Sales order to consider for MTO scenario

Hi PP experts
How to ensure the consideration of sales order requirements for MTS or MTO.
Is it possible to distinguish by order types.
I request please indicate the config requirements for this.
warm regards
sairam akundi

Sairam,
I am not sure as to what excatly you are looking for.
However please note the following with respect to sales order requirements for MTO and MTS:
For MTO: The requirements type in the procurement tab of the sales order should be KE or any other requirements type that supports procurement from sales requirements. To be able to enter the KE requirements type in the sales order the material master should have Planning strategy group which suppotrs MTO  Example: 20 which is specified in the MRP3 view.
For MTS: The requirements type in the procurement tab would be KSL or any other which supports make to order. The Planning strategy group for this in material master should be 10.
The configurations for this include the
1) configuration of the Planning strategy group which contains a list of planning
strategies allowed. 
2) configuration of individual strategies which combine the requirements types from Production and Sales. The requirements class which is keyed in the requirements type determines excatly how the planning and procurement occurs.
The above configurations are pre-defined in standard SAP. You could change them if you require to.
Check the configs under:
SPRO>SD>Basic functions>Av check and transfer of requirements.
With the above basic settings, in case of MTO sales order would drive the production. In case of MTS production is carried based on forecast values (Planned independent requiremts irrespective of sales order requirements). The warehouse stock is then allocated to the sales order at the time of delievry.
For more help check the SAP online help on Planning strategies.
Hope above is useful.
Regards
Ram

Similar Messages

  • Change in Sales Order Qty in a MTO scenario

    Hi,
    We had confirmed 5 Qty for the Production Order created with reference to Sales ORder(MTO scenario), now after confirmation of 5 qty, sales order qty is reduced to 3., then in this situation, what we need to do for the already confirmed extra Quantity 2 for this sales order. I think we need to cancel the confirmation for the extra qty 2?. Please clarify and explain what we need to do this for this extra Qty 2 in detail.
    Case 2) If the Sales Order qty is changed to 7, then we will be creating a new Production Order for this new quantity 2 with reference to the same sales order.  Am i correct?.IF wrong, please suggest how should we balance the extra requirement of 2 EA.
    Thanks in advance.

    Is your query being posted even before you actually tried the 2 cases which you refer to in your system?
    If so, then first do the simulation in your sandbox, check how system behaves when you do that. Also check by clicking on ATP check for the material within SO.
    Once you do the above your query will be self answered, if you still face any issue then revert with the specific details.

  • Moving Average Price and Total Stock not updated for MTO scenario

    We are using MTO with planning strategy 20, individual collective indicator is 1 (individual requirement only) and price control is V for finished goods. We are facing the following problems after we perform GR of above FG from MFBF (Repetitive -run schedule header):
    1)Total Stock field (LBKUM)in Accounting View 1 remain as blank but the sales order stock is appear in Stock Overview screen.
    2)Moving average price does not updated after periodic settlement is carried out.
    It seem that problem can only be resolved if we change the planing strategy to MTS (ex:40), appreciate that if any of you can provide the solution.
    p/s: on ECC5 system.

    Hi,
    Good morning and greetings,
    The standard SAP says as below
    The Raw Materials should have MAP 'V' and the SFG and FG should have the price control as 'S' basically because the standard costing variant PPC1 uses the sequence of Standard Price as the first update at the time of price update and settlement.
    I presume MFBF is used for Repetitive Manufacturing and not for MTO scenario...Repetitive Manfuacturing is MTS scenario...Goods receipt of production order is normally done through MB31.
    If you still want to use the MAP for FG and SFG then you will have to change the costing variant appropriately to pick the MAP first at the time of goods receipt and settlement.
    Please reward points if found useful.
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • Planning Strategies for MTO scenario

    i have an FG which has strategy 20 assigned to it. I have an SFG which i want to link to the sales order. i also want the planned order to be generated to capture the minimum and maximum lot size and not generate on per requirement basis. example for the semi-finished, a sales order needs a reqt of 20, but min and max lot size is 12000, planned order should be 12000. how do i do this?

    Hi Raf,
    as you know that, for MTO Scenario the Lot sizin will be EX and no other settings are allowed.
    But there is a provision fulfill the requirement.
    Now in the Transaction: OMI4 for the lot size : EX
    For MTO Lot size select 1  Lot-for-lot with rounding
    Maintain the rounding value in the MRP Views as per your requirement like 12000 PC.
    Now every time system tries to round it to 12000.
    Hope this helps..
    Regards,
    Siva

  • Steps for execution of valuated and unvaluated for MTO scenario

    Hi,
    Can any one provide the steps for execution of valuated and unvaluated for MTO scenario.
    regards,
    RAM

    Hi,
    Please find below the details about Valuated and non-valuated Sale Order scenarios:
    SAP Scenario 1 - Valuated Sale Order Stock u2013 with Sale Order Controlling u2013 (MTO, ATO and ETO with VC)
    1     Enquiry     
    2     Opportunity     
    3     Quotation (Creation and Approval). In case of ETO u2013 BPO is created and updated in quotation (condition type)     
    4     Creation of Sale Order     
    5     MRP Run u2013 Creation of Planned Order u2013 Creation of Production Order and Purchase Order     
    6     External Procurement u2013 Goods Receipt     ROH Inventory A/c Dr (BS)
         To GR/IR A/c Cr (P&L)
    7     Material Consumption to Production Order     In FI:
    ROH con. A/c Dr (P&L)
        To ROH Inventory A/c Cr (BS)
    Same is the case with HALB
    In CO:
    Cost of Material is debited to Production Order
    8     Activity Consumption to Production Order     No FI Posting
    In CO:
    Production Order is debited and cost center is credited with activity cost
    9     Goods Receipt from Production Order     FG Inventory A/c Dr (BS)
       To COGM A/c Cr (P&L)
    10     Delivery to customer     In-Transit A/c   Dr. (BS)
       To FG Inventory A/c Cr (BS)
    11     Invoicing to customer     In FI:
    Customer A/c Dr (BS)
       To Revenue A/c Cr (P&L)
    COGS A/c   Dr (P&L)
        To In-Transit A/c Cr (BS)
    In CO:
    COGS and Revenue are posted to COPA
         Period end closing u2013 Production Order     
    12     Revaluation of activity prices     Production Order and Cost Center will be debited or credited as the case may be
    13     Calculation of WIP     In FI:
    WIP A/c  Dr. (BS)
      To Change in WIP A/c Cr (P&L)
    If the Order is completed:
    In FI:
    Change in WIP A/c   Dr(P&L)
       To WIP A/c Cr (BS)
    14     Calculation of Variances     Variances are Calculated on the Production Order. No FI or CO entries
    15     Settlement to Sale Order     Production Order and Sales Order will get debited/credited depending on whether they are positive or negative variances
    Period end closing u2013 Sale Order
    16     Result analysis at Sale Order     Result Analysis run will identify the status of the sale order and will enable the postings to COPA at the time of settlement
    17     Settlement of Sale Order     
    In FI:
    Variances A/c Dr (P&L)
      To COGS Account Cr (P&L)
    (It would be otherwise if variances are positive)
    In CO:     
    COGS, Revenue and Variances are settled to COPA
    SAP Scenario 2 u2013 Non-valuated Sale Order Stock u2013 with Sale Order Controlling
    Process Step     Business Process Flow     Value Flow u2013 FI/CO
    1     Enquiry     
    2     Opportunity     
    3     Quotation (Creation and Approval)     
    4     Creation of Sale Order     
    5     MRP Run u2013 Creation of Planned Order u2013 Creation of Production Order and Purchase Order     
    6     External Procurement u2013 Goods Receipt     In FI:
    Consumption A/c   Dr (P&L)
       To GR/IR A/c  Cr (P&L)
    In CO:
    Material costs will directly get posted to Sale Order
    7     Material Consumption to Production Order     Not applicable
    8     Activity Consumption to Production Order     In FI:
    No Entry
    In CO:
    Activity Costs are posted to Production Order
    9     Goods Receipt from Production Order     Only Material Document for movement of goods will be there.  The stock is neither valuated in CO nor in FI
    10     Delivery to customer     Just goods movement from sale order stock to customer. No value postings in FI and CO
    11     Invoicing to customer     In FI:
    Customer A/c Dr (BS)
       To Revenue Cr (P&L)
    In CO:
    COGS and Revenue get posted to Sale Order
         Period end closing u2013 Production Order
    12     Revaluation of activity prices     Prodn Order and Cost Center will be debited or credited as the case may be
    13     Calculation of WIP     No WIP
    14     Calculation of Variances     No Variances
    15     Settlement of costs to Sale Order     All the costs accumulated in Production Order gets collected to Sale Order
    16     Settlement of Variances     No Variances in Production Order
         Period end closing u2013 Sale Order     
    17     Result analysis at Sale Order     In FI
    WIP A/c  Dr. (BS)
      To Change in WIP A/c Cr (P&L)
    If the Order is completed:
    Change in WIP A/c   Dr (P&L)
       To WIP A/c Cr (BS)
    No CO postings will happen
    18     Settlement of Sale Order     COGS, Revenue and other direct sale order related values will get posed to PA.
    Best Regards
    Surya

  • While we create Sales order in CRM for Madhya Pradesh State JIVP (VAT Payable) showing twice in order

    Dear SAP,
    While we create Sales order in CRM for Madhya Pradesh State JIVP (VAT Payable) showing twice in order, but calculation has taken one time i.e. 14%, only JIVP displaying twice (Attached Screen shot S3.JPG) in CRM order, when comes to ECC side it is showing correct entry (Attached Screen shot S4.JPG) .
    Due to duplicate condition records exist in CRM table CNCCRMPRCUS956 (Attached Screen shot S1 & S2.JPG).
    This happens for MP state, as duplicate entry exist with MP state only,
    Please guide us to resolve the same.
    Regards,
    JK

    Hi JK,
    There is two thing. first is that when you create a sales order very same time pricing conditions added in the transaction as per the pricing procedure add for transaction type. these pricing procedures are transaction type specific not state or country specific so it will work. check here you are getting duplicate condition ?
    When ever you add material in the transaction that very time one the basis of the pricing condition added in the transaction IPC method do pricing. check after adding material in transaction duplicate condition is coming ?
    Secondly whenever the document replicates in ERP re-pricing again happening on conditions so theses conditions get corrected in ERP. Here if document is re-priced then system will consider it as change so again there suppose to be Bdocs get created from ERP to CRM again overwrite document so condition will be synchronized in CRM . I would request check the same too and revert.
    Thanks,
    Prem,

  • Sales order is blocked for Delivery-ZH Cost estimate Req

    Hi experts,
    When I am saving the sales order I am getting the informative message standard cost estimate for material xxxx is missing. when i am creating delivery with reference to sales order  it is not allowing me to do delivery it is showing that Sales order is blocked for Delivery-ZH Cost estimate Req( in  a log). Can you pls let me know what configuration I have to check.
    Regards,
    Sunina Agarwal

    hello, friend.
    it looks like product costing has been activated in your environment.  if such is the case, you would have to coordinate with your FICO consultant, and they have to make the necessary standard cost estimates.
    please also check if the cost estimates are part of the incompletion procedures.  if it is, you would not be able to bill the transaction even if this is taken out of the incompleteness procedure.
    regards.

  • Sales Order contract reference for IDOC

    Dear Guru's,
    Good Day,
    We are implementing a Sales order IDOC process for our client with Message type ORDERS (Inbound). Normally in a standard sales order process when u enter a Sold to party, Ship to party and material number system will automatically refere a OPEN CONTRACT available for the sold to party, Ship to party and material.
    In my case client has used a customized DATA-T type for Contract to sales order copy control, because of which system is not refering open contract when i run the IDOC.
    We can change the COPY CONTROL but client is using this process for more then 2 yrs. we dont know what will be the implecations or effect it will show on my client other SAP process.
    Can any one suggest me who i can refere a contract thru IDOC. May by thru BAPI or BADI.
    Your suggestions will be more appreciated.
    With best regards,
    M. Rajendran.

    Hi Dude,
    I tried checking it with E1EDK41 segment and i gave the open contract number in the field XBELNR. Still Sales order is not refering the contract.
    Any other option available.
    With Best Regards,
    M. Rajendran.

  • User Exists In Sales Order Creation Program for adding "Reason For Reject"

    Hi gurus
    I have following requriement
    As New Sales Order created (VA01) by default or at the time of saving the sale order, perticular "Reason for Rejection" should be set to each line item.
    This is then can be removed in change (VA02) with Mass change.
    We need this to review the sales order / block sales order from MRP run.
    Please let me know how to manage this or is there any user exist for the same.
    Thanks
    Sunil K

    Hi,
    As per my knowledge the automatic creation of rejection order is not possible, still will check out and know.
    but for urgent use you will have to follow the manual way of changing the line items from OK to blocked for apporoval so you can achieve their not passing on to MRP.
    manual way is what is described below:
    You can either reject the whole sales document or individual items.
    Reject all items:
    If you want to reject all the items, choose Reject document in the change modus for the sales document.
    The system automatically selects all the items and you can enter a reason for rejection in the following dialog box.
    Enter the appropriate reason for rejection and choose Copy.
    The system assigns the same reason for rejection to all the selected items.
    Reject individual items:
    If you only want to reject some of the items, select those items in the item overview screen and choose Edit - Fast change of... - Reason for rejection.
    A dialog box appears in which you can enter the appropriate reason for rejection.
    Enter the appropriate reason for rejection and choose Copy.
    The system assigns the same reason for rejection to all the selected items.
    Reject individual items with different reasons of rejection:
    If you want to enter different reasons for rejection for the items, choose the Reason for rejection tab page from the overview screen when changing the sales document.
    You can enter a different reason for rejection for each item in the Reason for rejection field.
    regards,
    Siddharth.
    Edited by: SD on Mar 15, 2008 10:22 AM

  • Sales Order - Availability check for components

    Hi All,
    I have 2 parts to my qns.
    1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
    2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
    Await inputs.
    Anyone to help on this?
    Edited by: Vivek on Jan 15, 2008 10:56 AM

    As we know, availability check is controlled by the combination of checking rule and the checking grp.
    U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
    In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
    The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
    Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
    Currently, the checking rule is predefined in SD.
    while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
    Hope i answers.
    Reward points if it is useful.

  • Without exceeding the credit limit sales order is blocked for credit check.

    Dear Experts,
    In my production server as well as quality server sales order is blocked for dynamic credit check.But the fact is that the credit limit is not exceeded.only 18% of the credit limit is used by the cutomer.The same problem is there in quality server also.
    Kindly help.
    Best Regards
    Biju

    Dear Biju,
    Check whether the customer code has exceeded credit limit in any other credit control area.
    Run the following programs.
    RVKRED77 , RVKRED88 , F.28
    After credit re-organisation, please check again and revert back.
    Also would like to ask you whether you have made any recent changes in the credit master data [FD32].
    Thanks & Regards,
    Hegal K Charles

  • For  MTO scenario,multi level bom is not working sap afs pp

    Hi Experts,
                  We are implementing MTO scenario for our client. I have maintained  strategy group for FERT is 40 and strategy group for HALB and ROH are 20.
                   For single level BOM , requirements is not getting generates properly.
                  I would like to know What are all the settings is required to create AFS BOM.(single and multi level)
                   Please suggest me.
    Thanks & Regards,
    Deepika.

    Hello Deepika,
    As we know AFS materials are planned at SKU level (Grid and stock categories)  you can use AFS MRP (/N/AFS/MD02) only.
    Please refer OSS note Note 981747 - FAQ - AFS Production Planning
    Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
    Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
    Steps are as,
    1. Create a MTO/PTO sales order for an AFS material.
    2. Run AFS MRP using transaction code /AFS/MD02.
    3. Convert the planned order to production order.
    Best Regards,
    R.Brahmankar

  • Multiple Preq for MTO scenario

    experts,
    I have a sales order in receiving plant , after every MRP run, it gives rise to a new PReq , in a MTo scenario,
    Special procurement key is 40 and availability check is 02 in the receiving plant. Can anybody advise why this is happening and required steps to correct it.

    Hi,
    Sales order will generate the requirements. P Req will creation depends on which option you choosed in "Create Purchase req" in MRP Run. In Material has Specical Procurement key in Rec Plant means it is procuring material from the other plant. when you run MRP in recieving plant it generates STO PR.
    and you are not specified what you are looking for.
    regards
    Siva Reddy

  • Sale Order MRP Run for All Order Line Items

    Greetings...
                     I have One Sales Order , in which i have ten different Line Items .
    Now I have to Run the MRP on basis of Created sales Order so that all Line items wi get consider insingle MRP Run on sales order base MRP Run.
    How to take MRP Run of One Sale Order for all Line Items.???
    In MD50 , we can have sales Order with Item..

    In MD50 you can give only one item at a time.
    Its a standard transaction meant to accomodate changes relevant for MRP after plant level MRP run  related to specific sales order Item.
    so either you need to do it multipal times by changing material or you need to go for MD02.
    Please explain bussiness case in detail why you want to restrict your MRP run for items in a specific sales order.
    Regards

  • Sales Order Not Checked for Credit Limit

    Most of the time, in our course of business, the customer account and BP/Credit limit are setup prior to the input of any order.
    However, if in the case the customer was setup (BP created in background, but segment/credit limit not assigned yet), and an order was created immediately the order will not be checked for credit.
    We are considering putting a check in the order that it must be checked or it is considered incomplete.
    We have a background job that runs every few hours to assign the BP to the credit segment (we have only one credit segment, in addition to 0000) and give a default credit limit.  But we need to ensure that all orders are checked.
    How are others handling this situation?
    Thanks

    We have already put in place the use of a background job to create the BP/segment with a default credit limit.
    We are hoping to come up with a method that is full proof and not manual.
    Depending on how frequently the job runs and the timing between that and setting up a customer master record and entry of a sales order, there could be a sales order entered before the background job was completed.

Maybe you are looking for