Route not determing automatically at sales order level for some sales order

Dear All ,
Route not determing automatically at sales order level  for some sales orders.We are using automatic route determination without wt group,eventhough we have configured the required settings
I have checked all the forums but didn't find any solution for the same.
Looking for your inputs .
Thanks inadvance
Regards
Venkat

Hi
1. Copare the Routes which are Automatically determined and which are not automatically determined
2. Have you mainted this route to be RELEVANT FOR TRANSPORTATION without this check route will not get picked up.
SPRO > Logistic General > Shipping > Basic Shipping Function > Routes > Define Routes > Define Routes and stages > Select the Route and check for it's settings > CHECK MARK Relevant for Transport. Without this check the route will not get picked up as of my understanding.
Thanks
RB

Similar Messages

  • How to Find Out The Production Order Number For The Sales Order Line Items

    Hi All,
    I want to know the number of production orders for each sales order line item. I know the sales order number .Can anyone tell me how the tables can be linked to get all the production order numbers for each sales order line item.

    I think it depends on your configuration. But check fields KDAUF and KDPOS in table AUFK.  or in table AFPO.
    Regards,
    Rich HEilman

  • Costing affect with MRP at planned order level and after production order

    Dear all,
    How the costing affect with MRP at planned order level and after production order completion?
    Edited by: Maulik on Jun 24, 2009 1:59 PM

    Dear Maulik,
    check Mr. Vinod's inputs abt costing
    1. Maintain following master data:
    MM01 Material Master with Costing and accounting view. Make sure all the cost Std, Moving avg etc is maintained along with valuation class in Accounting view 1. In costing tab pls make sure "with qty structure" and "Material Origin" are ticked.
    CS01 BOM with components marked with costing relevance in Status/Long Text Tab. Also check all the qty are correct.
    CR01 Work Center in Basic data tab maintain standard value key sau SAP1 and in costing tab maintain the workcenter, activity type and formulas (Usually standard formulas like for Machine Hours SAP006, Labour SAP007, Setup Activity SAP005 is used).
    KL01 Cretae activity types, in basic data tab maintain ATyp Category AS "1" and cost element (as provided by your FI Guy).
    KP26 Activity pricing, here with the combination of Activity type and the cost center you assign price to the activity.
    2. SPRO Activity
    Maintain Costing sheet IMGControllingProd cost controllingProd Cost PlanningBasic settingoverheadsdefine costing sheet.
    OKKN Define costing variant, you define costing type (In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to like std price, moving avg etc), Valuation Variant (defines how the prices are prioratized), date control and transfer structure.
    3. Costing Process Flow:
    1. CK11N CREATE COSTING RUN
    2. CK24 CREATE PRICE UPDATE (You Mark and release the prce to be updated)
    4. COSTING VARIANT WRT PP
    1. OPL1 DEFINE COSTING VARIANT WRT PP
    2. OKK4 or OPN2 DEFINE VALUATION VARIANT
    3. OKK1 or OPM1 DEFINE COSTING TYPE
    4. OPL8 ORDERTYPE DEPENDENT PARAMETER (assign the above creted costing type for both planned and actual)
    Hope this will throw some light on product costing.
    Regards
    kumar

  • I moved from the UK to Sweden. My trial expired in the UK but I was not able to purchase CC in Sweden for some reason. I was told to create a new account in Sweden with a new Adobe ID. When I did, the trial downloads did not work and I could not purchase

    I moved from the UK to Sweden. My trial expired in the UK but I was not able to purchase CC in Sweden for some reason. I was told to create a new account in Sweden with a new Adobe ID. When I did, the trial downloads did not work and I could not purchase the CC at discount price.

    Moving this discussion to the Adobe Creative Cloud forum.
    Kriskristferson if you are facing difficulties with your order then please contact our support team directly at Contact Customer Care.

  • New order type for a purchase order similar tu UB.

    Hi,
    I would like to know if it is possible to create a new order type for a purchase order. This new order type should work as a UB order type but "plant" and "storage location" should be indicated by default and shouldn't be changed.
    How should I proceed?
    Thanks in advance.
    Luis.

    The problem is that If I specify default values for each user (plant and storage location) It will always propose these values when using different order types. This can't be.
    Isn't there any other solution in standard sap?
    Edited by: LUIS ÁLVAREZ on Apr 26, 2010 11:25 AM

  • Internal Order Mandatory for some G/L Codes

    Hi Friends
    I need one help I want configure Internal Order Mandatory for some G/L Codes.
    How I configure this.
    Please help me.
    Regards,
    Hemant Kumar

    Hi
    Go to OBC4--maintain field status variant and set CO/PP Order --required entry for the particular field status group.
    You can write validations in GGB0 and activate in GGB4.
    these will work out.
    regards
    Venkat

  • Automatic Single Item multi-level planning on sales order creation

    Hi all,
    I am using strategy 50 and want planning for single item to be carried out at the time of sales order creation to avoid MRP run everytime sales order is created..In order to achieve it i checked Automatic Planning Indicator in "OVZG" for the requirement class "045" which is requirement class for sales order of strategy 50. But still unable to achieve the desired result..
    Please guide me through.
    best regards,
    shah

    HI shah,
    in sales order go to Procurement tab there u will get the requirement type. system will determine requirement class based upon following criteria
    1) by strategy group in material master
    2) if strategy group not there then MRP group
    3) if mrp group not there then material type
    4) by this also not able to fine the requirement type then special rule is used with the help of item category and mrp type
    5) if this also fails then it will go with item category only
    6) this also fails then it will give any requirement type
    hope this is clear
    regards
    ramakant

  • Stock confiramtion at sales order level for future date- Availability Check

    Hi all
    Here is the scenario
    This setting is available in the system:
    Stock is available
    Sales order created with Requested delivery date in future-> not confirmed
    Sales order created with Requested del date today -> confirmed
    The requirement :
    how and where to change this setting in IMG so that also orders with Requested Delivery Date in future are confirmed if stock is available.
    As this is urgent request to respond quickly.
    Regards
    Devender

    Hello Devender,
    You can achieve the mentioned scenario by configuring ATP. You can do ATP with RLT or ATP without RLT.
    In ATP with RLT, system will check and confirm the quantities from existing stock only and if quantities are insufficient then the system will consider inline POs or manufacturing time to confirm remaining quantitites.
    Else you will be getting schedule lines for only items in stock and remaining will be unconfirmed as ATP without RLT will be activated i.e., system will check and confirm the quantities from existing stock only.
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMGSDBasic fncsAvailability check and TORAvailability checkAvailability check with ATP logic or against planningDefine checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    Reward points if helpful.
    Regards,
    Priyanka

  • For some sales orders output type is not showing even thoug configured in N

    Hi ,
    I have 100 sales orders out them 10 sales orders out put type is not appearing in VA02->goto->OUTPUT->HEADER->EDIT
    In Tcode : NACE every thing is configured accordingly.
    As an abaper what can I do.

    Hi,
    1. go to transastion VA02.
    2. enter the sales order number for which you are not getting the output type
    3. go to > extras>output--> header >edit> you will get the output messages window
    4. In Application tool bar you find the ICON i (determine analysis ) or press cntr+F1.
    5. in analysis out put you will find the reason why the output type is not getting selected.

  • Open Order Quantity for open sales orders

    Is there a standard SAP Report that gives the open order quantity for every open sales order.   "Open" is defined as any order quantity that has not shipped.  Delivery creation is not the same as shipment.   VA05 Report does not contain enough information to calculate the open order quantity for an ERP-based backlog report.

    Try VA05 schedule lines standar variant...include status fields and both ordered qty and confirmed qty. In SAP standard system order status, status A means open orders fully (Nothing shipped, everything opened). Status B means in process orders (Partially processed - shipped). Status C means complete orders (Nothing opened). As there is no delivered qty in VA05,  you need to download to excel the file and calculate the difference between both qty fields for each A and B status. That is a way to get the missing qty to be delivered or open qty as you stated.
    Hope it helps.
    Jorge Fernandez

  • Two different Incompletion log in item level for one sales document type

    Hi All,
    we are using one sales document type for 5 different sales org, now we are implemented new sales org.
    pervious all 5 sales org we have setup incompletion log at item level 5 fileds.now for new sales org we need to setup out 5 fields we need to setup 3 field.
    how to maintain same sales document type 2 different incompletion log.
    i have checked in forum i found out below link.but is not matching for my requirement.
    http://forums.sdn.sap.com/thread.jspa?threadID=1433420
    Thanks,
    Kumar

    Hi ,
    Thanks for your responds.
    i will check with my ABAP  person if any thing is required i will come back to you.
    Thanks,
    kumar

  • Change the order type for a sales document already created

    Hi gurus,
    please let me know if there is any possibility for changing the order type for sales document (sales order) already created,
    thank you

    Hi,
    Rambabu is correct. Check the  alternate sales document types which your current sales document type is having in VOV8 transaction. You can have the current sales document type replaced with the assigned alternate sales document type 1 or alternate sales document type 2 during run time in the during creation  or change mode  subject to the current sales order is not having any subsequent document. Re-pricing will happen accordingly and all the things of order will get redetermined.
    Hope this explains.

  • Purchase Order missing for some of the Sales Order for few customers

    Hi All,
    There are few sales orders for which corresponding PO is missing.
    But most of other Sales orders for the same set of customers, PO is coming.
    Could you please enlighten me how this PO is assigned to the Sales order or it is updated with the Inbound Idoc ..
    In any case what may be the reason for PO missing for these sales order...How I can explore this...?
    Thanks,
    Sanjeet

    Hi sanjeet,
       If your IDOC is ORDERS05, Check if you are getting the PO Number in : E1EDK01-BELNR
    Regards,
    Ravi

  • Not able to find out invoice level for customer collection

    Hi Experts,
    We are not able to find out  invoice level payment details for the collection
    They are provided collection amount and reference no, but here problem is customer have more than 20 company codes and they cleared in multiple co.codes , also user not maintained any reference while clearing the invoice, so we only able to find out the collection amount but we dont know for which invoice it is cleared.
    can any one help us,

    The given link take to the window where CPU patch for all the quarter available.
    The Critical Patch Updates released to date are listed in the following table.
    Critical Patch Update Latest Version/Date
    Critical Patch Update - October 2012 Rev 1, 16 October 2012
    Critical Patch Update - July 2012 Rev 1, 17 July 2012
    Critical Patch Update - April 2012 Rev 2, 19 July 2012
    If I click on Critical Patch Update - October 2012 its takes to the window for selectin the database version (11.2.0.3). From there it goes to the Patch Set Update and Critical Patch Update October 2012 Availability Document [ID 1477727.1] which I had already checked.
    There for the database products it shows the below option.
    Table 9 Patch Availability for Oracle Database 11.2.0.3
    +*<moderator edit - deleted MOS Doc content - pl do NOT post such content - it is a violation of your Support agreement>*+
    It doesnt have the sepreate CPU patch. The below CPU patch is for the OC4J. I had a check.
    Thanks
    SHIYAS M

  • Process order required for each sales order without mrp run

    Hi, it is mto scenario. wants system to create a process order for each sales order without running mrp. please advise is it possible? if possible please guide what settings need to be done. Thabk you.

    HI
    You can create production order with reference  to sales order using t code CO08.
    Check and revert
    Regards
    Anupam Sharma

Maybe you are looking for

  • Badi or user-exit for QA32 after save

    I need a badi or user exit to execute exactly after save in QA32 ..I tried belows but they are not that i want QPL1_SUBSCREEN_ADDON INSPECTIONLOT_UPDATE Check these Exits: QEVA0004 Exit for changing information line in usage decision he QEVA0005 User

  • Can connect w/ iBook, but not new iMac

    Just got a new iMac (yay me!). But I can't get it to connect w/ my wireless router. However, my old iBook doesn't have any problem. I'm trying the same network as the iBook, but it keeps saying it can't connect. Any ideas?

  • Antispam Plugin Issue for Lotus Notes w/ Solution

    Background: We have a case open with Ironport due to some Spam issues we are currently experiencing and I wanted to use the current version of the plugin instead of the customized one our company has developed into our template. I was trying to insta

  • Udev not loading firmware

    Might be something simple i'm overlooking, but with kmod installed udev is stalling trying to load firmware (and fails): ieee80211 phy0: brcmsmac: fail to load firmware brcm/bcm43xx-0.fw ieee80211 phy0: brcmsmac: Failed to find firmware usually in /l

  • How to add XML Header tag to XML output from XI?

    Hi , My requirement is I need to genarate the XML according to client requirements. I am able to genareate the XML with  <?xml version="1.0" encoding="UTF-8" ?>  as Header but client requiremetn is like this <?xml version="1.0" encoding="UTF-8" ?> <?