SAP WM -Capacity check

Hi
Help me to solve this issue.Iam trying to do stock palcement for a material whose Base UOM is Each and Odering UOM is "CAR", CAR=12 EA.Iam trying to place the material intially in the fixed bin ,if the fixed bin is full place in the rack area.
Iam using capacty indicator "4" (based on article) for the rack area, defined capacity usage as "1" in the material master and Total capacity as 500 in the storage bins. when i receive 50 cartons means 600 EA ,i expect 480 EA (40 cartons) to be placed in the first bin and the remainaing 120 EA (10 cartons) in the next bin .But system is throwing the error " Bin capacity is too low ".
when enough empty bins are avialbel y the system throws this errors.
The problem is  if all the quantity  can't be fit in the fixed storage bin due to its capacity then the remaining has to be put in a rack area.
Is the system to be enough intelligent to split the suitable quantity in two parts in order to fill completly the fix storage bin and the remaining to another storage bin.
Help me to solve the issue.
Regards
Kumar

Hi Kumar
Hope you are using Near Picking Bin putaway strategey. If so, you can choose Capacity Check method in storage type as "3 - Check based on maximum quantity per bin in storage type"
As system will check the maximum quantity defined, available quantity in the bin and suggest suitable overflow/reserve bin and not fixed bin
If bin quantity is less than maximum quantity defined in master level and putaway quantity is well within the maximum quantity, system will suggest Fixed bins
Regards
Siva

Similar Messages

  • Goods receipt Capacity check in PO creation- EHP2

    Hi
    I have activated business function LOG_MM_CI_1 in our ECC 6.0 system . I have also activated Goods receipt capacity check and subsequent settings in customization . I am able to view the GR capacity check icon in Purchase order creation (ME21N). When I click this icon by selecting the line item , system does not perform any function . I have read in SAP documentation that Vendor can be assigned to door . I am not able to find this assignment in the system . Not sure whether this function is only applicable to retail system and not to SAP R/3 . If some one worked on this functionality , kindly request you to throw some light on this functionality .
    with regards,
    Joseph Anand B

    Same thing is happening to me right now .. did you found out what the error was,, or what was missing ?
    Please reply soon as I have a demo on the same in two days..
    Regards
    Digant.

  • Capacity check is not working while creation of Production order

    HI Gurus,
    I want to restict the system that in case of insufficient capacity at the work centers, sysstem should not create the production order. For that i did the setting
    1) Unchecked the tick for the Capacity check & enter the profile SAPSFCG013 in the OPJK for the business functions 1 & 2.& also make the setting for the Release order '3".
    2) Maintain the same profile in the production profile & maintain that profile in the Mat Master
    3) In the CR02, activate the tick for the finite scheduling & uncheck for the can used for several operations.
    But i have creted the production orders & at the time of capacity check system is giving the message " Capacity avaiolable at all the work centers. But i check in the CM50, all the work centers are overloaded at the respective date.
    But i can create & release the p[orduction order.
    Requesting all to give your comments & solutions.
    Regards
    ACP

    ACP,
    ....after confirming all the operations system is allowing me to save
    When you confirm an order, you are by definition saying that the capacity existed for that order (you have just declared to the system that all operatons have been performed, and therefore all capacity was available).  I can't imagine why you would not wish to save that order, since you must somehow post the physical work that has already been done.  Capacity availability check is really only useful when the order to be checked has not yet been executed.
    CM50 displays capacity requirements.  CM50 does not perform the same function as Capacity availability check.  To ensure that all of your orders fall within you capacity constraints, you must perform capacity levelling.  Capacity availability check does not work the same as a Material availability check - don't assume that what you know about a material ATP will be applicable for a capacity ATP.  Read the help on Capacity levelling.  It is not generally possible to stop a manually created production order from being saved, due to any capacity situation, without using an enhancement.
    http://help.sap.com/saphelp_erp60/helpdata/en/60/13e308133a11d3bf550000e83235ee/frameset.htm
    Naturally, you can use enhancements to have the system meet any business requirement that is not met with the standard Cap Availability check.
    Best regards,
    DB49

  • Problem in capacity check

    Hi guys,
    We want to use capacity check functionality in WM.  I have done all configuration.  We have given capacity as 1,000 kg for the bin type.
    In material master, weight is given as 50 kg.  It is accepting goods receipt upto 20 nos.  it is fine upto this.
    if we do migo for 30 nos, what we expect is, 20 nos should go to bin-1 and 10 nos should go to bin-2.  But it is giving error that, bin capacity is exceeded.
    how to achieve this functionality?  Do we need to activate addition to existing stock for this?
    Please suggest

    Hi,
    When you create the TO you make palletization - based on settings on WM2 view of the material master or you can do it manually (override the master data setting or w/o any master data setting).
    During TO creation SAP considers the quantity you defined during palletization (e.g. 30 kg) and wants to place this quantity into a storage bin.
    So, you have to define the proper quantities during palletization You cannot set SAP - as per my best knowledge - to change this (split the defined quantity) during determination of destination bin.
    Regards,
    Csaba

  • PO creation-ME21n-Why SAP does not check company code and Plant relation

    Hi All,
    Does someone know, why SAP does not check Plant and company code relation at the time of PO creation or how can we put validation between plant and company code at the time of PO creation.
    <b>Example:</b> Suppose i have a company 0001 which is assinged to Plant 0001. when i am creating a PO with another company code 0002(Entering at header level-Org, data) and using Plant 0001 at line item level. SAP does not do this validation.
    How can we put this check in place?
    Thanks in advance.
    Deepak

    Hello Deepak,
    There are three types of purchasing
    - Company code specific :You need to assign company code to Pur organization
    - Plant specific : You must assign plant to pur organization
    - Cross company purchasing: No assignment between company code and pur organization.
    In the case 3, the system will not check company code and plant relationship, but it will check plant and pur organization specific.
    The following is the copy of sap help text:
    You can assign a purchasing organization to one company code. This is company-specific purchasing.
    You can assign a purchasing organization to no company code. This purchasing organization can then procure for all plants assigned to it, irrespective of the company code to which the plant belongs.
    Since each plant must be assigned to a company code, the company code can be determined via the plant in each procurement transaction, even if the procuring purchasing organization is not assigned to a company code.
    A purchasing organization must be assigned to one or more plants. This is plant-specific purchasing.
    Now, check your company-code and purchase organization assignment.
    Hope this helps.
    Regards
    Arif Mansuri

  • Capacity check in wm

    HI,
    I have been working on few strategies in putaway. One of the storage type which uses open storage strategy with mixed, addition to existing are allowed. With capacity check based on material. I have issue at time of creating transfer order. please consider the below case and explain me how to get rid of this error.
    For eg: Material , capacity usuage 1.0
    total capactity of bin 100.
    Goods receipt for 110 quantity ,
    At time of creating TO based on material document the system gives error " No destination storage bin to be found in strage type". I thought system will put 100 in one bin and rest 10 quantities in another bin but it doesn't happen.
    If i receive quantity 100 or lesser than this quantity system proposes the bin number based on the storage type and storage section search.
    --SJ

    Hi ,
    Thanks steve.
    I found that the system is searching for the right bins as per the section indicator.  since the capacity is low it gives error"no destination bin found". These bins are empty.
    scenario:
    when the goods receipt is for 120 ea..
    material capacity usuage : 1
    bin capacity : 100.
    for the above scenario , is it possible to split these quantity in such a way that the system puts 100 in one bin and 20 in another bin.
    --SJ

  • Capacity check problem in Project system

    hi,
    i have some questions for the Capacity check problems in Project System.
    1. if one Person is assigned to diffierent Work Centers, for example,  person A is assigned to Work Center 01 under Plant 01, and Work Center 02 under Plant 02, how can i do the Capacity check?
       if i want to use A of Work Center 01 in the Project, the System will only check the Capacity of  01, or both of 01 and 02?
    2.  What is the Pooled Capacity?
    Rgds,
    Liang

    hi,
    1.Capacity check takes place at plant level itself..
    2.Pooled capacity:- This is created separately in [u wil find in PP] and this capacity can be used by different work centers.
    regards
    pushpa

  • Urgent pls ---- How to install SAP XI and check SLD configuration

    Hello,
    Pls send me links/pdfs/how to guide links  --- to install SAP XI and check SLD configuration.
    Regards

    Hi,
    A copy:
    Links:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/73527b2c-0501-0010-5398-c4ac372c9692
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/6bd6f69a-0701-0010-a88b-adbb6ee89b34
    Follow these steps while installing XI:
    1. Windows server or advanced server with latest service patch.
    2. IE 6.0 with latest service patch
    3. Install Microsoft office and winzip, acrobat
    4. Install JDK with version 1.4.2_03 or above with the corresponding JVM
    5. Install the SAP GUI 6.20
    6. Make sure that you have hard disk space of 10 GB in C drive and 50 GB in the installation drive.
    7. Make sure the virtual memory is between 512 and 1594 or above for the installation drive.
    8. Copy the dumps of following DVDs into the installation drive.
    • Installation Master DVD
    • Installation Export
    • Additonal Components for SAP BW/SAP XI,SAP MI,SAP KW
    • SAP Web As Java
    9. Start the installation from the DVD dump Installation Master DVD.
    10. When installing the ABAP Database the SID of the oracle default database should be different the ABAP database SID.
    U can go through the Installtion Guides for Installing XI from http://service.sap.com/instguides (SR1 installation)
    u can also refer to service.sap.com/platforms to see the available platform on which XI can be installed. ( Windows/linux/UNIX)
    or you can even go through this weblog which clearly talks to you about XI installation
    XI installation: https://websmp202.sap-ag.de/~sapidb/011000358700009389172004E.PDF
    In addition to this installation guide you also need to download the XI configuration guide which is very useful for technical configurations of various adapters and XI system.
    At the same place you will also get the XI configuration guide e.g XI30ConfigGuideSPS11.pdf.
    U can also download SAP Exchange Infrastructure 3.0 SR1 Installtion Guide from the articles scetion.
    ABOUT XI :
    If it’s just that you wanted to know more about sap xi....then the information below should definitely help you.
    The best way to learn XI would be to make the maximum use of XI from its forums, weblogs, presentations, etc in SDN.
    First I thought I will just give u the basic steps involved in doing any scenario in XI. This is very essential for a beginner.
    First of all you would need to define your product, software component, business system and configure the technical landscape in the sld.
    You then go on to create the objects in the repository, you import your software component here and then begin your design steps. To import your RFCs n Idocs if you require any before proceeding.
    Then under the name space which you want, you go on to define your data types, message types and message interfaces.
    Then you do your message mappings where you specify your source and target message types and the relation between them, then you do your interface mapping. If you are using a BPM, you do the integration process.
    Once you have this done, you will have to move to the directory, here is where you define how you use the objects and how you configure them to work as a scenario.
    You assign your business system to the configuration scenario which you have created, and create the communication channels. Then you go on to configure the receiver determination, interface determination, and the sender and receiver agreements. Once you’re done you will have make sure you activate your objects. The exact parameters steps depend on what kind of scenario you are implementing.
    You can use sxmb moni or the runtime workbench to monitor the entire scenario which you have done.
    Also I would suggest this link on SAP help for any info that you want on XI,
    http://help.sap.com/saphelp_nw04/helpdata/en/14/80243b4a66ae0ce10000000a11402f/frameset.htm
    <b>
    Cheers,
    *RAJ*</b>

  • Capacity check during Planned order to production order conversion

    Hello Gurus,
    I have a strange situation during capacity check.
    While Converting the planned order to Production order, I release the order and I don't get any warning. All work centers are available
    But for the same material/quantity/dates, if I create the Production order manually, release it, system check the capacity and I got the message the Capacity Over loaded (which is correct also as there are overload on the work centers).
    My question is why I am not getting this message while converting the planned order to production order.
    There are overload on the work centers and manual creation of Production order is working fine, but problem is during planned order to production order conversion.
    For information, I have maintained Finite scheduling indicator in OPKP, capacity availability indicator "NO CHECK" is also blank in OPJK.
    It will be grateful if you can please help me here.
    Thanks in advance,
    Sandeep Kumar

    Hi KK,
    Thanks for your feedback.
    I have checked all these settings but still no success.
    I am surprised but it is not a customizing issue I believe, because capacity is checked in Dev client while converting planned order to production order. I am facing this issue only in Staging client.
    Master Data is same. In CM01, in Quality(Staging) client, it is showing overload. while creating production order, it shows overload but only when convert from planned order to production order, it does not show overload .
    Please suggest what else I need to check.
    thanks in advance.
    Br,
    Sandeep Kumar

  • Precalculation SAP Server Capacity before deploy Roll Out Project

    Hello Experts,
    Kindly any one share your great experience to help our requirement.
    We are planning to implement new business scenarios and new client in existing Production server.
    Before deploy new business functionalists, what are factors need to consider in existing Production server.
    How to precalculate SAP server capacity to adopt new functionality, how affect workload, performance, memory..etc..
    Kindly any one the list of factors.. and some standard document.
    Regards,
    Karthik

    Hi Karthik,
    First find out the 'capacity' of your current server hardware. Ask the HW provider for the SAPS number of the machines, or look it up on SAP's benchmark sides http://service.sap.com/benchmarks
    Then monitor the current usage of your servers to find out how many SAPS you need for the existing functions, and how much headroom you have left.
    And for the new functions, look whether some sizing guideline exists (http://service.sap.com/sizing) or if a sizing for the new application is implemented in the quicksizer tool.
    With that, it should be a simple a + b = c type calculation.
    Best Regards, Randolf

  • Capacity check problems

    hi,
    i have some questions for the Capacity check problems in Project System.
    1. if one Person is assigned to diffierent Work Centers, for example, person A is assigned to Work Center 01 under Plant 01, and Work Center 02 under Plant 02, how can i do the Capacity check for this person?
    if i want to use A of Work Center 01 in the Project, the System will only check the Capacity of 01, or both 01 and 02?
    2. How to config Capacity check in PS?
    Rgds,
    Liang

    hi,
    1.Capacity check takes place at plant level itself..
    2.Pooled capacity:- This is created separately in [u wil find in PP] and this capacity can be used by different work centers.
    regards
    pushpa

  • Rough-cut Capacity Check at any level on the Plng Hierarchy ??

    Fellow Experts,
    I have the following Planning hierarchy on my self-defined, consistent planning, Info structure:
    MFG Plant >> Prod Family >> Materials.
    Product Family is a grouping of materials by Machine Cells(Work centers). I've the data available @ the material level & the same is also auto-aggregated at the Prod Family levels. At this point I want to trigger Rough-cut capacity check at the Product Family level.
    I've maintained the key-figure on the Info Structure, required data set-up on MC35, config for Scheduling parameters (to do rough-cut planning) & selection ID maintenance for Rough-cut Plng Profile to be picked up. Yet, the system keeps bumping me off with "No Resource Load exists" error.
    Is there something wrong I'm doing or my expectations are incorrect?? Could someone help me out here??
    Cheers
    Anand

    HI,
    Make sure the capacity planning relevant field is maintained for the Infostructure config setttings in MC7F.
    Regards
    Ratan

  • Automate SAP System Health Checks using eCATT

    Hello Mates,
    Can somebody throw light on the possibility of Automating SAP System Health Checks Using eCATT ?
    Are there any readily available scripts within? If so from which version of SAP? or, have they to be custom developed?
    Thanks in advance for your time and responses.
    Best regards, MAN0J

    Hi manoj,
    Examine this ozz note:
    131561
    see this links
    http://www.sap.com/asia/industries/pdf/auto_fin_HC%20Customer%2026jun.pdf
    http://whitepapers.silicon.com/0,39024759,60044324p,00.htm
    thanks
    karthik

  • Capacity check during sale order creation

    hi,
      i have the following doubts,
    1. During sale order creation i need capacity availability check for that i make settings, its working good,if i put the order in the evening time but system take the start time as morning shift starting time.can any one guide me to take the time as the order creation time. and also help me how the system check the capacity.
    2. During sale order creation , if suppose capacity is loaded means it will show a pop up with the name capacities with overload,
      Here i need the clarification how the system calculate the requirements and requirements order, capacity load, from where the system get the information for these calculation.
    Muthamil

    Hello, you are working with a make to order scenario, that means that a planned / production order must be created to address specifically your customer requirement ??
    By standard SAP you can have a capacity availabily check once the production order is in the creation phase....but this should be too late for you.....

  • SAP KW - cannot check in info objects

    Following error message pops up while selecting root object for creating structure:
    The SAP R/3 System reported the following error while trying to retrieve templates:42-638: Error when transferring data.
    Please advise.

    Able to check in objects after changing .ini file and uninstalling MS Word udgrades.

Maybe you are looking for

  • Keyboard shortcuts not working in Prelude CC 2014.1

    Not sure why but none of my keyboard shortcuts are working in Prelude CC 2014.1 For example, I can't use the Cmnd + right/left arrow to move forward or backward from one marker to the next. The keyboard shortcut even in the menu is actually greyed ou

  • User Decision step type

    Hi, I have developed a WF for 'Notification of Absence'. In this, a leave request is sent for approval. When the leave request is Rejected, the creator has to make a decision (User Decision step type used) as to 'Withdraw' or 'Update' the request. Bu

  • How to remove text without changing background

    Hey there, I'm having an issue. I need to remove the text saying "A Innland", but the background isn't quite the same at all points - the further right you go, the lighter it becomes. How would I go on about removing this? The text is ingrained in th

  • SQL 2008 R2 SP2 release to WSUS

    Hello, With the recent release of SQL 2008 R2 SP2 I was curious as to when Microsoft will be pushing it out to WSUS services? I've already done some testing in our environment with a manual download of it, but I was hoping to release it to my product

  • Services disabled for Group and individual

    I have just loaded OSX Server 10.6 onto a mini mac that was running OSX Server 10.5 and have upgraded to 10.6.1 As I was creating user accounts and testing capabilities I noticed that the ability to publish calendars did not work. Looking through WG