Report for WIP
Hi freinds,
I am looking for a report that will display the WIP.
I tried thru CO and KB reports but those are not working at my side.
if any1 knows about it or any1 has developed such a report and is able to send me, i'll b so thankful to him.
or u can mail me @ [email protected]
points rewd for sure.
Regards
Snehal.
Karthik,
Try to explore the option of using Storage location resource, and still I think you need to have a Custom report to get the data required by you.
<b>
<a href="http://help.sap.com/saphelp_47x200/helpdata/en/8b/d7ef02d08711d2b4c0006094b94273/frameset.htm">Link to Storage Location Resource</a></b>
Regards,
Prasobh
Similar Messages
-
Hi Friends
The requirement is to generate a report showing the stock of the components in the semifinished stage.
For eg to manufacture a component "X" there are some 6 operations 0010,0020,.......0060(total lead time is around 3months). Since the lead time is long & the mfg of this component may be halted at any operation (eg after completing operation 0010,0020,0030) & kept in store because of some capacity constraints and the balance operation 0040 to 0060 may be done at a later point
of time to get the finished component "X".
The client needs to know the stock of this semifinished component "X' like
Material PrOrNo PrOrdqty Op0010 Op0020 Op0030 Op0040 Op0050 Op0060
X 10000010 10 - 5 3 - 2
X 10000055 5 2 - - - 3
Pls suggest the best method to achieve this.
Thanks in advance
KarthikKarthik,
Try to explore the option of using Storage location resource, and still I think you need to have a Custom report to get the data required by you.
<b>
<a href="http://help.sap.com/saphelp_47x200/helpdata/en/8b/d7ef02d08711d2b4c0006094b94273/frameset.htm">Link to Storage Location Resource</a></b>
Regards,
Prasobh -
WIP QTY. AND VALUE IN SINGLE REPORT FOR A PARTICULAR PERIOD
Is there any report for a particular period that we can get the WIP qty. and value in single report. If there what the fileds we have to select.
Ex. We want what is the consumption qty. and value and what is the GR qty. and value for the period ending June 08.Hi,
You can use the T-Code KKAS to get the WIP Qty against a given plant/material combination.
some of the other supporting t-codes are:
KKAO WIP Calc.: Collective Processing
KKAQ Display WIP - Collective Processing
KKAT WIP Display for Product Cost Coll.
KKAV WIP Calculation for Cost Object Hier
KKAW WIP Display Cost Object Hierarchy
KKAX WIP Calculation for Order
KKAY WIP Display for Order
Regards,
JLN -
Can using query create aging report for GL Account
Hi all expert,
I have a challenge scenario which customer request print out aging report for the following GL Account.
This is not a business partner account. However, customer want display like aging report.
30 days aging report for the following GL accounts by projects:-
i) WIP (Work In Progress) account
ii) Accrued Revenue account
iii) Accrued Cost account
Examples:
Current Balance 30 day 60 day 90 day 120 day
Account WIP 10000 2000 3000 5000 0
Any idea or example given? If yes, can you provide a query here?
Regards,
Eric TanHi Eric
In standard SAP Business One this is difficult as the reports are 2 dimensional. To achieve this you will need to write multiple select statements into a temporary table and then select the final result from the temp table. Here is a sample for you to test:
USE [*DATABASE_NAME*]
GO
/****** Object: StoredProcedure [dbo].[REPORT_NAME] Script Date: 04/24/2009 13:17:21 ******/
SET ANSI_NULLS ON
GO
SET QUOTED_IDENTIFIER ON
GO
CREATE proc [dbo].[*REPORT_NAME*]
as
set nocount on
begin
DECLARE @Day_no varchar(2)
DECLARE @Month_no varchar(2)
DECLARE @Year_no varchar(4)
DECLARE @Start_Date Datetime
SET @Day_no = DAY(GetDate())
SET @Month_no = MONTH(GetDate())
SET @Year_no = YEAR(GetDate())
SET @Start_Date = @Year_No + '/' + @Month_no + '/' + @Day_no -- + '/' + @Year_No
IF OBJECT_ID(N'tempdb..#CRDAGEING', N'U') IS NOT NULL
drop table #CRDAGEING
SELECT T0.[CardCode] AS [CardCode], T0.[CardName] AS [CardName], -T0.[Balance] AS [Balance], CAST(0 AS MONEY) AS [Current], CAST(0 AS MONEY) AS [1Week], CAST(0 AS MONEY) AS [2Weeks], CAST(0 AS MONEY) AS [3Weeks], CAST(0 AS MONEY) AS [4Weeks], CAST(0 AS MONEY) AS [5Weeks], CAST(0 AS MONEY) AS [6Weeks], CAST(0 AS MONEY) AS [Over6Weeks], CAST(0 AS MONEY) AS [Avg3Months], CAST (0 AS MONEY) AS [Onhand] INTO #CRDAGEING FROM OCRD T0 WHERE T0.[CardType] = 'S' -- and T0.[CardCode] <> '' --and T0.[DocDate] >= @FromDate AND T0.[DocDate] <= @ToDate
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] <= @Start_Date GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] >= DATEADD(DAY,1,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,8,@Start_Date) GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,8,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,15,@Start_Date) GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,15,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,22,@Start_Date) GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,22,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,29,@Start_Date) GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,29,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,36,@Start_Date) GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,36,@Start_Date) and T1.[DueDate] <= DATEADD(DAY,43,@Start_Date) GROUP BY T1.[ShortName]
INSERT dbo.#CRDAGEING SELECT T1.[ShortName], NULL, 0, 0, 0, 0, 0, 0, 0, 0, -SUM(T1.[BalDueDeb] - T1.[BalDueCred]), 0, 0 FROM JDT1 T1, OCRD T2 WHERE T2.[CardType] = 'S' and T2.[CardCode] = T1.[ShortName] and T1.[DueDate] > DATEADD(DAY,43,@Start_Date) GROUP BY T1.[ShortName]
SELECT SR.[CardCode], MAX(SR.[CardName]), SUM(SR.[Balance]) AS [BalanceOwing], SUM(SR.[Current]) AS [Current], SUM(SR.[1Week]) AS [1Week], SUM(SR.[2Weeks]) AS [2Weeks], SUM(SR.[3Weeks]) AS [3Weeks], SUM(SR.[4Weeks]) AS [4Weeks], SUM(SR.[5Weeks]) AS [5Weeks], SUM(SR.[6Weeks]) AS [6Weeks], SUM(SR.[Over6Weeks]) AS [Over6Weeks] FROM dbo.#CRDAGEING SR GROUP BY SR.[CardCode] ORDER BY SR.[CardCode]
END
Go to Microsoft SQL Studio manager and select your company database. Then expand the list and select Programmability > Stored Procedures. Right click on Stored Procedures and select New Stored Procedure. Copy the above code over the code in the edit window and change the database name as well as report name. Then select Execute to create the stored procedure. If you make changes, remember to change the word CREATE to ALTER (with other words CREATE for the first execute, and ALTER thereafter). Then in SAP Business One create a new query and leave everything blank. Click on execute and select the pencil to change to edit mode. Remove the words SELECT and type in EXEC REPORT_NAME (change the REPORT_NAME to the name you used in SQL). Then execute again and the results will be displayed in SAP Business One.
Let me know if you get stuck. Remember the above is an example and will need to be changed to use your tables and fields as required. The basic idea is to move across by one column with each select statement. So for example the first select statement does the CURRENT column, the second one the 30DAYS column, and so on.
Kind regards
Peter Juby -
Time Out error problem when i run the report for the whole plant
Dear all,
pls find the below coding, when i execute this report for the whole plant , it gives me time out error since it has to process huge database. pls suggest me in which part of my below coding i can improvise or any other better way to fetch the same result.
pls note that
i m using Views for querying.pls also note the comments given in Bold to understand the reason behind the coding.
Views used in are - ZVPOD and ZVPRDCONF.
START-OF-SELECTION.
Data: zstat type jest-stat.
data: stklocaf type mska-lgort.
data: stklocas type mska-lgort.
<u><b>To collect the status of the production order by joining the ZVPOD and JEST table.</b></u>
CLEAR it_ZVPRODDET.
SELECT DISTINCT ZVPOD~bukrs ZVPOD~aufnr ZVPOD~objnr
jest~stat ZVPOD~werks ZVPOD~arbpl ZVPOD~J_3AKORD2
FROM ZVPOD
INNER JOIN jest ON ZVPOD~objnr = jest~objnr
INTO CORRESPONDING FIELDS OF wa_ZVPRODDET where
plnbez in FGM and arbpl in wc and werks in plant
and SSAVD in eldate
and J_3AKORD2 in cups and jest~inact ne 'X'.
APPEND wa_ZVPRODDET TO it_ZVPRODDET.
ENDSELECT.
SORT it_ZVPRODDET BY aufnr stat.
<u><b>Loop thru Itab to check and delete the records from itab for the specified status.</b></u>
LOOP AT it_ZVPRODDET INTO wa_ZVPRODDET.
IF wa_ZVPRODDET-stat = 'I0045' . " TECO - compl
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
ELSEIF wa_ZVPRODDET-stat = 'I0009' . " CNF - Confirmed
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
ELSEIF wa_ZVPRODDET-stat = 'I0012' . " DLV - Delivered
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
ELSEIF wa_ZVPRODDET-stat = 'I0046' . " CLSD - Closed
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
ELSEIF wa_ZVPRODDET-stat = 'I0076' . " DLFL - Del Flag
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
ELSEIF wa_ZVPRODDET-stat = 'E0003' . " SCLS - Short Close
CLEAR tj30t.
SELECT SINGLE txt04
FROM tj30t INTO tj30t-txt04
WHERE stsma = 'PRDHOLD' AND
estat = 'E0003' AND
txt04 = 'SCLS' AND
spras = 'EN'.
IF sy-subrc = 0.
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr.
ENDIF.
ENDIF.
* Condition for Prod Order released - REL
IF wa_ZVPRODDET-stat = 'I0002'.
mreleased = 'Y'.
else.
mreleased = 'N'.
endif.
zstat = wa_ZVPRODDET-stat.
IF mreleased = 'N'.
DELETE it_ZVPRODDET WHERE aufnr = wa_ZVPRODDET-aufnr
and stat = zstat.
ENDIF.
ENDLOOP.
<u><b>Loop thru the filtered ITAB to get all the production order details for the production order number specified in the where clause( zaufnr ) and populate another internal table.</b></u>
LOOP AT it_ZVPRODDET INTO wa_ZVPRODDET.
zaufnr = wa_zvproddet-aufnr.
zarbid = wa_zvproddet-arbid.
at new aufnr.
SELECT DISTINCT * INTO CORRESPONDING FIELDS OF walnpln
FROM zvpod where plnbez in FGM and arbpl in wc and SSAVD in
eldate and werks in plant and J_3AKORD2 in cups and aufnr = zaufnr.
APPEND walnpln TO itablnpln.
endselect.
endat.
endloop.
clear walnpln.
<u><b>
Looping thru Internal table and performs all the following calculations and inner loop
and also relevant querying.</b></u>
<u><b>Assume that ITABLNPLN holds appox. 8000 records.</b></u>
LOOP AT itablnpln INTO walnpln.
contot = 0.
SELECT distinct * INTO CORRESPONDING FIELDS OF TABLE itablnp
FROM zvprdconf where aufnr = walnpln-aufnr and
j_3asize = walnpln-j_3akordx and stzhl ne '2' and stokz ne 'X'.
clear zvprdconf.
SELECT single isdd
FROM zvprdconf into zvprdconf-isdd
where aufnr = walnpln-aufnr and
j_3asize = walnpln-j_3akordx and stzhl ne '2' and stokz ne 'X'.
SELECT single isdz
FROM zvprdconf into zvprdconf-isdz
where aufnr = walnpln-aufnr and
j_3asize = walnpln-j_3akordx and stzhl ne '2' and stokz ne 'X'.
IF sy-subrc EQ 0.
<u><b>Assume that ITABLNP holds appox. 30 records.</b></u>
loop at itablnp into walnp.
contot = contot + walnp-J_3ALMNGA.
move walnp-J_3ASIZE to walnpln-J_3ASIZE.
move zvprdconf-isdd to walnpln-zdate.
move zvprdconf-isdz to walnpln-ztime.
endloop.
walnpln-output = contot.
endif.
walnpln-wip = walnpln-menge - contot.
if walnpln-werks = '1000'.
stklocaf = '1050'.
stklocas = '1060'.
elseif walnpln-werks = '2000'.
stklocaf = '2150'.
stklocas = '2160'.
endif.
select single kunnr into walnpln-ship from vbpa where
vbeln = walnpln-KDAUF and PARVW = 'WE'.
zship = walnpln-ship.
move zship to walnpln-ship.
select single kalab into walnpln-zactqty from mska
where matnr = walnpln-plnbez
and j_3asize = walnpln-J_3AKORDX and LGORT = stklocaf.
condense walnpln-kdauf.
zsales = walnpln-kdauf.
concatenate zsales 'S' into zso.
select single kalab into walnpln-zsndqty from mska
where matnr = walnpln-plnbez
and j_3asize = walnpln-J_3AKORDX and LGORT = stklocas
and J_4KSCAT = zso.
zmatn = walnpln-plnbez.
zsale = walnpln-KDAUF.
walnpln-kdauf = zsale.
walnpln-plnbez = zmatn.
zcust = walnpln-kunnr.
walnpln-kunnr = zcust.
select single bezei into walnpln-season from TVV2T where
kvgr2 = walnpln-kvgr2 and SPRAS = 'E'.
select single bezei into walnpln-shipmode from T173T where
vsart = walnpln-vsart and SPRAS = 'E'.
STRL = strlen( walnpln-j_3akord2 ).
if strl = 4.
move walnpln-j_3akord2 to walnpln-j_3akord3.
clear walnpln-j_3akord2.
endif.
move zremk to walnpln-remk.
MODIFY itablnpln FROM walnpln.
contot = 0.
clear itablnp.
ENDLOOP.
PERFORM build_fieldcatalog.
PERFORM build_layout.
PERFORM display_alv_report.Hi raja,
Plese go through the suggessitions.
1.avoide the select ...endselect. write the below select
CLEAR IT_ZVPRODDET.
SELECT DISTINCT
ZVPOD~BUKRS
ZVPOD~AUFNR
ZVPOD~OBJNR
JEST~STAT
ZVPOD~WERKS
ZVPOD~ARBPL
ZVPOD~J_3AKORD2
FROM ZVPOD
INNER JOIN JEST ON ZVPOD~OBJNR = JEST~OBJNR
INTO CORRESPONDING FIELDS TABLE IT_ZVPRODDET
WHERE PLNBEZ IN FGM AND
ARBPL IN WC AND
WERKS IN PLANT AND
SSAVD IN ELDATE AND
J_3AKORD2 IN CUPS AND
JEST~INACT NE 'X'.
IF SY-SUBRC = 0.
SORT TABLE IT_ZVPRODDET.
ENDIF.
2..first of all dont delete a record inside the loop. instead use the Field symobols.
have u obsereved you code in the loop!!!!. wht u r doing..
u r removing the same record which u in the loop..
If u wanto delete the entires with check to<b> stat</b>... <b>then.. why dont u put the STAT field in Wher e condition..?</b> by this you reduce the data base select time..
Now the select query is like the below....
CLEAR IT_ZVPRODDET.
SELECT DISTINCT
ZVPOD~BUKRS
ZVPOD~AUFNR
ZVPOD~OBJNR
JEST~STAT
ZVPOD~WERKS
ZVPOD~ARBPL
ZVPOD~J_3AKORD2
FROM ZVPOD
INNER JOIN JEST ON ZVPOD~OBJNR = JEST~OBJNR
INTO CORRESPONDING FIELDS TABLE IT_ZVPRODDET
WHERE PLNBEZ IN FGM AND
ARBPL IN WC AND
WERKS IN PLANT AND
SSAVD IN ELDATE AND
J_3AKORD2 IN CUPS AND
JEST~INACT NE 'X' AND
( STAT <> 'I0045' AND
STAT <> 'I0045' AND
STAT <> 'I0009' AND
STAT <> 'I0012' AND
STAT <> 'I0046' AND
STAT <> 'I0076' AND
STAT <> 'E0003' ).
IF SY-SUBRC = 0.
SORT TABLE IT_ZVPRODDET.
ENDIF.
<b>3.</b> WHT IS MEANING OF THE SELECT
<b> CLEAR TJ30T.
SELECT SINGLE TXT04
FROM TJ30T INTO TJ30T-TXT04
WHERE STSMA = 'PRDHOLD' AND
ESTAT = 'E0003' AND
TXT04 = 'SCLS' AND
SPRAS = 'EN'.
IF SY-SUBRC = 0.
DELETE IT_ZVPRODDET WHERE AUFNR = WA_ZVPRODDET-AUFNR.
ENDIF.</b>....... IN WHERE CONDION U R GIven all are constant values right?..
why u need select it inside the loop.. u can write before the SELECT from ZVPOD..
that why first checke this field then go for fur thure selects..
<b>now u r code looks like this....</b>
CLEAR TJ30T.
SELECT SINGLE TXT04
FROM TJ30T INTO TJ30T-TXT04
WHERE STSMA = 'PRDHOLD' AND
ESTAT = 'E0003' AND
TXT04 = 'SCLS' AND
SPRAS = 'EN'.
IF SY-SUBRC = 0.
CLEAR IT_ZVPRODDET.
SELECT DISTINCT
ZVPOD~BUKRS
ZVPOD~AUFNR
ZVPOD~OBJNR
JEST~STAT
ZVPOD~WERKS
ZVPOD~ARBPL
ZVPOD~J_3AKORD2
FROM ZVPOD
INNER JOIN JEST ON ZVPOD~OBJNR = JEST~OBJNR
INTO CORRESPONDING FIELDS TABLE IT_ZVPRODDET
WHERE PLNBEZ IN FGM AND
ARBPL IN WC AND
WERKS IN PLANT AND
SSAVD IN ELDATE AND
J_3AKORD2 IN CUPS AND
JEST~INACT NE 'X' AND
JEST~STAT <> 'I0045' AND
JEST~STAT <> 'I0045' AND
JEST~STAT <> 'I0009' AND
JEST~STAT <> 'I0012' AND
JEST~STAT <> 'I0046' AND
JEST~STAT <> 'I0076' AND
JEST~STAT <> 'E0003' ).
IF SY-SUBRC = 0.
SORT TABLE IT_ZVPRODDET.
ENDIF.
ENDIF.
there are so many select inside the loop...... please Delete all of them.... write them be for the loop.......using the FOR ALL ENTRIES.....
THEN LOOP THE TABLE USING THE WHERE CONDITIONS.
<b>Plese write u updated code here again</b>.. -
Monthly Production Report for Excise
Dear All,
I need a monthly production report for Excise purpose as per Indian statutory requirement.
The requirements are
1] There should be a date range to select the period of the report
2] It should show a report only on those items which are marked as 'sales item' in the item master data [ so that all the other intermediaries / WIP's willn't appear in the report.
3] If one item is produced / manufactured using different production orders, We need a consolidated quantity for the period under selection.
Report Format :
Item code - Item Description - Planned Quantity - Manufactured Quantity - Open Quantity
Thanks in advance,
Regards,
Suresh KannanHi Suresh,
Try this query
SELECT T0.ItemCode, T1.ItemName,
SUM(T0.PlannedQty) 'Planned Qty',
SUM(T0.CmpltQty) 'Manufactured Qty', SUM(T0.PlannedQty-T0.CmpltQty-T0.RjctQty) 'Open Qty'
FROM dbo.OWOR T0
INNER JOIN dbo.OITM T1 ON T1.ItemCode = T0.ItemCode AND T1.SellItem = 'Y'
WHERE T0.RlsDate >=[%1] AND T0.RlsDate <=[%2] and T0.Type != 'D'
GROUP BY T0.ItemCode, T1.ItemName
Regards,
Bala -
WIP report and WIP gl value differ
Dear all,
When I execute KKAO report for a particular month, the WIP values for some orders differ from the WIP Gl Balance for the particular period.
Please suggest me why this difference occurs?
Thanks & Regards,
A.Anandarajan.Hi Dasuni ,
As you might be aware , whatever results the system computes for Work in Process for partially delivered orders and for Variances for fully delivered orders are posted to Financial Accounting using Settlement. If you look at the Production order settlement rule , you will have PER and FUL settlement rules described wherein if in one specific period , you do not settle the order , the same may be settled in the next period by virtue of the FUL indicator. So, in your case , it is a clear indication that one such orders was not settled during May but was settled during June. That is what apparently I can make out of this.
Regards,
Venkat. -
Cost elements for WIP (TCODE : OKGA)
Hi All,
I am working with Production Order wip calculation, varaince and settlement.
In the RA key configuraion,(for WIP calculation)In OKGA, tcode we define, the cost elements for a perticular line id, for WIP calculation.
I wanted to know, what is the purpose of these two cost elements.
If I execute line item report, I dont see any value on these cost elements, after wip calc and settlement.
However, I see the work in process on it, in the layout. I want to know, the exact purpose of these cost elements assignment.
Is there any internal controlling document that is getting posted?
Regards
SRHi Swastik,
Those cost elements (category 31) are used to calculate and store WIP values at the detailed level of so called line IDs.
Line IDs are groups of cost elements that were posted to production order.
For example you can calculate and store WIP separately for Raw Materials, Semis, Activities and overhead.
You can also settle them to different GL Accounts via mapping in txn.OKG8.
Hope it helps,
Szymon -
Could any one teel me how to see coverage report for core1_mini regression
Hi every one:
I would like to see coverage report for core1_mini regression with vcs. I used the follow command:
sims -sim_type=vcs -vcs_build -vcs_use_cm -vcs_cm_args="line+cond+fsm+tgl" -group=core1_mini.
After simulation, 4 files have been generated:
cm_data.line,cm_data.cond,cm_data.fsm,cm_data.tgl.
(under /coverage/verilog)
Are these four file for all tests(mini regression 68 tests totally)?
Is it true? shall I moify somewhere in sims,1.262 ,for example vcs_cm_merge? I feel a little confussed.
Thanks in advance!If Remote wipe is activated it can't be undone. And Once the Wipe is done, the device can nö longer be tracked.
Sorry. -
Dear All,
every month we are calculating WIP & Overhead in month end activities .
How to get the monthwise report for Plant Overhead & WIP .
Pl guideDear,
WIP standard reports apart from KKAQ Plant wise and CO43 for overhead
Summarized: KKBC_HOE - With Defined Summarization Hierarchy
Target/Actual/Production Variances
S_ALR_87013139 - Cumulative
S_ALR_87013140 - Periodic
Work in Process
S_ALR_87013151 - Actual/WIP: Cumulative
S_ALR_87013152 - Actual/WIP: Periodic
KOB8
Regards,
R.Brahmankar -
Report for Qty Contract and Value Contract with PO release exceeding limits
Hi All,
Is there a std report in SAP that the users can use to view Qty and Val Contracts that has exceed in Qty (in case of Qty Contracts) or Val (in case of Val Contracts) ?
Thanks in advance!hi Duke,
If thinking logically, then there is no report for the same..this may be because you enter the qty or value limits in the contract doc itself....So, when you make the PO for the same, and if the qty or value exceeds the system automatically provides the message..stating that the qty or value has exceeded....
So, there is no report for the same...
Hope it helps...
Regards
Priyanka.P -
PS report for Actual and commitment Balance
Dear experts,
Is there any report in PS where i can see list of projects has actual balance and commitment balance?
Note: I want to see only the balance of actual cost ( which is not settled) and commitment balance (Open PO, PR etc..)
Regard
VetrivelanHi,
For commitment- CJI5
actual - CJI3 with correct layout as per you requirement.
also try S_ALR_87013558 report & go to line item report for detail actuals(& you have to change the layout accordingly) & commitment.
hope this would help you...
regards,
SL -
Simulair report for FBL5N and FBL1N for new general ledger on segment level
We are working with segments in new G/L ledger. We want to run a open item report where we can combine customers and vendors by segment. The vendors and customers are linked in the master data. In the "old" reports FBL5N and FBL1N you can do this but not by segment.I found the following report on segment level:
- S_PCO_36000218 - Receivables: Segment
- S_PCO_36000219 - Payables: Segment
What I'm missing is to run 1 report for Customers and vendors. What I'm missing to is that there are only some fields available on line item level. (I like to have invoice number, documentype,.......)
Is there a standard report for this in new genaral leger?
Is it possible to ad additional field to th list viewer.What is this user license type? All financial transactions need professional license.
Thanks,
Gordon -
How to create a report for open sales orde documents which are not invoiced
Hi Experts this is urgent,
+pls give the Logic for document flow+
My requirement is create a report for sales orders which are not invoiced using the following table.
VBAK : sales order header
VBAP : sales order item
VBFA : sales document flow
VBUK for processing status
KOMV for duties value and sales order value
LIKP : delivery not header
LIPS :delivery note item
For information : In the header level the processing Status is indicated in the table VBUK field LFSTK for one sales order number. A,B , C are the possible entries.
Case A : When a sales order is invoiced we can display information on the header status :
Overall status : Completed and display a invoice number in the document flow. When the items of the sales orders are invoiced the process status is the following : Overall status Completed
Delivery status Fully delivered
Case B : An open sales order not delivered and not invoiced will have overall status : Open on the header and item level and will not have subsequent documents.
Case C :
When the items for the sales order are delivered but not invoiced the status will be u201Cfully deliveredu201D
And the subsequent documents will be delivery notes and good issue if the delivery note is issued.
With regards
ravi
Edited by: ravik ravik on Jun 25, 2008 3:29 PMHello Ravi,
U neednot develop any report..
there is std report with txn V.02
or copy this and make necessary changes.
Reward, if helpful.
Rgds,
Raghu. -
Hi All,
I need to develop an Aging report for open invoice, there is no indication for open invoice or close invoice since we are using customise DS and DS from third party system. only one key flag we have is clearing date. so kindly let me know how to write the logic for this requirement.. can I use Customer exit for this? I have an Idea to do like
first logic is
*If Clearing date = blank than invoice is = open (by using of this logic we can get all open invoice).
second logic
total number of invoice = current date - document date.
but I do not know how to implement this logic in BEx hnece kinnly advice me whether this logic can be work or suggest with different solution ples..
Regards,hi,
You can check few default PO reports wid proper paramater in it
or
Can check table EKBE
or
Check PO history in the PO doc
Or
Check the ME80FN
Regards
Priyanka.P
Maybe you are looking for
-
3rd gen Ipod Touch won't sync/show in Itunes after 10.4.08 update
On Saturday (7/30) I updated to ITunes 10.4.08 and updated to 4.3.5 (8L1) on my touch. It worked fine and synced properly after it d/l'd. Later in the day I plugged my Touch back into my computer and it wouldn't sync or show in ITunes. No error's or
-
IDOC Syntax Error E0072 with status 26 after upgrade to ECC6.0
Hi We have upgraded SAP R/3 from 4.6C to ECC6.0. After upgrade, when we create PO and output EDI, we are seeing this IDOC syntax error E0072 for Mandatory Segment E1EDK01. In 4.6C it was working fine with no issues, only after upgrade this problem st
-
Hi, I am following this blog to name the target file/directory dynamically at the runtime : /people/sameer.shadab/blog/2005/09/23/an-interesting-usage-of-variable-substitution-in-xi But I am getting this error in the CC monitoring : Could not process
-
Configuring BPM in Clustered/Managed Server
Hi, I have completed the deployment for Oracle BPM and SB installation in the WebLogic Server successfully which includes BPM Engine, BPM workspace and all with the configuration wizard. Now i am looking for reference material to configure the BPM to
-
Bridge CS6 does not recognize videos but CS4 does
Hi forum, My copy of Bridge CS6 suddenly stopped showing a preview image for video files and does not play them either. Lightroom 4.4 and Lightroom 5 also do not recognize video files (.mov's, .avi's, m-pegs...). My Lightroom used to have no proble