Scrap scenario

Hi Guys,
     My client wants to post the scrap and sell it. we are using REM.
scenario is
1) subcontracting - metal sheet will be sent to vendor and it will comeback in different size along with the scrap (vendor sends back the scrap getting generated during the operation)
2)operation scrap & component scrap
I have gone through many threads but iam not sure about the process like...
in MFBF i can select the scrap option and post it
Mb1a  i can issue the scrap using 551
using MB1B i can just transfer the material to the scrap storage location (only for component scrap)...which one is ideal??
how can i proceed?
Thanks,
SRK

IF U Maintain a Scrap  % In Operation , U could n't able to sell
Thats why mr Guru asked to create a Material code for the scrap with Scrap Value and maintain a - ve qty In BOM
and tick the backflush indicator and assign it into routing. when U confirm the operation, go to goods movement, U can change the qty as per the actual and post the scrap, scrap will update the stock and U can sell.
maintain  scrap % in Operation is only used for planning.
regards,
Sundaresan

Similar Messages

  • Mapping of scrap scenario

    Hello Experts,
                          I have a scenario were I need to map scenario for scrap, while producing finished product.
    Example: Finished product --A
                   Semi-finished product--B
                   Raw material product--c
    While producing product A, some of B material gets as scrap for me, but if send it to a process industry(sub-contracting to vendor) i can get it back as my raw material C.
    please suggest me how can I map my scenario.
    Thanks
    Satya

    Hi,
    If you always send it for sub contracting then
    Make finished Product as A
    Semifinished Product as B
    Semi finished product as C (in you case RM)
    Bi product as D (Which you termed as scrap)
    Now make a BOM of C in which D will be component.
    send material D for sub contracting and recieve material C from vendor.
    Regards,
    Vishal

  • Credir Memo Scenario

    Hi expert
    i need to give a vendor credit memo after i send the material for scrap
    scenario :
    i procure a Packaging role i dont find any quality rejection when its check at quality dept, because we come know the material at the time of opening of packaging role at the time of production.
    then we send the particular quantity for scrap, now in this case i dont do vendor return, because i have internal agreement with the vendor for the same.
    For the same i would like to for credit memo for the vendor, because at the time of audit, it will show a liabilities.for FI dept
    Regard
    Nabil

    If you invoiced already,then do credit memo for scrapped qty & value.
    Edited by: Jeyakanthan A on May 11, 2011 2:17 PM

  • Scrap reduction in MFBF

    Hi All,
    Can anyone explain Scrap scenario in REM using MFBF transaction
    1) if scrap is not maintained in Material master/BOM  then by using MFBF scrap option can we do it?
    2) REM Confirmation type  - Activity backflush  usage  or scenario
    plz explain
    thanks
    Ather

    I've been using Creative Cloud since last September and been paying AUD $37.99 + AUD $1.14 exchange rate fee (yes I am bitter about that), however I just looked at my account and it shows my monthly subscription payment is now $29.99.  I guess I'll need to wait until 28 Feb (invoice date) to see what gets charged to my credit card.
    Cheers, Peter

  • Sales order for scrapping

    Hi friends,
    We had  some old materials recycled .  Our gain from recycling is far under material's standard cost.  For the recycling gain, we are going to bring in it with sales order. However, the margin will be too low and will make the gross sales revenue inaccurate.
    My question is
    1. What is the process like to handle this scrapping scenario with sales order.
    2. should we handle this scenario with new order type
    3. Will the GL against this type of sales be changed from sales revenue to something else?
    Your advices will be deeply appreciated.
    Thanks,
    Linda

    Hi Linda
    If I understand correctly, you sold some old materials to a recycler at a reduced price.
    On the basis of what you have told us, this should be treated as any other sale.  The fact that the sales price is less than the material's standard cost is irrelevant.  Technically, your accountants should have written down the value of the stock when it was realised that the stock had declined in value.  If they have not done so, then you should be taking the financial hit when you sell the stock.
    I do not understand why you say that this transaction will make the gross sales value inaccurate.  Product is being sold.  The average margin will be brought down by this transaction, but that is what is happening.
    For the sake of simplicity I would not create any new config just to support this one transaction.  If the accountants in your organisation feel that this transaction should not be accounted for as a normal sale then they should make FI adjustments to reflect this.
    Regards
    James

  • Assembly Scrap Calculation

    Hi all
    We are using assembly scrap scenario. To produce 3900 finished goods we have to start by producing 6000 and becaus of scrap end up with 3900. The scrap is 6000 - 3900 = 2100. We can achive this by putting a assembly scrap factor. The calculation would be 2100/3900 = 53.84615385 % will be the scrap factor. Now we will have to round this to 53.85 in SAP. Is there a way that the assembly scrap factor could be calculated in a way where 3900/6000 = 60% . This way I get a nice round number instead of 53.85
    Any thoughts on this
    thanks a lot

    Hi John,
    Donot calculate your %rejection on the basis of single reading...it should be calculated on the basis of you historical readings database...it is not necessary that everytime scrap will be 2100 pcs to produce 3900 pcs it may vary accordingly you % will also vary...so you should take mean of thease and decide the scrap % system will automaticaly plan that many additional pcs in planning run...
    i.e. If your assembly scap is 55%and you want to produce 4000 pcs then 0.55*4000=2200 additional pcs are req. means actually you need to produce 6200 pcs.likewise everytime system will calculate scrap you just have to enter your req. qty.
    where as %scrap fig can be kept on higher side as well lower side depending upon your tolerance limit and safety (buffer) stock if you maintain.
    Regards
    Hemant gadhari

  • Automatic generation for credit memo

    Hi Experts ,
    I have 2-main scenarios for vendor returns process :
    1- Regular Scenario:
    a-Replacement the rejected goods after sending these goods back to the vendor(in this case the fresh goods will be received against the same P.O)
    b- creation of credit memo , that means the vendor won't be able to replace the rejected goods (in this case , my client wants to generate credit memo in the system automatically or some alert to be triggered to the responsible person to create the credit memo in the system ?????)
    2-Scrap Scenario:
    a- vendor will tell my client to scrap the rejected goods  and he will send fresh goods instead of these rejected (i this case my client will receive the fresh goods by movment type "501" to avoid affecting the moving average price of material, so how the warhouse person will come to know that fresh goods will be against these goods which has been scrapped?????)
    b-vendor will tell my client to scrap the rejected goods  and he will ask my client to place debit note for him (in this case , my client wants to generate credit memo automatically or some alert to be triggered to the responsible person to create credit memo in the system????)
    Regards

    check this link. it has given how to set output type for pdf/smart form, I think same output type need to be used but for Idoc type GSVERF
    http://help.sap.com/bp_bblibrary/500/Documentation/G93_BB_ConfigGuide_EN_US.doc
    In this step you define a Output Determination Procedere for the Billing Documents (Credit Memos) creating on Sales return Process.

  • Scarp Mapping.

    Dear MM Gurus,
    Here I have scenario that getting scrap from production, for that using movement type 531/551, apart from that maintenance  scarp getting from plant and capital consumption, so I need map this scrap scenario into SAP. So please advise me which movement type is appropriate?
    How to increse scrap stock at stock level?

    HI
    Fits thing is that what you want ? your client business requirement  ?
    You want sale that scrap ? you want to book inventory for that scrap? these are import things.
    for same you have to create material code and material type  if business required.
    If its is valuated ,then you have to do setting in OBYC for same ,if it is not valuated only qty update and if you have already material type with you for qty update then you can continue with that material type and only create new material code .
    can you explain in details
    Regards
    Kailas Ugale
    Edited by: kailasugale on Dec 15, 2011 3:25 PM

  • Repetitive Component Scrap for MTS scenario using MFBF transaction

    Hi,
    We are trying to replicate the functionality of posting a backflush document to process Repetitive material component Scrap for MTS scenario with BOM explosion using MFBF transaction into a custom RF program.
    We tried to use 'BAPI_REPMANCONF1_CREATE_MTS' to backflush the Scrap for the above scenario. But it did not help. And no other BAPI's exist. BDC'ing the transaction doesn't help as it contains Table Controls and lot of subscreens an dit is highly volatile for a RF screen.
    In view of above restrictions, we are not able to find a solution of how to implement the above functionailty in a RF program.
    Can someone please help us in this regard.
    Thanks.

    Any Body plz ? .. Even I need this.

  • Assembly scrap in REM scenario

    Hi Experts,
    My scenario is relevant to REM, during back flush in transaction MFBF am posting the assembly scrap by selecting assembly scrap radio button and in the scrap posting screen with reason of variance, as per logic the quantity of the plan order should be reduced by scrap quantity, am able to see the goods issue document but the plan order quantity is not getting reduced.
    Are there any specific setting needs to be done for posting of assembly scrap?
    Please help to explain the complete process of assembly scrap in case of REM.
    Regards
    cs

    Hi Anupam,
    I have checked the process as per your advise and it is working fine, but here am having an issue as if am scraping through quality it is scrapped with movement type 553, which is booked as loss.
    But actually we are retrieving the components from these 5 units and reusing them in another FG.
    As we are working with REM we are using CO07 production order without material for rework purpose in that case the scrapped assembly is issued to production order and components are retrieved with 531.
    Is there any possibility that the scrapped assembly can be shown as stock and issuance can be done?
    Or how can we address this scenariou2026
    Regards
    Chandan

  • Scrap in Repetitive scenario

    Hi,
    My client produces different species of plants in nursery. Total planned order qty is 100, in MFBF client wants to post finished qty as 90 only because rest 10 qty is scrapped ( wasted).
    Finished product has only one BoM item as seeds and one operation as labor operation.
    How to do this in SAP and what about cost( of scrapped: material and labor ) and its related reports??
    Regards.

    Hi Anupam,
    You said material document with V type is in MF12. I searched but couldn't find exactly as you said rather the V type which i found in MF12 was for documents created with reprocessing records. And now you are saying "  as such there is no indicator in MF12".
    Please explain in detail.
    Thanks for your effort.
    Regards.

  • Scrap in copa by customer,country....CO-PA costing based scenario

    Hi expert,
    I have a question. In KE30 I have value field for scrap with an amount and my user want to see this amount splitted by customer, but if I select customer I donu2019t have any value linked, all the value is not assigned to char custumer
    The pp order that generate this scrap is linked to an SD order, so I think that there should be the link with customer.
    I have seen that Profitability Segment Characteristics KNDNR Customer is created and in transaction KEDR I have the following:
    In step 13, Table lookup Sort field from Customer, in detail:
    Definition :
    Source fields for table lookup
         KNA1 KUNNR Customer Number 1 =CO-PA KNDNR Customer
    Assignment of table fields to target fields
         KNA1 SORTL Sort field =CO-PA SORTL Sort field
    Condition : Nothing
    Attribution : Nothing
    what i shoud do or check to have scrap by customer as detail in my report. I also would like to see the value field splitted by country , continent...etc all this char are already created and mentioned in KEDR.
    i have more then one comany code.
    thanks

    Hi,
    how could i be sure that scrap are charged on PP? If i look at ke24 and i select value field for scrap i can see from orign data the PP order and SD order.
    In Characteristics of copa doc in Customer related chars i have the following filed mentioned but empty:
    Customer
    Country
    Customer group
    Sales Group
    Sales Office
    If i enter a new rule of derivation how can i update the historical data? to see all old scrap assigned to the characteristics of customer, country....ecc there is a tcode for update?
    For country i have found already this derivation rule:
    Source field:
    CO-PA     LAND1     Country Key
    target fields
    CO-PA     WW030     Continent
    why it doesn't work? if i have more company code should i enter them in folder condition of the derivation rule step?

  • Reconcilliation of the Scrap w.r.t challan in case of subcontracting.

    Dear All,
    My client is having the requirement is to do the reconcilliation of the scrap qty , which got generated at the vedor's end w.r.t subcontracting challan
    ,As per the Indian Excise Law , total weight of the material(raw material) going outside for the subcontracting has to
    come back of same weight (finished good /raw material itself )only within 180 days, if it has not come back , then company has to reverse the cenvat credit taken.
    Now in our scenario ,suppose Purchase order created of 80KG and in the BOM, raw material is mentioned as 100KG in the +ve qty and 20KG as the -ve qty as the By product, Now during the 541 , qty sent is of 100KGbut Finished good recieved is of 80 kg as per PO qty , and corresponding reconcilliation is being done and after this , system is allowing to compelete the subcontracting challan,but at the same time by product which was given in the -ve qty , has not come back.
    So as per the Excise Law total weight has not come back on the challan ,so system should not allow to compelete the challan. and accordingly Cenvat Credit has to be reversed.
    Please suggest the way out , how the receiving of Scrap can be done against the subcontracting challan and reconcillaiton
    Client is not agreed to receive the material by movement type 542 , which has no linkage with the subcontracting challan.
    Regards
    Nitin

    not answered

  • How to move return stock to scrap

    scenario: where we ship goods to customer but the goods are not reached to customer or lost meanwhile we do replacement  to the same customer but the goods that are not reached or lost will be back after somedays so we need  this material to be scrapped.so how to move goods to scrap?
    where we need to move return goods from customer to scrap . can any body tell me step  by step process please...
    can we do directly by MIGO (Goods issue the order to scrap)  by using 551 Movement type and adding new Reason for movement as Lost..? it will have any financial implications?
    or
    please suggest the new prcoess
    Thanks
    arjun

    scenario: where we ship goods to customer but the goods
    are not reached to customer or lost meanwhile we do replacement
    to the same customer but the goods that are not reached or
    lost will be back after somedays so we need this material
    to be scrapped.so how to move goods to scrap?
    What happened exactly ?????Customer has taken insurance ? Whether material has reached your location?
    Edited by: Jeyakanthan A on Jul 6, 2010 9:39 AM

  • Sale of imported scrap

    Hi,
    The scrap is either imported or purchased through high sea purchase and if the material is found inferior quality the same will be returned to the party or on the supplieru2019s advice the material will be sold to another customer.
    The AED paid on the imported material or the material purchased through high seas purchase will be transferred to the supplier or the new customer. The required tax Procedure will as follows:
    Assesable Value          100.00                   622,768.57
    CVD     14%             14.00      14% on assesable value     14%          87,187.60
    Cess on CVD     2%               0.28      2% on CVD     2%            1,743.75
    HSCess on CVD     1%               0.14      1% on CVD     1%                871.88
    Customs Cess     2%               0.29      2% on CVD, Cess and HSc on CVD     2%            1,796.06
    Customs Hscess     1%               0.14      1% on CVD, Cess and HSc on CVD     1%                898.03
    AED     4%               4.59      4% on the above total     4%          28,610.64
                   119.45                   743,876.53
    TN Vat     4%               4.78      4% on the above total     4%          29,755.06
    Gross Value               124.22                   773,631.59
    The above calculation is followed on payment of import duty. Out of the duties mentioned above, except cess on customs and HSCess on customs, other duties are eligible for input credit. Hence on sale we will have to reverse the input credit taken.
    At present, we are selling the scrap which is arising out of our manufacturing activity. The provision of TCS is applicable on sale of these scraps. In the earlier one it is only trade and the scrap is not out of the manufacturing activity. Hence there is no TCS provision is required.
    The RG1 Sales register is to be updated whenever the sale of imported scrap is made with CVD, Cess on CVD, HSCess on CVD and AED.
    help me
    shrinath

    Dear Sangshetty
    Is this a trading scenario?
    1) You are buying material from one country & sell it highseas to a customer
    2) You are selling the same material at Bond sales thru bonded warehouse
    3) You are transferring materials from bonded to your local wharehouse paying all duties & further sell it off taking cenvat credit
    In first case you are paying no duty
    Second case only VAT will come
    Third case BCD+ CVD + cess on cvd+ ecess on cvd + Cess + Ecess + AED
    You have to map the third case like depot sales. J1IJ while capturing materials
    J1IG while selling the same. In this case you passon the exact duty what you have paid to govt. The duty is not based on your selling price. So after you do pgi you do J1IG transaction which will pass percentage duty what you have paid first to the sales volume. In this case the pricing analysis tab wont reflect the actual duties
    Just try this
    Regards
    Deepu Pillai

Maybe you are looking for

  • How To Handle DB That Takes Time To Open

    I am using DAO to link sql server tables into mdb.  With one database I have it takes roughly 60 seconds for the database to become available to link in the table.  When I open the database normally (w/o code) it takes about 5 seconds for the Databas

  • Error while using BAPI_DOCUMENT_CREATE2

    Hi All, I am using the bapi BAPI_DOCUMENT_CREATE2 for creating a Document info record. I am getting an error "You are not authorized for activity 52 document type QUA". Can any please help with this. Regards.

  • Looking for Best Program to Create Online Training Lessons

    I'm looking to purchase some software to create online training lessons. The lessons would consist of screen shots, dialog boxes, narration, possibly animation. Given that Captivate has Flash, I'm hopeful that it would do the trick and be somewhat us

  • Edit previous lifecycle designer file, now on mac

    I made a interactive PDf in lifecycle designer a couple of years ago when I was on PC, now i am exclusively mac and they want me to update the file.  I am only updating the logo and small print, not the interactivity.  How on earth do I do this witho

  • DWMX2004 -- I can't get it to recognize a SWF

    I'm trying out Flash CS3 with my trusty ol' Dreamweaver MX2004, on Mac OS 10.4.9. I've had another DW site active for four years; this is the first time I've tried Flash. The swf plays as expected (I've posted it for reference at www.somethinghappeni