SAP Performance Evaluation

Hi: everybody
We have implementated SAP for one year. Our headquarter will check out SAP system. I have to write a report to show our SAP system performance evaluation. I  wish him to satisfied with my team job. so this report will include hardware, business operation, user training, and so on. I think at least.
Can everybody provide me a template about this report?
Thank you!
Henry

Hi,
Very intersting query. I spent some time and got this link:
https://www.sdn.sap.com/irj/sdn/netweaver?rid=/webcontent/uuid/a06a3512-1a23-2a10-caa5-ee60d87ec953 [original link is broken],
Please keep us updated if you find something useful.
Regards,
Rakesh

Similar Messages

  • Database Performance Evaluation Benchmarking Tuning

    Does anyone by chance have any articles or websites that deal with Oracle (or generic) database performance evaluation, benchmarking, and/or tuning for a STANDALONE PC database installation? I have Oracle 10g installed on my personal machine and I want to find some information that will help me place the performance evaluation into a more professinal context. Any links relating to this would be very appreciated.
    regards,
    John

    Why do you expect there to be a difference in evaluating performance for a standalone PC database installation vs. a server database installation? Other than the fact that, presumably, you won't find network events in the top wait events, I'm hard-pressed to think of any differences.
    You would evaluate performance and tune the system the same way on a standalone database as on a database on a server box-- you would figure out what operations are important, figure out how quickly those operations need to run, figure out which of the important operations are running slowly, figure out what those operations are spending time doing, and then figure out how to reduce the runtime. Of course, each of those steps can potentially be rather involved. There are plenty of articles and books on performance tuning-- Oracle has a few manuals, Jonathan Lewis's book on the cost based optimizer is excellent, Cary Millsap's optimization book is top flight, etc.
    As for benchmarking, unless the intention is to run something like the TPC benchmark on your desktop, which would seem odd, your benchmark is generally closely tied to your application-- i.e. figuring out how quickly the system performs a particular business operation. Generic benchmarks like TPC tend not to be particularly useful in the real world because they are unlikely to mimic your real workload.
    Justin

  • Supplier performance evaluation

    Dear Guru's
    Can we include supplier survey response and transaction data from SAPSRM/ECC to determine the KPI of suppliers? Can we also include the supplier status like blocked or black listed, expired in the report?
    Can we include category of supplier (like small scale industry) in Supplier evaluation report?
    You thoughts on it will be highly appreciated.
    Thanks and regards,
    Ranjan
    Ranjan Sutradhar

    Dear Experts,
    As mentioned in the above memo, a supplier can not see its performance evaluation by the buyer in SUS. Could you please share your thoughts on how we can enable our suppliers to see the vendor evaluation report in the SRM system?
    Any thoughts or idea will be highly appreciated.
    Thanks and regards,
    Ranjan

  • SAP Performance tuning

    What measures shall we take if it is needed to performance tune the SAP Server. It is getting too slow. It will be helpful if someone can send me some link about SAP Performance tuning, not ABAP performance tuning.
    Regards,
    Subhasish

    The SAP Servers can be slow because of many reasons:
    1. The Table Consistency: The tables should be consistent. A consistency check should be done regulalrly.Better would be using DB13 so that it can be scheduled in appropriate days.
    2. One major reason that I have found in recent times is the amount of authorizations that might be available to the users of the sytem. If all the users have a high volume of authorization objects in their user master buffer, then the response time becomes sluggish.This is true for most of the dev boxes that allow almost any amount of authorization for users and have a low RAM size.
    3. Also you might be intrested to check your network consistency. If you are accessing your servers from home with a wireless connection of 16kbps, you might want to configure your logon pad for such a crappy connection.
    Most of the BASIS performance tuning tasks such as ST04, STAT, ST02 and DB12 should be carried out too just to investigate furthur.
    Hope these were a few helpful tips.
    Peace be with everybody
    -Saurav

  • Any bapi for update MCJ4 report(SAP performance reports)

    Hi,
    Any bapi for update MCJ4 report(SAP performance reports)
    or
    how to update MCJ4 report from my webdynpro application.
    Regards,
    Deepak Singh

    Hi,
    Have you gone through this ,We already have the discussion on this .
    [http://forums.sdn.sap.com/thread.jspa?threadID=1162642]
    BTW , As you say, you are going to create the Milsetsone what is your reference is it WBS element and project definition or network , How are you planning to bring the reference data from the legacy system [ As example the WBS element against which the Milestone s are craeted] into SAP . Becuase as far as i know milestones area attached with project definition and then further down to WBS element so you need to bring the Project definition + WBS element to change create the milsetone .
    Thanks,
    Anjaneya .

  • SAP Performance Testing - Manual or Automated?

    Our organization is attempting to develop a regular performance testing effort.  Everything wehave read points to using a tool, such as LoadRunner, to do performance testing.  However, we're just starting and simply want to baseline several transactions, jobs, programs, etc (less than 30 items).  We have tools to monitor the backend results and grab metrics, but no tools to automate the testing itself.  Does anyone do their performance testing manually?  What are some advantages to doing this?

    Hi Yogi,
    I think HP LoadRunner is one of the best tools for SAP performance testing. I did it for many years. It is now included with Solution Manager. Here is the link for for HP Mercury regarding performance testing.
    https://h10078.www1.hp.com/cda/hpms/display/main/hpms_content.jsp?zn=bto&cp=1-11-126_4000_100__
    Please check this site as well, it has lot of valuable information.
    http://www.wilsonmar.com/1loadrun.htm
    Regards, Nabi.

  • SAP Performance

    Hi Friends,
    I would like to know how to chek SAP performance. How can we check SAP performance what T Codes we use to check the performance. what to check with the T-codes please let me know.
    If performance is bad then where we need to check please let me know,
    Thanks,
    praveen

    Hi Praveen,
    Let me add some key steps to analyze performance of your system (e.g. R/3 system).
    Start with the transaction ST03N.
    *St03N:*  Try to find the Avg. Response time for the Dialog task for all the servers and instances.
    SAP Threshold for this is 1000ms. If you see >1000ms, which means your system is having some issues and some tuning is needed.
    The parts of response time are:
    DB time (SAP threshold is 40% of Avg. Response time)
    CPU time (SAP threshold is 40% of Avg. Response time)
    Wait time (SAP threshold is 10% of Avg. Response time)
    GUI time (200ms.)
    Roll wait time (200ms.)
    Roll in time(20ms.)
    The other times are which are not direclty part of response time:
    Processing time (<2*CPU time)
    1. DB time is high, which mean above SAP threshold:
    ST04 (database monitor):
    Lookinto Database buffer quality (SAP Threshold is 94%)
    If this Database buffer quality is less than the SAP threshold try to increase database buffer cache size.
    Shared pool size (generally from 600MB to 2GB depending on the size of the database)
    In the same ST04 screen look for user/recursivecalls, if this factor is >20 then we can say thre are some expensive SQL statements which in need of tune. Analyse the top expensive statements. possible reasons of expensive SQLs are i) incorrect index access (Solution is create new index or reorganize the index)
    ii) high table size (Soluiton is archiving some of the old entries)
    2. If CPU time is high, which mean above SAP threshold:
    ST06 (OS monitor):
    Go to Detailed Analysis Menu--> Top CPU , check existence of Non-SAP (external) programs by sorting by CPU time.
    Try to run these external programs in offline hours.
    ST02 (Buffer Monitor):
    Check for any swapping happening in all the buffers. If you observe high swapping for any buffer, increase the size of the buffer.
    Here program buffer (PXA) is important buffer.
    3. If Wait time is high, which mean above SAP threshold:
    SM50 (Workprocess Monitor):
    Look for all the configured work processes are in Waiting or Running state.
    If all the wotk processes are running state, then increase the number of Dialog work processes.
    SM66 (Global work process Monitor):
    This monitor will help to analyse the total work processes configured in all the servers and instances.
    4. If GUI time is high, which mean above SAP threshold:
    ST06> Detailed Analysis Memu> LAN check by ping (4096 bytes for all the presentation servers)
    This will help to findout network performance. If you see high Avg. time or Loss time for any presentation servers from the result, which means there are some settings in need of change for that presentation server.
    SE38-->execute PROFGEN_CORR_REPORT_5 report.
    from the output check if any user assigned with >1000 user menu nodes.
    SAP threshold is 1000 menu nodes.
    5. If Roll Wait time is high, which mean above SAP threshold:
    Please review SAP Notes 8963 and 99584. Roll wait time with a high value is a first indication for a slow network between the GUI and the CRM instance. Please check connections between the frontend and your servers. You can monitor relatively high average roll wait time, high average frontend network time per dialog in transaction ST03N. Please check your network with network vendor.
    Specifically, check the network between application servers and fronts by running NIPING test as per SAP Note 500235.
    If you need any further information feel free to reply me.
    Thanks and Regards,
    Pavan Kumar Gali.

  • Agent performance evaluation

    Hi ,
    My company need to deploy the uccx script to add new feature with old script the feature is agent performance evaluation quality. once the agent the hung off the head set the system transfer the call the evaluationperformancequality and the customer press 1 excellent 2 very good 3 good 4 bad . and send all data to SQL server  the data incloud  ( time duration , agent ext , caller ID , date and time ) ,
      have we here uccx 8.5 the script attached. call manager 8.5, unity 8.5
    please i need assistance to create this feature in this script and how to trunking with SQL server
    thanks

    This is called post call survey and in UCCX is typically invoked with CAD workflow.
    Chris

  • Besides LoadRunner, any other SAP Performance Test tool?

    Hi, Dear All:
    I'm doing some planning for the SAP performance test. But our budget is very limited. It seems my company could not afford LR. LoadRunner took over 95% of this market. Beside LR, I heard Worksoft Certify is another option. Is there any other tool or open source tool?
    Thank you all so much in advance.

    Hello,
    If you are looking for simulating load using minimalist tools, a crude way to do this would be configuring Ecatt scripts and running them from multiple machines
    But I think it doesn't work for web based transactions.
    Regards,
    Siddhesh

  • Mapping Ontime delivery requirement in sap vendor evaluation

    Hi,
    Have below requirement for calculating score for ontime delivery performance.
    1. Evaluation will be executed weekly once
    2. For the given weekf if18 are on time out of 20 total, then the vendor gets a 90% on time score
    Tried mapping this
    1. By making std.delivery date variance as 0
    2. Maintaining points as below
    0          100
    99.9      1
    but the above settings are not working. With the above settings, system is not even calculating the on-time delivery performance.
    with this I realized that maintaining  std.delivery date variance(at least 1) is mandatory for SAP.
    Can I one guide me how to map above requirement.
    Thanks in advance
    Hari

    Hi,
    I have logged similar request before and never got a satisfactory solution. My recommendation is to check the attached link, it details how the scores are calculated with reference to the config you have created. Just rolled out vendor evaluation in my organisation and this document was very useful.
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/8d/b985b0414511d188fc0000e8322f96/frameset.htm]
    Thanks.

  • Survey: Performance Evaluation of ERP-Systems

    Hello,
    In course of my Bachelor thesis I´m conducting a survey about u201EPerformance evaluation of ERP-Systemsu201D. I would like to ask you to take part in this survey; it will take you only about 10 minutes. The link below will lead you to the survey, which is available in German language only.
    http://erp-performance-umfrage.qpk.info
    Thank you very much for your time!
    Veronika Schreiber (Student at Technische Universität München)

    you need to look at the landscape the current system is in.
    How many systems are required for the full end to end processes?
    User friendly?
    What can SAP do that the other systems cant?
    Will these things/ processes add value to the business i.e. MSS/ ESS, SRM, FSCM
    How much manual work is required for month end?
    SAP it can be automated, and the key month end closing should be able to be reduced.
    Hope this gives you some ideas of what else to consider.
    Please award points if this is useful.

  • Performance Evaluation to be done by HR Specialist

    Hi All,
    In Fusion Performance Management cycle, Line Manager will evaluate and provide the rate to Goals and Weightage in the performance document of employee.
    Is there a possibility were HR Specialist can do the evaluation on behalf of the Line Manager.
    Client HR wants to an evaluation and over write the ratings in Performance Document of employee.
    Regards
    Pradeep Badiganti

    1. PL cannot be combined with CL, If employee is combining and applying for CL which has PL before then at the time of leave application, system to throw error message and should not allow him to apply for it
    Ans:- For this you need to write a BADI/USER EXIT and Need to develop atable in se11 for Combination leaves this can be done by ABAPers
    2. If employee is applying for sick leave in between PL then while applying for SL, should throw error message and should not him to apply for it
    Ans:- For this you need to write a BADI/USER EXIT and Need to develop atable in se11 for Combination leaves this can be done by ABAPers
    3. Holidays / Weekly offs falling betn PL treated as PL
    Ans:-In this Table you can do this T556C or in Time Management -> Define Counting Rules
    4. To chk for Saturday / sundays / holiday, if these holidays are falling between PL then PL to include / treat these holidays also
    Leave taken during notice period, should throw error message and should not allow the user to apply
    Can you  Explain me in brief  4th Question
    Warm Regards
    Raja Sekhar

  • SAP Software Evaluation

    I am new to SAP and first time on this forum, although I have worked with Financial Applications from other publishers. Where can I download eval SAP software so that I can install on my test server and play with it?
    I am interested in the Financial Accounting and HR modules of SAP for the Windows platform (or Linux).
    Please send (or cc) your replies to [email protected] Thank you in advance.
    Message was edited by:
            kelvin kel

    No business application is released for evaluation (love to be proven wrong though). Only Portal, KM, Collaboration on the Java side, and BI/BW on the ABAP side.

  • RFC's for SAP Performance data

    I am in the process of developing a Performance Monitoring System for SAP in Java.
    The requirement is to fetch the performance metrics from SAP in a Java application. I know there are some RFC's available in CCMS module. But the customer is not interested in CCMS module.
    Could anyone let me know whether there are any RFC's available in SAP for extracting performance data other than CCMS?
    If anyone had come across this situation, please let me know.
    Thanks,
    Vijay

    Hi,
    there are severam methods for estimating av. response time after the upgrade, for the beginning you coud try to estimate
    hardware (cpu, memory, disks) just to keep those resp. times on the same level. Use the followin notes:
    089305, 0113795, 0178616, 517085 .... until you get note for your target release
    then you have to add all deltas, and you will know the whole delta between releases.
    For the first estmation of time change you can count it by using coeffition  as deltas, example delta cpu = X
    resp. time after upgrade = X * current resp. time
    This formula gives you only impresion on resp.  time, not precisse measure. Better calculation is simply
    by calculating current system in saps, than using delta (for cpu) You can estimate required number of saps for target release, and X=req. SAPS for target/ current SAPS (btw. take for the estimation number of SAPS for current HW  target release  only, don't use the number of SAPS for 46C!), and again:
    after upgrade = X * current resp. time
    Please remember, thera are much better ways to estimate res. times, but it means detailed analysis of the system load, it can't be given as gold rule
    Kind regards,
    Mirek

  • RFC & SAP Performance

    Hi,
    We have a situation where Web Portal makes an RFC call. We are thinking about limiting the number of users that can log onto the portal simultaneously.
    What are the performance issues related to maximum number of simultaneous calls to this RFC? If say 100 log into the site simultaneously, 100 RFC calls would be generated. Will there be any performance related issues?
    Thanks

    Hello,
    Generally if data is structured properly,it should not create problems.
    What causes problem for such RFC calls is amount of time SAP takes to respond .If you have RFC which is not wirtten in good way (for optimised performance) then SAP takes lots of execution time to return data back to calling application & that sometimes is an issue for users who would not like to wait for 30-40 seconds just to get some data based on which they will go ahead & decide further actions.
    Hope this helps.
    Thanks.

Maybe you are looking for