Reports for two costing Area With one operating concern

Hi,
What are the reports I can get if I am having two different costing area for my comapnies with same operating concern
Thanks in advance for your input
CHEERS

Thanks Sreekanth ,
I want to what are the reports that will be generated. And what cannot be done if we have two controlling area instead of one.
CHEERS

Similar Messages

  • Report for two sponsors on one project

    I would like to make report for two sponsors: Each of them want to see only a Cash flow (Budgeted Expense Cost and Actual Expense Cost) that is related to him/her.
    It is possible to do something similar in two ways:
    1. Activity Usage Spreadsheet - Spreadsheet Fields - Time interval - Cost - Budgeted Expense Cost and Actual Expense Cost
    2. Activity Usage Profile - Activity Usage Profile Options: Filter by bars/curver (Expenses); Show Bars/Curves (Budgeted and Actual)
    while Timescale: Show primary Dates (Type - Calendar; Date interval - Quarter/Months).
    But in both way Expenses are grouped together and it is not possible to differentiate who is financing what.
    Thanks!

    Yes, we are only replacing image files. So--since no one here
    is familiar with merge-- if we do as you suggest using Windows
    Explorer, the steps will be:
    1) One writer works on his/her computer's local drive and the
    other writer works on his/her computer 's local drive (no shared
    drive).
    2) Each writer creates an Image folder on his/her computer's
    local drive
    3) Each writer captures (Snag-it) images from the
    application, opens the captured image in Photoshop and sizes the
    new image file to match the size and width, border, etc parameters
    of the image in the current Help's HTML code. (writer will have to
    view HTML code to get image size)
    4) Each writer will copy the new image files into his/her
    local drive-based Image folder--giving the new image the same name
    as the image that is being replaced).
    5) The image files in the first writer's Image folder are
    then copied to the Image other writer's Image folder.
    6) The new Image folder containing all the new image files is
    copied into the RoboHelp source directory, overwriting the old
    Image folder.
    7) The writer with the new Image folder (containing all the
    new images) then generates and publishers the RoboHelp project.
    Is this correct?

  • Operating concern for two company code with different currency

    Hi,
    We are merging two company code into one SAP server.
    We decide to use on chart of account, and to use one operating concern.
    For company code A: the currency is CNY, for company code B: the currency is TWD.  The operating concern currency is:CNY.
    So i need to in KEA0(maintain operating concern) active company code currency, right?
    So every posting in company code B will be posted in TWD and CNY to COPA same item, right?
    In KE30 report, where to add characters: Currency type that i can show company code B report in TWD?
    Thanks.

    Dear David,
    Yes. If you have different compancy codes within one controlling area, you have to maintain currency type with 10-Company code currecny and while maintaining the operating concern also you have to choose the company code currency only.  Then only you will get the reports with respect of your company code currecny level. This will be basing on your company code-sales organisation, plants and other charcters assignment basis in your configuration.
    All the best,
    Dharma Rao. Yekula.

  • Report for Landing cost

    Hi SAP Guru's,
    Do we have any standard report for Landing Cost in the procurements, please suggest.
    Thanks,
    Reddy

    Hi Manish,
              We need to get one report with the total cost of material procurement which includes the excise, transportation and insurance.
    Thanks,
    Reddy.

  • Dynamic routing for a Business Service with multiple operations

    I have two business services with multiple operations. Business service A (bsA) has operations OpA1 and OpA2. Business service B (bsB) has operations OpB1 and OpB2.
    Depending on incoming Proxy message and operation, I have to do one of the following
    1. If someValue = A and operation= Op1 then invoke operation opA1 of bsA
    2. If someValue = B and operation= Op1 then invoke operation opB1 of bsB
    3. If someValue = C and operation= Op1 then invoke operation opA1 of bsA AND* operation opB1 of bsB and return aggregate data of both invocations
    1. If someValue = A and operation= Op2 then invoke operation opA2 of bsA
    2. If someValue = B and operation= Op2 then invoke operation opB2 of bsB
    3. If someValue = C and operation= Op2 then invoke operation opA2 of bsA AND* operation opB2 of bsB and return aggregate data of both invocations
    Using a dynamic route node or dynamic routing options, I am able to achieve cases 1, 2, 4, and 5.
    But for cases 3 & 6, I can not use a route node. When I use a Service call out instead, then I am forced to create a Operational branch but that does not seem like the best design since for every new operation added to the business services, I have to add a new branch to the Operational branch and redo all the functionality for that branch.
    Basically, I am looking to achieve the functionality of the Route node ( no need to specify the operation ).
    Any thoughts/ideas on what the best design would be?
    thanks

    For cases 3 & 6, why don't you route to another proxy service where you can simple do two service callouts, merge output data somehow and return them to the first proxy?
    If you look for "special route feature", that could possibly call two services for a single message, I'm afraid you won't succeed.

  • Analysis report for standard cost in CK33N

    Hi,
    Analysis report for standard cost
    Using variant Z003 in CK11N.
    Planned cost 3 is the output used for planning and this is adjusted by making changes to the BOM throughout the process
    In CK33 you compare the 2011 cost for the product with the proposed cost for the next year.  For some parts it works and for others it splits the lines,  though the calculation is still correct.
    Regards,
    T.Harish Kumar

    Hi Revital,
    I believe the last option is correct.
    Thanks,
    Gordon

  • Is there a way to have two different iTunes for two different iPhones on one Windows User account?

    Using Windows 7, iphone 4.
    I've read as many threads on these forums and as many kb's as I could find, but I sttill can't figure it out. I have 2 iPhones. Let's call them, "wife" and "hubby". I want to have two separate iTunes, one for each of the phones. Hubby is the Windoows User. I don't want to set up a different Windows User for wife.
    Hubby was the original iPhone. When I plug it in, iTunes recognized it has Hubby's iPhone. Then I unplug Hubby and close iTunes. I plug in Wife but iTunes stll comes up with Hubby under Devices and syncs Hubby's iTunes to Wife's iphone.
    I've tried using the shift key when I open iTunes to set up two separate .itl files to no avail.
    Is there a way to have two different iTunes for two different iPhones on one Windows User account?
    Thanks!

    What happens if you rename the iPhone "Wife" when it shows up as "Hubby", then choose a different set of apps/playlists to sync with? iTunes is supposed to be able to manage multiple devices, each with their own selection of content. Perhaps you "restored" "Wife" with a backup from "Hubby" when you first set things up which is now causing confusion.
    To create a new library press and hold down the shift key as you click the icon to start iTunes and keep holding shift until asked to choose or create a library. You need to use the same technique to switch back.
    tt2

  • PO No range when we ink two SRM system with One ECC system

    Hello Experts,
    We have a client requirement to link Two SRM Systems with One ECC system.
    In this case what number range we need to maintain in both SRM systems for PO.
    -The number range of ECC PO should get update whenver the PO is transferred from any of the two SRM system.
    -We have Extended classic scenario.
    -Also PO Doc type is going to be same.
    Can we handle this by increasing the buffer of the number range in one of the SRM system?
    Any idea...pls help urgently.
    Best Regards,
    Anil
    Edited by: anil.s.verma on Oct 1, 2010 4:33 PM

    Hello Anil,
    Being in Extended Classic Scenario (leading PO being in SRM, R/3 PO number range is concidered as external because PO number is given by SRM), the only solution for you is to:
    1- give same number range interval for PO (internal in SRM system 1 and SRM system 2, external number range in R/3), e.g. 3100000000 - 3199999999
    2- in SRM system 2, fill in current number with (for example) 3159999999 and let empty (or current value) in SRM system 1
    3- assign, in each system for your concerned transaction type, number range as internal in SRM and external in R/3.
    In this way, you will avoid overlaping in R/3 between PO numbers coming from SRM system 1 and SRM system 2
    Regards.
    Laurent.

  • Two sales areas in one shop??

    Hi experts!!
    I am trying to configure B2B application..
    My questions are the following:
    Since product catalog is assigned to one sales area, and one product catalog is assigned to one shop and one shop is assigned to one customer configuration.
    How can we have two sales areas in one B2B application????
    Thank you in advance!!!!

    Hi
    1. Sales Area is controlled by the CATALOG VARIANT within the product catalog.
    2. Create one more catalog variant within the same product catalog and assign the other sales area to that catalog variant.
    3. While logging you will get the catalog variant selection screen from their you can select the required catalog variant (applicable for the respective sales area) and enter the webshop
    Hope this will be helpful.
    Regards

  • Two business area in one entry

    hi..
    i received a payment from customer.when i check this voucher by fb03 than in a single document it is showing Business Area 1100 and 1200 both. How the System is allowing to select two business area in one entry?
    Thanks & regards
    Rekha sharma

    Hi
    At the time of initial posting of the document itself you might have posted two line items with a two business areas.  Try to post only one line item.  There is no standard control to stop the posting of 2nd line item by Standard SAP.
    Cheers
    Srinivas

  • Can i use two apple tvs with one itunes account?

    can i use two apple tvs with one itunes account?

    yes and you can use more then 2
    just don't give them the same name

  • How do I delete a number of duplicate tunes with one operation?

    How do I delete a number of duplicate tunes with one operation?

    See here: https://discussions.apple.com/thread/3293239?start=0&tstart=0
    B-rock

  • HT3678 quicktime pro doesn't accept my registration code.  I have paid for two codes and neither one works.

    quicktime pro doesn't accept my registration code.  I have paid for two codes and neither one works.

    Ensure that you're following these steps.

  • Error when linking report to stored procedure defined with one input parm

    Error when linking report to stored procedure defined with one input parameter
    The report will work ok, when the parameter is removed from the stpred procedure
    An unhandled win32 exception occurred in crw32.exe[4480]
    Stored Proc (sql server 2005)
    USE [Allegro]
    GO
    /****** Object:  StoredProcedure [dbo].[SP_Test]    Script Date: 07/08/2009 10:42:14 ******/
    SET ANSI_NULLS ON
    GO
    SET QUOTED_IDENTIFIER ON
    GO
    ALTER procedure [dbo].[SP_Test](@valuationmode VARCHAR(55)) as
    Begin
    select
         valuation,
         valuationtime,
         valuationmode
    from valuation
    where valuationmode = @valuationmode;
    End;

    This is an example of a stored procedure that is trying to be linked to a new report as the only datasource.
    If I remove the parameter I can create a report, however this will return all of the results of thw query to the report, rather than the desired results. If I add the parameter on the Crystal Report, the stored procedure then has to return all of the results to Crystal and then perform the filtering of records. By using a parameter in the stored procedure, you should be able to do all of the filtering as part of the query on the databse server, making this more efficient.

  • Why is there only one Operating Concern defined in GBI?

    Hi all,
    I have the following question: when looking at the CO structure of the GBI case study, why is there only one, global operating concern defined? According to the definition of an OC, it is the level whereupon profitability analysis is performed. So why is in GBI that has two very distinct business areas not at least two OCs defined (one per business area), if not more (per product)?
    As a follow-on, what is then the relation between OC and Controlling Area? I am looking for a plain English explanation that I can also use for teaching purposes.
    Thank you in advance for reading!
    Regards,
    Gerhard

    Hi Gerhard,
    I hope my reply is not too late.
    I agree with you.  Profitability analysis is typically done at a detailed level - by market segments, which may be defined by geographical segments, customer groupings, product groupings, salesforce grouping, etc.  CO-PA does support profitability analysis at such detailed levels.
    After defining an operating concern and activating it, the system generates a series of database tables for the operating concern.  I took a screenshot of the (partial) structure of the "master" table for the global GBI operating concern, GL00, from the GBI 2.2 system I am using, below:
    As you can see, with such a table structure, CO-PA is capable of capturing profitability information at a very detailed level for reporting and analysis.
    You may also notice that operating concern is not a field in the table.  The reason is, the entire table (as well as its related tables in the same series) is used only for operating concern GL00.  Its name is even hard-coded in the last 4 characters of the names of these tables.  When CO-PA reports are executed in SAP ECC, they retrieve data from only one series of tables, i.e., only data of only one operating concern can be reported.
    Back to your question: Why is there only one operating concern and not two?  The wisdom of defining one global operating concern is that profitability data of both controlling areas (Europe and North America) will be updated into the same series of database tables and reported together.  If there had been two separate operating concerns for the two controlling areas, there would have been two series of database tables, making profitability analysis across the two areas difficult, if not impossible.
    Let me know if you need further clarifications.

Maybe you are looking for