Result recording configuration with automatic close indicator

Hi Guys,
I was testing this automatic result configuration in my system.
I selected the u201C1u201D (i.e. Automatic Close) Recording Configuration indicator on the plant level in SPRO > QM > Basic Settings > Maintain Settings at Plant Level> plant > Result recording tab > Recording configuration > maintain Automatic Close.
Next, I entered the three user parameter ID QAE, QAN, and QAS in the user parameter SU3. However, I leave the parameter value for these three ID blank as I donu2019t know what to put in.
During result recording, I tested this MIC characteristic on both reject and accept scenarios (i.e. fall under lower/upper limit, and fall outside lower/upper limit). To my surprise, nothing happens. In another word, there is no automatic close incurs on the inspection characteristics (i.e. both the accepted and rejected checkbox still remain unchecked even I navigate around, and hit the u201Ccontinueu201D, u201Cbacku201D, or u201Csaveu201D button).
Further, I have fulfilled the following prerequisite as specified in the SAP help portal on this topic:
1 - The inspection scope is fixed scope of this MIC.
2 - I entered the target sample size (i.e. both the value in the u201CInspectu201D and u201CInspectedu201D field is similar).
3 - I think I should have the authorization because I have entered the three parameter IDs on the SU3.
May I know what is wrong?
Can it be the parameter values for the three parameter ID are blank in my SU3? If so, what value I should enter for these three param ID? If not whatu2019s going wrong?
Thanks
YY

Hi Gajesh,
For some reason, it doesnu2019t work.
I think I will tell my guys to perform manually pressing the Lock icon button to force it to valuate and also become status 5, since this the two valuation checkboxes, i.e. accept and reject checkbox is either ticked correctly according to the sampling plan setup in the sampling schema.
Further, I donu2019t see why this extra manual step is so difficult for my worker.
Thanks for your help
YY

Similar Messages

  • Result recording - Integration with external software

    Hi,
    Inspection is done using the external software & the results are stored in the external database.
    How can we transfer the inspection results in QM Result recording?

    Hi,
    For the upload to the SAP-System, the function module BAPI_INSPOPER_RECORDRESULTS will be used with the following mandatory input parameters:
    -     Inspection lot number
    -     Inspection operation number
    -     Inspection point number
    -     Partial lot number
    -     (SAP-)batch number
    -     Characteristic results (for characteristics with summarized result recording)
    -     Single results (for characteristics with original result recording).
    The transfer between subsystem and QM is done asynchronously. The mapped result data will be send as IDoc to the SAP system, or via direct call of the BAPI_INSPOPER_RECORDRESULTS via RFC.
    If the data is send as IDoc, the BAPI-ALE interface must be setup to process the BAPI_INSPOPER_RECORDRESULTS at receipt of a new IDOC.
    Kindly contact with your ABAP'er for further process.
    Thanks & Regards,
    Srinivas.D

  • Multiple results recording for Delivery inspection lot

    Hi Gurus,
    My requirement is to configure for quality results recording for sales delivery document. Where client wants to record Customer, supplier, Umpire, etc results record for inspection characteristics.
    I got response from few Sapiens that I should use Inspection point concept for multiple results recording. Could anyone cna tell me how can I do this.
    Your help will be highly appreciated.
    Thanks,
    Kumar

    Hi Kumar,
    Okay!
    First of all letu2019s try to understand whether inspection points are really suitable for your requirement or not. Accordingly further errors can be eliminated. I just try to understand.
    A- Using Inspection Points
    1.     Inspection points are used when you inspect the same parameters again and again.
    2.     When you click on results tab in QA32, system asks you put some identification number. Letu2019s say you put A1 and then press enter. Thereafter you record the actual results (LENGTH, WIDTH etc.) You save this without giving UD.
    3.     For the next time when you again click on results for the same inspection lot, system again asks you to put identification number. This time suppose you put A2. Then again you record the results (LENGTH, WIDTH) for A2.
    4.     Likewise you can retrieve the inspection results from system with respect to inspection point (identification point).
    5.     Typically this can be used for chemical industries where you record the temperature of the same chemical after every ½ an hour. Here 10:00 am, 10:30 am can be used as identifications numbers. As a result of which you can get the information that at 10:00 am temperature was 40 Deg and at 10:30 am it was 75 degree Celsius.
    If your requirement resembles this situation, then only the use of inspection points would be fruitful.
    B- Without Inspection Points
    But if you want to record the readings by various agencies like customer, umpire (refer following pattern)and want to compare them there are other ways.
    1.     Reading by your inspector
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    2.     Reading by customer
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    3.     Reading by umpire
    a.     LENGTH u2013 100, 101, 102mm (average is 101mm)
    b.     WIDTH     - 10.50, 10.50, 10.60mm (average is 31.6mm)
    You can achieve this without using inspection points also. For this in QP02 you need to create 3 operation; Inspector, Customer and umpire respectively. Feed the MICs in each of these operations. When you click on result tab system will throw pop up for these 3 operations. Double click on Umpire if you want to record results noted by umpire. Likewise for rest of the operations. You can do this even after UD also (after 1-2 months also). You need to use MIC with control indicator as long term characteristics for this in QS23.
    Regarding averaging of results u2013 This can be achieved using single result recording MIC with or without inspection points. Use appropriate sampling procedure. When you feed results in QA32 system automaticaaly averages out the reading. This can be viewable against phi symbol.
    Finally you did mention that u201Chere I am not getting the newly created inspection lotsu201D. Does that mean inspection lot (10 origin) has not created?
    Regards,
    Anand Rao

  • Upload Document while result recording

    Hi Experts,
    I need your help on the below scenario to check the feasibility and possible solution.
    Scenario : We have a MIC result recording screen where user needs to attach document(mostly captured image) for each or some MIC and record the Inspection results in SAP QM along with documents.
    we are using SAP MII as front end to record the results and then post these results recording along with document to SAP QM.
    please guide what is the best solution to achieve this , Is there any BAPI available to do this etc..?
    Appreciate your response.
    Nikhil

    Hello,
    In standard SAP, In DMS it is not possible to enter document at MIC level as no object link will be there for MIC level.
    But either u need to store all document as above said in inspection lot level or at UD level. or u need to make some customize call screen at MIC level by using enhancements or Exits and solve your requirement.
    In Stdn SAP its not possible.
    Regards

  • Runtime error for Inspection Point Results Recording

    Hi,
    I am changing the already done Results Recording for using already used Inspection Point.
    I am getting the runtime error. Anybody came across such error?
    Regards
    Ramakanth

    Hi,
    In the in-process inspection I am using Inspection Points. Initially I have done Results Recording once with quantities.
    And then again I wanted to change the quantities for the same Inspection Point. So, I went to Results Recording for same Inspection Point and changed the quantities and saving. At this event I am getting Runtime error.
    I  have even deactivated one BADI INSPECTIONLOT_UPDATE and tried again. Even then I am getting same error.
    Ultimately my requirement is this:
    My client wants UD at operation level. They want only quantity which is accepted in Results Recording to be moved to the next operation. In the operation level confirmation the system should only accept the quantity which is accepted in Results Recording.
    Any suggestion in this regard.
    Thanks
    Ramakanth

  • RESULTS RECORDING WITH FREE TEXT IN QUALITY MANAGEMENT

    Hi,
    How can I give free text of 300 chars In results recording? For a process order with batch number & recipe, (in which master inspection characteristics are mentioned which are linked to general characteristics.)
    I created characteristics (type CHAR)(which can be used as free text in results recording ) I have created class, assigned chars to class & finally to material. Also assigned MIC to this class chars.
    When I do results recording I need to have these characteristics to be display as free text of 30character width. But since I have to give selected set for this general chars.(which is the system requirement) I have given  selected set while creation of characteristics.
    Due to this I can only select the codes from the selected set. Is there any process in which I can write free text up to 30 cars during results recording in quality module? & those characteristics I want to assign to MIC so that when process order is executed the first operation of quality can be done for RR.
    With Regards,
    Kareena

    Hi Kareena,
    All of first let me make it clear, if you will assign a Class Characteristic to the MIC, then it will become either Qualitative or QNT.
    Now toeards your questions solution.
    Option:-1
    As suggested by Venkatr, make the control indicator "Docu. Req" in the MIC control indicator set, page:-2. for the line item of MIC in the insepction plan.
    So, the system will prompt you a message to insert a text as described by Venkat, where you can enter the Long text also (Check the button available in the lower part of that small window)
    Option:-2
    Create a document type for this purpose, and assign a file, having 300 char. to the MIC, with the help of the "Object Link" function of SAP, avaialble with RR screen also.
    Reagrds,
    Shyamal

  • Acrobat XI Pro automatically closes itself with no messages etc. after few seconds

    Greetings all,
    I don't know why but my Acrobat XI Pro (11.0.0) automatically closes itself (with no warning, no messages etc.) after few seconds. I installed the AXI as a part of the CS6 Master Collection on my Windows 8 (x64) laptop. Just as suggested at some other posts in the forum:
    I checked the "security settings (enhanced)" tab but the protected view option is already off.
    I searched for the eula.exe under the "Program Files (x86)\Adobe\Acrobat 11.0" folder but there is no eula.exe. May it be not present because I installed it as a part of CS6 Master Coll. package?
    I am using Eset Endpoint Antivirus as a third party Anti Virus Software.
    The problem occurs when:
    I open up a pdf file from outlook etc.
    I manually open a pdf file from windows explorer
    I open adobe acrobat with no file to view
    As I mentioned above, I see no error messages or warnings during the closing down. It acts as if I clicked the close button on the top right corner. I know that there are a lot of posts in the forum about this issue, but none of them helped me to solve my problem. I would be glad if you can help me with this problem.
    Thanks,

    Hey i was having this issue also with Adobe Acrobat pro... it only seemed to be affecting one program that produced PDF output automatically. When the processes finished the PDF is supposed to be displayed and instead it would rapidly flash across the screen and close. THen i would have to hunt for the PDF to review its content. I tried a couple of things like deleting my preferences for acrobat C:\Users\[your user name]\AppData\Local\Adobe\Acrobat\10.0. You might have to show hidden files. In the explorer window select Organize-> Folder and search options-> once that opens view -> check show hidden files, folders and drives. then navigate that path above. Make sure adobe is closed then delete everything in there or move it off to another folder if your worried it will break it further.
    That did not fix the problem though. I opened the application and ran my process again same results (adobe closes pdf auttmagically). so i opened adobe acrobat and navigated to Edit -> Preferences -> look under the General tab and click the select default PDF handler and that seemed to fix my problem. I also disabled the enhanced security look further down in that list under security enhanced. then a reboot so it is possible that the enhance security setting was the cause i think i will play with that for a minute to see if it was but i think my issue was the default handling. good luck

  • Automatic Results Recording for Inspection Plan

    I'm trying to activate automatic results recording, at the beginning I get this meassage: "In customizing for default value of inspection type(400) you have to activate the following check boxes, " check characteristics", "Inspection with task list" & "Automatic assignment", I've done that. Yet, it sill doesn't work and the lot status is "CRTD" however it should be updated to "REL" status.

    Hi,
    Did you search enough before posting this query? There is plenty of discussions over this matter.
    Based on the details given above, I don't think you have created an inspection plan.
    Automatic assignment will assign the task list automatically to the inspection lot once it is created. You didn't mention if you have created one or not. Pl check that.
    If the inspection plan is created, there could be possibility that material is assigned to more than one task list (inspection plan). If that is the case, you wouldn't get inspection lots with REL status but CRTD only.
    ntn

  • HT4623 I've updated to IOS6 and now i couldn't open any apps and they're automatically close. And can't sync with itunes properly.. Help me!!

    I've updated to IOS6 and now i couldn't open any apps and they're automatically close. And can't sync with itunes properly.. Help me!!

    Perform a Reset... Try again...
    Reset  ( No Data will be Lost )
    Press and hold the Sleep/Wake button and the Home button at the same time for at least ten seconds, until the Apple logo appears. Release the Buttons.
    http://support.apple.com/kb/ht1430

  • Result recording to be done after UD with long term inspection

    Dear All
    I have activated two MIC's for long term inspection. Inspection lot is created and UD is provided after Result recording. i have run QA12 and go to EDIT/RESET/INSPECTION COMPLETION.  status of UD changed to LTIN and then in Qe51 / qe51n i selected long term inspection but error message is coming '' NO CHARACTERISTICS WERE FOUND". Plz help , how to do result recording after UD.

    Dear Even if the char is long terms & if you have forcefully completed the chars then even if char has LTIN status it will not allow you.
    But check this in your sandbox and revert.
    1. In the MIC set the 'Optional Characteristic' and 'Long tem inspection ' in the control indiactors.
    2. Attach MIC in inspection Plan
    3. Do results recording and comlpete UD. all short term charactericts are closed.
    4. QA12Change UD with history for Inspection Lot ,
    Menu-> Reset inspection completion -> Status changes to LTIN
    5. Goto QA02 --> you woudl see " do you wnat to compete Long term inspections" --> yes
    6. Then Long term inspection characterictic is open for results recording.
    7. Change and complete results --> Make UD
    Check and Revert.
    Cheers
    KK

  • Time event C019 integration with results recording

    Hi ,
          Posted this in the QM forum and got no response so reposting it here.  I am asking for a discrete manufacturing scenario. Does any one know how to integrate CO19 time event confirmation with the results recording transaction. Usually on the mfg floor the mfg people will do in process inspection. They are used to more of a clock in clock out way of working. They clock into the operation, they do the manufacturing activities and then they do the inspection activities. Once both are done they clock out and the material moves to the next operation. I knoe we can tie in manufacturing confirmation (CO11N) transaction with the results recording for inspection points. But I am looking to tie in the CO19  time event transaction to do the clock in clock out and tie it with the inspection point results recording transaction. The operators on the floor do not want to go to mutliple transactions to record thier time on that operation. Do you know how that can be done and if its even possible ?
    Also do we have to use inspection points or can we do it without inspection points ?.
    Thanks

    GS, Time events are always tied to a record group technically and this prohibits free/extended usage of the transaction compared to say CO11N.
        Explore further on the details provided in the sap help site which states,
    'You can only confirm quantities when you confirm processing time events.
    You can only confirm activities that cannot be assigned to a particular record type group (Set-up,processing, teardown) by using the time event ‘Variable activity’. The confirmed value is assigned to corresponding value in the standard value key parameters'..

  • Does Safari support Automatic Proxy Configuration with a .wpad file?

    Hello,
    I was wondering if anyone knows whether Safari supports Automatic Proxy Configuration with a .wpad file?
    Morgan

    HI Morgan ..
    Safari is extremely finicky about proxies and according to Wikipedia it dates back to older browser versions.
    http://en.wikipedia.org/wiki/Web_Proxy_Autodiscovery_Protocol

  • Automatically create PR with collective PR indicator

    Hello,
    Since ERP6.0 it's possible to group material components in a project according to a "collective purchase requisition indicator", i.e. material components with the same indicator will be put into the same PR.
    We already have a customer program that creates new material components using BAPI_NETWORK_COMP_ADD. However, this BAPI does not seem to have a possibility to set a collective PR indicator when creating the components. (Also it's obviously not possible to set the indicator later.)
    Do you know a BAPI or FM that can create a material component and set the collective PR indicator?
    Thank you
    Roland

    Hi Roland,
    I am sorry to say, there is not a possibility to do that. The collective purchase requisition indicator
    cannot be filled via BAPI. This functionality is not yet available.
    Apologies for not being more positive this time.
    Best regards,
    Enrique
    Edited by: Enrique Sosa Dominguez on Sep 9, 2011 2:58 PM

  • VALUATION NOT APPEARING IN RESULT RECORDING

    Hello....
    I have created an inspection plan where i have assigned all the characteristic to be inspected with quantative data.
    Upon goods receipt inspection lot is generated,
    while doing result recording when i enter the result for eg. if the characteristic value is 1-10, and i enter the reult as 1, the valuation has to be set automatically as accepted but its not appearing, could anyone please let me know am i missing any settings.
    Suggestions will be worth appretation

    Hi sarfrazbaig  ,
    If you are using sampling procedure, check the "Valuation Mode". It must be "Manual Valuation" to achieve the valuation Manually.
    The trx code will be QDV1/2/3 for Sampling procedure.
    Regards,
    Shyamal
    =================================================================================
    Okey if you are not using the sampling procedure then,
    Set the value as "Automatic Close" / Close, Navigate and save automatically" in the IMG settings at Quality Management->Basic Settings->Maintain Settings at Plant Level, here for the relevant plant select the "Result Recording" Tab and set the mentioned vales for the field "Recording configuration"
    Revert for for further inputs.
    Regards,
    Shyamal
    Edited by: Shyamal Joshi on Aug 12, 2009 12:24 PM

  • Default defect class during results recording

    Hi all,
    In the inspection plan I have maintained target value 20, lower limit 19 and upper limit 21 for one MIC which has single recording. When I do results recording for the MIC, I entered value 18, 20, 20, 20, 21, 18 was rejected automatically with a defect class Major defect A. Where is the default defect class from? If I want to enter a different one, how to change it?
    The only place I can imagine is the configuration of Catalog 9 Defect Class in which defect class is assigned to each Code, but in my case no Code was selected.
    Please help.
    Thanks.
    Danny

    Hi,
    Follow the path QCC0> Quality planning> Basic Data> Catalog> Define defect class.
    In this field, you can customize the details as per your need.
    Once done, you need to assign it to Plant level setting as told by Rohit.
    ntn

Maybe you are looking for

  • 42" flat panel TV not working

    I'm having difficultly connecting my new 42" flat screen tv to my old powerbook g4 15". Using a direct DVI to HDMI connection will not work at all however a DVI/VGA adapter connecting to the tv's VGA slot does work it just doesn't work full screen -

  • Netflix no longer working on iPad

    Please help. Netflix was working this morning. I deleted the App, cleared the history and cache and reset the network. I then reinstalled the App still not working. Any suggestions please?

  • How can I make the spry accordion remember the panel open when I refresh the page or jump to a new page?

    How can I make the spry accordion remember the panel open when I refresh the page or jump to a new page? I am using the accordion feature on all my pages as a navigation aid. It has three panels. When you refresh the page the panel goes back to the d

  • Processing Schema Validation error in BPM?

    Hi all, We have a file to IDOC scenario where if the schema validation fails on the file adapter sender agreement, we want to pull the filename and send it in an error email. So, we are talking about the adapter specific message attribute "Filename".

  • Reply to vj (qery on the inner joins v/s performane test)

    this is ravi shiva's friend. hi vj,          u r working for intelli group....and i had met u twice. by the way give u r contact number i want to speak to u personally.           here is the code...  REPORT  rv_sid_purchase_order_status NO STANDARD P