Scheduler not reponding

Hi,
I am having an issue with the Scheduler with release Release 10.1.3.4.
The scheduler tab is not responding when I click on it. I was previously able to schedule an indiviual report. However, now when I go to schedule an individual report, I get the following error:
+Exception [TOPLINK-7001] (Oracle TopLink - 11g Release 1 (11.1.1.0.0) (Build 080319)): oracle.toplink.exceptions.ValidationException Exception Description: You must login to the ServerSession before acquiring ClientSessions.+

Restarting the OC4J service resolves this problem and I am able to schedule reports again.
However there is obviously an underlying issue with the scheduler. Has anyone come accross this issue before?

Similar Messages

  • I get this message box when I click on a link (in a document or email)"firefox is already running, but not reponding. To open a new window, you must first close the existing firefox process, or restart your system"

    if Firefox is already running and click on any link in Word, Excel, Outlook, etc. A message box pops up and I have to hit OK to close it.
    "firefox is already running, but not reponding. To open a new window, you must first close the existing firefox process, or restart your system"

    if Firefox is already running and click on any link in Word, Excel, Outlook, etc. A message box pops up and I have to hit OK to close it.
    "firefox is already running, but not reponding. To open a new window, you must first close the existing firefox process, or restart your system"

  • OVi suite do not reponding !

    OVi suite do not reponding ! and if it repondet do not  find My N86 ! even th PC do not find it.. and ! i Have the V30.009 and i dosent have the face detectin !! ...  plzzz hept mee !!,,

    Here you can try to do this workaround:
    1. Click Start
    2. Click Control Panel
    3. Click Programs and Features or Add/remove Programs
    4. Choose Nokia Nokia Cable Connectivity then Change and repair
    5. Do the same for PC Connectivity Solution - Change then repair
    6. Reboot computer
    7. Try to connect the phone again.
    Cheers
    kriz
    "If you want to win friends, make it a point to remember them. If you remember my name, you pay me a subtle compliment; you indicate that I have made an impression on you. Remember my name and you add to my feeling of importance."

  • Acrobat X Not Reponding for 30 seconds almost every time I open a file

    Acrobat X Not Reponding for 30 seconds almost every time I open a file
    The title says it all.
    This happens on 4 computer systems, including:
    Windows 8 64-bit desktop, FRESH INSTALL
    Windows 8 32-bit laptop, FRESH Install
    Windows 7 64-bit desktop, REINSTALLED AND PROBLEM PERSISTS
    Windows 7 32-bit laptop
    I have read long forum postings of people having this problem on many different versions of Acrobat and Reader and tried many of the purpored solutions, none worked.
    I would like some expert advice, but more importantly why hasn't Adobe investigated and solved this widely reported phenomenon that has gone on for years? There is no way I would upgrade to Acrobat XI (which some people report has this problem) unless Adobe acknowledges and fixes this.
    Where do I report this issue to Adobe?

    no idea what IPM is.  not in the help file.  any way, who cares?  this is a bug that needs to be reported.  where does one do that?

  • Ipod nano not reponding fully doesnt say conected to mac

    ipod nano is completly frozen not reponding to computer cant reset what should i do?????

    You need to reset your iPod by holding down Menu and Select for 6-10 seconds...
    Resetting iPod
    It may take several attempts. The above link also has "tips" if your iPod does not seem to be resetting.
    btabz

  • MY IPAD WILL NOT REPOND tHE iCLOUD bACKUP NOTIFICATION IS ON TH ESCREENYET i CAN NOT TURN IT OFF OR TURN THE IPAD OFF.  WHEN i SWIPE TO TURN ON OFR OFF NO RESPONSE,

    My ipad will not repond - the icloud backup notification is on the screen.  I can not remove it by clicking on OK I can not get the slide to unlock or slide to lock to work either.

    Reboot the iPad by holding down on the sleep and home buttons at the same time for about 10-15 seconds until the Apple Logo appears - ignore the red slider if it appears on the screen - let go of the buttons. Let the iPad start up

  • Scheduling not possible; duration cannot be greater than interval

    Hi,
    i am runing one yard management scenario.When i am trying to schedule the activity of a vehicle in yard monitor system showing the message "Scheduling not possible; duration cannot be greater than interval
    Could you please help in this regard?
    Sandip

    can you tell me which version it is >
    i try to fix in dtexec
    getting following error :
    Started:  2:02:13 PM
    Error: 2015-01-30 14:02:14.68
       Code: 0xC000F427
       Source: Member Eligibility
       Description: To run a SSIS package outside of SQL Server Data Tools you must
    install Member Eligibility of Integration Services or higher.
    End Error
    Warning: 2015-01-30 14:02:14.69
       Code: 0x80019002
     Description: SSIS Warning Code DTS_W_MAXIMUMERRORCOUNTREACHED.  The Execution
     method succeeded, but the number of errors raised (2) reached the maximum allow
    ed (1); resulting in failure. This occurs when the number of errors reaches the
    number specified in MaximumErrorCount. Change the MaximumErrorCount or fix the e
    rrors.
    End Warning
    DTExec: The package execution returned DTSER_FAILURE (1).
    Started:  2:02:13 PM
    Finished: 2:02:14 PM
    i cannot upgrade original package

  • Help! My iPhone 5 wont turn on after battery died. iPhone is not reponding to charger or anything I have tried...

    Help! My iPhone 5 wont turn on after battery died. iPhone is not reponding to charger or anything I have tried... Hard reset is not in option beacuse iPhone is turned off.

    Your only chance is letting it charge for about 10min, then connecting it in recovery mode, explained here:
    http://support.apple.com/kb/HT1808
    If it does not charge at all, you'll have to get it serviced by Apple.

  • KM Scheduler not working

    Hi all,
                   I have created a KM Scheduler and have also set the time table to it , but never runs at the scheduled time. And when I deploy from NWDS , I get the following errors.
    com.sap.portal.plugins.ConfigFrameworkArchiver > No privateArchive.properties file is defined.
    [25.06.10 / 19:21] #ERROR LEVEL# com.sap.portal.plugins.ConfigFrameworkArchiver > Missing file plugin.header.properties in /KMScheduler/src.config/install/meta/expanded/cm/services/schedulertasks
    [25.06.10 / 19:21] #ERROR LEVEL# com.sap.portal.plugins.ConfigFrameworkArchiver > Config archive successfully created (time to export 750 ms)
    Is it because of the above errors that the Scheduler is not working? How can I rectify the above errors?

    Hi,
    Have you assigned a CM system to the Scheduler, if already assigned, try assigning a different node if available. Also check whether there are any errors at the scheduled time when the scheduler is supposed to run.
    Also try uploading the par through support and see whether the error is coming.
    Regards,
    Vinod

  • Scheduling agreement delivery schedule not continue for a next month.

    Hi.!
    What are the setting I have to maintain so that delivery schedules are transmitted OR used for particular month not beyond that.(means not required to continue for next month.)
    Thanks and regards,
    Prashant

    Hi,
    You can limit the validity to date (e.g. 31.12.2008) you want in "Source list" via t-code ME01, then after 01.01.2009 system will generate the planned orders instead of the schedule lines in SA.
    Regards
    Tao

  • Route schedule not updated in some line item of a sales order

    Hi Gurus,
    All order are processed through the EDI interface automatically. Order
    XXXXXXXXX for USA customer 40000XXXX is maintained in route reschedule
    setup T-code VL52 on specific departure day thursday.
    above are line item of same sales order, with same shipping point and route .
    Why only some salesorder lines missing the route schedule ?? 
    Please Help
    Regards
    Abhilash

    When you post a query here, you need to have patience until some members go through your post.  Please dont expect somebody should respond to you immediately as everybody has their own priorities.
    Coming to your query, it could be due to many reasons as per the following note:-
    Note 1750978 - Route Schedule does not populate on sales order
    Go through the Resolutions given in the above note and check with your system
    G. Lakshmipathi

  • MRS (Multi resoource scheduling) not working properly

    Hello All,
    We have MRS 610  installed in our landscape. We have configured it to integrate with Maintenance orders. We are facing an issue as to not all orders are reflected in the planning board though we make exact replica of orders which already exists in the planning board. Those orders which are there in the planning board doesnot reflect the changes that are done to it in PM module. I have checked all the demand related configuration settings and all seems to be fine. The inegration between PM and MRS is not working properly. Orders are getting pulled into the planning board if we run the report /MRSS/SGE_DEM_DATA_MIGRATION.
    We recently upgraded to SP4 level. Kindly help me to trouble shoot this issue.
    Many thanks in advance.
    Boby

    Dear Bob
    As far as I have understood that your problem is that the backward integration is not happening.
    That means whenever you are assigning a resource to the PM Order these alocation are not reflected in PM Order. Just check following points.
    1. Check weather you have activated back integration of PM or not !
    2. Check this under the node: Sources of Demands->Orders-> Control integration of PM/CS Orders
    3. Also make sure that you have activated back integration of demand type R3OR in the node Sources of demand.
    4. Check PM Settings related to Work centre
    5. Apply the Note 1135513 - MRS: Changes to standard for PM/CS
    integration
    Also please go through the Documentation supplied with the sofware Installation CD for MRS.
    It gives step by step activities how to proced with config.you will have to go through this documentation very thoroughly as all information is avalable .
    Also check this link
    http://help.sap.com/bp_serv603/ServInd_DE/html/index.htm
    This link gives  best practices for services industry.
    Go To Business Information > Preconfigured Scenarios > (Right hand side )>SAP ERP Scope >Scenarios - by Business Areas>Project Resource Management >Service Order with Resource Scheduling (MRS).
    This will serve you as guidance for configuration.
    With regards
    Mangesh

  • Scheduling not carried out in BAPI_PROJECT_MAINTAIN

    Hi All,
    I am facing a problem that while updating the basic start date and basic end date for WBS elements using BAPI_PROJECT_MAINTAIN, the scheduling is not being carried out. Basic dates of WBS Elements are saved properly. But the project start date and end date are not updated accordingly.
    I am passing the following inputs:
    I_PROJECT_DEFINITION = <Project Number>
    I_PROJECT_DEFINITION_UPD-PROJECT_DEFINITION = 'X'.
    I_PROJECT_DEFINITION_UPD-START = 'X'
    I_PROJECT_DEFINITION_UPD-FINISH = 'X'
    I_WBS_ELEMENT_TABLE-WBS_ELEMENT = <WBS element Number>
    I_WBS_ELEMENT_TABLE-PROJECT_DEFINITION = <Proj Defination>
    I_WBS_ELEMENT_TABLE-WBS_BASIC_START_DATE = <Basic Start Date>
    I_WBS_ELEMENT_TABLE-WBS_BASIC_FINISH_DATE = <Basic End Date>
    I_WBS_ELEMENT_TABLE_UPDATE-WBS_ELEMENT = 'X'
    I_WBS_ELEMENT_TABLE_UPDATE-PROJECT_DEFINITION ='X'
    I_WBS_ELEMENT_TABLE_UPDATE-WBS_BASIC_START_DATE = 'X'
    I_WBS_ELEMENT_TABLE_UPDATE-WBS_BASIC_FINISH_DATE = 'X'
    I_METHOD_PROJECT-REFNUMBER = '00000'.
    I_METHOD_PROJECT-METHOD = 'SAVE'.
    I_METHOD_PROJECT-REFNUMBER = '00001'.
    I_METHOD_PROJECT-OBJECTTYPE= 'WBS ELEMENT'
    I_METHOD_PROJECT-METHOD = 'UPDATE'
    I_METHOD_PROJECT-OBJECTKEY = <WBS element number>
    Please let me know the resolution to this problem.

    Hi All,
    I am facing a problem that while updating the basic start date and basic end date for WBS elements using BAPI_PROJECT_MAINTAIN, the scheduling is not being carried out. Basic dates of WBS Elements are saved properly. But the project start date and end date are not updated accordingly.
    I am passing the following inputs:
    I_PROJECT_DEFINITION = <Project Number>
    I_PROJECT_DEFINITION_UPD-PROJECT_DEFINITION = 'X'.
    I_PROJECT_DEFINITION_UPD-START = 'X'
    I_PROJECT_DEFINITION_UPD-FINISH = 'X'
    I_WBS_ELEMENT_TABLE-WBS_ELEMENT = <WBS element Number>
    I_WBS_ELEMENT_TABLE-PROJECT_DEFINITION = <Proj Defination>
    I_WBS_ELEMENT_TABLE-WBS_BASIC_START_DATE = <Basic Start Date>
    I_WBS_ELEMENT_TABLE-WBS_BASIC_FINISH_DATE = <Basic End Date>
    I_WBS_ELEMENT_TABLE_UPDATE-WBS_ELEMENT = 'X'
    I_WBS_ELEMENT_TABLE_UPDATE-PROJECT_DEFINITION ='X'
    I_WBS_ELEMENT_TABLE_UPDATE-WBS_BASIC_START_DATE = 'X'
    I_WBS_ELEMENT_TABLE_UPDATE-WBS_BASIC_FINISH_DATE = 'X'
    I_METHOD_PROJECT-REFNUMBER = '00000'.
    I_METHOD_PROJECT-METHOD = 'SAVE'.
    I_METHOD_PROJECT-REFNUMBER = '00001'.
    I_METHOD_PROJECT-OBJECTTYPE= 'WBS ELEMENT'
    I_METHOD_PROJECT-METHOD = 'UPDATE'
    I_METHOD_PROJECT-OBJECTKEY = <WBS element number>
    Please let me know the resolution to this problem.

  • Scheduling not working in InfoView for printing or email

    I recently upgraded from Crystal Report Server XI R1 to Crystal Report Server 2008. My schedules for reports were lost. I rescheduled some using infoview. They ran as scheduled but would not print or email. I had to reschedule them using CMC. They then worked. Is there a configuration setting to allow scheduling to work in info view? Is this a security issue. I was logged on to infoview as admin.

    You may want to check the job server settings to ensure that Email is an authorized output.

  • T:schedule not defined in tomahawk.tld

    Hi, I have been trying to use the tomahawk schedule component.
    I have faced 2 problems up to now:
    1st... Cant find in a maven repository the adequate tomahawk jar file, so I downloaded it manually and put in the repo.
    2nd... The tld <%@ taglib uri="http://myfaces.apache.org/tomahawk" prefix="t"%> does not have the tag definition to the schedule component.
    Here is my eclipse .classpayh entry: <classpathentry exported="true" kind="var" path="MAVEN_REPO/tomahawk/jars/tomahawk-1.1.4-SNAPSHOT.jar"/>
    What should I do to solve this problem?
    Thanks

    Hello,
    schedule passed from the sandbox project to the tomahawk, and it seems to me that it was not correcty deployed with the 1.4 snapshot...
    i found the tlds for t:schedule under 1.5 snapshot. though it is an unofficial release you can reach it changing at http://people.apache.org/builds/myfaces/nightly/
    inside there are schedule examples and tlds...
    good luck.

Maybe you are looking for

  • Restriction for release of billing document to accounting

    Hi All, Need you inputs for meeting the below requirement. There is a requirement to control the release of billing document of a certain billing type to accounting based on certain users. The posting block has already been ticked at the definition o

  • I need to get the cluster information using"MSCluster.Cluster" object

    Hi, Please anyone solve my problem ? I need to get the cluster information using"MSCluster.Cluster" object. Set objCluster = CreateObject("MSCluster.Cluster") objCluster .open <clustername> If i run the vbscript " Microsoft VBScript runtime error: Ac

  • Internal table occurs 0 --------- why obsolate?

    Hi, Can anybody tell why the declaration of internal table occurs 0 and internal table with header line is obsolate now? Explain the adavantages of newer one. is there any performance related issue? Thanks in advance Debjani Lahiri

  • Migrating from 8.1.7.4 to 9i.....Issues??

    I have 4 separate projects that I have created and am using in an 8.1.7.4 instance. We are going to be upgrading both test and production servers to 9i instances. What do I need to do to ensure OWB projects will be fine in 9i? Is there a checklist of

  • Handling existing Podcasts

    I've read a lot of posts about people (like myself) who have a lot of existing podcasts from other sources, and would like to use iTunes to manage and sync them. So far, it seems that there is a tag "Media Kind" which needs to be set to "Podcast", bu