Reversal of Production Order Confirmation through IDOCS

Hello all,
              The time for each operation in a  production order is logged in KabaBEnzing tool called Autotime. This is sent to SAP through IDOCS and the order confirmation is created. There is a scenario where the supervisor could have entered the wrong time against an operation. Is it possible to reverse the confirmation through IDOCs. If yes, please let me know what should be the approach? Also, I heard that SAP does not accept negative time to do the reversal. How true is this?
All helpful answers will be rewarded.
Thanks,
Kalyan

Hello,
I saw your message and we are doing the same thing.  Did you find any answers to your questions.   We are using Kaba for our shop system and now we would like to sent negative numbers back to sap because of supervisor adjustments.  I have not found any way to set Sap to allow it.  What conclusions have you came up with the situation.
Thanks again,
Jeff

Similar Messages

  • Production order confirmation thru IDoc , IDoc has been processed twice

    Hi Experts,
    Good day.
    I have a problem with my Production orders confirmation using IDoc automatic processing.
    I have an IDoc that has successfully confirmed a Production order, the Idoc has a status of 53.
    However, after a month, the Idoc has been used again on a different Production order confirmation, and the IDoc resulted again to status 53.
    Could you kindly confirm if this a SAP standard behavior or an error? If this is an error, is there any available SAP notes that I can use.
    Here is the spec of our system:
    ECC 5.00 - SP SAPKH50015
    Please kindly provide us your idea on this.
    Thank you very much.
    Kind regards,
    Rosalinda Ines Aben
    PP Support

    Hi Rosalinda, i have the same problem. You found some solution ?
    Thanks a lot !!!.
    Federico Cicerchia

  • Trying to create a Sales Order Confirmation through IDoc

    Hi,
    I am trying to create Sales Order Confirmation through ALE with message control.
    My recieving system is XI server.
    Can u please send me the steps to what to be done to trigger IDoc automatically.
    The condition types and access sequence created is for Output type customer but i am sending it to XI Server.
    please help me.
    Thank you in advance,
    Gangolu.

    Hi Gangolu,
    Have a look at url. Hope this provides some inputs.
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/73527b2c-0501-0010-5398-c4ac372c9692
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/6bd6f69a-0701-0010-a88b-adbb6ee89b34
    Thanks
    Lakshman

  • Production order confirm thru IDOC

    Hello Guru,
    we are having problem to our confirm Production order it has COGI error BA deficit on a same material with same batch.
    our production order A, B, C, and D are process thru transaction code LM00. afterw that we check the process order thru WE02 and it already has status 64 thats why we do BD20 to Order A,B,C and D (all process in same time) to make it status 53. the problem seems occur after doing BD20 all of this order pick one batch 11111 for component material 123. this cause us 4 COGI error after BA deficit since batch 11111 had no enough stocks to make the requirement of material 123 for the order A, B, C and D.
    How was this happen? and how could we fixed this?
    Please provide helps
    Thanks
    Ryan

    Hi Rosalinda, i have the same problem. You found some solution ?
    Thanks a lot !!!.
    Federico Cicerchia

  • Production order confirmation through BAPI

    hi all,
    i have an issue regarding the order confirmation 'BAPI_PRODORDCONF_CREATE_TT'. the order is getting confirmed but the confirmed yield is not geeting updated . ihave passed the order number , operation , Activity Currently to be Confirmed, and unit of measure. can anyone please suggest on this . urgent. do i need to pass the quantity if yes where and which parameter and which quantity to pass to the function module.

    Hi , I have the same problem. When I am running BAPI_PRODORDCONF_CREATE_TT , after successful execution it gives msg that ORDER Confirmation saved. But when i check that in CO14, its not showing the update.

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • Price difference on cancellation of production order confirmation

    Hi,
    We are having a material which is maintained at price control "S". We have created a production order for the material. In due course of business, we did confirmation for say 100 pcs of the material. However, immediatly on confirmation, we realized that we do not need to do the confirmation & hence we did the cancellation of the production order confirmation using CO13.
    On doing the production order confirmation cancellation, we observed that the system has posted some amount to "price difference account"
    We also observed that once in a while this kind of entries do get posted.
    It is requested to please let us know in why system is behaving this way?
    We have checked SAP Note no 216080 "Price difference when reversing GI for S-Priced material" & SAP Note no 215980 'Price difference during GR for the production order". However we are not convinced that these could be the reason for the price difference.
    Thanking you in anticipation
    Regards
    Santosh Kumar Agarwal

    Hi,
    Yes, you are correct in the understanding that the system creates quants in 914 when the production order confirmation is cancelled. But, it does not generate any TR or TO in the background to post the stock back into the original storage type.
    Can we not use the put away strategies so that the system determines where to place the material? My query is that despite all the configurations for automatic TO creation and confirmation for movement type 262, it does not generate a TO (or TR) in the background when a production order confirmation is cancelled using CO13.
    However, if I manually post a material using MB1A for 261 movement type and reverse it using 262, it generates a TO and confirms it as per the setting in configuration.
    The same thing does not work when we run it through PP (CO11N and then CO13).
    Any suggestions on how to approach this and where to check for missing configurations?
    Thanks and Regards,
    Gaurishankar

  • Cancellation of Production Order confirmation (CO13) not generating TR/TO

    Hi,
    We are facing a typical issue in the PP-WM interface. When we create an order and confirm it (partial confirmation), the Goods movement happens (261 mvt type) as desired and the TO is created and confirmed in the background.
    But, when we try to reverse the movement type (cancelling the production order confirmation using CO13) then there are no TRs or TOs generated in the background (for movement type 262).
    When I manually try to post a material document for 262 movement type, it creates a TO in the background (as per the configurations that I maintained) but this does not happen when movement type 262 is called using PP interface.
    The movement type configurations are all done for Automatic TR and TO generations - this works with normal IM process (when we manually post using MB1A transaction) but not with the return Goods movement happening with PP.....here, the material comes back to the interim storage type 914. We then need to create a TO manually and confirm it to take the stock back in to the original storage type and bin.
    We want that when a process order confirmation is cancelled then the materials should be posted back in to the original storage type and bin (from where the material was issued against the order).
    For Info: COGI shows no errors during the 262 movements, also, material document is generated for 262 movement type but no TR/TO generated.
    Is there any configuration that we have missed?
    Thanks and Regards,
    Shankar

    Hi,
    Yes, you are correct in the understanding that the system creates quants in 914 when the production order confirmation is cancelled. But, it does not generate any TR or TO in the background to post the stock back into the original storage type.
    Can we not use the put away strategies so that the system determines where to place the material? My query is that despite all the configurations for automatic TO creation and confirmation for movement type 262, it does not generate a TO (or TR) in the background when a production order confirmation is cancelled using CO13.
    However, if I manually post a material using MB1A for 261 movement type and reverse it using 262, it generates a TO and confirms it as per the setting in configuration.
    The same thing does not work when we run it through PP (CO11N and then CO13).
    Any suggestions on how to approach this and where to check for missing configurations?
    Thanks and Regards,
    Gaurishankar

  • Reversal of Production order

    HI SAP Folks,
                  IS it possible the <b>Production order reversal</b>? If yes Can u give me some idea  how to go about it?

    Hi
    if u want to reversal the Production order Then Go to that order and then
    GOTO-FUNCTION-DELETION---ACTIVATE.
    If u have already pick the material against that order and confirmed that order then first cacel that order confirmation through CO13 Then reverse that material through MB51 PUT MOVEMENT TYPE 262. .
    hope this helps
    Rgds
    Pankaj Agarwal

  • Goods receipt during reversal of production order

    Hello ALL,
    I use production orders confirmation with Aut.goods receipt.
    Example is the following:
    I confirm 3psc of production order for semi-finished product, so system posts 3pcs with 101 movement type.
    Production order status is DLV
    Then 1 pc is consumed for the next production step, it means the physical stock is now 2 pcs.
    In the next step I want to reverse the confirmation of  production order with movement type 102 ( I use CO13 )
    I get message in COGI - Deficit of  unrestricted-use - 1pc and I am not able to reverse goods receipt at all. Production order status is still DLV. Reversal of material document is impossible.
    I know it is reasonable but my question is: is it possible to reverse goods receipt only partially during CO13 - for 2 pcs and get production status PDLV ???
    I know the sulution is to return missing 1 pc, but I would like to avoid this
    thanks for help
    KS

    dear KS,
    as far as i know...
    ...every confirmation entered in the system can be canceled : if you entered three confirmations (just an example) for an operation, you can also cancel three confirmations and all confirmations automatically created by them
    1. you can change confirmations or partially cancel them;
    2. if you also activate user statuses when confirming an operation, these statuses are not automatically canceled when you cancel the confirmation;
    3.if you cancel a confirmation, the functions that were triggered by a trigger point are not revoked (for example, creating a rework operation).
    good luck!

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

  • Production order created through procurement wizard but purchase order connected in SO

    SBO Localization: Korea
    SBO Version:SAP Business One 8.82 (8.82.073) PL: 10
    Production order created through procurement confirmation wizard on the base of sales order. In sales order "Procurement document" field production order number showing correct. But if click on document arrow then same number of purchase order opening where as we expect that production order should open. This is something like connection bug. This happens only if sales order approval workflow is active. In relationship map we can see production order is connected. See details in attached pic.
    I have also tested this case in Belgium localization the result is almost same. The difference is only if clicked on procurement document number arrow (from sales order document) then different number of purchase order opens.
    Is this known issue? Could someone please provide me the solution?
    Yogesh Chaudhari

    Hi,
    It is application error. Please check SAP note:
    1718843 - Blank production order or purchase request displayed if
    “Procurement Doc.” selected in “Form Settings” window
    Thanks & Regards,
    Nagarajan

  • Mass reversal of work order confirmations

    Hi all,
    Can we do a mass reversal of work order confirmations which we do through IW41 transaction,instead of reversing the confirmations one by one, if so please explain how.
    Thanks & Regards,
    Jegashree

    Dear,
    There is no mass confirmation cancellation Txn available in standard SAP.
    Use
    BAPI_ALM_CONF_CANCEL     Cancel confirmation for maintenance/service order
    Hope it will help you.
    Regards,
    R.Brahmankar

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.