[SD] table for Schedule line date

If we display a sales order through Va03 and Go to tab Item overview. There is a excel sheet kind of display showing
all items. The 12th col is 'First Date' and the f1 help says its 'Schedule line date'.
I need to display this date in my report.
<i>F1 Help Says :</i>
<b>Schedule line date</b>
The delivery date for the schedule line. The delivery date can be the
Date requested by the customer, or (if the requested date cannot be met)
Earliest date proposed by the system after automatic availability checks and delivery scheduling
<b>Use</b>
The system uses the delivery date for each schedule line together with predefined time estimates for delivery activities (such as picking and packing) to determine the
Material availability date
Loading date
Goods issue date
Transportation planning date
<b>Dependencies</b>
If you want the system to automatically determine the above dates, the Delivery scheduling and Transportation scheduling fields must be active in the sales document definition ( Tools --> Customizing, Sales and Distribution --> Basic Functions --> Delivery scheduling and transportation scheduling --> Define scheduling by sales document type).
<b>Note</b>
If there is more than one schedule line for the item, the system displays the earliest delivery date in the item and overview screens.

Hi flora
You can get he details of the schedule line data in the VBEP table.
EDATU is the schedule line date
regards
kishore

Similar Messages

  • How to back date for schedule line date of Consignment Fill-Up

    Hi,
    There are available stock for the material used. In VA01 of order type KB - Consignment Fill-up, I put in a backdated schedule line date (example: 09.09.2008). However, the system automatically proposed a new schedule line date of today's date (example: 13.10.2008).
    How can I remain the backdated date with confirmed qty instead of today's date?
    Thanks.

    Hi Wooi Ling
    when system is not able to confirm the schedule lines, the system would give a proposal date on which the requirement can be met.
    in this case ,you can do one thing , you can set the indicator " Fix date and quantity " in the item schedule line. this would fix the date and the quantity for delivery and the schedules lines.
    this would also mean the customer accepts the delivery and quantity confirmed by the system, The system then passes on MRP requirements so that the confirmed date and quantity can be met.
    hope this helps
    thanks
    akasha

  • How to use customer extension table for schedule line for shopping cart ?

    Dear Experts,
    One of our client wants to have schedule lines in shopping cart item. I am thinking of using customer extension table at item level for shopping cart. Could you please help me on  how I should proceed with the appending the structures so that the end user can fill the shopping cart schedule line details?
    Which fields should I consider in such cases?
    Thanks and regards,
    Ranjan

    Hi.
    I guess you use SRM 7.0. Please go to IMG.
    SRM -> SRM Server -> Cross-Application Basic Settings -> Extensions and Field Control (Personalization) -> Create Table Extensions and Supply with Data
    Regards,
    Masa

  • Schedule Lines dates for sales order

    Our goal is this:  On the line item > Schedule Line tab there is the requested delivery date.  In the details of that schedule line there are five different dates:
    Delivery Date
    Goods Issue Date
    Loading Date
    Material Aval. Date
    Transportation Plan. date
    We need to be able to put in the customers requested date that is in the future on this schedule line, but if the parts were to be recieved in earlier then the date they requested, then we would want the parts to ship out early automatically.
    For Example:  Customer Requested date is 01/31/08  and the parts are confirmed to come in on 01/31/08.  The parts end up coming in on 01/20/08, so the next time the delivery list is run, we would like the parts to ship out right away.
    Is there a way to do this?

    Thank you for the quick response.  I understand that we can use the reschedule report to manually monitor the product whether is comes in or not, but was hoping to achieve having a static date on the schedule lines of when the customer requests the parts, and then the delivery date that activates the MRP and ATP checks would be an earlier date.  So when the parts come in, it would read from the delivery date.
    Not sure if this is even possible, or if SAP standard for the schedule line dates is to how only one active date per schedule line.

  • Schedule line date in Sale order for backward sched.

    Dear Experts,
    In my MTO Scenario, I want to Use Backward Scheduling, so as any change in Schedule line dates in Sale order shall take effect at least in planned order Stage, i.e in output of MRP,
    But not happening so..
    I  have customized OPU5 and checked OPU3 as well,
    Please suggest...
    Regards
    Raghu

    HI Mario,
    Thanks for reply,
    I have not worked in this strategy but will try,
    What i found was, in Planned orders detailed scheduling tab, the Scheduling type appeares to be Forward, but when i convert it to Production order it shows backward scheduling.
    This duel behavior is difficult to understand.
    Regards
    Raghu

  • GRs created for schedule line of future date

    While making Goods Receipts using MIGO transaction, we are seeing tha GRs can be done for scheduling agreements having schedule line of future dates. Is there some way of restricting the GR upto to current date only. Meaning suppose if I have the following schedule lines:
    category of delivery date         delivery-date           schedule quantity
    M                                               01.2010                   100
    M                                               02.2010                    200
    M                                               03.2010                    150
    Currently the system is allowing to do GRs of quantity = 450 (100 + 200 + 150) in the month of February, 2010.
    But I want that while doing a GR in February, 2010 the system should allow to do GR of quantity 300 only (100 + 200). Please let me know how we can do so in the system.
    Regards,
    Pratima.

    Dear Veer,
    Your answer has helped in the MIGO transaction. Please let me know if something similar is possible for inbound deliveries also. Meaning like in MIGO transaction, I should not be able to make inbound deliveries (in xns VL31N) for schedule lines of future dates / months.
    Regards,
    Pratima.

  • Step wise config data for schedule line agreements

    DEar All,
    I need urgently one the foolowing doc:
    step wise config data for schedule line agreements.
    thanks
    regards,
    s KUMAR

    Hi,
    1) Scheduling Agreement is a long term agreement and PO is normally a one-off. When you have long term relation with supplier you will go with SA.
    2) SA need not have delivery schedules at the time of ordering. It's like a contract with vendor for all basic prices, quantities & terms. You will release schedules as & when required. This method is very popular with manufacturing ind (e.g. automotive) where they negotiate prices but delivery schedules are given periodically based on their actual production/sales demands.
    3) In a PO, you must give schedules in PO itself.
    4) If you know contract & release order (or call-off) concept, then SA is like contract and SA schedule is like release order. PO is release order.
    or
    While using schedule agreement, you will create delivery schedule, when ever you require materials.
    Firm and trade off zone in delivery schedule details will be forwarded to your vendor. you can create daily , weekly , monthly schedule lines
    Example : if you have created a schedule agreement for product " A " for quantity 1000, and you require material of 100 nos in the first month, you can create schedule line for this 100 only and this will be transmitted to vendor( if you are using LPA you have to release schedule line). when ever you require further qty based on your requirement you will create another delivery schedule line, then it will be transmited to vendor.
    In case of PO if you are ordering 1000 qty , you need to specify the delivery date in Purchase order it self, and all the dates are immediately transmited to vendor along with Purchase order.
    For configuration steps please follow
    http://help.sap.com/saphelp_47x200/helpdata/en/93/7439fb546011d1a7020000e829fd11/frameset.htm
    Hope this will help.
    Thanks,
    Raja

  • Inbound Delivery for Schedule Lines of future date

    We have a requirement where in we want to disallow inbound creation for scheduling agreements for schedule lines of the future. For example if we have the following schedule line for a scheduling agreement
           Month        Quantity
    M    01.2010     100
    M    02.2010     200
    M    03.2010     150
    Currently the system is allowing inbound delivery creation of quantity = 450 (100 + 200 + 150) in the month of February, 2010.
    But I want that the system should allow inbound delivery creation in February, 2010 for quantity 300 only (100 + 200). Please let me know how we can do so in the system.
    Regards,
    Pratima.

    Hi Rami ,
    Maintain different schedule lines in PO - Item Details - Delviery Schedule tab.
    This would allow only those qty that is due on that date when creating inbound delivery.
    Regards
    Ramesh Ch

  • Schedule line date vs actual delivery date

    Hi All,
    Is there any standard report or work around available to compare customers schedule line date vs actual delivery date
    Thanks & Regards,

    Hi Abir,
    I think your talking about a "On time Delivery report" to track actual delivery against the quoted delivery.
    There is no standard report available in SAP for this.
    This is hard to track if you have maintained multiple schedule lines for a one single line item.
    (Where you maintain multiple delivery dates in schedule line level to quote  multiple delivery dates. If you have maintained multiple line items to quote multiple delivery dates, this would have been easy)
    Because you do your delivery based on your sales order line item. Not based on your schedule lines. Therefore in your delivery line item table (LIPS) you cannot see Schedule line number. Therefore you cannot compare quoted delivery against actual delivery date.
    Assuming you have maintained your multiple delivery dates in Schedule line level, this is how you have to proceed.
    - Use VL10E transaction to create delivery against schedule lines.
    - Create append structure in the LIPS table to accommodate to carry the schedule line item of sales order in each delivery document + Line Item combination.
    - Use this user-exit u2013include  MV50AFZ1. Can save the particular sales order schedule line in the LIPS, earlier created append structure field.
    Then you have the schedule line number available in the LIPS table, Now you can code your report to capture quoted delivery against actual delivery date.
    Hope this helps you !
    Anupa

  • How to get schedule line date copied to "First date" in sales order

    Dear forum
    I am creating a sales order as normal and put in a Requested Delivery Date (KETDAT) for the order.
    This requested delivery date is then copied to the "First date" (ETDAT).
    Now, the ATP is checked for each line item in the order and a Schedule line date / material availability date is calculated for each line item.
    My question is: Is there any way to have the "First date" field of the line item in the sales order populated by the first material availability date (calculated by ATP), instead of copying the Requested  Delivery Date? Any user exit? Any config?
    It would mean that every time I rerun ATP check in the sales order line item, the "First date" field would change if the material availability date change. If there is multiple material availability (multiple schedule lines) dates per line item, then the earliest date would be copied to the "First date" field.
    Is there such functionality? Or possibility to config/program?
    /Ola

    Kannan
    OK. Unfortunately reservations cannot be created at the serial number level. So the unsupported way of doing this is updating the mtl_serial_numbers tables. I hope you would know (by some means) which serial numbers you want to allocate to a specific sales orders. If you know, update group_mark_id column in mtl_serial_numbers table with your order_line_Id, This will avoid any one from picking the serial numbers (they will not come up in the LOV or will not be auto allocated).
    But you have to make sure to take it off when you actually want to pick this order line and allocate this serial number. So just before you pick release/ confirm this order line you need to update column back to null so that you can allocate that serial number.
    Thanks
    Nagamohan

  • Complete MRP status according to Sales order schedule line data

    Dear All,
    Please help me to get technical configuration releted to
    "complete MRP status according to Sales order schedule line data"
    or MRP w.r.t. Schedule line
    Please send fields and table and logic specification .
    Thanks & Regards,
    Ashish Gautam

    You can use following Fm for change sales order
    CALL FUNCTION 'BAPI_SALESORDER_CHANGE'
      EXPORTING
        salesdocument     = p_vbeln
        order_header_in   = s_order_header_in
        order_header_inx  = s_order_header_inx
        behave_when_error = 'P'
      TABLES
        return            = it_return
        order_item_in     = i_order_item_in
        order_item_inx    = i_order_item_inx
        schedule_lines    = i_sched
        schedule_linesx   = i_schedx.

  • In which tables deleted schedule lines are stored

    Hi All,
    I want to know in which tables deleted schedule lines in VA02 VA32 are stored.
    How to get the deleted Schedule line item quantity.Please give me reply as early as possible.
    Thanks,
    Saritha

    Hi Saritha,
    As my understanding there is no table to store the deleted schedule line data.
    You have to identify badi or user-exit before deleting the schedule lines data in the VA02 program and in that exit you have to write the code to populate the deleted schedule line data in to your own custom tables(you have to create custom tables).I have used the same method for deleted deliveries.
    In sap CDHDR /CDPOS contains only changed data but not deleted data.
    Thanks,
    shyla

  • Re: Check Schedule Line Date Change

    Hi,
    I need to prevent the user from manually changing the schedule line date, but still allow
    BAPI_SALESDOCUMENT_CHANGE to do the same when required.
    I have tried checking the SL date change in user-exits USEREXIT_MOVE_FIELD_TO_VBEP,
    USEREXIT_SAVE_DOCUMENT_PREPARE and USEREXIT_SAVE_DOCUMENT, but have been unsuccessful.
    Any pointers appreciated.
    Thanks,
    GShankar

    Hello Girija,
    I  have used similar concept for something else in Sales order and i know it will work for schedule line as well. I propose two solutions;
    1. While saving the sales order let the User-Exit grey out the 'schedule line' feild and create a table with key 'approver' and User ID feild and let User-Exit Validate this 'Approver's User ID which will be seperately fed into the system (these User Id can be of those who are allowed to change the Schedule line).
    2. Instead of Creating Table for 'Approver - User ID' you could Use Status Management. In this case you could allow system to grey the 'Schedule Line' Feild in some stauts and the user may be allowed to Change in some other User Status. Eg:Status-'Schedule line Change' May allow system to Change the Feild in this case you table will have to be maintained only once or can be hardcoded to check the status and behave accordingly.
    I hope I was Clear in explaining the logic. Good luck

  • Open quantity for scheduling lines

    Hi,
    I need calculate open quantity from scheduling lines(based on date) for Scheduling Agreement (similar like VL10I works). I noticed that open quantity is not maintain in VBEP. So could you help me?
    BR,
    Z

    Hi,
    For calculating open quantity for scheduling lines ,u need to query the sales order number in table VBUK and check the field GBSTK , it will be an open order .
    You can look in table VBAKUK for this .
    This is Join of VBAK and VBUK entries. You can eliminate a join if you fetch it from VbakUk
    Now once it is confirmed that it is open then fetch the entries from VBAP.
    Hope it helps you.
    Thanks,
    Sarita Singh

  • Use of NOSCL(Counter for scheduling lines) in 02LIS_02_SCL

    Hi,
    I want to extract PO value from 02LIS_02_SCL in BW. The value which I get in PSA table is +ve and -ve. I am boserving the sum value for any PO is zero.
    I wanted to know what is the use of NOSCL(Counter for scheduling lines) in 02LIS_02_SCL? I can observe that PO value corresponding to NOSCL =1 is +ve, i.e. I am getting all the +ve value in order for which NOSCL = 1. The positive PO value is as per R3 data.
    Thanks in advance

    Dear SDBI,
    Thanks for reply.
    I checked for rejection indicator. Again for every positive value there is negative value and for every negative value, its marked with rejection status. So when value for any  particular value is summed up, we get result value as zero.
    I need following information:
    1. Is it possible for every every positive PO value, there is negative value?
    2. How to reconcile the data in PSA of 2LIS_02_SCL with R3 tables?
    Thanks again.
    Jaydeep.

Maybe you are looking for

  • Error while downloading libtorrent using yaourt

    here is the entire message : use following PKGBUILD instead, it compiles OK: # Contributor: Swen Simon <swsimon at gmail dot com> pkgname=libtorrent-svn _pkgname=libtorrent pkgver=1060 pkgrel=1 pkgdesc="BitTorrent library written in C++" arch=('i686'

  • BTE F110 Edit Proposal

    Guys, I found the BTE 00002105 for the creation of the proposal in t-code F110. But the same BTE doesn't work for the Edit Proposal. I will need a BTE for editig the proposal (when clicking on the save button). Dou you know if there's any? Thanks!

  • Close Window (with O/P) out of IFrame

    Hi experts, I did create a new component (with bsp_wd_cmpwb) and therein a window. In this window I call an IFrame which is another BSP-Application. Now I would like to close this window out of the iframe. I did already create an O/P to close the win

  • Close window - need help

    Hi everyone, I'm working with JDeveloper 10.1.2, struts and uix pages. In my page1 I have a button to open a new window and in this new window I need to have a button to close it. I have done something like this: <submitButton event="EditarContactosE

  • What is the lock symbol and circular arrow on the top of my iPad and how do you get rid of it?

    My iPad has this lock sy,boll on the top of it and now I can't go into portrait mode(I'm stuck in landscape). How do you get rid of it?!?! Please help!