Single PR during MRP

Hello Gurus,
My client is having a unique requirement.
He has got 1000 raw materials in a BOM. Whenever he runs MRP he gets 1000 PR's for 1000 materials. His requirement is to have a single PR with 1000 line items.
The reason behind this is the release strategy for the PR. The head of department has to check each PR and only then he releases ( based on the cost, if it is costing very high he will not release the same ). There are 3 levels of releasing.
So can we have a single PR generated for 1000 materials after MRP. I know this is not possible in std SAP so can anyone suggest me a workaround or how to do the development?
Naren

Hi Narendra,
After MRP run system will create seperate purchasing requisitions for every external procrument material. This is standard SAP procedure. But you can get collective requirement for a purchase requisition by MRP lot size as TB or WB in MRP1 view of material master,so system will create one purchase requisition for day or week for particular material.. But we can assign the no. of purchasing requisitions to one purchase order also.
In Code: ME, left side top left corner you are having document overview, put it on and from selection variant select purchase requisition. Then drag and drop the required PR into shopping cart.
The other purchase requisition can be adopted to shopping cart in 'Item detail screen -- delivery schedule tab. Just select PR then drag and drop the PR to the shopping cart in the item detail screen. This will increase your total qty in the item overview screen.
Delivery dates should be same.
Hope it will help you.
Regards,
R.Brahmankar

Similar Messages

  • Cheracteristic consideration during MRP run

    Dear frnds,
    during implementation for one steel industry i have stuck up in problem which is
    they have crm plant in which finished products are endless depending upon thickness like .023,.325
    if we make material master for every thickness then it will infinite number of material master.
    so we thinking for single material master group of thickness i.e for single mmr for range of thickness and during sales order creation person will mention actual thickness in text of sales order or we can make it configurable and characteristic for actual thickness so during he will mention actual thickness in characteristic value.
    but problem is that during mrp run, characteristic value is not taking into consideration,
    so i want some customization so that characteristic value is considered during mrp run
    please help me out its very urgent
    thanks

    Hello,
    are you talking about a pure ERP implementation? A good description on modelling this with APO can be found in the Best Practice for Primary Steel (see link on BPX Mining and Metal).
    Usually we work with configurable material variants, as a starting point.
    Best regards,
    Stefan

  • Consideration of stock of discontinued FG or trading material during MRP Run

    There is an functionality of follow up material for component. I would like to know if there is any similar option available for finished goods or trading materials.
    I am doing procurement planning for externally procured Trading materials. Now my previous material A is being replaced by material B. Therefore all the planned independent requirement is available in system only for B. But still there is some stock available for material A. How can it be considered during MRP run for material B.
    Example,
    Material A:
    On Hand Stock = 100
    Planned Independent Req. = 0
    Material B:
    On Hand Stock = 300
    Planned Independent Req. = 1000
    In this case if we run MRP for material B, how we ask system to plan Purchase Requisitions for 600 instead of 700 for material B, considering stock of material A.

    Hello
    Please refer to the following SAP note:
    43636 - Discontinued parts
    This note provides a detailed explanation of the system standard design of the usage of discontinued parts with material requiremenst planning and the most common questions about this issue.
    The following information is provided on this note regarding the PIRs:
    2. Planned independent requirements and forecast requirements are not redirected.
                  Explanation: Planned independent requirements after the effective-out date are not redirected but are provided with an exception message in the MRP list stating that they cannot be included in the availability check. Planned independent requirements and forecast requirements are therefore displayed in the MRP list and in the stock/requirements list. However, they do not influence planning
    BR
    Caetano

  • Schedule lines are not getting generated during MRP Run

    Schedule lines are not getting generated during MRP Run. I have maiantained source list for the material with proper validity date and also maintained scheduling agreement . MRP relevvant Indicator , I have marked - 2 which means -Record relevant to MRP. Sched. lines generated automatically.
    Still I am not able to get schedule lines and instead of that *Purchase Requisitions* are getting generated.
    Can any one help me and suggest me what to be done in this case .
    Thanks & Regards ,
    Nirmalya

    Dear,
    Welcome to SDN,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
    Regards,
    R.Brahmankar

  • How to consider sample qty of raw material's quality inspection during mrp.

    hi expert.
    i have to consider sample qty of raw material's quality inspection during mrp.
    i am wondering how to implement it.
    is this possible?
    thank you~~!!

    Hi Seung Hyun,
    I think it depends on the sample quantity, whether it is a fixed quantity or it depends to the raw material quantity or requirement from the orders. If it is not fixed, then you can use scrap percentage as suggested by Vivek.
    If it is fixed quantity, then there are several alternatives to follow:
    Include the sample quantity to your safety stock
    Create another material number to distinguish the sample from the original raw material number and include it in the BOM
    Regards,
    Julian

  • Base value & excise amount during MRP MIGO & MIRO

    Excise base amount & excise values are calulated & put during MRP based MIGO & similar process is again done during MIRO.Can't this duplicacy be avoided.
    Hitesh Chaturvedi

    Hi
    You have to calculate excise base value during MIGO as well as MIRO because both these activities are done by different departments.
    Some times the value calculated during MIGO is wrong and is corrected by excise dept during part2 posting in J1IEX as well.
    So u cant avoid it doing twice

  • Subcon Quota Arrangement behavior during MRP

    Dear Gurus,
    Currently, we have a scenario wherein during subcon process there can be 3 Vendors active. During MRP, we would like to have an output as per below:
    Requirement: 1500
    Vendor A: capacity 500 - priority 1
    Vendor B: capacity 700 - priority 2
    Vencor C: capacity 500 - priority 3
    If I run MRP, I would like system to have PR's Vendor A with 500 then as the Vendors capacity is only 500 the remaining requirement should be passed on the succeding vendors. So from my example, Vendor B should have 700 and Vendor C should have 300.
    Is this possible using Quota Arrangement. I was trying to test but I cannot get my desired result.
    Please note that the settings in the material master is already set to Quota usage 4 and the lotsize is weekly with splitting quota activated.
    Thanks,
    Raymond
    Edited by: Raymond on Oct 10, 2011 11:17 AM

    Hi,
    Yes I have maintained below in MEQ1 just for testing but I cannot get the desired result:
                      Quota Percentage        Maximum Lot size      Priority
    Vendor A:   100                                 500                           1
    Vendor B:    100                                 700                          2
    Vendor C:                                           500                          3
    Set-up Weekly lotsize with splitting quota and quota usage 4.
    But during MRP execution, I think the system splits the requirement quantity into 2 and distribute to Vendor A and Vendor B then if it reached maximum lotsize it proposed to vendor C.
    our requirement is first to consider Vendor A then Vendor B then Vendor C according to maximum lot size and priority.
    Any idea if this is possible?
    Thanks,
    Raymond

  • Alternative items during MRP run

    Hi,
       I have seen discussion on alternative items in BOM. Thanks for all for sharing your knowledge. I knew alternative items will be choosen while creating / release of production order (material availability check)
    Requirement:
          For material A, I am using component B as priority 1 and component C as priority 2.
    During MRP run, system needs to CHECK component B first. If stock is not available for component B then system need to consider component C automatically. It should not create any planned order for component B.
    Is it possible, system will check automatically alternate items during MRP run? if so kindly let me know the logic.
    If not, is there is any user exit. Customer is asking this facility. Its his basic requirement.
    Kindly give your suggestions....
    Regards / US

    Hi.
    I might have typed it wrong, I think the right one is called DIMP.
    As far as I know you don't have to purchase it. In the past those extensions were known as Industry Solutions, in this case Automotive and A&D.
    Before you go to this complexity for interchangeable materials functionality in MRP, I recommend that you have a design review with your customer, to strengthen the point that if two materials are the same for all usage purposes, but only differ, let's say, in the source (different manufacturer). for that in SAP we would define ONLY ONE material number, with additional manufacturer part number info, and in some cases with a classified batch.
    Regards,
    Mario

  • Storage location consideration during MRP Run

    Hi All,
    Within a company code, i am having 2 plants namely PS12 & PS13. In plant PS12, i am  three storage locations namely 1201, 1202,1203. Similarly in plant PS13, i am having stores 1301,1302,1303.
    During MRP run, i do not want to consider the stock in all the storage locations of PS12. The storage location 1203 to be exclued during MRP run. How to set this?
    Your input will be appreciated very much,
    Thanks
    Kumar

    Hi Kumar,
    Goto SPRO>Production>Planning>Define Storage Location MRP per plant, add the storage location to be ignored during MRP and select indicator '1' against it. Thereafter, all the materials created with this storage location will be defaulted with value '1' in the field 'SLoc MRP indicator'. However this can be modified later if required.
    For existing materials, select indicator '1' in the field 'SLoc MRP indicator' avaialble in MRP view under the column 'Storage location MRP'. Go for a mass update for a huge list of materials.
    Check this and revert for any clarifications.
    Regards,
    Murali

  • Intercompant STO working during MRP run.

    Dear Experts,
    How intercompany stock transfer works during MRP run?
    I mean if one company is purchaser and other is vendor and purchaser company's planned delivery time is 10 days and replenishment time in other company is 3 day then will system consider these two times in creating purchase requisition in first plant ( in MD04)?
    Regards
    Deepak Sharma
    9818263889

    Hi,
    Say your purchaser is plant A, vendor is plant B. STO can make by spl.procurement key 40 in MRP2 view in plant A.
    If you create requirement in plant A, system will create planed order for that material.In plant A, system will consider only planned delivery time of 10 days.
    In plant B, system will create dep requirement. suppose if stock is not available that time system will consider to replinishment the material as 3 days.
    This 3 days will not consider in Plant A.
    Regards,
    Dharma

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • Planned Order deletion during MRP

    Hi all,
    We want to delete the planned orders during MRP, but before saving is done.
    So, we are trying to use the BAdI MD_PLDORD_CHANGE and method CHANGE_BEFORE_SAVE_MRP .
    After finding out the process order, we were trying to set the importing parameter IM_VSTAT to "L", which can be used to delete the planned order..
    But since it is an importing parameter, we cannot change the value of the parameter.
    Is there any alternate ways of deleting the orders before MRP is done ?
    Regards,
    SP.

    Not sure I understand the situation correctly...You want to delete the planned orders before MRP runs again. WHy do you want to do that ? Are these firmed Planned orders ?

  • DURING MRP RUN MATERIAL IN QI STATUS HOW TO GET MATERIAL OUT OF QI

    HELLO EXPERTS:
    DURING EVERY 24 HOUR MRP RUN 1 OR 2 MATERIALS SHOWS AS BEING IN QI STATUS WHEN IN RESTRICTED STOCK..... MY UNDERSTANDING IS MATERIAL IN RESTRICTED STOCK IS NOT IN QI.....CAN YOU EXPLAIN WHY

    Dear in SAP generally there are 3 stock statuses are in use most of the time they are Unrestricted,Blocked and QI stock.
    When you have activated any inspection setup in MM QM view based on the setup when you do any movement for that material it will create an inspection lot with stock posting to QI,based on your results you can send that QI stock to unrestricted or blocked through Usage Decision(QA11).
    Now during MRP run if you don't want to consider the QI stock for net requirement calculation check this badi as in standard SAP You would be able to define only the following stock types not available for MRP run.
    1. Stock In Transit
    2. Blocked Stock
    3. Restricted Use stock.
    This you need to configure in OPPQ transaction in the available stock section for the plant.
    So in standard it is not possible to restrict QI stock from not considering as available stock, if required you need to look for Implementing BADI "MD_CHANGE_MRP_DATA ", please check with your technical consultant(Abaper).
    Cheers
    KK

  • Selection of BOM During MRP

    Dear All,
    I have three alternatives of BOM.The lot size and the validity period for all the boms is same.Now during MRP Run the system only selects the first alternative and plans the depending materials of that BOM.
    I want to set the system in such a way that i can able to select any alternative of bom and carry out the MRP Run.
    Please help me ..
    Regards
    Prashant

    Hi Prashant,
    With same valid From & To Date and Same Lot Size,
    In this case system will select first BOM alternative.
    If you want to choose a particular BOM then go for  production version ,assuming that u r not willing to change the lot size or valid from & to date,then u lock the production versions which you dont want to show to the system before running MRP except the one which u r willing to choose.
    We cant choose manually the prod.version during MRP.
    Assuming that in MRP4 view of FERT material u have given option 2 in BOM slection method.
    The other way is u manitain different lot size and acccordingly the production version will be selected by the system.
    I hope it will help you.
    Regards,
    R.Brahmankar

  • Rounding of Decimal for dependent requirement During MRP Run

    Hello Experts,
    I have the following scenario:
    We are currently enabling Characteristic Based Planning in our system.
    Our one component is selected when two characteristic values are met through object dependencies.
    Ex: Component A = Char A= '002' and Char B ='002'
    Now we have given the following Usage Probability for the two characteristic:
    Char A = 20%
    Char B = 15%
    And the total PIR quantity is 25 Pcs for Configurable Header.
    With the above usage probability and PIR Qty, We have a dependent requirement of 0.75 Ea
    ((20% X 15%) of 25 Pcs) = 3% of 25 Pcs = 0.75 Ea of the component
    Now during MRP Run I want to round the dependent Requiremnet to 1 Ea instead of 0.75 Ea.
    Any suggestion towards the solution will be appreciated.
    Regards,
    Vinod

    Hi Vivek,
    As mentioned we are using Characteristic Based Planning.
    The component is selected based on a Selection comdition which is as follows:
    Component 721290201000 = $PARENT.BCS_RL_LINE_LOADER = '002' and $PARENT.BCS_RL_WAFER_VENDOR ='002'
    When the above two conditions are met the component is selected.
    In Characteristic Based Planning we give percentages (Usage Probabality) to the characteristic values like:
    $PARENT.BCS_RL_LINE_LOADER/'002' =20%
    $PARENT.BCS_RL_WAFER_VENDOR/'002'= 30%
    For the Parent which is a KMAT Material we maintain the PIR say 40 Qty.
    Now the component qty is calculated as follows:
    721290201000 =(20% X 30%) of 40 Qty of parent
    721290201000 =(6%) of 40 Qty of parent
    721290201000 = 2.4 Qty of component is the dependent req.
    Now my requirent is to round the dependent requirenment to 3 during MRP Run. Please note that the purchase requisition got from the above dependent requirement is rounded to 3 qty.
    Now I want to round the dependent requirement.
    Regards,
    Vinod