Role of ABAP Consultant in an Upgrade Project

Hi Friends,
I'm an ABAP consultant, I've worked on Implementation Projects till now. Last one was on ECC 6.0.
I have been assigned to an upgrade project (from 4.6 to ECC 6.0).
So can anybody let me know what is the role and what are the responsibilites of an ABAP consultant in an Upgrade Project?

Hi,
Role of technical consultant:
1) Code fixes and bugs for upgrade objects
2) SPAU / SPDD corrections
3) removal of obselete statements by checking through the code inspector or EPC
4) replacing the BDC on enjoy transactions with BAPI
5) replacing the call transaction on obselet transactions with the corresponding new transactions.
Few of them are listed above..
Reward if useful
Regards
Shiva

Similar Messages

  • Role of a functional consultant in an upgrade project

    Hello friends,
    My client is planning for an upgrade of 4.7 to ECC 6.0.
    Could you pls give me some info regarding the Role of a functional consultant in an upgrade project.
    Naveen

    The role of a functional consultant in an Upgrade depends on the scope of the project.
    whether it is a Technical Upgrade or a Functional Upgrade.
    Following would be some of responsibilities -
    Coordinate with Client  Business/Functional Team to identify critical business processes, understand the functionality of the custom developments
    Overall Test Planning, Preparation of Test Plans, test scripts and executing Unit and Integration testing
    Providing clarifications for functional related issues during UAT
    It is is functional upgrade analyze which custom functionalities can be retired and which can be brought back to standard.
    Prepare a POC on the recommended new functionalities on how these would be useful for the Client.
    Training the Client super users
    Preparing training documents
    Analyzing the obsolete transacations and modifying the documents with the new transactions
    Hope this helps you.

  • What are the roles & responsibilites of consultant in SAP upgradation or mi

    Hello ,
    Would you please any dody help me to provide the role & responsibilities of consultant in SAP upgradation or migration project.Thanks.
    Regards,
    Sampally

    Hello,
    If the project is of technical up gradation then with no functionality changed, Then the job of abap consultant is critical, right from creating spdd and spau, interfaces, debug the new programs and fix the bugs if exists in the new programs. The functional consultant has to test the new system from functions point of view; functional consultant is responsible for taking user acceptance test before going on live to the new system.
    Regards,
    Vivek

  • Upgrade project - Roles and Responsibilities

    Hi All,
    Can any one tell me what are the roles and responsibilities of a SD consultant in a upgrade project.
    thanking you in advance for your kind help.
    regards
    S D Toshniwal

    major reponsibilities of SD consultant would be
    Configuration and customization of various sales documents delivery documents and billing documents.
    Partner functions at various document levels.
    Incompletion logs at pre-sales, sales and at Delivery documents.
    Copy controls
    Maintaining pricing at various document levels
    Output and text determination
    Account determination
    Carrying rebate agreements at billing document level etc.
    Regards,
    Vishal

  • MM Upgrade Project

    Hi
    What are the roles & responsibilities of MM Consultant in a upgrade project ?
    What are the major functionality difference between SAP 4.7 c & Ecc 6.0 version ?
    Explain me in detail ?
    Thanks & Regards ,
    Mani.

    HI,
    Upgrade is of two types :
    1. technical : in technical upgrade role of funcitonal consultant is to test all the existing functionalities in ECC development (unit testinf)and QA server(UAT )
    Also MM consultatn has to sit with Abaper for some SPAU adn SPDD adjustments.
    2. Fucntional Upgrade: respective consultatn has to identify teh new functions and take it up further with Business for approval and sign off and then implement the new funscitons.
    http://solutionbrowser.erp.sap.fmpmedia.com is the site where in you can get the new  functionalities available in target source.
    Award points if helpful as points collection awards through SAP goes to welfare of some of the poorest regions of the world
    regards

  • I want information about as a abap consultant what can do in realtime proje

    hi ,
    this sri,i wantformation about as real time abap consultant what can do in real time project,i want  process what consul tant do.

    Hi Sri,
    The major roles of ABAP Consultant is:
    1.Analyze/Understand the Functional Specs.
    2.Prepare the Tech Specs based on the Functional Specs(Given from Functional people/Team Lead}
    3.Start coding/write program in DEVELOPMENT Server.
    4.Unit Testing
    5.Send to Quality Server.(By transporting from Development server)
    6.Once it get approved from ur Team Lead , it will be moved to PRODUCTION Server.
    7. Prepare the documentation.
    I hope it helps u..
    Regards,
    KK

  • Upgradation project to ECC 6

    Hi all
    Can anyone please provide some guidance, if possible also send some documentation, which I can follow to work on a upgradation project.
    Currently system is 4.7, and they want to upgrade to ECC 6.
    What are the steps involved, what would be my role as FICO consultant, in such upgradation, because i have never worked on a upgradation project.
    Any input will be highly appreciated.
    Krishna

    http://solutionbrowser.erp.sap.fmpmedia.com/
    http://service.sap.com/releasenotes
    http://service.sap.com/upgrade
    http://www.sap.com/solutions/business-suite/erp/pdf/BWP_ERP2006_Upgrade.pdf
    https://websmp104.sap-ag.de/instguides
    SAP Business Suite App->SAP ERP -> SAP ERP 6.0

  • Abaper role in Upgradation project

    Pls let me know the Role and Responsibilities of  ABAPER in Upgradation project.

    Murugesh,
    are we people here for only replying your qns?
    we all have own work at our desk also.it is not nesseccery for us to ans your qns.please dont say like this as you are saying.it is community you have to understand how can servive in community.please dont xpect here from anyone to spoon feeding to you.please support SDN.
    Go through this info.
    SAP Implementation:
    SAP Implementation is the whole of processes that defines a complete method to
    implement SAP software in an organization. It is based on best practices and case studies from various literature sources and presents a collection of processes and products that make up a complete implementation method to allow any organization to plan and execute the implementation of SAP (ERP) software. The SAP implementation process is made up out of four main phases, i.e. the project preparation where a vision of the future-state of the SAP solution is being created, a sizing and blueprinting phase where the solution stack is created and training is being performed, a functional development phase and finally a final preparation phase, when the last tests are being performed before the actual go live.
    ABAP Developer Role is to prepare the Technical Specification (based on a Functional Specification given by a Functional Consultant), build the code, Review the code and finally to prepare the Unit Test Cases. Sometimes ABAPer may be asked to do a technical research for an optimal solution.
    SAP Support:
    After a go live, the application needs a maintenance/support to resolve the issues/tickets raised by the users when using the application. Ticket is like a request for changes/bug fixing or a request for a new ABAP Developer Role includes bug fixing/change the existing code due to new requirements/build a new code etc.
    SAP Upgrade:
    SAP Upgrade is nothing but upgrading the software with a superior version which has got more advantages when compared to the earlier version.
    ABAP Developer Role is to go through transactions SPAU/SPDD to compare the old and new version of the change and finally need to activate the relevant one. Some times might need to work on SAP notes too.
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d163a7-0301-0010-d9b0-98f692ea3c60
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/2e8e5288-0b01-0010-2ea8-bcd4df5084a7
    Go through this link.I think you don't need any other doc.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/index.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/472443f2-0c01-0010-20ab-fbd380d45881
    https://websmp102.sap-ag.de/upgrade-bw
    please close this thread after giving mark.
    Rgds,
    Amit

  • What is the role of an abaper in upgradation project from 4.7 to ecc6.0?

    Hi anybody pls forward  any documentation and ppts to understand the upgradation project
    What is the role of an abaper in upgradation project from 4.7 to ecc6.0?
    what we have to check and we have to upgrade give some guidance
    thanks in advance.

    Hi,
    check the below link..
    http://www.thespot4sap.com/upgrade_guide_v2.pdf
    reward if helpfu.
    Regards,
    Nagaraj

  • Abap consultant role in implementation project

    hi
    may i know
    abap consultant role in implementation project
    and implementaion steps

    SAP provides the SUIT but the service companies like IBM & Infosys do two activities to make that suit workable for a perticular client's buisness.
    1. Configuration
    2. Customization
    The abap consultant's role is to customizing the standard suit accoring client's buisness. Also there may be many 3rd party systems involve in for the client along with SAP. To create the interface of SAP and those 3rd party systems and manage the data transfer is also a job ob ABAP consultant.

  • SAP MM Functional Consultant's role in a Upgrade Project from 4.6C to 6.0

    Hi Guys,
    I will be thrown into a SAP Upgrade Project. I would appreciate if someone could shed some light on what a SAP MM Functional Consultants role would be in this kind of Project.
    I would appreciate a comprehensive guide where it includes role within each stage of the ASAP methodology for Upgrades.
    Thanks guys.

    > I will be thrown into a SAP Upgrade Project. I would appreciate if someone could shed some light on what a SAP MM Functional Consultants role would be in this kind of Project.
    - defining the core processes
    - test and customize them
    - release the customizing transports for production
    > I would appreciate a comprehensive guide where it includes role within each stage of the ASAP methodology for Upgrades.
    Since each project is different and each system has a different customizing/configuration it's not possible to generate a step-by-step guide what you have to do. The requirements are usually defined by the business.
    Your project leader should be able to give you a project plan (e. g. by using Solution Manager Upgrade Project) where you can get an idea based on the system you're going to upgrade.
    Markus

  • ABAPer role in upgrade project

    Hi,
    Please let me know the ABAPer role with upgrade project. When Std programs updated by support packs what are the responsibility of ABAPers?
    Thanks,
    Praneeth

    Hi,
    Automatic- It means that there will be a green icon. You will have to just click it and it is done.
    This is because the changes to the SAP Object have been done either via SNOTE for some note application or you have used the modification assistant. So SAP does not have any problem in determining the changes. So the adjustment is automatic.
    Semi-Automatic - In this case there will be a yellow icon. This means that you have to make some manual adjustments. This is because SAP considers that the adjustments are proper but still there is some discrepancy.Probably this is because you have made some note changes and additionally inserted some comments like begin of changes by xxxx on yyyyy for note zzzzz.
    So in this case SAP will give you a split screen editor in whihc your existing code and the one coming from support pack will come. So you have to adjust accordingly.
    Manual Adjustment - In this case there will be a red icon. This means that you have to make the chnages manually. This is because SAP finds a lot of discrepancy in your program and the one coming via support pack. The reason can be either the earlier note was incorrectly applied or you have added your own code for some custom requirment. So again SAP gives you the split screen editor to make the adjustments.
    Your assumptions about Reset to Original and Adopt Modifications are correct.
    I hope it solves your queries.
    Regards,
    Ankur Parab

  • Role of MM consultant in Upgrade Project

    HI,
    i am in ot my First Upgrade Project.what will be the role of MM consultant when upgrade is happened from 4.6 c to ECC 6.0 from configuration point of view.
    can any one guide me regarding this.we are going for Technical Upgrade
    regards
    subhash

    hi subhash,
    first you have to see what kind of modified business processes are followed in ECC6 as compared to version 4.6.sure you will get to know which fields are new in MM cycle. then prepare document for technical guys about the same so that they can provide same funcationality by modifing code of  4.6
    second some time technical guys not able to under stand which kind of information is requred in perticular case(report) then MM consultant can help them for understand the business requirement.
    they can also tell from which table a technical person can fetch the data.
    if useful then plz provide points
    BR
    Rajeev

  • Abap consultant role in support  project

    hi
    may i know
    abap consultant role in support  project
    and support stpes

    Hi,
       1. Need to check the tickets.
       2. Based on priority find the bugs and rectify.
       3. Check the jobs that daily execute, If any failure then reexecute that with proper inputs...
       4. Update the status in tickets.
      Over all what technical person is doing the same thing needs to be done in Support projects.
    Rgds,
    Bujji

  • Wht is the role of BI Consultant in Upgradation ??

    Hi Experts ,
    Can anyone give a step by step answer or a link or a material
    for the same
    Correct answers will be awarded with full points
    Regards ,
    Subash Balakrishnan

    Hi,
    The Upgrade Project Lifecycle can be explicitly divided into the following phases:
    Phase I:
    u2022     Project plan
    u2022     Test planning
    u2022     Release strategy
    u2022     Resource mobilization
    u2022     Contingency Planning
    This is the Planning Phase of any Upgrade Project. Before beginning, it is highly essential to verify that there is technically a direct upgrade path between the source and target versions on the SAP Service Marketplace including any Industry Solutions. Redefine Business case and Metrics; Establish the Project Plan, then the Agenda for the Project is scheduled, derive the Project estimates, validate the estimate and the resource needs, organise the same. Leveraging the existing processes for development, testing, deployment and transition will decrease the work efforts by 10-30% in contrast to its comparable implementation. Ensure that the scope for Technical upgrades are restricted to the existing functionality and processes, effort is required to confirm if there are any major changes on them based on the review of SAP released notes and documentation.
    Phase II:
    u2022     Gap Analysis between SAP old and newer versions.
    u2022     Identify business flows & custom development for testing
    u2022     Test scripts preparation
    u2022     Business flow testing in Sandbox system
    u2022     Error Identification
    u2022     New functionality Identification
    This is the Analyze Phase of any Upgrade project. Analyze business processes, Identify Application requirements, Assess Process gaps and define a Role based Authorization design. A list of Development objects critical to the SAP Upgrade must be defined with accuracy. All Efforts to identify the interface points and all application integration.Incase, Client has a test model that is recently used then complete the Test Scripts, Expected results and Test data else complete the re-work and re-development of the entire Test Model. A Sandbox instance needs to be created early in the analysis Phase. Performing Sandbox Upgrade to the new SAP version using the existing Development or Production instance will enable us to forecast the new requirements and the changes foreseen in the Upgrade.  It is very essential to conduct SAP Technical Upgrade Assessment and Go-live Functional Check. During Integration Testing, check for unusual long runtimes for Custom Program and transactions; identify any new errors in the existing functionality along with the new functionality that needs to be added.
    Phase III:
    u2022     Determine Resolution for Gaps
    u2022     Identify and design the configuration required
    u2022     Determine development work for error resolution
    u2022     Consultant testing in Test System
    u2022     Design new functionality
    u2022     Identify Conversion activities in Productive system
    u2022     Super User Training
    This is the Design Phase of any Upgrade Project. During this phase, Configuration Upgrades are made and minimal configuration adjustments are detected and adjusted during testing. About 10-20% Design effort is required to remediate the errors in the custom report and other Technical developments since there is a change in the standard SAP Data Model and Data Dictionary objects. Here, Consultant Testing plays an important role in the identifying the minimal errors and adjusting the same. Plan Conversion activities since existing data is in place during the Technical Upgrade.
    Phase IV:
    u2022     Configure the systems as per the gaps and errors
    u2022     Implement relevant SAP Notes & Patches
    u2022     Implement Programming Changes
    u2022     Implement new functionality
    u2022     Consultant/Superuser testing in Test System
    This is the Build Phase of any Upgrade Project. Complete the master configuration as per the errors identified and gaps recognized. Build and test the Application components and Technical Architecture through SAP notes and Development changes for the new functionality.Hence, it is necessary to install all the environments needed to support the Upgrade environment. Prepare training material and all the documentation that is necessary for the Enduser/Superuser training in the Test System.
    Phase V:
    u2022     Final Superuser testing and confirmation
    u2022     Resolution of errors identified in Super user testing
    This is the Test Phase of any Upgrade Project. Application testing and Integration testing should be completed in full in order to ensure that Upgrade relevant changes works in tune with the Business Processes. Super Users play an important role in testing the same and reporting any new unforeseen errors but at the same time responsibility lies within the Consultants and the Technical Team to ensure that any functionality not working is not a totally new requirement and is a part of the already existing functionality. This will avoid any time and effort being wasted in a totally new functionality.Hence, there should be a trial run of the upgrade process, including all pre- and post-validation tasks, business continuity tasks, and technical upgrade tasks. This is to ensure the Completeness of the Cut-over strategy, resource allotments and various dependencies.
    Phase VI:
    u2022     Transport upgrade relevant changes in Productive System
    u2022     Final Conversion activities
    u2022     Go-live
    This is the Deploy Phase of any Upgrade Project. Plan for deployment. For this, it is highly important to assess Deployment readiness, authorize deployment, Plan a detailed Release strategy to transport the Upgrade relevant changes to Production. The next task in line will be the plan on Conversion of Data and hence Migration to the Production.Normally, majority of the Upgrades stabilize within a week before the actual handoff to the Support Team.
    Testing Management & Control:
    Testing is extremely essential, test scripts should be actual, provided by business. Business should be involved as much as possible, to prevent testing of programs or functionalities that is no more used and ensure that programs and functionalities that are used are also tested. Actual and complete test scripts prevent losing time by ineffective testing and surprises after go-live.
    Testing has to be done with different customers, domestic and foreign in different countries, to detect language dependent errors.
    Print programs in MM (Purchase Order) and SD (Sales Order, Delivery, Invoice) need special attention, because they are very often and very much modified to suit special customer requirements.
    The output has to be tested thoroughly and inspected very attentively. The following needs to be checked:
    u2022     Are all necessary fields printed out
    u2022     Are addresses right and not only with one item line, but with two, three or many.
    u2022     Are the texts printed right, is with languages everything in order etc.
    User acceptance test with real business roles should be done as extensively as possible, because what is functioning with consultant authorisations /sap-all might not be functioning with business roles with much less authorisations.
    Release Strategy:
    Follow a detailed and planned strategy to release transport requests relevant to Upgrade. The transport can start from the Sandbox System.But, before being imported to the Development System; the transport requests can be stored in a buffer. Similarly, transport from Development System to Quality Assurance System and from Quality assurance to Production system follows the same strategy.
    Country Version Approach & Impact:
    Country versions should be given special care to ensure that country-specific deviations and Taxes due to legal implications work well without any issues.
    The Go Live Approach , Follow-up Activities, Critical Success Factors & Deliverables:
    All development should be stopped. Just the minimum of changes absolutely necessary for support should be done, no other new modules or add-ons should be installed at the same time, otherwise the situation can become very complicated.
    Dump analysis is very important to detect errors and these dumps should be taken care of on a daily basis, when testing and after go-live
    User variants /batch job variants tend to disappear or become outdated.
    Interfaces should be tested very carefully, by users themselves, because only they know what they are really doing. The interface might be functioning basically, but for example the search help for material is not functioning at all. It is difficult to compile all such details in test scripts.
    For workflow, a really experienced expert should be involved. Otherwise the search for errors might cost lots of time.Many programs are involved, standard and customer objects and their interrelationship is difficult to see and debug, especially with background processes. And if workflow is not working after upgrade, it might be difficult for customer to find workaround.
    It is good to keep a non-upgraded system until the go-live and intensive care period is over. It is quite often good to see, how customer programs were functioning before upgrade, copying of pre-upgrade programs or methods might be very useful to make customer programs run again, when they are using standard ABAP objects that are changed by upgrade or even no more existing after upgrade. And users tend to claim after upgrade that functionalities are no more working, which never have been functioning, to get them without a change request. All these should be taken care of.
    Hence, I believe that the above mentioned methodology and key points would suffice to ensure a planned and successful Upgrade without any major surprises or chaos.
    Assign points if helpful.
    Regards,
    Sumit

Maybe you are looking for

  • Itunes, ID3 tags, & hard drive corruption

    My wife is having a strange problem with her iMac, and it’s got me a bit mystified. I’m hoping someone here can shed some light on what might be going on. I apologize in advance for the long post. The problem is that when she plays some songs in iTun

  • Rotated in iMovie, but not rotated when brought into iDVD?

    I shot a video on my iPhone in the vertical. I rotated it in iMovie so it wouldn't be sideways. I opened iDVD to make a DVD of this movie. The movie appears sideways in iDVD, even though it looks correct in iMovie. Oh what to do?

  • I've changed the exch. rate, but the Amount in Local Curr.EUR isn't changed

    Hi All, I've posted a bank document in USD dollars. In FB03 I can see for that document the  "Amount in document currency" (USD $) and the Amount in Local Currency (EUR). Later I've set the "exchange rate" in S_BCE_68000174. If i turn to display that

  • Video Clips Cutting out

    Can somebody please help? I have copied some video clips into itunes and onto my Ipod classic. When they are in Itues they play correctly. When I play them on the Ipod they cut out about 2/3rds of the way through so I keep missing the ending. Any adv

  • Process message according to a condition

    Gentlemen, I created a process, which modifies a table column when a certain button is pressed. I want to modify the column in that case only, if the sysdate is later than the "begindate" column of the table. So I modified my process to be conditiona