDHOLD' AND
          ESTAT = 'E0003' AND
          TXT04 = 'SCLS' AND
          SPRAS = 'EN'.
    IF SY-SUBRC = 0.
      CLEAR IT_ZVPRODDET.
      SELECT DISTINCT
           ZVPOD~BUKRS
           ZVPOD~AUFNR
           ZVPOD~OBJNR
           JEST~STAT
           ZVPOD~WERKS
           ZVPOD~ARBPL
           ZVPOD~J_3AKORD2
        FROM ZVPOD
        INNER JOIN JEST ON ZVPOD~OBJNR = JEST~OBJNR
        INTO CORRESPONDING FIELDS TABLE  IT_ZVPRODDET
        WHERE PLNBEZ IN FGM AND
              ARBPL IN WC AND
              WERKS IN PLANT AND
              SSAVD IN ELDATE AND
              J_3AKORD2 IN CUPS AND
              JEST~INACT NE 'X' AND
              JEST~STAT <> 'I0045' AND
              JEST~STAT <> 'I0045' AND
              JEST~STAT <> 'I0009' AND
              JEST~STAT <> 'I0012' AND
              JEST~STAT <> 'I0046' AND
              JEST~STAT <> 'I0076' AND
              JEST~STAT <> 'E0003' ).
        IF SY-SUBRC = 0.
          SORT TABLE IT_ZVPRODDET.
        ENDIF.
      ENDIF.
    there are so many select inside the loop...... please Delete all of them.... write them be for the loop.......using the FOR ALL ENTRIES.....
    THEN LOOP THE TABLE USING THE WHERE CONDITIONS.
    <b>Plese write u updated code here again</b>..

  • Monthly Production Report for Excise

    Dear All,
    I need a monthly production report for Excise purpose as per Indian statutory requirement.
    The requirements are
    1] There should be a date range to select the period of the report
    2] It should show a report only  on those items which are marked as 'sales item' in the item master data [ so that all the other intermediaries / WIP's willn't appear in the report.
    3] If one item is produced / manufactured using different production orders, We need a consolidated quantity for the period under selection.
    Report Format :
    Item code   - Item Description  - Planned Quantity  - Manufactured Quantity - Open Quantity
    Thanks in advance,
    Regards,
    Suresh Kannan

    Hi Suresh,
    Try this query
    SELECT T0.ItemCode, T1.ItemName,
    SUM(T0.PlannedQty) 'Planned Qty',
    SUM(T0.CmpltQty) 'Manufactured Qty', SUM(T0.PlannedQty-T0.CmpltQty-T0.RjctQty) 'Open Qty'
    FROM dbo.OWOR T0
    INNER JOIN dbo.OITM T1 ON T1.ItemCode = T0.ItemCode AND T1.SellItem = 'Y'
    WHERE T0.RlsDate >=[%1] AND T0.RlsDate <=[%2]  and T0.Type != 'D'
    GROUP BY T0.ItemCode, T1.ItemName
    Regards,
    Bala

  • WIP report and WIP gl value differ

    Dear all,
    When I execute KKAO report for a particular month, the WIP values for some orders differ from the WIP Gl Balance for the particular period.
    Please suggest me why this difference occurs?
    Thanks & Regards,
    A.Anandarajan.

    Hi Dasuni ,
    As you might be aware , whatever results the system computes for Work in Process for partially delivered orders and for Variances for fully delivered orders are posted to Financial Accounting using Settlement. If you look at the Production order settlement rule , you will have PER and FUL settlement rules described wherein if in one specific period , you do not settle the order , the same may be settled in the next period by virtue of the FUL indicator. So, in your case , it is a clear indication that one such orders was not settled during May but was settled during June. That is what apparently I can make out of this.
    Regards,
    Venkat.

  • Cost elements for WIP (TCODE : OKGA)

    Hi All,
    I am working with Production Order wip calculation, varaince and settlement.
    In the RA key configuraion,(for WIP calculation)In OKGA, tcode we define, the cost elements for a perticular line id, for WIP calculation.
    I wanted to know, what is the purpose of these two cost elements.
    If I execute line item report, I dont see any value on these cost elements, after wip calc and settlement.
    However, I see the work in process on it, in the layout. I want to know, the exact purpose of these cost elements assignment.
    Is there any internal controlling document that is getting posted?
    Regards
    SR

    Hi Swastik,
    Those cost elements (category 31) are used to calculate and store WIP values at the detailed level of so called line IDs.
    Line IDs are groups of cost elements that were posted to production order.
    For example you can calculate and store WIP separately for Raw Materials, Semis, Activities and overhead.
    You can also settle them to different GL Accounts via mapping in txn.OKG8.
    Hope it helps,
    Szymon

  • Could any one teel me how to see coverage report for core1_mini regression

    Hi every one:
    I would like to see coverage report for core1_mini regression with vcs. I used the follow command:
    sims -sim_type=vcs -vcs_build -vcs_use_cm -vcs_cm_args="line+cond+fsm+tgl" -group=core1_mini.
    After simulation, 4 files have been generated:
    cm_data.line,cm_data.cond,cm_data.fsm,cm_data.tgl.
    (under /coverage/verilog)
    Are these four file for all tests(mini regression 68 tests totally)?
    Is it true? shall I moify somewhere in sims,1.262 ,for example vcs_cm_merge? I feel a little confussed.
    Thanks in advance!

    If Remote wipe is activated it can't be undone. And Once the Wipe is done, the device can nö longer be tracked.
    Sorry.

  • Report Overhead, WIP

    Dear All,
    every month we are calculating WIP & Overhead in month end activities .
    How to get the monthwise report for Plant Overhead & WIP .
    Pl guide

    Dear,
    WIP standard reports apart from KKAQ Plant wise and CO43 for overhead
    Summarized: KKBC_HOE - With Defined Summarization Hierarchy
    Target/Actual/Production Variances
    S_ALR_87013139 - Cumulative
    S_ALR_87013140 - Periodic
    Work in Process
    S_ALR_87013151 - Actual/WIP: Cumulative
    S_ALR_87013152 - Actual/WIP: Periodic
    KOB8
    Regards,
    R.Brahmankar

  • Report for Qty Contract and Value Contract with PO release exceeding limits

    Hi All,
    Is there a std report in SAP that the users can use to view Qty and Val Contracts that has exceed in Qty (in case of Qty Contracts) or Val (in case of Val Contracts) ?
    Thanks in advance!

    hi Duke,
    If thinking logically, then there is no report for the same..this may be because you enter the qty or value limits in the contract doc itself....So, when you make the PO for the same, and if the qty or value exceeds the system automatically provides the message..stating that the qty or value has exceeded....
    So, there is no report for the same...
    Hope it helps...
    Regards
    Priyanka.P

  • PS report for Actual and commitment Balance

    Dear experts,
    Is there any report in PS where i can see list of projects has actual balance and commitment balance?
    Note: I want to see only the balance of actual cost ( which is not settled) and commitment balance (Open PO, PR etc..)
    Regard
    Vetrivelan

    Hi,
    For commitment- CJI5
    actual - CJI3 with correct layout as per you requirement.
    also try S_ALR_87013558 report & go to line item report for detail actuals(& you have to change the layout accordingly) & commitment.
    hope this would help you...
    regards,
    SL

  • Simulair report for FBL5N and FBL1N for new general ledger on segment level

    We are working with segments in new G/L ledger. We want to run a open item report where we can combine customers and vendors by segment. The vendors and customers are linked in the master data. In the "old"  reports FBL5N and FBL1N you can do this but not by segment.I found the following report on segment level:
    - S_PCO_36000218 - Receivables: Segment
    - S_PCO_36000219 - Payables: Segment
    What I'm missing is to run 1 report for Customers and vendors. What I'm missing to is that there are only some fields available on line item level. (I like to have invoice number, documentype,.......)
    Is there a standard report for this in new genaral leger?
    Is it possible to ad additional field to th list viewer.

    What is this user license type?  All financial transactions need professional license.
    Thanks,
    Gordon

  • How to create a report for open sales orde documents which are not invoiced

    Hi Experts this is urgent,
    +pls give the Logic for document flow+
    My requirement is create a report for sales orders which are not invoiced  using the following table.
    VBAK : sales order header
    VBAP : sales order item
    VBFA : sales document flow
    VBUK for processing status
    KOMV for duties value and sales order value
    LIKP : delivery not header
    LIPS :delivery note item
    For information : In the header level the processing Status is indicated in the table VBUK field LFSTK for one sales order number. A,B , C are the possible entries.
    Case A : When a sales order is invoiced we can display information on the header status :
    Overall status : Completed  and display a invoice number in the document flow. When the items of the sales orders are invoiced the process status is the following :  Overall status       Completed            
    Delivery status      Fully delivered      
    Case B : An open sales order not delivered and not invoiced will have overall status : Open on the header and item level and will not have subsequent documents.
    Case C :
    When the items for the sales order are delivered but not invoiced the status will be u201Cfully deliveredu201D
    And the subsequent documents will be delivery notes and good issue if the delivery note is issued.
    With regards
    ravi
    Edited by: ravik ravik on Jun 25, 2008 3:29 PM

    Hello Ravi,
    U neednot develop any report..
    there is std report with txn V.02
    or copy this and make necessary changes.
    Reward, if helpful.
    Rgds,
    Raghu.

  • Aging report for Open Invoice

    Hi All,
    I need to develop an Aging report for open invoice, there is no indication for open invoice or close invoice since we are using customise DS and DS from third party system. only one key flag we have is clearing date. so kindly let me know how to write the logic for this requirement.. can I use Customer exit for this? I have an Idea to do like
    first logic is
    *If Clearing date = blank than invoice is = open (by using of this logic we can get all open invoice).
    second logic
    total number of invoice = current date - document date.
    but I do not know how to implement this logic in BEx hnece kinnly advice me whether this logic can be work or suggest with different solution ples..
    Regards,

    hi,
    You can  check few default PO reports wid proper paramater in it
    or
    Can check table EKBE
    or
    Check PO history in the PO doc
    Or
    Check the ME80FN
    Regards
    Priyanka.P

Maybe you are looking for

  • 3rd gen Ipod Touch won't sync/show in Itunes after 10.4.08 update

    On Saturday (7/30) I updated to ITunes 10.4.08 and updated to 4.3.5 (8L1) on my touch. It worked fine and synced properly after it d/l'd. Later in the day I plugged my Touch back into my computer and it wouldn't sync or show in ITunes. No error's or

  • IDOC Syntax Error E0072 with status 26 after upgrade to ECC6.0

    Hi We have upgraded SAP R/3 from 4.6C to ECC6.0. After upgrade, when we create PO and output EDI, we are seeing this IDOC syntax error E0072 for Mandatory Segment E1EDK01. In 4.6C it was working fine with no issues, only after upgrade this problem st

  • Dynamic file name ?

    Hi, I am following this blog to name the target file/directory dynamically at the runtime : /people/sameer.shadab/blog/2005/09/23/an-interesting-usage-of-variable-substitution-in-xi But I am getting this error in the CC monitoring : Could not process

  • Configuring BPM in Clustered/Managed Server

    Hi, I have completed the deployment for Oracle BPM and SB installation in the WebLogic Server successfully which includes BPM Engine, BPM workspace and all with the configuration wizard. Now i am looking for reference material to configure the BPM to

  • Bridge CS6 does not recognize videos but CS4 does

    Hi forum, My copy of Bridge CS6 suddenly stopped showing a preview image for video files and does not play them either.  Lightroom 4.4 and Lightroom 5 also do not recognize video files (.mov's, .avi's, m-pegs...).  My Lightroom used to have no proble