Requirements quantity doubled in BW for PP cube using 2lis_4_p_comp

Hi Guys,
I am facin the following problem:
For some process Orders loaded from R/3 to BW, the requirements quantity of some of the Components in the Order has got doubled. But for other components in the Same Order, the quantity shows correct values.
The data is being loaded by delta process.
I tried running RSA3 for the same Process Order. Now, in RSA3, it shows correct qunatity.
I am not sure, why the Req. quantity values got doubled in earlier delta loads.
Do let me know if anybody has faced this prob. b4.
Request you to kinldy reply at the earliest.
Thanks,
punkuj

Hi Oscar,
The setup was run a long time back..
The orders that I am facing problems with are created recently.
So, I dont think duplication while running the setup is possibe.
Thanks,
Punkuj

Similar Messages

  • Good document for creating cube using AWM wih oracle 10.1.0.2 version

    Can anyone provide some good guide for implementing the OLAP cubes using ORACLE ver 10.1.0.2.0 with AWM Release 1.
    Also, please let me know whether I need to apply any patches.
    The demo provided under this link has some differences when trying to implement.
    http://www.oracle.com/technology/products/bi/olap/viewlet/awm10g_viewlet_swf.html
    Your help is appreciated.

    Well, if some of the required componets were missing, I would imagine you getting an error when trying to connect?
    Where is this ASP application actually running?
    Is it running on your localhost IIS web server?
    If not, any setup on your computer will be irrelevent.
    If it is, you need to install MDAC components, and 2.8 is the latest.
    If running on your local IIS, did you try to create a very basic ASP page which just creates a connection to the database in question? Does that work?
    Do you have ON ERROR statements in your code to bypass any/all SQL errors?
    If you create a simple UDL file on your desktop and specify the server/user/password (ater selecting Oracle OLEDB driver), does the connect button work?

  • Round Requirement quantity of component for subcontracting

    Hello,
    I need to round a requirement quantity of component   in subcontracting PO automatically? So in MD04 it shows as rounded quantities not just the base on BOM cmponent quantity ( Only for component what we send to vendor not the kit we recieving back ).
    Any help will be appreciated!
    Best Regards,
    Owais
    Edited by: Owais on Jul 8, 2011 3:13 PM

    Hello,
    It just help planners to plan better.
    We already cofigured so the components gets pick at rounded value on WM side. Its just MM side, if we can round the value for subsequent requirements. (Component requirement QTY - ERFMG)
    Any Help!!!
    Thanks.

  • Capture ERFMG - Requirement quantity for a component

    Hi All,
    I have a requirement where in i need to capture the requirement quantity for a component(ERFMG).
    The problem is the value exists only at runtime in the following structure MDPM.
    I am writing the code in an exit   EXIT_SAPMM06E_013 where in i cannot capture this value from this structure.It is not storing in a database table also . how can i get this value  ?
    Kindly help.
    Priya.

    Hi,
    Thank you for your post!
    It is exactly what I have done but as I above mentioned:
    Subsequent problem
    The system schedules the dates correctly on the component level, but re-schedules the dates for the project the day you schedule and erase the complete old scheduling dates except for the activities with constraints.
    If I have an "old" scheduled project and I add some new components anywhere in the complete project structure additional needs. I go then to the project definition level and schedule the complete project. My result is that on project definition and WBS elements no changes but on all activities (without confirmation) the system put the start date the day which I re-schedule the project.
    That what I want  to avoid and let the initial planned schedule date on activity level the same as before re-scheduling the project.
    Do you have any further advices?
    Thank you in advance for your input
    Best regards

  • Table for Demand/Requirements quantity

    Hi ,
    Can you help me determine if there is a table in PP and MM module that contains the demand or requirements quantity for each material? I need to create a customized report that will show the demand per period of time(monthly).
    Thanks in advance.
    Regards,
    Melvin Salayo

    Hi,
    Check the below tables you will get the reuired stuff
    *Planned indepedent requirements:*
         PBIM                    Independent requirements for material
         PBED                    Independent requirement data
         PBHI                    Independent requirement history
         PBIV                    Independent requirement index
         PBIC                    Independent
    Reservations
         RESB                    Material reservations
         RKPF                    header
    Thanks
    Satya

  • Tables for MRP requirements quantity.

    Dear Experts,
    I have requirements where in I want to know the table from which I will get the the material requirements quantity.
    Example is as below;
    I have given PIR through MD61 of "ABC" material as 100 qty.
    After this through MD02 i will generate requirements which will appear in Stock Requirements list MD04.
    If stock is available then accordingly it will create PR/Planned order.
    Here my requirement is that i want to display pure requiremnets that is 100 qty irrespective of what stock is available.
    In which table i will get this pure requiremts.
    Please help.

    Hi,
    Please check in table:
    PBED - PIR items
    MDKP
    MDTB
    Also you can use FM:  MD_STOCK_REQUIREMENTS_LIST_API. Best is use this FM.
    Regards,
    Alok Tiwari
    Edited by: Alok Kumar Tiwari on Dec 14, 2011 11:28 AM

  • When we drilldown at document level it displays one record for each cube

    Dear Experts .
    The users want to see the report by status for the order detail report at document level it displays one record for each cube .
    They want to see the single line for the order quantity , Amount, Billing quantity delivery and amount along with the Sales order number , billing document number billing date , delvert date ..et in signgle line. ( Sale order DeliveryBilling)
    When we are doing on Multiprovider recording displaying from each cube.
    We have tried with Constant selections and it is not giving the required results m since these want to see by status. Due to huge data performance reasons we re unable to use it .
    Please provide your valuable inputs.
    Thanks,
    Mahesh.

    Mahesh,
    If you want to get detail data with respect to Sales order - delivery - Billing, on top of Multiprovider you can come up with Constant selection.
    But I am not clear that why constant selection is not working properly, can I have some light on that.
    Probably, you are struggling with multiple records .
    I suggest you to go with end routine and map all fields to one IC and do reporting on that single IC, then your requirement will fulfill.
    But here we need to take care of performance issues and process chain scheduling wile loading deltas.
    If Multiprovider is not working properly , then try with Infoset(If you have more than 2 ICs it not possible).
    Regards,
    rvc

  • Replenishment with less than required quantity

    All,
    We are executing replenishment via RLLNACH1 (or LP21) from our high rack to our fixed bins in the background. 
    We then run RLAUTA10 to create the TO from the TR.  We have selected allow partial prov in TO and Select partially processed TO's. 
    In some cases, we are seeing TO's created for less than the required quantity or NO TO's at all when there is enough stock in both cases. 
    Scenario 1:
    Material Master Settings for fixed bin:
    Min:  10
    Max:  102
    Replen Qty: 0
    Stock situation: 
    High rack for bin1 = qty 26
    High rack for bin2 = 120
    Fixed bin Qty avail stock = 4 (below min)
    TR created for Qty of 98 (102 minus 4 avail).  TO created for only 26 (the first bin above in full).  This leaves the TR partially processed, with remaining open qty of 72 (98 minus 26).  The system did not create TO a second line item for the TO from the other available stock in bin2 for the balance up to the maximum.  Any ideas why not?  Does GR Date in high rack bin or quantity in the high rack bin?
    Scenario 2:
    Material Master Settings for fixed bin:
    Min:  30
    Max:  50
    Replen Qty: 0
    Stock situation: 
    High rack for bin1 = qty 150
    High rack for bin2 = 300
    High rack for bin3 = 275
    Fixed bin Qty avail stock = 15 (below min)
    TR created for Qty of 35 (50 minus 15 avail).  TO is NOT being created.  There is plenty of stock in high racks.  Not sure why???
    This is creating many ineffeciencies in our system.  Please respond.
    Regards,
    Sandy Miner

    Thank you very much for your reply.  I believe my settings are correct for my strategies and storage type master data. 
    Storage Type Search strategy is going for both high rack and double pallet (001 & 002).  My stock in question is located in the high racks (001).  High racks are SU managed.
    The materials in question are not batched managed, so that should not be an issue.
    The fixed bin storage type has 'addition to stock' set and it is not SU managed.  We do not allow mixed storage of any kind.  I don't THINK this is a problem because the fixed bin is not SU managed and, as stated before, the material is not batched managed, so changing it to setting "A" several homogeneous storage units per bin should not impact this because it's not SU managed.  Do you agree?
    I am checking the back ground job log as well, to see if there's any messages in that log.  I do like the idea of creating the TO manually and 'debugging' the search strategy, etc. 
    Any other input would be helpful.  Especially about the mixed storage note above.  Could this be an issue?  Do you allow mixed storage in your fixed bins?  Are you settings similar?
    Thank you,
    Regards,
    Sandy

  • How to make field requirement quantity mandatory in maint order?

    Hi Experts,
    I would like to make filed RESBD-MENGE - requirement quantity field in component tab of maintenance order mandatory. But I am not getting the IMG settings for this. I checked this screen settings for components for PM/CS orders. But I didn't  get this field in that screen. Can anybody help me out on this?
    Thanks and Best Regards,
    Praveen.

    Hi,
    I need this to activate for all order types. I think this can be accomplished by user exit IWO10009, which will trigger during saving event. I didn't try for this but i used this exit previously for checking during saving event for some other field. I think this can be used here also so that while saving the system will check the field and if the field is empty, system will give the error message. some coding may required to check the field.
    If you have any alternative idea kindly share.
    Thanks and Best regards,
    Praveen

  • Requirement quantity and quantity withdrawn are not matching

    From a production order the requirement quantity of one component is 4 and for another component, it is 2. But the withdrawn quantity for the first component is 5 and for the 2nd component it is 0. This has caused a COGI error.
    Also the total quantity and the delivered quantity is shown as 6.
    How can this be corrected and prevented from happening in the future.

    Hi Jeby,
                Thanks very much for your reply.
    Batch management is not used for both the components.
    For both the components the storage location is mentioned in the components overview of the production order. When I checked in the material master the same storage location is existing in the materiala master also

  • Help required in reading freight price for PO item. See below code.

    H All,
    I have a requirement to read frieght cost for each PO item.
    Please see the below code and let me know is this approach is correct or not.
    * Fetch PO header details for selected criteria
      SELECT ebeln                         "Purchasing document
             bstyp
             bsart
             loekz
             lifnr                         "Vendor
             ekgrp                         "Purchasing group
             bedat                         "Document date
             knumv
        INTO TABLE t_ekko
        FROM ekko
       WHERE ebeln IN s_ebeln
         AND lifnr IN s_lifnr
         AND ekgrp IN s_ekgrp
         AND bedat IN s_bedat.
      IF sy-subrc EQ 0.
        DELETE t_ekko
         WHERE ( bstyp NE c_bstyp_f
           AND bsart NE c_bsart_nb
           AND loekz NE space ).
        SELECT knumv
               kposn
               kdatu
               kbetr
               kwert
               lifnr
          INTO TABLE t_konv
          FROM konv
           FOR ALL ENTRIES IN t_ekko
         WHERE knumv EQ t_ekko-knumv
           AND lifnr EQ t_ekko-lifnr
           AND kdatu EQ t_ekko-bedat
           AND kappl EQ c_kappl_m
           AND kschl EQ c_kschl_frc1.
    *  Fetch PO item details for the retrieved purchase orders
        SELECT ebeln                       "Purchasing document
               ebelp                       "PO item
               txz01                       "Short text
               matnr                       "Material
               matkl                       "Material group
               menge                       "PO quantity
               meins                       "UOM
               netpr                       "Net price
               netwr                       "Net value
         INTO TABLE t_ekpo
         FROM ekpo
          FOR ALL ENTRIES IN t_ekko
        WHERE ebeln EQ t_ekko-ebeln
          AND matnr IN s_matnr
          AND loekz EQ space
          AND matkl IN s_matkl.
    LOOP AT t_ekpo INTO fs_ekpo.
    * Read header details from EKKO for each PO item
        READ TABLE t_ekko
              INTO fs_ekko
              WITH KEY ebeln = fs_ekpo-ebeln.
        IF sy-subrc EQ 0.
          MOVE:
            fs_ekpo-ebeln TO fs_poitems-ebeln,
            fs_ekpo-ebelp TO fs_poitems-ebelp,
            fs_ekko-lifnr TO fs_poitems-lifnr,
            fs_ekko-ekgrp TO fs_poitems-ekgrp,
            fs_ekko-bedat TO fs_poitems-bedat,
            fs_ekpo-txz01 TO fs_poitems-txz01,
            fs_ekpo-matnr TO fs_poitems-matnr,
            fs_ekpo-menge TO fs_poitems-menge,
            fs_ekpo-meins TO fs_poitems-meins,
            fs_ekpo-netpr TO fs_poitems-netpr,
            fs_ekpo-netwr TO fs_poitems-netwr.
    * Read table KONV for fetching fieght charge
          READ TABLE t_konv
                INTO fs_konv
                WITH KEY  kposn = fs_poitems-ebelp
                          kdatu = fs_poitems-bedat
                          lifnr = fs_poitems-lifnr.
          IF sy-subrc EQ 0.
            MOVE:
              fs_konv-kwert TO fs_poitems-fri_val.
          ENDIF.                           " if sy-subrc eq 0.
    Please suggest me.
    Thanks,
    Jwala
    Edited by: Rob Burbank on Mar 12, 2009 12:09 PM
    Please use code tags

    Hi,
    I believe the approach is good, I would have done similar.
    Regards,
    Gilberto Li
    Edited by: Gilberto Li on Mar 12, 2009 5:13 PM

  • Open Hub For BPC Cubes

    Hi Gurus,
    I have an issue about the open hubs for BPC cubes. I have a need to take my transactional data from my BPC cube to a table.So  I want to create an open hub on my BPC planning cube.
    But when i create the open hub on BPC cube, it doesn't read the package. So, data cannot be read. But the open hubs work on my BW cubes.
    Is there anything i should do different for BPC cubes ? How can i make the open hub work?
    Thanks in advance..
    Fatih

    Hi Fatih,
    Glad you got this working, but a word of warning: As far as I am aware, customer SAP BW development linked to objects in the BPC namespace is not supported. It may very well work, but BPC may also delete and recreate BW objects at any time and without warning, which can leave you in a situation in your production environment that is very difficult to recover from without manual modification of the production BW environment.
    The recommended way to export data from BPC NW into a flat table is to use the BPC data manager Export package. You may want to try this option and see if you can meet your requirements this way.
    Ethan

  • Quantity Baed Order Type for Release from ASCP

    Hi All,
    I have got requirement where the order type for release is defined based on the quantity. For certain set of items, they can be made warehouse with some base items if the quantity to be shipped is less than a threshold quantity ( say 15). But they need to be drop ship from plant if the quantity s greater than this.
    How can setup this in ASCP.
    Current solution that I am evaluating is using release hooks. Using release hooks I am evaluating the change in order type based on quantity.
    Any suggestions or simpler way to do this?
    Regards,
    Yash

    Dear Sunny
    Have you solve the problem?
    When I use J3AT for allocating stock, I meet the same error with you, Just for some of the Sales orders.
    Thanks.

  • CN 752: Requirement quantity & & smaller than quantity withdrawn & &

    Dear Gurus,
    I have found a strange behavior in SAP PM order processing.
    Even after withdrawing the spare parts, system is allowing to change the required quantity.
    If someone is increasing the quantity thats fine.
    But if someone is decreasing the quantity, system should not allow it.
    System is giving below information message:
    CN 752
    Requirement quantity & & smaller than quantity withdrawn & &
    I want to give error in such scenario.
    I have tried setting an error message for above message, but its not working.
    Any help in this regard will be highly appreciated.
    Please help.
    Thanks & Regards,
    Mihir Popat

    Hello,
    Thank you very much for your inputs.
    I have checked that, but it is still not working for me.
    I have debugged the standard code and found that it is hard coded over there as information message for message CN 752, and system is not checking any table while issuing the message.
    However for message CN 750, system checks the table and decides accordingly, whether to give warning or error.
    Hence, it is clear that it will be information message only.
    I will be mapping my requirement with user exit CNEX0026, where i will check the withdrawn quantity and required quantity and decide on whether to give error or not.
    Thanks to all for your help.
    Closing the thread.
    Regards,
    Mihir Popat

  • Reservation: withdrawn quantity exceeded requirement quantity

    Hi Gurus.
    Please help.
    Is there a way to check why withdrawn quantity exceeded requirement quantity in reservation? System should get standard message M7362 when this happens. Settings in OMCQ are correct.
    Thanks in advance...

    Hi,
    The message might relevant for the scenario of GI to reservation, which issued quantity greater then reserved quantity in reservation.
    You may check your reservation with MB25 for listing your reservation document and I suggest to use MB26 for collective and more accurate GI processing of relevant reservations.
    Cheers,
    Girang

Maybe you are looking for

  • Wallstreet will not boot up

    Hi all, I have a 233mhz Wallstreet that I was given a while back because it didn't work, so I figured I'd mess with it. Here's the situation... 1. As soon as you plug it in, the green light comes on, the fan comes on full force, and it stays that way

  • Mac to Mac via Ethernet?

    This is such a simple, stupid question that I'm sure that it has been answered many times, but although I have searched these fora diligently, I cannot find an answer; I suspect that the problem is that I'm using the wrong search terms. Here's the pr

  • Looking for the Apple DIY HDD Instruction (MBP2012 NR)

    I remember from my last Macbook that there was a website on apple.com where you could download instructions on how to replace your hard drives and RAM. There is a link on google which however only relates to the main support page. I know that upgrade

  • How to enable S3 Sleep State on Z87-G43 with Win7 X64

    I have been trying without success to enable the S3 Sleep State (Suspend to RAM) on my new system.  I have enabled the Intel Rapid Start in the BIOS, but one of the entries under Intel RS says "No valid IFFS partition found".  This notation is greyed

  • Concept and Steps of Distribution Resource Planning.....please reply

    Hi Experts, Can anyone tell me about the concept and steps to exicute Distribution resource planning in pp? Please help experts. Regards, sap pp Edited by: sap  pp on Jan 15, 2009 9:48 AM