Sales Order does not show up at the resource level.
Hi guys,
I have a flour mill of having 4 processs (resources)
1). Tempering (cleaning).
2). Milling.
3). Blending.
4). Packing.
I have two identical sales order. One has been through all the process (resources) and showed in the DS Planning board but, other one has not shown up there. It happens to me couple of times that such sales order do not show up at the resource level. Where should I check and correct? Aslo which way can I follow up these missing sales order? and What shoud I do if this situation happens?
Thanks
Shaan.
Edited by: Shaan313 on Sep 27, 2011 8:22 PM
313,
https://service.sap.com/sap/support/notes/1406120
Since you asked the question, I can assume that you don't have an "S" number. speak to the person in your company who administers your SAP Service Marketplace account (this is usually someone on your Basis team), who can obtain one for you.
Or, you can try on your own. A few stars have to be in alignment for the second method to work.
https://service.sap.com/request-user
Best Regards,
DB49
Similar Messages
-
Sales order does not allow make-to-order production
Dear Friends,
I am trying to do do planned order for sales order in MD50 it was showing the error message as
"Sales order does not allow make-to-order production"
Can any one solve this
ShakthiHi Shakthi,
It is also possible to set the priority for Requirement Type determination like
0 Material master strategy, then item category and MRP type
1 Item Category and MRP Type
2 as 1, with check for allowed requirement type.
The transaction for this is same as "Requirement Type Determination :
Sales and Distribution --> Basic Functions --> Availability Check and Transfer of Requirements --> Transfer of Requirements --> Determination Of Requirement Types Using Transaction
Look for "Source".
In this transaction, Please, check "Requirements".
Please, make sure of the following 2 things :
1. If you do not set an indicator for maintaining the requirements class: Transfer of requirements is not carried out, irrespective of the specification you make at schedule line level for the transaction.
So it is necessary to mantain the setting first at the Requirements Class. As mentioned in my earlier posts, the requirement class for the material can be found out from Planning Strategy / MRP3 view --> Main strategy (defined in the strategy group) --> Requirement Class for Customer Requirements.
The IMG path for "Define Strategy" is Production --> Production Planning --> Demand Management --> Planned Independent Requirements --> Planning Strategy --> Define Strategy.
2. Once the "Requirements" indicator is set in Requirement Class, the requirements indicator at the Schedule Line decides whether or not you require transfer of requirments for the relevant transaction.
I hope this should solve your problem.
Regards,
Sandeep -
a movie i purchased does not show up in the download after it suddenly stopped while downloading over half way through.. help!
I totally agree, I am not going to discredit your comment as everyone is entitled to their opinion as I am BUT, I will not bad mouth other members, especially since may have not have written my initial statement in a logical manner so Ill try and answer them in order to your response.
1. I DO LIKE iTunes in general and on the whole BUT I dislike the new update, iTunes 11, it has completely buggered everything up.
2. Prior to the update, everything worked brilliantly, including Apple TV. It was user friendly and was easy to use. The new update is counter-intuative and is hard to find, fix anything and as I have had to find out at my cost, reset my Apple TV and start downloading all over again. So let me reaffirm, it is iTunes11 I find hard to fathom, not the old iTunes.
3. No I am not a developer but I have been using PC's for over 20 years so I do know how one works.
4. Good Question about who would help me, again, it is someones opinion against someone elses. One day, I may write something that generally people agree with, another they may not, depends on the subject.
5. " I do not love Apple" ?yet I have an iPhone 4s, iPad and Apple TV, find that an illogical comment!
6. I have made a General Search on the forums on the subject and the general consensus is that the new update is one update to far.
7. Oh, I am not a genius otherwise I would have solved the issue in the first place!
Just to re-iterate, I am not bad mouthing Apple in general, all I am saying is that iTunes 11 is one update to far and I am not the only one saying it.... some have gone a lot further than I have, again, their opinion and who am I to argue with them as I have an opnion as you do and I will most deffinatly not bad mouth a member because I disagree with them for the above reason, debate it, yes, not belittle them.
Hope these have cleared up my initial statement? -
I've a new account on iMac. When composing an email the contact list does not show up on the bar, which would allow me to select the persons I want to include on the distribution of the email. When I start keying in a name in the email, it comes up with the person's address, which shows it is synced. How do I engage the contact list from the email like I do on my old account (where a contact list icon shows up, along with the "attach" and other icons) ?
With the New Message window open, go to the View menu and select "Customize Toolbar...".
In the screen that opens, drag the item labelled "Address" into the Toolbar area of the New Message window, then click the "Done" button.
That item should be then added to the Toolbar for the New Message window.
Note that the main Mail window and the New Message window (as well as the separate message window if you open a message that way) use different toolbars - the settings/inclusions for one do not carry over to another. -
Yesterday I reset my settings on my iphone 4 to correct a problem. Today I am unable to connect to itunes to sync my phone. The device does not show up on the screen. What can I do?
Best practices says plug the USB cable into the computer, then plug the 30 pin connector into the iPhone.
If everything is working correctly, you should be able to plug the iPhone in at any time. Before or after opening iTunes.
Depending on what settings are selected in iTunes, the program may or may not automatically open when you connect the device. -
I have an app that does not show up on the left under iTunes. How do I delete it?
I have an app that does not show up on the left under iTunes. How do I delete it from my Iphone 5?
If the icon exists on your screen, just do a long press on that icon and when the small X appears on top of the app, press it and it will delete it. As long as this is not an Apple app, since those cannot be deleted.
-
my itunes in pc fails to secure link with itunes store it shows the process bar it automatically quits the process it also does not shows any on the screen. i am using windows xp service pack 3. what shoul i do?
Diagnostics test
Microsoft Windows XP Professional Service Pack 3 (Build 2600)
ECS G31T-M7
iTunes 10.5.2.11
QuickTime 7.6.9
FairPlay 1.13.37
Apple Application Support 2.1.6
iPod Updater Library 10.0d2
CD Driver 2.2.0.1
CD Driver DLL 2.1.1.1
Apple Mobile Device 4.0.0.97
Apple Mobile Device Driver 1.57.0.0
Bonjour 3.0.0.10 (333.10)
Gracenote SDK 1.9.5.502
Gracenote MusicID 1.9.5.115
Gracenote Submit 1.9.5.143
Gracenote DSP 1.9.5.45
iTunes Serial Number 0012ABAC07F3CCB0
Current user is an administrator.
The current local date and time is 2011-12-31 14:06:21.
iTunes is not running in safe mode.
WebKit accelerated compositing is enabled.
HDCP is not supported.
Core Media is not supported. (16005)
Video Display Information
Intel(R) G33/G31 Express Chipset Family
**** External Plug-ins Information ****
No external plug-ins installed.
**** Network Connectivity Tests ****
Network Adapter Information
Adapter Name: {7599FAD1-1BB9-4AC6-80AF-404253DC519E}
Description: Atheros L2 Fast Ethernet 10/100 Base-T Controller - Packet Scheduler Miniport
IP Address: 192.168.1.5
Subnet Mask: 255.255.255.0
Default Gateway: 192.168.1.1
DHCP Enabled: Yes
DHCP Server: 192.168.1.1
Lease Obtained: Sat Dec 31 13:46:09 2011
Lease Expires: Tue Jan 03 13:46:09 2012
DNS Servers: 192.168.1.1
Active Connection: LAN Connection
Connected: Yes
Online: Yes
Using Modem: No
Using LAN: Yes
Using Proxy: No
SSL 3.0 Support: Enabled
TLS 1.0 Support: Enabled
Firewall Information
Windows Firewall is on.
iTunes is enabled in Windows Firewall.
Connection attempt to Apple web site was successful.
Connection attempt to browsing iTunes Store was successful.
Connection attempt to purchasing from iTunes Store was successful.
Connection attempt to iPhone activation server was unsuccessful.
The network connection timed out.
Connection attempt to firmware update server was unsuccessful.
The network connection timed out.
Connection attempt to Gracenote server was successful.
Last successful iTunes Store access was 2011-12-31 14:00:02.
**** Device Connectivity Tests ****
iPodService 10.5.2.11 is currently running.
iTunesHelper 10.5.2.11 is currently running.
Apple Mobile Device service 3.3.0.0 is currently running.
Universal Serial Bus Controllers:
Intel(R) 82801G (ICH7 Family) USB Universal Host Controller - 27C8. Device is working properly.
Intel(R) 82801G (ICH7 Family) USB Universal Host Controller - 27C9. Device is working properly.
Intel(R) 82801G (ICH7 Family) USB Universal Host Controller - 27CA. Device is working properly.
Intel(R) 82801G (ICH7 Family) USB Universal Host Controller - 27CB. Device is working properly.
Intel(R) 82801G (ICH7 Family) USB2 Enhanced Host Controller - 27CC. Device is working properly.
No FireWire (IEEE 1394) Host Controller found.
Connected Device Information:
rawkiss’s iPhone, iPhone 3G running firmware version 4.0
Serial Number: 86931UEAY7H
**** Device Sync Tests ****
Sync tests completed successfully.I have found a fix after doing additional research through this forum. Tech Note #328730 addresses this problem and it works for Photoshop Album 3.2 even though it was written for release 1.0.
Here is a link that will take you directly to the Tech Note:
http://kb.adobe.com/selfservice/viewContent.do?externalId=328730
When using this fix the Tech Note indicates:
"Imported image data and tags are lost when you re-create the My Catalog.psa file, so you need to reimport images and reapply any tags"
however it did retain the captions (at least it did for me). -
I am trying to sync my ipad3 to my itunes on a pc laptop, the ipad does not show up in the itunes left hand column. an ipod is already synced to the itunes. any suggestions welcome
Hi lindaasw,
Welcome to the Support Communities!
Do you have the latest version of iTunes for Windows installed? I would turn on the sidebar and the menu bar just to make sure you are seeing everything. If the iPhone is still not recognized in iTunes, follow these troubleshooting steps:
iTunes: Turning on iTunes menus in Windows 8 and 7
http://support.apple.com/kb/HT5610
iTunes 11: Frequently used features
http://support.apple.com/kb/HT5649
iOS: Device not recognized in iTunes for Windows
http://support.apple.com/kb/TS1538
Cheers,
- Judy -
sharing does not show up on the side column ... tried turning off home sharing then turning it back on ... shared shows up untell i click "done " then its gone.
Yes, I have also tried and failed when setting up Home Sharing. I have followed the instruction given on the Support website, but this is all I see:
Both computers are on the same local network and both allow Home Sharing and are signed in with the same user name. I am not sure what else to do. Any suggestions? -
I read the article on how to remove Bing; however, it does not show up on my list of installed programs and it does not show up in the list of extenstions under "Tools" and "Addon" yet it is installed as an extention to the right of the addlress line. It is not my home page. Help!!!
See also:
*https://support.mozilla.com/kb/Removing+the+Search+Helper+Extension+and+Bing+Bar
*https://support.mozilla.com/kb/Troubleshooting+extensions+and+themes
*http://kb.mozillazine.org/Resetting_preferences -
Named Criteria created, but it does not show up in the Data Controls view
Hello there,
I wish to use a data-bound ADF Mobile ListView in one of the pages on the app. However, only entries of the underlying data that fulfill a certain condition shall be displayed in the list. The condition basically is an "Equals" test against a bind variable in the pageFlowScope. Therefore, I have created a corresponding Named Criteria for the data control - proceeded like described here:
https://blogs.oracle.com/adf/entry/create_named_criteria_in_ejb
The Named Criteria, in my case, has been created and saved, yet it does not show up in the Data Controls view of JDeveloper. Therefore, I cannot drag it on a UI element to use it.
I only have the "Operations" folder where the quick guide above also shows a "Named Criteria" folder.
Refreshing or restarting JDeveloper did not solve this.It was all taken care of by Gaurav Aggarwal
He got me all fixed up, Thank you for your concern.
Daniel Walters -
On windows 8.1 charms bar does not show up and the touch functionality is also degraded
upgraded my elitepad 900 to windows 8.1 . after this the charms bar does not show up and the touch functionality is also degraded while playing games. i believe i need the latest synaptics gesture suite. Cannot find it. Please help.
I am sorry, but to get your issue more exposure I would suggest posting it in the commercial forums since this is a commercial product. You can do this HERE.
HP ElitePad 900 G1 Tablet Support
TwoPointOh
I work on behalf of HP
Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
Click the “Kudos, Thumbs Up" on the bottom to say “Thanks” for helping! -
We have a DVD in the super drive on our Macbook Pro that will not eject. The DVD does not show up on the desktop. Have tried the keyboard eject button, and also restarting the computer. Any ideas on how to eject it?
here is a troubleshooting article from Apple about this: http://support.apple.com/kb/ht2801. Hope this helps
-
I have an iPod Nano that is synced to my mac, but it is sent in for the battery issue. Anyway, I have bought a 2nd gerneration Ipod touch and I want to now sync it to my mac, but it does not show up in the left menu bar. Please help. Thanks All!
http://support.apple.com/kb/TS1591
There have been some problems accessing pages on the Apple web site. If the hyperlink gives you a "We're sorry" message, try again. -
I have just installed a new hard drive in my imac intel 20" (2006) and upgraded the memory and now the hard drive does not show up in the 'select destinations' folder of the install program. I can see the hard drive in the disk utilities window however it wont let me do anything.
It is a seagate 1TB SATA II drive however it is displaying it as a 7.3 TB.
If anyone has any suggestions I would be happy to hear them.
I have tried to erase and partition and get the same error message each time, 'Input/Output error'.
I have tried starting the thing with the install disk which is Mac OS X (Tiger?) which came with the computer. No good.
Anyone?Thats correct. I can see it in the list however when I attempt to erase it or partition it it's like it's not being found or recognised and it throws up the input/output error message. I am pretty sure that the sensor it attached correctly and it is a SATA drive. I can see all the infor regarding the drive when disk utility is open and it all looks good but I cant access it or do anything with it. It's taunting me!
The install disk is in the drive and the install program runs right up to the point where you have to select the location for the install and there is just nothing in the box where you have to select the hard drive icon.
I have my suspiscions about the drive but any help would be appreciated.
Maybe you are looking for
-
Is it possible to delete my game center nickname?
Is it possible to delete my nickname in game centre and use it in another Apple ID?
-
Installed and used Gravity (once after installing-...
Installed and used Gravity (once after installing-) but not able to find in menu/prog. manager? Ovi Store says it is installed but now nowhere to be found on the 5230. Help please - this is a really cool app. that I am keen to keep using.
-
Need clarification on drag n drop
I need a small clarification on the following requirement. User has setup and data entry module. In the setup module, user has the option to select what are the text boxes to be displayed in the data entry screen. After submission, he will get all th
-
Logical Partition Only? Windows Arch Dual Boot
ASUS Eee PC I want to dual boot for the present time and my hard drive is currently partitioned as: Winows - NTFS - Primary partition - 70 GB Hidden - Fat32 - Primary partition - 15 GB Unknown - Other - Primary partition - 20 MB Unallocated - 147 GB
-
Dear Collegues! I have an invalid Character in the InfoObject ZKIDNR. The Character givin me problems is |. It comes at the end of the Kind-number, f.ex 5000459372|, and only in one single record, so it is a mistake. I get the error in ODS (0FIGL_O02