Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

Hi Gurus,
Please help on this issue to get any user exits .....
As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
Master data:
Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
Process flow:
1) Avalon Specific Serial numbers generation for finished goods through production order release status.
              (A11206000001)
                                    A  - Avalon
                                    1   - PCB Unit 1
                                    12 - Year 2012
                                    06 - Week
                                    000001 - Running serial number for the week.
2) Production order confirmation through CO11n transaction.
3) Production order Goods receipt through MIGO transaction against order.
4) Quality Inspection with Usage Decision through QA32 transaction.
5) Goods Issue for Delivery.
SAP Product Error:
1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
2) System does not track and control the finally confirmed serial numbers during order goods receipt.
3) System does not track and control the last goods receipt qty in Usage Decision.
4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
Regards,
Santha

Hi Santha,
This is a bit vast, but I'll try to address at least some of the issues:
1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
2- during GR system will propose those SNs that you have defined for the order at release or creation.
3- ?
4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
6- ?

Similar Messages

  • Serial number creation while confirmation of production order

    Hi team
             Can we crete serial numbers while confirmation of production order. I know how to create serial no while creation of proudction order, while taking usage decision in quality. Is there any way to create serial no while confirmation of production order.
    regards
    ssp

    Hi siva
        There is no way to create serial number at production order confirmation, only at creation and release the order.
    but u can maitain MMSL profile and the sno will create at GR from shop floor to warehouse
    I hope it will help to u
    Regards
    S.Anbalagan

  • Serial nos entry during production order confirmation in CO15 - User Exits

    Hi all,
    Is there any user exit existing for a serial nos screen pop-up during production order confirmation.
    Regards,
    Sravan Kumar V

    Hi,
    For serial numbers at the time of goods receipt, u have to activate sr. no. mgt for that particular finished product. This can be done by assigning sr. no. profile in the material master record of that material in work scheduling view. once this is done , system will automatically prompt for sr. nos at the time of goods receipt. I am not aware about any user exit.
    Thanks & Regards,
    Vijay Patil

  • Serial Number assignment at confirmation

    Hi Gurus
    As per our process we have serial numbers assined to the components.
    This we are able to do  but when confiming the order partially system is not asking for the serial number to be confirmed.
    Can anybody let me know what settings can be made for getting this option so that we can specify the serial no. while confirming the order partially.
    Venkata Varanasi

    Hi Venkat,
    For this serial no confirmation, you can maintain the serial no profile in the material master work scheduling view, then you can create Routings for many operations (for ex: 0010 -0050). Then you can create production order when you release the production order, the system will show the pop-up screen for serial no options. then you will click on automatic button , the system will generate the serial no automatically.
    Next you will run the transction for CO11 production order confirmation, immediately system will show the different operation, if you will select the operation 0030, then it is called Partially confirmed for the production order. Then you will check the prodcution order display in CO03, the order status will show REL, PCNF.
    In standard SAP, the production order confirmation CO11, there is no option for serial no pop up screen. If you want to get the production orde confirmation with serial no in the t.code CO11, you will go for Z Development. you can check serial no tables, produciton order tables & confirmation production order tables.
    Please let me know any further clarification.
    Regards,
    Mohan.R

  • BAPI-To create production orders with reference to sales order & item

    Hi,
    Can anyone tell me which is the best method to create open production orders?
    Is there any BAPI available for creating production orders with reference to sales order & item.
    I tried this BAPI "BAPI_PRODORD_CREATE".
    I am getting pop up to enter serial number while executing the custom program.
    Which table contains the serial number(effectivity parameters)?.

    I have custom screen fields on notification service!
    i think a bdc is better.

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

  • I just continued my trial on photoshop and need to find my serial number in order to continue. Where can I find that?

    I just continued my trial on photoshop and need to find my serial number in order to continue. Where can I find that?

    Creative Cloud products don't use serial numbers.  Simply log-in with your Adobe ID (email) and password.
    Nancy O.

  • Production order confirmation using CO15

    Hi ,
    When i am confirming production order with reference to sales order using CO15 , material document is being posted only for assembly material , but not for components.
    Please let me know how i can correct this.
    Thanks in advance.
    Regards,
    sudheer

    Sudheer,
    You can display confirmation using transaction CO14, here you click the goods movement tab, and if you find GI items highlighted in Blue then these goods movement error needs to be reprocessed. Execute transaction CO1P and save the records there, then execute transaction COGI and clear the error records.
    Regards,
    Prasobh

  • Production order confirmation document

    Hi All,
    After carrying out production order confirmation, material document generated is not displayed at the front end.Instead we get messege that "confirmation of order XXX is saved".We have to view that in MB51/COOIS .
    How to display confirmation material document number ( Not confirmation number ) in the front endscreen. This is required as user can write down document number at the time of confirmation for his record.
    Whether there is any option?
    Regards,
    Milind.

    Hi,
    Do the below given settings to print your confirmation document after you confirm the production order.
    Go to OPJ8, check on print confirmation.
    Now you do the confirmation. You will get the confirmation slips.
    Thanks
    Muthu

  • Using employee in production order confirmation

    Dear All,
    I want to use employee number registration in production, order confirmation.
    What transaction I must to use?
    I checked PA40, but I don't need to implement HR module, and there are many other informations that I dont't use in PP.
    I need for a name, surname, employee number, date for beginning, date for ending.
    Can somebody tell me an easy way to do this?
    Thank you very much!
    Regards,
    Marian

    Hi
    Go to PA40 enter the Personnel no. XXXX , From date and click manual hire then execute. Then enter the Personnel area, Employee group and Employee subgroup and save then you will get create personal data screen in that you enter name, surname, employee number, date for beginning, date for ending then SAVE.
    If you follow the above procedure you can get the personnel number in confirmation screen.
    Prerequisites:
    You need to create in SPRO
    1. Personnel area
    2. Employee group
    3. Employee subgroup
    Thanks
    S.Murali

  • Checks in userexits of production order confirmations from PDC in CO16N

    Hi,
    we are using PDC interface for production order confirmations. This is done by Idoc type PPCC2PRETTICKET01 (time ticket) based on BAPI BAPI_PRODORDCONF_PDC_UPLOAD_TT. Standard confirmations are working well. In case of SAP detected errors the confirmations are registered for error handling in CO16N.
    So far so good but we have some own check logic implemented in confirmation user exit CONFPP04 and BADI WORKORDER_CONFIRM. These checks are working fine whith online confirmations in CO11N but not in background PDC Idoc processing. I checked the function module EXIT_SAPLCORF_104 for exit CONFPP04 but it has got no exception. The call in SAP processing is like this:
          CALL CUSTOMER-FUNCTION '104'
               EXPORTING
                    CAUFVD_IMP    = I_CAUFVD
                    AFVGD_IMP     = I_AFVGD
                    AFRUD_IMP     = E_AFRUD
               IMPORTING
                    AFRUD_EXP     = LS_AFRUD
               EXCEPTIONS
                    ERROR_MESSAGE = 01
                    OTHERS        = 02.
      CASE SY-SUBRC.
        WHEN 0.
        WHEN 1.
          MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO WITH
                  SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4
                  RAISING CONF_DATA_FALSE.
        WHEN 2.
          MESSAGE E174 RAISING CONF_DATA_FALSE.
    How can I throw the exception when there is no exception defined in the function module interface without modification?
    As 2. option I wonder if it is better to implement the check logic in the BADI WORKORDER_CONFIRM Method AT_SAVE. This has got an exception ERROR_WITH_MESSAGE. But I don't know if this will lead to CO16N registration of the confirmation.
    Any hint how I can solve the problem to apply the online checks in CO11N also to PDC interface confirmations with CO16N in error case?

    Hi Michael,
    First, I think that the BAPI that you are looking for is: BAPI_PRODORDCONF_CREATE_HDR
    Second,
    I don't think that in the framework of such a forum it can be explained in detail how to use BAPIs; nevertheless, here are some highlights:
    A BAPI is an executable piece of code that can be called from either an external program within SAP (Z program), or called from an external system either via RFC, or as a web service (depends on your NetWeaver  release).
    As such, it has input (import) data that you transfer when you call it, and output (export) data that you recieve when it ended processing.
    More detailed information, documentation, and a description of the import/export parameters, as well as error handling, one can find in SAP by calling transaction BAPI.
    Regards,
    Mario

  • Batch Split during GR for Production Order Confirmation

    Hi All,
    We need to do batch splitting during GR for Production Order Confirmation.We are using CO11N for confirming the Production Order and in the PP settings auto GR is activated once the Confirmation is done.
    Currently it is generating only single batch number for the complete quantity, but our requirement is that we need that system should create separate batch for each piece.
    For ex.: Production Order is for 100 pce, when we do Production Order confirmation, system is automatically doing the GR by 101 movement type and it is creating one single batch for full 100 pce. But we want the batch number should be generated for 1 pce i.e. we want to split the 100 pce into 100 batches with 1 pce each.
    Please let me know what can be done for this requirement.
    Regards,
    Ankit

    Dear,
    In OPK0 you need to active the screen Mill: Goods Receipt (8485) for confirmation profile for the single-screen entry.
    Best way is use BAdI /SAPMP/SPLIT_CO11N for the Enter Time Ticket for Production Order transaction (CO11N)
    you must activate BAdI implementation /SAPMP/SPLIT_POPUP and/or /SAPMP/SPLIT_CO11N for this BAdI
    I have use the same BADI it will ask you number of split according to that it will split the GR line item.
    Please refer this link,
    http://help.sap.com/saphelp_dimp50/helpdata/EN/4e/1796374b088e5ce10000009b38f8cf/frameset.htm
    Regards,
    R.Brahmankar

  • Production order confirmation detail problem

    Hi,
    how can i get the production order confirmation detail by sending confirmation mumber alone?
    in BAPI_PRODORDCONF_GETDETAIL, it need confirmation counter. but if i know confirmation number alone, how can i get the details? which BAPI shall i use to get the confirmation details by sending confirmation number alone?
    regards
    senthil

    Dear Senthil,
    I saw you already solved this thread.
    call function 'BAPI_PRODORDCONF_GETDETAIL'
          exporting
            confirmation              = conf_detail_2-conf_no
            confirmationcounter       = conf_detail_2-conf_cnt
         importing
         RETURN                    = i_return2
           conf_detail               = conf_detail_3 .
    In this FM there has no any tables.
    How can I get the details?
    Could you please advice me?
    Thanks in advance.
    Bishnu
    18/10/2011

  • Changr HU quantity generated via PRoduction order confirmation

    Hi gurus,
    I have created GRN of 112 quantity via production order confirmation.
    My plant andstorage location is Handeling unit managed so with GRN handeling unit gets generated.
    but packing had done for 1 quantity only.
    now how to change this quantity?  I tried HUCANC t code and gave the HU number but system is giving error that HU can not be cancelled.  first cancelled material document
    but GRN has made 112 quantity which is correct then how HU got packed with 1 only?
    I stuck up pls help

    when I am trying to change Hu in humo i am getting following error
    Storage type 111 does not allow repacking - HUs cannot be changed
    also getting following error if I am changing the quantity or emptying the Hu
    Handling unit 10016000800120555 has status "cannot be changed" - Process cancelled
    Edited by: vrunda on Jul 9, 2010 10:57 AM
    If I tried to delete
    Handling unit 10016000800120555 contains items that cannot be deleted
    Edited by: vrunda on Jul 9, 2010 10:58 AM

  • Creation of production order with reference to sales order

    dear all guru's,
                       i m having a requirement of creating production order with ref to sales order but without changing my old strategy of make to stock.
    regards
    ujwal

    Hi,
    For the purpose of creation of production order with reference to sales order while maintaing MTS strategy you need to maintain Make to stock strategy 40 in strategy group in MRP-3 View of Material Master.
    This is the only Make-to-Stock Strategy which enables you create Production Order against both Sales order as well as Demand / PIR.
    So if your strategy group is already 40 then you need not change it.
    However if you are using any other Make-to - Stock strategy like 10, 11 etc. then it is not possible to create Production Order against Sales Order since they dont consider Sales Order in planning.So you need to change them and set strategy group as 40.
    Hope this helps.
    Revert if you have any doubt.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Sep 27, 2008 8:50 AM

Maybe you are looking for

  • Report generation toolkit and signal express user step : problem of closing reference in "Stop" event

    Hi all, I'm trying to make a package of Vis to easily make Excel reports with Signal Express. I'm working on LabVIEW 8.2.1. I'm using the report generation toolkit, so I build a .llb from my project which contains all the hierarchy of my steps, but a

  • Installing java ee sdk (java_ee_sdk-6u1-jdk-linux-x64.sh) on x64 linux

    Hello guys, this is my first post here :) so don't bash me too much. Trying to get the Java EE installed on gentoo linux x86-64 here. Downloaded java_ee_sdk-6u1-jdk-linux-x64.sh from oracle.com. I have tried different jres: 32 bit, 64 bit. now I have

  • Can crosstab show multiple objects in top header?

    can crosstab show multiple objects in top header? for example, the data showed as : customer  city name  city value      product name  product value     A             Paris          1             food              N     A             London         

  • Lion 10.7.5 slowed videos down & many pop-ups

    I have an old MacPro late 2007 bought in 2008.  6 hard drives...24 Gb RAM...I was running OSX Snow Leopard 10.6.8.  Now 1) I keep getting pop-ups such as MacKeeper almost anytime I click on  a web page now...  2) When viewing YouTube all the videos s

  • Change settings of differents Region of a single Track

    Hi, I would like to know if it is possible in garage band to change settings (like effects, or the sound level) of a single region (part) of a track. If it's possible. How can i do to do this? Thanks Ciao, Vorrei sapere se è possibile cambiare le imp