Sales order to consider for MTO scenario
Hi PP experts
How to ensure the consideration of sales order requirements for MTS or MTO.
Is it possible to distinguish by order types.
I request please indicate the config requirements for this.
warm regards
sairam akundi
Sairam,
I am not sure as to what excatly you are looking for.
However please note the following with respect to sales order requirements for MTO and MTS:
For MTO: The requirements type in the procurement tab of the sales order should be KE or any other requirements type that supports procurement from sales requirements. To be able to enter the KE requirements type in the sales order the material master should have Planning strategy group which suppotrs MTO Example: 20 which is specified in the MRP3 view.
For MTS: The requirements type in the procurement tab would be KSL or any other which supports make to order. The Planning strategy group for this in material master should be 10.
The configurations for this include the
1) configuration of the Planning strategy group which contains a list of planning
strategies allowed.
2) configuration of individual strategies which combine the requirements types from Production and Sales. The requirements class which is keyed in the requirements type determines excatly how the planning and procurement occurs.
The above configurations are pre-defined in standard SAP. You could change them if you require to.
Check the configs under:
SPRO>SD>Basic functions>Av check and transfer of requirements.
With the above basic settings, in case of MTO sales order would drive the production. In case of MTS production is carried based on forecast values (Planned independent requiremts irrespective of sales order requirements). The warehouse stock is then allocated to the sales order at the time of delievry.
For more help check the SAP online help on Planning strategies.
Hope above is useful.
Regards
Ram
Similar Messages
-
Change in Sales Order Qty in a MTO scenario
Hi,
We had confirmed 5 Qty for the Production Order created with reference to Sales ORder(MTO scenario), now after confirmation of 5 qty, sales order qty is reduced to 3., then in this situation, what we need to do for the already confirmed extra Quantity 2 for this sales order. I think we need to cancel the confirmation for the extra qty 2?. Please clarify and explain what we need to do this for this extra Qty 2 in detail.
Case 2) If the Sales Order qty is changed to 7, then we will be creating a new Production Order for this new quantity 2 with reference to the same sales order. Am i correct?.IF wrong, please suggest how should we balance the extra requirement of 2 EA.
Thanks in advance.Is your query being posted even before you actually tried the 2 cases which you refer to in your system?
If so, then first do the simulation in your sandbox, check how system behaves when you do that. Also check by clicking on ATP check for the material within SO.
Once you do the above your query will be self answered, if you still face any issue then revert with the specific details. -
Moving Average Price and Total Stock not updated for MTO scenario
We are using MTO with planning strategy 20, individual collective indicator is 1 (individual requirement only) and price control is V for finished goods. We are facing the following problems after we perform GR of above FG from MFBF (Repetitive -run schedule header):
1)Total Stock field (LBKUM)in Accounting View 1 remain as blank but the sales order stock is appear in Stock Overview screen.
2)Moving average price does not updated after periodic settlement is carried out.
It seem that problem can only be resolved if we change the planing strategy to MTS (ex:40), appreciate that if any of you can provide the solution.
p/s: on ECC5 system.Hi,
Good morning and greetings,
The standard SAP says as below
The Raw Materials should have MAP 'V' and the SFG and FG should have the price control as 'S' basically because the standard costing variant PPC1 uses the sequence of Standard Price as the first update at the time of price update and settlement.
I presume MFBF is used for Repetitive Manufacturing and not for MTO scenario...Repetitive Manfuacturing is MTS scenario...Goods receipt of production order is normally done through MB31.
If you still want to use the MAP for FG and SFG then you will have to change the costing variant appropriately to pick the MAP first at the time of goods receipt and settlement.
Please reward points if found useful.
Thanking you
With kindest regards
Ramesh Padmanabhan -
Planning Strategies for MTO scenario
i have an FG which has strategy 20 assigned to it. I have an SFG which i want to link to the sales order. i also want the planned order to be generated to capture the minimum and maximum lot size and not generate on per requirement basis. example for the semi-finished, a sales order needs a reqt of 20, but min and max lot size is 12000, planned order should be 12000. how do i do this?
Hi Raf,
as you know that, for MTO Scenario the Lot sizin will be EX and no other settings are allowed.
But there is a provision fulfill the requirement.
Now in the Transaction: OMI4 for the lot size : EX
For MTO Lot size select 1 Lot-for-lot with rounding
Maintain the rounding value in the MRP Views as per your requirement like 12000 PC.
Now every time system tries to round it to 12000.
Hope this helps..
Regards,
Siva -
Steps for execution of valuated and unvaluated for MTO scenario
Hi,
Can any one provide the steps for execution of valuated and unvaluated for MTO scenario.
regards,
RAMHi,
Please find below the details about Valuated and non-valuated Sale Order scenarios:
SAP Scenario 1 - Valuated Sale Order Stock u2013 with Sale Order Controlling u2013 (MTO, ATO and ETO with VC)
1 Enquiry
2 Opportunity
3 Quotation (Creation and Approval). In case of ETO u2013 BPO is created and updated in quotation (condition type)
4 Creation of Sale Order
5 MRP Run u2013 Creation of Planned Order u2013 Creation of Production Order and Purchase Order
6 External Procurement u2013 Goods Receipt ROH Inventory A/c Dr (BS)
To GR/IR A/c Cr (P&L)
7 Material Consumption to Production Order In FI:
ROH con. A/c Dr (P&L)
To ROH Inventory A/c Cr (BS)
Same is the case with HALB
In CO:
Cost of Material is debited to Production Order
8 Activity Consumption to Production Order No FI Posting
In CO:
Production Order is debited and cost center is credited with activity cost
9 Goods Receipt from Production Order FG Inventory A/c Dr (BS)
To COGM A/c Cr (P&L)
10 Delivery to customer In-Transit A/c Dr. (BS)
To FG Inventory A/c Cr (BS)
11 Invoicing to customer In FI:
Customer A/c Dr (BS)
To Revenue A/c Cr (P&L)
COGS A/c Dr (P&L)
To In-Transit A/c Cr (BS)
In CO:
COGS and Revenue are posted to COPA
Period end closing u2013 Production Order
12 Revaluation of activity prices Production Order and Cost Center will be debited or credited as the case may be
13 Calculation of WIP In FI:
WIP A/c Dr. (BS)
To Change in WIP A/c Cr (P&L)
If the Order is completed:
In FI:
Change in WIP A/c Dr(P&L)
To WIP A/c Cr (BS)
14 Calculation of Variances Variances are Calculated on the Production Order. No FI or CO entries
15 Settlement to Sale Order Production Order and Sales Order will get debited/credited depending on whether they are positive or negative variances
Period end closing u2013 Sale Order
16 Result analysis at Sale Order Result Analysis run will identify the status of the sale order and will enable the postings to COPA at the time of settlement
17 Settlement of Sale Order
In FI:
Variances A/c Dr (P&L)
To COGS Account Cr (P&L)
(It would be otherwise if variances are positive)
In CO:
COGS, Revenue and Variances are settled to COPA
SAP Scenario 2 u2013 Non-valuated Sale Order Stock u2013 with Sale Order Controlling
Process Step Business Process Flow Value Flow u2013 FI/CO
1 Enquiry
2 Opportunity
3 Quotation (Creation and Approval)
4 Creation of Sale Order
5 MRP Run u2013 Creation of Planned Order u2013 Creation of Production Order and Purchase Order
6 External Procurement u2013 Goods Receipt In FI:
Consumption A/c Dr (P&L)
To GR/IR A/c Cr (P&L)
In CO:
Material costs will directly get posted to Sale Order
7 Material Consumption to Production Order Not applicable
8 Activity Consumption to Production Order In FI:
No Entry
In CO:
Activity Costs are posted to Production Order
9 Goods Receipt from Production Order Only Material Document for movement of goods will be there. The stock is neither valuated in CO nor in FI
10 Delivery to customer Just goods movement from sale order stock to customer. No value postings in FI and CO
11 Invoicing to customer In FI:
Customer A/c Dr (BS)
To Revenue Cr (P&L)
In CO:
COGS and Revenue get posted to Sale Order
Period end closing u2013 Production Order
12 Revaluation of activity prices Prodn Order and Cost Center will be debited or credited as the case may be
13 Calculation of WIP No WIP
14 Calculation of Variances No Variances
15 Settlement of costs to Sale Order All the costs accumulated in Production Order gets collected to Sale Order
16 Settlement of Variances No Variances in Production Order
Period end closing u2013 Sale Order
17 Result analysis at Sale Order In FI
WIP A/c Dr. (BS)
To Change in WIP A/c Cr (P&L)
If the Order is completed:
Change in WIP A/c Dr (P&L)
To WIP A/c Cr (BS)
No CO postings will happen
18 Settlement of Sale Order COGS, Revenue and other direct sale order related values will get posed to PA.
Best Regards
Surya -
Dear SAP,
While we create Sales order in CRM for Madhya Pradesh State JIVP (VAT Payable) showing twice in order, but calculation has taken one time i.e. 14%, only JIVP displaying twice (Attached Screen shot S3.JPG) in CRM order, when comes to ECC side it is showing correct entry (Attached Screen shot S4.JPG) .
Due to duplicate condition records exist in CRM table CNCCRMPRCUS956 (Attached Screen shot S1 & S2.JPG).
This happens for MP state, as duplicate entry exist with MP state only,
Please guide us to resolve the same.
Regards,
JKHi JK,
There is two thing. first is that when you create a sales order very same time pricing conditions added in the transaction as per the pricing procedure add for transaction type. these pricing procedures are transaction type specific not state or country specific so it will work. check here you are getting duplicate condition ?
When ever you add material in the transaction that very time one the basis of the pricing condition added in the transaction IPC method do pricing. check after adding material in transaction duplicate condition is coming ?
Secondly whenever the document replicates in ERP re-pricing again happening on conditions so theses conditions get corrected in ERP. Here if document is re-priced then system will consider it as change so again there suppose to be Bdocs get created from ERP to CRM again overwrite document so condition will be synchronized in CRM . I would request check the same too and revert.
Thanks,
Prem, -
Sales order is blocked for Delivery-ZH Cost estimate Req
Hi experts,
When I am saving the sales order I am getting the informative message standard cost estimate for material xxxx is missing. when i am creating delivery with reference to sales order it is not allowing me to do delivery it is showing that Sales order is blocked for Delivery-ZH Cost estimate Req( in a log). Can you pls let me know what configuration I have to check.
Regards,
Sunina Agarwalhello, friend.
it looks like product costing has been activated in your environment. if such is the case, you would have to coordinate with your FICO consultant, and they have to make the necessary standard cost estimates.
please also check if the cost estimates are part of the incompletion procedures. if it is, you would not be able to bill the transaction even if this is taken out of the incompleteness procedure.
regards. -
Sales Order contract reference for IDOC
Dear Guru's,
Good Day,
We are implementing a Sales order IDOC process for our client with Message type ORDERS (Inbound). Normally in a standard sales order process when u enter a Sold to party, Ship to party and material number system will automatically refere a OPEN CONTRACT available for the sold to party, Ship to party and material.
In my case client has used a customized DATA-T type for Contract to sales order copy control, because of which system is not refering open contract when i run the IDOC.
We can change the COPY CONTROL but client is using this process for more then 2 yrs. we dont know what will be the implecations or effect it will show on my client other SAP process.
Can any one suggest me who i can refere a contract thru IDOC. May by thru BAPI or BADI.
Your suggestions will be more appreciated.
With best regards,
M. Rajendran.Hi Dude,
I tried checking it with E1EDK41 segment and i gave the open contract number in the field XBELNR. Still Sales order is not refering the contract.
Any other option available.
With Best Regards,
M. Rajendran. -
User Exists In Sales Order Creation Program for adding "Reason For Reject"
Hi gurus
I have following requriement
As New Sales Order created (VA01) by default or at the time of saving the sale order, perticular "Reason for Rejection" should be set to each line item.
This is then can be removed in change (VA02) with Mass change.
We need this to review the sales order / block sales order from MRP run.
Please let me know how to manage this or is there any user exist for the same.
Thanks
Sunil KHi,
As per my knowledge the automatic creation of rejection order is not possible, still will check out and know.
but for urgent use you will have to follow the manual way of changing the line items from OK to blocked for apporoval so you can achieve their not passing on to MRP.
manual way is what is described below:
You can either reject the whole sales document or individual items.
Reject all items:
If you want to reject all the items, choose Reject document in the change modus for the sales document.
The system automatically selects all the items and you can enter a reason for rejection in the following dialog box.
Enter the appropriate reason for rejection and choose Copy.
The system assigns the same reason for rejection to all the selected items.
Reject individual items:
If you only want to reject some of the items, select those items in the item overview screen and choose Edit - Fast change of... - Reason for rejection.
A dialog box appears in which you can enter the appropriate reason for rejection.
Enter the appropriate reason for rejection and choose Copy.
The system assigns the same reason for rejection to all the selected items.
Reject individual items with different reasons of rejection:
If you want to enter different reasons for rejection for the items, choose the Reason for rejection tab page from the overview screen when changing the sales document.
You can enter a different reason for rejection for each item in the Reason for rejection field.
regards,
Siddharth.
Edited by: SD on Mar 15, 2008 10:22 AM -
Sales Order - Availability check for components
Hi All,
I have 2 parts to my qns.
1. When a sales order is created for a component, with a req date, the system checks & informs if the mtl can be provided on the req date & if not proposes a new date - May i know which checking rule is used & also what all does the system check for?
2. A component say 'ABC' is used internally for production purpose & also sold as a spare part. A sales order for this component is created with a req dt. say 1.3.2008. The system commits the stock to the sales order. A production order is created later with a req. dt for 'ABC' say 1.2.2008. So when i carry out a collective availability check for the plant with ATP checking rule & with availability check reset indicator ticked, i believe the system should reset the commitments made to the sales order & assign the stock to the production order, but it is not happening so. Once the commitment is made to the sales order, it is not resetting, how can i change this behaviour?
Await inputs.
Anyone to help on this?
Edited by: Vivek on Jan 15, 2008 10:56 AMAs we know, availability check is controlled by the combination of checking rule and the checking grp.
U can see this at OVZ9 Screen. checking grp is proposed from material master Sales org 2 view or MRP2 views.
In the OVZ9 screen itself, we are setting what are all the stocks the system has to include when doing availability check.
The checking rule specifies the scope of the availability check for the respective transactions in sales and distribution by specifying precisely which stocks, receipt and issue elements should be taken into account during the availability check.
Every checking rule is allocated to a checking group: together these two elements determine the final inspection requirements. In addition, the checking rule includes a specification whether or not an availability check should take into account the replenishment lead time.
Currently, the checking rule is predefined in SD.
while answering to the second question, i think the system carries out the availability check again at the time of delivery, provided u need to maintain the availabililty check indicator at req. class level.
Hope i answers.
Reward points if it is useful. -
Without exceeding the credit limit sales order is blocked for credit check.
Dear Experts,
In my production server as well as quality server sales order is blocked for dynamic credit check.But the fact is that the credit limit is not exceeded.only 18% of the credit limit is used by the cutomer.The same problem is there in quality server also.
Kindly help.
Best Regards
BijuDear Biju,
Check whether the customer code has exceeded credit limit in any other credit control area.
Run the following programs.
RVKRED77 , RVKRED88 , F.28
After credit re-organisation, please check again and revert back.
Also would like to ask you whether you have made any recent changes in the credit master data [FD32].
Thanks & Regards,
Hegal K Charles -
For MTO scenario,multi level bom is not working sap afs pp
Hi Experts,
We are implementing MTO scenario for our client. I have maintained strategy group for FERT is 40 and strategy group for HALB and ROH are 20.
For single level BOM , requirements is not getting generates properly.
I would like to know What are all the settings is required to create AFS BOM.(single and multi level)
Please suggest me.
Thanks & Regards,
Deepika.Hello Deepika,
As we know AFS materials are planned at SKU level (Grid and stock categories) you can use AFS MRP (/N/AFS/MD02) only.
Please refer OSS note Note 981747 - FAQ - AFS Production Planning
Question 5 Made-To-Order Planning -Multi-Level (MD50) does not work for AFS Materials and Sales Orders containing AFS materials.
Answer: Made to Order Multi level planning functionality was never enhanced for AFS and hence transaction MD50 is not supported.
Steps are as,
1. Create a MTO/PTO sales order for an AFS material.
2. Run AFS MRP using transaction code /AFS/MD02.
3. Convert the planned order to production order.
Best Regards,
R.Brahmankar -
Multiple Preq for MTO scenario
experts,
I have a sales order in receiving plant , after every MRP run, it gives rise to a new PReq , in a MTo scenario,
Special procurement key is 40 and availability check is 02 in the receiving plant. Can anybody advise why this is happening and required steps to correct it.Hi,
Sales order will generate the requirements. P Req will creation depends on which option you choosed in "Create Purchase req" in MRP Run. In Material has Specical Procurement key in Rec Plant means it is procuring material from the other plant. when you run MRP in recieving plant it generates STO PR.
and you are not specified what you are looking for.
regards
Siva Reddy -
Sale Order MRP Run for All Order Line Items
Greetings...
I have One Sales Order , in which i have ten different Line Items .
Now I have to Run the MRP on basis of Created sales Order so that all Line items wi get consider insingle MRP Run on sales order base MRP Run.
How to take MRP Run of One Sale Order for all Line Items.???
In MD50 , we can have sales Order with Item..In MD50 you can give only one item at a time.
Its a standard transaction meant to accomodate changes relevant for MRP after plant level MRP run related to specific sales order Item.
so either you need to do it multipal times by changing material or you need to go for MD02.
Please explain bussiness case in detail why you want to restrict your MRP run for items in a specific sales order.
Regards -
Sales Order Not Checked for Credit Limit
Most of the time, in our course of business, the customer account and BP/Credit limit are setup prior to the input of any order.
However, if in the case the customer was setup (BP created in background, but segment/credit limit not assigned yet), and an order was created immediately the order will not be checked for credit.
We are considering putting a check in the order that it must be checked or it is considered incomplete.
We have a background job that runs every few hours to assign the BP to the credit segment (we have only one credit segment, in addition to 0000) and give a default credit limit. But we need to ensure that all orders are checked.
How are others handling this situation?
ThanksWe have already put in place the use of a background job to create the BP/segment with a default credit limit.
We are hoping to come up with a method that is full proof and not manual.
Depending on how frequently the job runs and the timing between that and setting up a customer master record and entry of a sales order, there could be a sales order entered before the background job was completed.
Maybe you are looking for
-
Why does some artwork embed into the file, but not others?
Hey everyone. I'm running iTunes 11.3.1. I'm incredibly obsessive about having organised files and one thing in particular I want is album artwork embedded into the music file itself, not just on iTunes. The problem I have is that the artwork will em
-
Why I can't purchase anything from UK Appstore? It says my ID connected to Kazakhstani store and I can't use it here in UK, I used to live in KZ. How to change stores? Create a new ID? But I still have my old e-mail address, will it valid as a new ID
-
Upgrading final Cut Pro - recieved as a gift, and designated "Not for Sale"
I've been working in FCP with a version that a friend, in the business, was given as a perk and passed on to me. The FCP that he gave me is marked "Not for Sale". I did register it. I just upgraded to Tiger and am having problems with dropping frames
-
Can I use ODI for creating warehouse in MYSQL?
Hi, I have Oracle 10g database. However, for the reporting and dashboarding purpose I want to create a warehouse. Can I use ODI to pick data from this existing Oracle 10g database and create a warehouse using MYSQL? Then I will use this MYSQL warehou
-
HD 24p from V1U has interlacing artifacts
I am just starting to play with my new Sony V1U. I shot a few clips at 24p and brought them into FCP. When I look at them on a 24fps, I still see interlacing on every 2 of 4 frames?? The clips themselves are still listed with a 29.97 timebase, but I