Running VL06IF in Background and Posting Goods Receipts

Hi All,
We need to be able to run VL06IF (WS_MONITOR_INB_DEL_FREE) in background mode and post goods receipts for the Inbound Deliveries selected based on our variant selection criteria.
Wondering if anyone is aware of a program that can select the inbound deliveries and post the goods receipts as part of the one process - which can be run in background mode, with the ability to accept a variant.
We are on: R/3 4.6C
All help greatly appreciated.
Thanks,
Ravelle
Message was edited by: Ravelle Wickham

VL06IF is list of Inbound deliveries.
To achieve what you want you should go to VL06I and select Goods Receipt.
Once you are there, you will see you are running program WS_MONITOR_INB_DEL_GDRC. There you can select a variant and run in Background.
Once the job is scheduled, the program WS_MONITOR_INB_DEL_GDRC is executed.
It should do it.
Leonardo De Araujo

Similar Messages

  • Inboud delivery creation and post goods receipt via idoc at same time

    Hi
    Does anybody knows if there is in idoc message/basic type that can create in one single step the inbound delivery for a purchase order and do the post goods receipt (on the inbound delivery)? Warehouse is not setup.
    KR
    Jimmy

    Hi All,
    Solved by myself.
    As expected , same code has been called for ob delivery and Ib delivery .
    Solution : Have called fm in background task .
    Thanks & Regards,
    Vinod.
    Knowledge has to be shared nt 2  accumulate .

  • Posting Goods Receipt with ASN number in ECC with Message type: MBGMCR

    We are using Basic Idoc Type :MBGMCR02 to Post Auto Goods Receipt in ECC.
    This happens when external system ( 3rd Party System) sends this message which in turn posts the GR in ECC.
    Thru Goods Movement BAPI
    My Question is CAN WE POST auto goods receipt thru MBGMCR02 with Inbound delivery as reference document - Instead use ASN ( Advanced shipping notification ) which is Reference document in inbound delivery to Post Goods receipt in ECC.
    This is required for our integration peice with 3rd party system.
    And also pl let me if we can use Basic types MBGMCR01 or MBGMCR03 to post auto goods receipt in ECC with reference to PO which has confirmation control key set and instead of passing inbound delivery number can we pass ASN number which is external delivery ( Reference ) number and post goods receipt successfully in ECC.
    Would appreciate your immediate help in this regard.
    Regards,
    Mahesh

    Thank you Vinod.
    We are using MBGMCR02 to post Auto GR by using BAPI - Inbound into ECC.
    We have a 3PL scenario where third Party system will push this message to us ( ECC) which in turn post Auto Goods receipt.
    Here is the process:
    Systems involved : SNC / ECC / 3rd Party
    ASN gets published in SNC  which in turn posts inbound delivery in ECC and a copy of Inbound delivery with SNC ASN number is sent to third party system.
    Third party system is the Carrier ( shipper) they in turn send us the shipment confirmation when they send the goods.
    When they send it to our ECC we have MBGMCR02 to post Auto GR in ECC thru BAPI calling MB_GOODS_MOVEMENT
    This will post the GR with respect to inbound delivery- That works fine..
    Now we are testing an scenario where instead of sendindg ASN to 3rd part system from ECC after Inbound delivery is created.
    We want to send the ASN information ( Which will have PO number as well ) without  ECC 's inbound delivery number directly to 3rd party system  after ASN gets published in SNC thru PI - This is before inbound delivery is created in ECC.
    And the requirement is when 3rd Party system sends the shipment confirmation to ECC  - They will send ASN ( SNC ASN) and ECC  PO number with quantity , vendor , movement type :101 , movement indicator etc -  CAN in ECC when you send these information without inbound delivery posts Auto Goods receipt.
    Based on SNC ASN which is external delivery number in ECC as per PO / Reference number in Inbound delivery document.
    Can MBGMCR01/ 02 / 03  posts GR in ECC with these information ( Mean without the ECC inbound delivery number )
    Which will allow us to avoid the step of sending ASN information along with inbound delivery to 3rd party system after inbound delivery is created - Instead will send directly from SNC / PI / 3rd party
    Point to be noted is - These are SNC PO's which will always have confirmation control key.
    When 3rd part send the shipemnt confirmation with SNC ASN number and PO number while posting Idoc in ECC any of MBGMCR idoc types should check / search for inbound delivery associated and post the GR in ECC
    Can you pl let me know your thoughts pl
    Thanks,
    Mahesh

  • Goods receipt and post goods issue are not updated back from EWM to ECC

    Hi Experts,
    Would anybody able to tell me the setting to be modified / defined to backward flow of information from EWM to ERP i.e. the goods receipt, goods issue are not being updated back in ECC once the goods receipt and  post goods issue are posted in EWM?
    It would be great help if i get the response as early as possible.
    Chakrapani Das

    Hi Chakrapani,
    You might want to try checking the customization on the SCM part following this path:
    SPRO - Extended Warehouse Management - Interfaces - ERP Integration - General Settings
    Pay special attention on the Check of ERP-EWM Configuration transaction.
    After you have checked these you should probably check the outbound queue monitor (tx SMQ1) from EWM to ERP. You can use the SMQ1 - Outbound queue and SMQ2 - Inbound Queue both in ERP and SCM to check the communication betweene these two systems.
    Also you may want to checkt the SLG1 - Analyse application Log in SCM in order to see if any internal bugs exist.
    All the best,
    Claudiu Maxim

  • BAPI needed for VL32 (Post goods receipt) and VT02 shipment transaction

    Hi,
    We are currently updating quantities and Performing a Post Goods Receipt against all associated inbound deliveries using BDC (VL32).
    Also, updating the completion date of associated shipments by BDC (VT02).
    As part of upgrade intiative ECC 6.0, we are trying to avoid BDC and looking for suitable BAPI's for the above tasks.
    Please help us in this regard,
    Thanks,
    Madhan.

    Hi,
    Please look following BAPI in Tcode BAPI.
    For Transport
    go tp Tcode BAPI --- > Logistic Exection ---> Transportaion .
    For Billing.
    go tp Tcode BAPI --- > Logistic Exection -> Shopping- >Inbound Delivery
    You find many more BAPI in this Transaction.
    BAPI for PGi is BAPI_GOODSMVT_CREATE.
    To change the header details of a shipment use
    SD_SHIPMENT_HEADER_CHANGE
    To change the stage data use
    SD_SHIPMENT_STAGE_APPEND
    SD_SHIPMENT_STAGE_CHANGE
    SD_SHIPMENT_STAGE_CHECK
    SD_SHIPMENT_STAGE_DELETE
    SD_SHIPMENT_STAGE_INSERT
    To add deliveries to shipment use
    SD_DELIVERY_ASSIGN_TO_SHIPMENT
    Thanks & Regards.
    ShreeMohan
    Edited by: ShreeMohan Pugalia on Jul 17, 2009 8:18 AM

  • Post Goods Receipt Accounting Not Generating

    Hello Experts,
    I brief the processs....
    Our client has trading business.  They have a material that is like a configurable material.  Based on their customer's requirement the configuration will be intimated to the vendor then vendor tells the cost so that they inform the price to the customer.  Based on the configuration the cost always varies from thousands to millions also.
    We have considered the material as standard material only (not configurable) and created a separate item category group to identify this material.  Because the configuration of the material is happening outside of SAP, so we have created a generic material code.  But to capture the MAP independently we are considering the material as batch valuated material (automatic batch).  The Individual Purchase Order (third party sales) process is configured to receive the material into our plant.
    Once the sales order is created the PR is getting generated in the back ground.  With reference to the PR we are generating the PO and receiving the stock with MIGO.  The stock is updating in the plant as sales order stock.  We are able to create the delivey and issue the goods.  The accounting document at goods issue is happening based on the valuation of the material (the cost at which we did the MIGO).  There is no problem in invoice creation.  Till this process everything is fine.
    While doing the Returns Sales process we are facing the issue.  With reference to the sales invoice we are generating the returns sales order then returns delivery and in the returns delivery the batch and valuation type are automatically coming.  But the issue is while doing the Post Goods Receipt the Accounting Document is not getting generated.  The value with which the accounting happened at Goods Issue (sales process) with the same value the accounting should happen in reverese postings at Goods Receipt.  We do not have quality check, so we are using 653 movement type in the case of returns to directly take the stock into unrestricted use.  We also checked the MAP at the time of Post Goods Receipt by giving the batch number but it is showing Zero in material master.  No single PGR of this material is generating the accounting.
    Please guide me where to correct the settings.
    Thanks,
    Sreehari.

    Hello BS Reddy,
    Thanks for your reply.
    I have maintained the Requirements Type as KEB (Req.Class also KEB) and it has the account assignment group-M and Special Stock indicator-E.
    I have run the returns cycle again but still accounting is not gettting generated at PGR.  Below is the screenshot of Req.Class-KEB
    Below is the screen shot of T.Code MBBS (Valuated Sales Order Stock).  I think the value should be upated here.
    Please let me know know where to correct the settings.
    Thanks,
    Sreehari.

  • How can I disable POST GOODS RECEIPT button in transactions VL31N/VL32N via Authorization or Role Level.

    How can I disable POST GOODS RECEIPT button in transactions VL31N/VL32N via Authorization or Role Level, There is a requirement from my client  and i propose two methode
    1- Creation of Ztcode ZVL32N and do changes ABAP program level
    2- Disablement via Authorization/Role level - but how can i find the auth object/ Authorization corresponds to POST GOODS RECEIPT button in VL32N

    I think you can make use of SHD0 - Transaction variant to achieve this. You can make it as grayed out while recording steps in SHD0.

  • Error while posting goods receipt

    Hi All,
    I am getting error message while posting goods receipt.
    The error says posting only possible 2007/06.....
    Thanks in advance
    kumar

    Go to MMPV give your company code and the period and the fiscal year and execute.
    Regards'
    Navin

  • Error in post goods receipt of delivery for a cross company return STO

    Hi
    I created a cross company return STO in ME21N (with returnd indicator). Vendor V001 (DC) and Site F001.
    I created a delivery in VL10B. Delivery Type NCR.
    I did a Goods Receipt for STO. Movement Type 161. Internally stock in issued from site F001.
    I am trying to do a Post Goods Receipt of the Delivery in VL02N and I am getting this error.
    Delivery quantity is greater than supplying site stock quantity
    Message no. VL900
    Supplying site is F001 which has enough stock.
    DC has no stock and I amtrying to return stock to DC from store.
    How to eradicate this issue?
    Thanks and Regards

    Hi
    http://wiki.sdn.sap.com/wiki/display/B1/SAPBusinessOne...ToGo-3.TheBasicsofFinancial+Accounting
    http://help.sap.com/saphelp_sbo88/helpdata/en/45/06b9997d720487e10000000a155369/content.htm
    kiran

  • Post goods receipt of HU items (Handling unit) inbound deliveries

    Hi all,
        could u plz tell me how to post goods receipt of HU 
        items. i am using BAPI Goods_movment_create
        ( movement indicator 'B' and '01') but it
        is giving error. i am not passing purchase number
        and item , insted i am passing inbound delivery 
        number and item. plz help me out.
    thanks and regards
    manish

    PLease read the FM documentation.
    It is given very clearly.
    Regards,
    ravi

  • Error while doing post good receipt

    Hi Frnd,
       I am doing Returns delivery VL02n while doing Post goods receipt i am getting an error saying that
    *Document is incomplete: You cannot post goods movement*
    The batches are not defined for delivery item 900001
    What is this error ?
    Regards
    Rakesh

    Hi Rakesh,
    Go to IMG... logistic general ... batch management ...  batch determination and batch check ... batch search procedure and check the activationu2026 Activate Automatic Batch Determination in SD
    Activate Automatic Batch Determination for Delivery Item Categories
    I think you have not checked the Auto batch determination for your delivery item categories.
    Please check and then try.
    Hope it helps,
    Regards,
    MT

  • Automatic Post Goods Receipt on TO confirmation

    Hi
    Hopefully someone can help with my issue.
    Issue: Unable to automatically do a PGR for an Inbound Delivery (IBD) which has an Warehouse managed material and a IM managed material.
    Scenario: We use warehouse management and Handling Unit Management. My scenario involves a inbound delivery with 2 lines. The first is for a warehouse managed material. The second is for an IM managed material (It is the packaging material). Upon confirmation of the warehouse transfer order I have the config set so it automatically PGRu2019s the IBD for the warehouse managed material
    (SPRO/Logistics Execution/Warehouse Management/Interfaces/Shipping/Define Shipping Control/Define Shipping Control at the Movement Type Level/  at movement type 101 it is set to value  4 ie Do not take WM qty as delivery qty, but post GR/GI)
    That works fine for the WM material however the IM line for packaging does not PGR & we have to manually go back to the IBD and do the post goods receipt. The IM line does have a different Movement type (501 as opposed to a 101). It also does not require putaway.
    Does anyone know of a trigger I can use to post the entire document? Batch jobs and manually posting the document is not preferred.
    Much appreciated,
    Adam.

    FYI - This is not possible as standard.

  • Material Document (Post goods receipt) for each Tranfer order in Inbound De

    Hello All,
    We have following the below process for goods receipt.
    1. Create Purchase order.
    2. Create Inbound Delivery.
    3.Create Transfer order for each line item in  Inbound Delivery
    4. Confirm tranfers orders.
    5. Post goods receipt will automatically takes place after last Transfer order confirmation for that delivery.
    So, in the above scenario the Inventory is not available in the IM till last transfer order is confirmed.
    So, is it  possible to create a Material Document at each transfer order confirmation and post IM inventory , instead of waiting till last transfer order is confirmed.
    please advice.
    Thank you
    T Reddy .

    Hello Aktar,
    Yes With standard SAP we can post  goods receipt either before using MIGO and after using VL32N.
    In our scenario we are using Inbound Delivery.
    So , with using Inbound delivery we are posting goods receipt after  last TO confirmation.
    But In our client they may take 2 days to puyawat all the items of an Inbound Delivery.So they do not want to wait till 2 days for the IM posting.
    ie in SAP WM as soon as Inbound delivery is created it creates negative stock in 902 and once all the transfer order are confirmed and then post goods receipt takes place and 902 is cleared.
    So, we are slitting the TO at delivery line item level and creating separate TO for each line item in a delivery.
    So, I am wondering whether is there a way so as soon as first TO is confirmed WM stock updates and IM stock also should also update with same amount with a material docuement.
    ie TO by TO IM posting should take place and at Last TO post goods receipt should happen at delivery level.
    Please advice.
    Thank you
    T Reddy.

  • Need Bapi Names for Post Goods Reciept and Post Goods issue to STO in MIGO

    Hi All..
    I need to post goods receipt using input data in MIGO. Is there any BAPI that i can use.
    Also once STO (Stock Transport order) is created, i also need to Post goods issue to STO in MIGO transaction. I do need a bapi for this too...
    Appreciate your help and will reward any helpful answers.
    Thanks..

    Hi,
    ata  : gm_header  type bapi2017_gm_head_01.
    data  : gm_code    type bapi2017_gm_code.
    data  : gm_headret type bapi2017_gm_head_ret.
    data  : gm_item    type table of
            bapi2017_gm_item_create with header line.
    data  : gm_return  type bapiret2 occurs 0 with header line.
    data  : gm_retmtd  type bapi2017_gm_head_ret-mat_doc.
    clear : gm_return, gm_retmtd. refresh gm_return.
    gm_code-gm_code      = '03'.
    gm_header-header_txt = firstscreen-bktxt.
        gm_header-pstng_date = sy-datum.
        gm_header-doc_date   = sy-datum.
        gm_header-ver_gr_gi_slip = ' '.  "print
        gm_code-gm_code      = '03'.
      move lineitem1-bwartwa  to gm_item-move_type     .
          move lineitem1-matnr  to gm_item-material.
          move lineitem1-erfmg     to gm_item-entry_qnt.
          move 'EA'    to gm_item-entry_uom.
          move lineitem1-werks  to gm_item-plant.
          move lineitem1-lgort  to gm_item-stge_loc.
          move lineitem1-kostl to gm_item-costcenter.
          while gm_item-costcenter+9(1) = ' '.
            shift gm_item-costcenter right.
          endwhile.
          overlay gm_item-costcenter with '0000000000'.
          append gm_item.
    call function 'BAPI_GOODSMVT_CREATE'
           exporting
                goodsmvt_header  = gm_header
                goodsmvt_code    = gm_code
           importing
                goodsmvt_headret = gm_headret
                materialdocument = gm_retmtd
           tables
                goodsmvt_item    = gm_item
                return           = gm_return.
    Thanks
    venki

  • Post goods receipt against a Inbound Delivery(VL32N) FM or BAPI Method

    Hi Expert,
       I am looking for a Function Module or BAPI Method to Confirm the Inbound Delivery i.e. that can post Goods Movement Against a Delivery Document.
    My scenario is Create PO-> create Inbound delivery-> post Goods Receipt.
    Regards,
    Kapil.
    Edited by: Kapil Kumar Gupta on May 5, 2011 2:46 PM

    In OSS note 520813 it is said:
    16. Question:
    Which goods movements should I not post using the BAPI_GOODSMVT_CREATE BAPI?
    Answer:
    You should not post the goods receipt for the inbound delivery using BAPI_GOODSMVT_CREATE BAPI because the document base and the status of the inbound delivery are not updated. See Note 199703.
    If you check OSS note 199703 you can see that it is valid from release 45 to release 500.
    Assigned to this note you can find another: 1050944 (it's worth of reading!!!).
    I feel there are contradictions here - it might possible that the first note (520813) is not updated properly. (As far as I remember in my case this BAPI was working properly too).
    In my opinion you should send a message to OSS and ask them whether the statement in note 520813 is still valid or not - you should also tell them that the referred note (199703) is not applicable to ECC6.0.
    (there's a setting in ECC6.0 which enables that document flow is updated if GR is posted via MIGO with reference to IBD - V_TVSHP-SPE_INB_VL_MM)
    I would like to ask you if you have a reply from them, please update this thread - it may be helpful for us.
    Edited by: Csaba Szommer on May 9, 2011 2:34 PM
    One more remark: (based on OSS note 1050944) it seems that you cannot use it only in case of packing (IBD with HU).
    Edited by: Csaba Szommer on May 9, 2011 3:05 PM

Maybe you are looking for

  • ANIMATIONS (.GIF FILES) AND LAYERS

    1. I HAVE PSE7 AND I CAN'T SEEM TO GET ANY ANIMATIONS TO WORK. IF I OPEN AN ANIMATED (.GIF) FILE, IT IS NO LONGER ANIMATED. DO I HAVE TO PUT IT ON A SPECIAL LAYER TYPE? WHEN I OPEN ONE OF THESE FILES, PSE7 CREATES 3 LAYERS FOR THE IMAGE, NONE OF THEM

  • Calling a method from a UICommand Object

    How do I call an action method from a UICommand object? I create a HtmlCommandLink in my backing bean, and I think I should be setting the action, but with what? The method takes a MethodBinding but I can't find much detail on how to get that. I just

  • 3G VPN established but no traffic using ASA 5505

      Hi All, hoping that someone can help me here. We are able to esatblish VPN connection but we cannot pass traffic out. Here are the details. ISP has a range of 25.16.0.0/15 and they are doing Natting. We are using Raven X and ASA5505 is connected. S

  • Entry in /etc/hosts.allow for insecure VNC?

    I read the ssh wiki article which teaches to add an entry to /etc/hosts.allow for sshd.  I am know that tunneling vnc through sshd is the way to go security wise, however, there are cases where I need to switch on un-encrypted vnc for the purposes of

  • In-process  inspection for rework operation

    Hi all, i have a production order to which the in-process inspection characteristics are assigned in routing. when a production order is released, an in-process inspection lot is created. Inspection is carried after the end of an operation.  During w