Request Transport issue for routines

Hi All,
I have created one routine 950,The system craeted include for this is RV60C950.
This include saved under the inculde of RV60CNNN.
After transported this changes to Qulatiy We have the routine RV60C950 inculde
But In the program RV60CNNN we do not have RV60C950 include
What is the cause?
Through access key i saved the include RV60CNNN in development and transported to qualtiy ,Request saying successfully transported but change not at all reflecting.What is the cause.
Please help me?

Hi,
Now trnasported ,i think its some server problem
thanks

Similar Messages

  • Transport-Leave Transport request in queue for Later import

    Dears,
    I want that U0 mode i.e. Leave Transport request in queue for Later import should always be selected by default while importing any transport.
    Please suggest,How it can be done.
    Shivam

    Shivam,
    Please check the attached link.
    [http://help.sap.com/saphelp_nw04/helpdata/en/3d/ad5b814ebc11d182bf0000e829fbfe/content.htm]
    Sample Syntax
    tp import T11k904711 P11 U0
    Hope this helps.
    Manoj
    Edited by: Manoj Chintawar on Mar 20, 2009 11:55 AM

  • XT278 Transport files for request &1 must still be transferred

    Hi,
    I´ve configured the transport routes between my DEV and PRD systems. But I´m getting the next message when I´m trying to import the request into the PRD system:
    XT278 Transport files for request &1 must still be transferred
    I´ve read that this success because each system has own transport group (
    hostsapmnt     rans).
    I´ve put the PRD on the same transport group that DES but I´m getting a error while i tried to import a request.
    What can i do? I want to avoid that every time what a request it will imported I want not to do QUEUE>VERIFY or Click in the green arrow.
    More thanks

    >> If I change the Transport group, Is it enough?
    No
    >> Or I must to change the DIR_TRANS parameter in the system?
    Yes
    >> The remained folders in, out will be afected? If I need to import support packages in one system and this have the DIR_TRANS pointed to the dir_trans of the DEV system, It will be affected?
    Yes and No, both. But you would be in advantage that you will be 'able' to use the 'same' support package 'files' all throughout the landscape - Instead of copying the SPs/files separately for 'each' system's EPS/in
    Thanks

  • ChaRM configuration issue for 2 Clients...

    Dear Friends,
    I have configured ChaRM in Solution Manager 7.0 EhP1 system. It is working fine without any issues. But now I came across a new requirement and finding trouble in configuring the required scenario.
    Currently there is only single client in DEV, QA and PRD system for which ChaRM is configured. Now, I want to configure the ChaRM for 2 clients in each system.
    For example,
    <ZCHARM_1> -- SOL:001 -- > DEV : 100 --> QAS : 200 --> PRD1 : 300
    <ZCHARM_2> -- SOL:001 -- > DEV : 500 --> QAS : 600 --> PRD2 : 700
    (Please note, ZCHARM_X is a project and SOL-001 is a Solution Manager ChaRM client).
    First up all, I would like to understand, is it possible? is it supported by SAP ?
    If yes, how can we configure client specific route for SAP standard transport layer (SAP)? What are the other concerns in using above system landscape in ChaRM?
    Please note, we do not want to use separate hardware for either DEV or QA system.
    Please can someone guide in this case?
    Rajesh Narkhede

    Rajesh,
    I am not aware if you have searched on this issue, but You may want to take a look at this thread.
    Change Request Management for multiple production clients
    This configuration should work fine, because in essence, its a 3 system landscape, so there should not be major issues on the way.
    From the TMS Standpoint you need to define a transport layer for each development client.
    You can create a single project with the logical components or you can create multiple projects with each set of systems. Remember to do the TMS configuration right and you should be set.
    Cheers!
    Edited by: Banerjee Vivek on Mar 29, 2011 1:02 PM

  • Requests transport in workflow

    Hi All,
    I am working in workflow.
    I completed my workflow objects in dvelopment server thats working fine in development server.I have a problem while transporting my workbench request from development to QA server. I transported all the requests from development to QA. Still change document events (transaction swec, bsvy) details ara not transported to QA.I dont know why? I transported my workflow requests from SE09 like abap requests.any other methods available to transport the workflow requests, can anyone help me, its very urgent, i am new to workflow.
    Thanks and regards,
    Natchiappan.M

    Hello Natchiappan,
    Sorry missed out myself in point number 5. What I meant from "After this do CTRL+S or simply press the push button. Unless you do the save changes will actually not get saved in the transport request. I think you have missed out on this step. "   was
    "After this do CTRL+S or simply press the SAVE button. Unless you do the save changes will actually not get saved in the transport request. I think you have missed out on this step."
    In order to avoid any confusion I am posting the entire solution once again below.
    It seems that you have not saved the changes in transports correctly. Check in your transports if there is an entry for manitainence view SWEVCDOBJ1. It is table maintainence view for SWEC.
    Anyways in order to solve this problem I anm suggesting you an approach. I will take the example of SWEC.
    1.Go to SWEC.
    2. Select the entries you want to transport.
    3. Then in MENU bar go to TABLEVIEW and then to TRANSPORT.
    4. A pop up would come prompting you for a transport request. Give the transport request and press enter.
    5. Now press the pushbutton INCLUDE IN REQUEST. At the bottom of the screen you will get an information message that entry have been flagged for inclusion in task xyz. After this do CTRL+S or simply press the SAVE button. Unless you save the changes will actually not get saved in the transport request. I think you have missed out on this step.
    6. Next go to SE01/SE09/SE10 and check whether the transport request user has entries for SWEVCDOBJ1 in it. If there are then changes have got successfully saved for SWEC. You can use the same approach for other transactions.
    Please let me know if this solved the issue for you. Please award points accordingly.
    Regards.
    Ruchit.

  • Request Transport...

    Hello all,
    I want to learn a support process- I have studied one of thread regarding work process of support.
    And there is something which I want to understand in depth and that is only overview:
    "When you need to solve the ticket. You would analyze the problem and identify that the SAP configuration has to be done for the required change.
    You would request a transport for DEV CLIENT to BASIS. You do the change and Request one more Transport to BASIS for QA client. The End user will test the same by creating a sales order for the new plant and approve it.
    Finally, you request a transport to move the changes to PRODUCTION. Once the change is deployed in production the TICKET is closed. "
    In the above process, I want to know about the Request Transport process and relevant Basis people work in depth, which t-code they use, Pls explain me the example and relevant practicle aspects, if you can give an example and relative practical solution to practice this request transport regarding the issue, would be best for me to understand because once i do it at my own with your guidance, I will be more confident how to transport the request from here to there.
    Rgrds,
    Geeta
    Edited by: GeetaChaudhary on Nov 12, 2011 3:16 AM
    Edited by: GeetaChaudhary on Nov 12, 2011 3:18 AM

    Usually you will have a landscape of 3 servers, Development, QA and production. You have to perform your customizing changes in DEV, then SAP will ask you for a transport to save those changes, when you are done you have to release your transport in transaction SE10 and then import the changes into the next server which would be QA* (where the user will test that your changes are ok) using transaction STMS, if everything is ok you release** again the transport from QA and import it into Production.
    *Depending on the politic sand customizing of the company you work on, you can create yourself the new transport request, or you will have to ask the basis guy to create it for you
    Usually the import into QA is performed by a recurrent job, which after x minutes imports every transport release from DEV into QA.  It could also happen that there is no such a job, and you have to inform the basis guy to import the change into QA
    Usually to release a transport from QA the manager will have to also approve the release (there can be n approvers needed)

  • Transformation Issue for 2LIS_03_BF

    Dear All.
    I am facing very strange issue for 0IC_C03 with the transformation of 2LiS_03_BF the cube was first got loaded from our Sandbox and every thing was fine, latter we connect BW development with R/3 development.
    i have transfer all the data source for MM Inventory and try to create the transformation for 2LiS_03_BF for the infosource 2LIS_03_BF_TR but it did not map any field, but with the sand box client with the same data source it mapped all the fields.
    Also when i try to load the 2lis_03_bf it make all the key field values to 0 even the process key is determined correctly in the R/3 side and Industry determination is alo set and also in BF10 BW is selected.
    i try to debug the update rule and found that the process key and the value is updated correctly in the routine but after that there is an exception coming CX_RSROUT_SKIP_VAL.
    please help....

    Yes reinstalling the business contents solve the problem and it come up with all the mappings but the strange problem is that all of my key figures after loading showing '0' value.
    i try to simulate the DTP by applying a break point on one routine and during the debugging it is filling the correct values and after some steps its throwing a CX_RSROUT_SKIP_VAL exception which might deleting the target value.
    i am totally lost that why this exception is coming as before it never comes it only comes when we connect the development system and try to load the cube from there.
    in between can you please help me out for getting rid of this exception.
    thanks & best regards,

  • Error: ORA-16778: redo transport error for one or more databases

    Hi all
    I have 2 database servers"Primary database and physical standby" in test environment( before going to Production)
    Before Dataguard broker configuration , DG setup was running fine , redo was being applied and archived on phy standby.
    but while enabling configuration i got "Warning: ORA-16607: one or more databases have failed" listener.ora & tnsnames.ora are updated with global_name_DGMGRL
    Please help me how can i resolve this issue .Thanks in advance.
    [oracle@PRIM ~]$ dgmgrl
    DGMGRL for Linux: Version 10.2.0.1.0 - Production
    Copyright (c) 2000, 2005, Oracle. All rights reserved.
    Welcome to DGMGRL, type "help" for information.
    DGMGRL> connect sys
    Password:
    Connected.
    DGMGRL> show configuration
    Configuration
    Name: test
    Enabled: YES
    Protection Mode: MaxPerformance
    Fast-Start Failover: DISABLED
    Databases:
    prim - Primary database
    stan - Physical standby database
    Current status for "test":
    Warning: ORA-16607: one or more databases have failed
    DGMGRL> show database
    show database
    ^
    Syntax error before or at "end-of-line"
    DGMGRL> remove configuration
    Warning: ORA-16620: one or more databases could not be contacted for a delete operation
    Removed configuration
    DGMGRL> exit
    [oracle@PRIM ~]$ connect sys/sys@prim as sysdba
    bash: connect: command not found
    [oracle@PRIM ~]$ lsnrctl stop
    LSNRCTL for Linux: Version 10.2.0.1.0 - Production on 08-OCT-2006 19:52:30
    Copyright (c) 1991, 2005, Oracle. All rights reserved.
    Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=IPC)(KEY=EXTPROC1)))
    The command completed successfully
    [oracle@PRIM ~]$ lsnrctl start
    LSNRCTL for Linux: Version 10.2.0.1.0 - Production on 08-OCT-2006 19:52:48
    Copyright (c) 1991, 2005, Oracle. All rights reserved.
    Starting /u01/app/oracle/product/10.2.0/db_1/bin/tnslsnr: please wait...
    TNSLSNR for Linux: Version 10.2.0.1.0 - Production
    System parameter file is /u01/app/oracle/product/10.2.0/db_1/network/admin/listener.ora
    Log messages written to /u01/app/oracle/product/10.2.0/db_1/network/log/listener.log
    Listening on: (DESCRIPTION=(ADDRESS=(PROTOCOL=ipc)(KEY=EXTPROC1)))
    Listening on: (DESCRIPTION=(ADDRESS=(PROTOCOL=tcp)(HOST=PRIM)(PORT=1521)))
    Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=IPC)(KEY=EXTPROC1)))
    STATUS of the LISTENER
    Alias LISTENER
    Version TNSLSNR for Linux: Version 10.2.0.1.0 - Production
    Start Date 08-OCT-2006 19:52:48
    Uptime 0 days 0 hr. 0 min. 0 sec
    Trace Level off
    Security ON: Local OS Authentication
    SNMP OFF
    Listener Parameter File /u01/app/oracle/product/10.2.0/db_1/network/admin/listener.ora
    Listener Log File /u01/app/oracle/product/10.2.0/db_1/network/log/listener.log
    Listening Endpoints Summary...
    (DESCRIPTION=(ADDRESS=(PROTOCOL=ipc)(KEY=EXTPROC1)))
    (DESCRIPTION=(ADDRESS=(PROTOCOL=tcp)(HOST=PRIM)(PORT=1521)))
    Services Summary...
    Service "PLSExtProc" has 1 instance(s).
    Instance "PLSExtProc", status UNKNOWN, has 1 handler(s) for this service...
    Service "PRIM_DGMGRLL" has 1 instance(s).
    Instance "PRIM", status UNKNOWN, has 1 handler(s) for this service...
    The command completed successfully
    [oracle@PRIM ~]$ lsnrctl stop
    LSNRCTL for Linux: Version 10.2.0.1.0 - Production on 08-OCT-2006 19:54:46
    Copyright (c) 1991, 2005, Oracle. All rights reserved.
    Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=IPC)(KEY=EXTPROC1)))
    The command completed successfully
    [oracle@PRIM ~]$ lsnrctl start
    LSNRCTL for Linux: Version 10.2.0.1.0 - Production on 08-OCT-2006 19:54:59
    Copyright (c) 1991, 2005, Oracle. All rights reserved.
    Starting /u01/app/oracle/product/10.2.0/db_1/bin/tnslsnr: please wait...
    TNSLSNR for Linux: Version 10.2.0.1.0 - Production
    System parameter file is /u01/app/oracle/product/10.2.0/db_1/network/admin/listener.ora
    Log messages written to /u01/app/oracle/product/10.2.0/db_1/network/log/listener.log
    Listening on: (DESCRIPTION=(ADDRESS=(PROTOCOL=ipc)(KEY=EXTPROC1)))
    Listening on: (DESCRIPTION=(ADDRESS=(PROTOCOL=tcp)(HOST=PRIM)(PORT=1521)))
    Connecting to (DESCRIPTION=(ADDRESS=(PROTOCOL=IPC)(KEY=EXTPROC1)))
    [oracle@PRIM ~]$ dgmgrl
    DGMGRL for Linux: Version 10.2.0.1.0 - Production
    Copyright (c) 2000, 2005, Oracle. All rights reserved.
    Welcome to DGMGRL, type "help" for information.
    DGMGRL> connect /
    Connected.
    DGMGRL> create configuration test as
    primary database is PRIM
    connect identifier is PRIM
    ;Configuration "test" created with primary database "prim"
    DGMGRL> add database STAN as
    connect identifier is STAN
    maintained as physical;Database "stan" added
    DGMGRL> show configuration
    Configuration
    Name: test
    Enabled: NO
    Protection Mode: MaxPerformance
    Fast-Start Failover: DISABLED
    Databases:
    prim - Primary database
    stan - Physical standby database
    Current status for "test":
    DISABLED
    DGMGRL> enable configuration
    Enabled.
    DGMGRL> show configuration
    Configuration
    Name: test
    Enabled: YES
    Protection Mode: MaxPerformance
    Fast-Start Failover: DISABLED
    Databases:
    prim - Primary database
    stan - Physical standby database
    Current status for "test":
    Warning: ORA-16607: one or more databases have failed
    DGMGRL> show database verbose prim
    Database
    Name: prim
    Role: PRIMARY
    Enabled: YES
    Intended State: ONLINE
    Instance(s):
    PRIM
    Properties:
    InitialConnectIdentifier = 'prim'
    LogXptMode = 'ASYNC'
    Dependency = ''
    DelayMins = '0'
    Binding = 'OPTIONAL'
    MaxFailure = '0'
    MaxConnections = '1'
    ReopenSecs = '300'
    NetTimeout = '180'
    LogShipping = 'ON'
    PreferredApplyInstance = ''
    ApplyInstanceTimeout = '0'
    ApplyParallel = 'AUTO'
    StandbyFileManagement = 'AUTO'
    ArchiveLagTarget = '0'
    LogArchiveMaxProcesses = '30'
    LogArchiveMinSucceedDest = '1'
    DbFileNameConvert = '/u01/app/oracle/oradata/STAN, /u01/app/oracle/oradata/PRIM'
    LogFileNameConvert = '/u01/app/oracle/oradata/STAN, /u01/app/oracle/oradata/PRIM'
    FastStartFailoverTarget = ''
    StatusReport = '(monitor)'
    InconsistentProperties = '(monitor)'
    InconsistentLogXptProps = '(monitor)'
    SendQEntries = '(monitor)'
    LogXptStatus = '(monitor)'
    RecvQEntries = '(monitor)'
    HostName = 'PRIM'
    SidName = 'PRIM'
    LocalListenerAddress = '(ADDRESS=(PROTOCOL=tcp)(HOST=PRIM)(PORT=1521))'
    StandbyArchiveLocation = '/u01/app/oracle/flash_recovery_area/PRIM/archivelog/'
    AlternateLocation = ''
    LogArchiveTrace = '0'
    LogArchiveFormat = '%t_%s_%r.arc'
    LatestLog = '(monitor)'
    TopWaitEvents = '(monitor)'
    Current status for "prim":
    Error: ORA-16778: redo transport error for one or more databases
    DGMGRL> show database verbose stan
    Database
    Name: stan
    Role: PHYSICAL STANDBY
    Enabled: YES
    Intended State: ONLINE
    Instance(s):
    STAN
    Properties:
    InitialConnectIdentifier = 'stan'
    LogXptMode = 'ASYNC'
    Dependency = ''
    DelayMins = '0'
    Binding = 'OPTIONAL'
    MaxFailure = '0'
    MaxConnections = '1'
    ReopenSecs = '300'
    NetTimeout = '180'
    LogShipping = 'ON'
    PreferredApplyInstance = ''
    ApplyInstanceTimeout = '0'
    ApplyParallel = 'AUTO'
    StandbyFileManagement = 'AUTO'
    ArchiveLagTarget = '0'
    LogArchiveMaxProcesses = '30'
    LogArchiveMinSucceedDest = '1'
    DbFileNameConvert = '/u01/app/oracle/oradata/PRIM, /u01/app/oracle/oradata/STAN'
    LogFileNameConvert = '/u01/app/oracle/oradata/PRIM, /u01/app/oracle/oradata/STAN'
    FastStartFailoverTarget = ''
    StatusReport = '(monitor)'
    InconsistentProperties = '(monitor)'
    InconsistentLogXptProps = '(monitor)'
    SendQEntries = '(monitor)'
    LogXptStatus = '(monitor)'
    RecvQEntries = '(monitor)'
    HostName = 'STAND'
    SidName = 'STAN'
    LocalListenerAddress = '(ADDRESS=(PROTOCOL=tcp)(HOST=STAND)(PORT=1521))'
    StandbyArchiveLocation = '/u01/app/oracle/flash_recovery_area/STAN/archivelog/'
    AlternateLocation = ''
    LogArchiveTrace = '0'
    LogArchiveFormat = '%t_%s_%r.arc'
    LatestLog = '(monitor)'
    TopWaitEvents = '(monitor)'
    Current status for "stan":
    Error: ORA-12545: Connect failed because target host or object does not exist
    DGMGRL>

    This:
    Current status for "stan":
    Error: ORA-12545: Connect failed because target host or object does not exist
    says that your network setup is not correct. You need to resolve that first.
    As for Broker setup steps how about the doc or our Data Guard 11g Handbook?
    It's 3 DGMGRL commands so I am not sure what 'steps' you need?
    Larry

  • Credit Memo Request already exists for item & 1 , & 2, etc

    Hi SD guru's,
    I am trying to create a credit memo request in reference to my sales order invoice and i am getiing this warning message "Credit Memo Request already exists for item ".
    How is this possible,when i am creating the credit memo request only for the 1st time. Message number displayed is V1498, can you please help me solve this issue.
    Also when i manage to enter into the credit memo request document by pressing enter to all those warning's, i am asked to enter the target quantity. How do i handle this? since i have maintained order quantity in my sales order and my sales invoice.
    Message number displayed is V1498, can you please help me solve this issue.
    Waiting for your kind help.
    Regards
    Ravi.D.Mansharamani

    Hi,
    You can control the quantity to be copied into Credit memo request through Copy Controls Quantity Update.
    The the same quantity will be copied from the reference document into target document.
    You are getting error as Credit Memo Request exists , because you have created the Credit Memo request for full Sales Order Qunatity.
    Regards
    Krishna

  • Date difference issue for Purchase order in R/3 and APO

    Hi,
       I am sending the purchase order from APO to R/3. When I transfer the data through CIF and see the curresponding entries in stock requirement list in R/3, purchase order is 1 day earlier than in SCM.
    However, when this purchase order is CIFed back to SCM, date appears correct in SCM ( as what it was before). Is this something because of timezone that difference in date appears in SCM and R/3.
    Can someone who came across date issues for transaction data transfer between SCM and R/3 elaborate in more detail please.
    Thanks,
    Sanjay

    Hello Somnath ,
    I am also facing the same issue which sanju was facing earlier in PRs .
    In APO I am not able to understand how system calculates the opening , start and end date .In my case the transportation time is 48 hrs , planned delivery time is 1 day and all calenders are 5*24 , GR proceeeing time .01 day . When I am creating PR at destination location on 06/06/2008 , 24:00:00 Hrs . System calculates the dates as follows :-
    Start date -06/05/2008 , 00:45:00 , end date -06/06/2008, 24:00:00 , opening date -05/20/2008 ,23:25:00 Hrs  . I tried to understand the formula given by you in your reply as Opening Date = Requirement Due Date - GR Time - Planned Delivery Time
    Start Date = Requirement Due Date - GR time - Transportation Duration
    End date = Requirement Date.
    But I am not getting the desired results.
    Could you let me know why the system is behaving in such way.I also want to know does system can create orders in such a way the opening date lies in past. If yes then can we restrict that ?
    Regards ,
    Mukesh
    Edited by: Mukesh  Kumar on Mar 9, 2008 1:59 PM

  • My laptop y510p has an issue for the third time and i need a replacement

    my y510p laptop got an issue for three times and i need a replacement
    i bought it in april/2014 and more than 2 and half months wasted for maintenance.
    first time:
    after few weeks i got problem with screen colors and i sent the laptop and the problem was in the motherboard and they replaced it.
    second time:
    i got it from maintenance center with 2 issues:
    1- camera wasn't working
    2- suddenlly  freeze from time to time , sometime a blue screen appear after ,  i need to turnoff laptop from the power button to work again and it takes so long to open after that.
    i sent the laptop again.
    note: maintenance center claims that there wasn't any issue and even the camera that they told me that they fixed it they didn't wirte it in report. that's what i figured out when i talked with lenovo customer services
    third time:
    suddenly freeze from time to time again when i tried to enter bios immediatly after freeze happen i found that 
    harddisk wasn't  appearing.
    so i sent it again and i asked for replacement
    maintenance replied that it's a motherboard and hardisk issues.
    stayed there for 45 days and i called them for like 7 times to know what is the reply on my request and every time they ask me to wait more.
    today i called them and they told me that the request of replacement is refused ...!
    and they told me to post a message here if i insist on replacement.
    laptop serial no:xxxxxxxxx
    Mod comment: Removed Serial number for posters security.

    It´s crazy how many people have the same kind of problems with this computer.. and what´s even worse is that it seems that the only option is to send it to Lenovo for a motherboard replacement. I have the same problem (mainboard dead) but unluckily for me, my y510p is out of warranty (I only used it for like 4-5 months then it was stored while I was away). Everyday I get on the internet to look for a motherboard replacement myself but I just can´t find any.. Why is that? 
    Also, this is a "new" computer, if I´m not wrong it was released around the end of 2013. How is it that they already discontinued it? Do they usually discontinue their products that fast? Or is it perhaps all these Y510P computers had problems from production? How can someone spend over a thousand dollars, use the computer for a few months (normal use, not even gaming..) and one day is dead and the motherboard needs replacement?? Why nobody really complains about this? I really don´t know what to do as that were all my money. I really just want to get rid of this crap and never ever buy Lenovo again and never ever recommend it to anyone. I don´t even feel secure spending the money on a motherboard replacement because it seems to me that the problem will come back. Because as I said this seems to be a problem in their production of this particular model. Again, over a thousand dollars computer and its quality is worst than the cheapest ones.. shame on Lenovo.

  • Transport target for business system not found in System Landscape Director

    Folks,
    We have new installed new PI 7.1 system and importing interfaces from the OLD XI 3.0 system in to new PID 7.1 system.
    We are getting following error when we try to import an interfaces in to new PID system:
    Import failed because of business system transfer object
    Communication component XID_FileSystem: Obligatory
    transport target for business system XID_FileSystem not found in
    System Landscape Directory
    We are yet to install PIQ system.
    All the interfaces in the old XID system have transport target of XIQ system.  I removed the  transport taget for the interface, but transport target is still showing in the Business system under transport target head.
    How can we overcome this issue as we will not have PIQ system atleast for two weeks.
    Thanks in advance,
    Regards
    Chandu

    Hi,
    You need to maintain Transport Groups and target for business systems while SLD transports between your XI system and PI 7.1
    Illustrated with DEv & PRD here.
    Procedure:
    1) Call Integration Builder screen on DEV Server with http://hostname:J2ee Port/rep
    2) Call SLD (System Landscape Directory) Component from the Integration builder
    Save all the Following .zip files on the Local Desktop
    3) Select the Software Component & say Export that you want to Export from DEV
    Server to Production server and which is going to use in the IR of XI
    4) Also Select the Product of the above SWC and say Export
    5) Select the Technical Systems (TS of XI & TS of the SAP R/3) and say Export
    6) Select the Business System(s) & say Export; those are associated with above Exported
    Technical systems.
    In Production Server
    1) Logon to the SLD of the Production Server.
    2) Create a Technical System and Business system which points to the Production SAP R/3
    3) Go to Administration TAB in the main page of SLD
    4) Select the Import option to Import the SWC , PRD, TS,& BS which we Exported Earlier in DEV Server
    5) Click on Browse and select the .zip files that is to Import into Production Server,
    Which were stored on the local desktop at the time of DEV Server Export
    And say Import Selected File Option
    By this we exported and imported the SLD Objects
    Now we have to create transport groups and transport targets in the Production server of SLD
    Creation of Transport Groups
    Edit GroupsGroup1) Select the Business systems 
    2) Click on New Group and give the name of the group as DEV_group & select the
    Corresponding Development serveru2019s integration Server
    3) Similar way create another group for Production serveru2019s business system as
    PRD_group and select the Production serveru2019s integration Server
    Creation of transport targets
    This is to Define which business systems in two different groups correspond to each other
    1) Select each Business system in the SLD and select transport TAB---click on
    Add/Change Target and select its corresponding target business system.
    For Example:
    If you select the business system of Production XI server means
    In the target you have to select group as DEVGROUP and the business system of Development XI server.
    Like this do the same for other business systems also
    Ex:
    BS_PRD_Integration Server----
    BS_DEV_Inetration Server
    How to create Transport Groups & transport Targets
    http://help.sap.com/saphelp_nw04/helpdata/en/ef/a21e3e0987760be10000000a114084/content.htm
    Regards
    Seshagiri

  • DBD: Error while trying to load the transport provider for odbc. Failed to load the library. System error: The specified module could not be found.

    Hello Everyone,
    We are getting an error while trying to create an Universe via Microsoft -> MS Analysis Services 2014 -> OLEDB for OLAP Provider under Connection in UDT -"DBD: Error while trying to load the transport provider for odbc. Failed to load the library. System error: The specified module could not be found."  We have installed BI 4.1 SP05 in our system. As per earlier posts in scn in BO XI 3.x this issue used to be for improper installation of Integration KIT but in our scenarion Integration KIT is within the BO 4.1 package so no seperate installation is required. Moreover I have checked whether all the driver is present under file: "C:\Program Files (x86)\SAP BusinessObjects\SAP BusinessObjects Enterprise XI 4.0\dataAccess\connectionServer\drivers" and seems everything is fine. But still I am getting this error. One important point is we could use IDT because in IDT still we don't have option to connect with 'Microsoft Analysis Services - 2014 (XMLA)' as we are using Microsoft Analysis Services 2014 version.
    Kindly help if anyone has faced the same problem with SAP BO 4.1.
    Thanks and Best Regards,
    Ghosal

    Hello Everybody,
    The problem is solved now after installing "OLEDB drivers from SQL Server 2012 Feature Pack". We had OLEDB drivers that comes directly from SQL Server but that did not worked out in our case.
    Thanks for your support.
    Best Regards,
    Ghosal

  • When spanning new tabs (firefox) my users are asked to re-authenticate with pages already signed into. Can you tell me how to fix this issue for firefox users?

    With some research I found regedit setting called “TabProcGrowth” that allows tabs to span without re-authenticating with certain browsers. Can you tell me how to fix this issue for my Mozilla Firefox users? Our current version of Mozilla Firefox is: 24.5.0 (x86 en-US). This was first noticed with a product called Confluence that we use in our Tech Support area. Users are having to reenter their password every time they click on a new link in confluence. Any help would be appreciated.
    Thank you,

    Hi Bernie:
    As long as you are accessing your internal server on http:// or https:// then I would expect the normal rules to apply. To see whether some external requests are being blocked, you might try using Firefox's Web Console, Network tab.
    You can open the console in the lower part of a tab using either:
    * Ctrl+Shift+k
    * "3-bar" menu button > Developer > Web Console
    * (menu bar) Tools menu > Web Developer > Web Console
    Click "Network" on the top bar of the Web Console.
    Then use the address bar or a bookmark to launch Confluence in the same tab. Each request made by Firefox should be displayed along with the result. You can click a row for more details.
    When I look up "TabProcGrowth" it seems related to the Protected Mode feature of IE8 and newer, which is not (yet) applicable to Firefox. http://blogs.msdn.com/b/askie/archive/2009/03/09/opening-a-new-tab-may-launch-a-new-process-with-internet-explorer-8-0.aspx
    However, if Confluence is heavily reliant on plugins such as Flash or Java, that could be a factor because plugins are run out-of-process in Firefox. In that case I suggest checking with Confluence for suggestions.

  • Transport strategy for your transport landscape is inconsistent

    Hello everybody,
    we had 4 system landscape.
    DEV>QAS>TST-->PRD.
    we move the request from DDEV >QAS>TST and then forward request from TST to PRD system.
    Now, we have delete the system TST from TMS, after deletion it give the warning.
    Transport strategy for your transport landscape is inconsistent.
    Message No. XT481
    Please suggest, what is meaning of this warning and how to correct.
    Thanks
    Ganesh

    You need to do following
    1. Logon to domain controller client 000 -->STMS --> Overview System --> Select TST --> SAP System --> Delete
    2. Reconfigure STMS  DEV>QAS>PRD
    3.STMS --> Overview Transport Routes  --> Configuration --> Distribute and Activate (To All System)
    Note : You should do this from Domain Controller client 000
    I assumed you know Step 2. If you dont please let me know i can guide you on that as well
    Cheers !
    Manish

Maybe you are looking for

  • Largest Thumbnail for viewing on 24" monitor

    Good Morning! I'm runnung bridge 2.1.1.9 and I have a 24" monitor and I'm wondering if there is a way to make the thumbnail large enough for 1 in the light table area instead of 2 now showing?  I've moved the slider in the lower right all the way to

  • Error loading from csv - how to integrate valid rows and drop invalid?

    Hello, Log from execution (step: load csv data): ODI-1228: Task SrcSet0 (Loading) fails on the target ORACLE connection ODI_STAGE. Caused By: java.sql.BatchUpdateException: ORA-12899: wartość zbyt duża dla kolumny "ODI_STAGE"."C$_0URZADZENIA"."C1_ZWI

  • Can't find final layer in Flash template...any suggestions?

    Hello, I am working with Adobe Flash CS4, and a template from flashmo.com. I've found Flash CS4 to be very easy to use, and quite helpful in manipulating templates. However, as a beginner, there are still some things that I have had a bit of trouble

  • My ipad 2 won't find it's current location since router change.

    My ipad 2 32gb wifi won't find it's current location. I've recently changed my old router from orange with a new one from orange and now my ipad can't find current location. I've looked at the settings for both the ipad and the router and should all

  • Raw vs. DNG image quality

    Operating system is XP I have a Canon 40D with CR2 files that need to be read. I do not YET have Photoshop CS3. Still on CS2. The advice here has been to download the DNG converter that comes with the camera raw version for CS3. I downloaded and used