Planned Order deletion during MRP
Hi all,
We want to delete the planned orders during MRP, but before saving is done.
So, we are trying to use the BAdI MD_PLDORD_CHANGE and method CHANGE_BEFORE_SAVE_MRP .
After finding out the process order, we were trying to set the importing parameter IM_VSTAT to "L", which can be used to delete the planned order..
But since it is an importing parameter, we cannot change the value of the parameter.
Is there any alternate ways of deleting the orders before MRP is done ?
Regards,
SP.
Not sure I understand the situation correctly...You want to delete the planned orders before MRP runs again. WHy do you want to do that ? Are these firmed Planned orders ?
Similar Messages
-
BADI For Changing Planned order Qty during MRP Run
Hi,
My requirement is i want to change Planned order qty based on some conditions during MRP run(MD02). Is there any BADI to fullfill my requirement.
Thanks,
KishoreNot sure I understand the situation correctly...You want to delete the planned orders before MRP runs again. WHy do you want to do that ? Are these firmed Planned orders ?
-
SNP planned order deleted in APO, but not in R/3.
OK Guru's,
We have a situation where during the weekend SNP planning runs, SNP Planned orders are deleted in APO, but the order is never deleted in R/3. The change pointer is not in CPP and there are no failed queues. Also, when you run CCR on planned orders, we will get an error on some orders saying "Not in APO" and the only option to reconcile that order is to "Send to APO". The option that should exist is "delete in R/3" becuase the deletion never occured in R/3.
If you send the order back to APO, the order will show in the "Production Confirmed" line of the Planning Book. This is because APO is thinking that this order is an order that was created in R/3 when in fact is it really is a SNP planned order.
Any clues to why this would happen?
thanks,
BrianHow are you getting the SNP Planned Orders to R/3 in the first place.
If you are transferring them using /SAPAPO/RRP7 then I guesss its a manual transfer and system does not consider SNP Planned Order deletion flag relevant for transfer to R/3.
You will need to look into CIF enhancement to send the deletions to R/3.
Normally SNP Planned Orders are not relevant for transfer to R/3 unless its replaced or converted to a PPDS planned order.
Somnath -
Hi Experts,
How do you delete collective planned orders? I mean by simply indicating the plant or MRP controller. Is there a log or you trace for this? What transaction code is used for this?Hi,
MD16 - Collective display planned orders
Just highlight the planned orders which you want to delete the planned orders then press "delete" button
once planned order deleted, can't trace the history, no log file
Regards,
Sankaran -
How can I set a fixed scrap qty on planned orders created by MRP?
During production of some specific subassemblies, destructive testing is done that requires us to scrap two pieces per production order. I know I can set an assembly scrap percent, but what I need instead is a way to set a fixed assembly scrap quantity that will get loaded onto every planned order created by MRP for these subassemblies. If we can't do this, we can't plan the correct order quantity and eventually end up being short of parts. I know we can set a safety stock or safety time, but I'd rather just plan the right quantities if possible.
Is there a user exit, configuration option, or master data setting that will allow me to do this?
Thanks,
RandyHi Randy
This can be solved by one solution. _You can try this._
You define the same item in BOM again with qty 2 nos. Double click on the item no. Then it will take you to item detail. There in Basic data tab page at quantity data ( Tick the fixed quantity. ).
When ever BOM explodes for the header material automatically The item will be exploded 2 nos extra.
Ex
The header is Mat X and items is Mat Y. While creating BOM for X give item Mat Y in item no 10. give the quantity as per the requirement.
And again give item Mat Y in items no 20. give quantity 2 nos and activate the fixed quantity tick as instructed above.
When ever requirement for Mat X is 100 nos. The plan order for Y will be 102 nos .
Hope this will clear.
Regards
J .Saravan -
Planned order creation via MRP depends, If we change Delivery date in STO
Hi,
Planned order creation via MRP depends, If we change Delivery date in Stock transfer Order.
I created STO with delivery date as 31.1.2012 and when i checked MD04, i can see Planned order created on 27.2.2012 with the same above STO quantity .
Now when i changed the delivery date as 30.1.2012 and runned MD03, and then checkd MD04, planned order disappeared.
Why Planned order got created when STO delivery date was 31.1.2012 and when I changed the delivery date in PO, planned order disappeared.
MRP profile details :
Plnd delivery time 1
GR processing time 1
Planning time fence 38
Tot. repl. lead time 38
Can you please let me know why system is beaving in this manner?
Regards
UtsavHi,
Normally , MRP runs based upon the requirements.If your STO is created for a date , system checks through the availabiloty check wheather there exists any stock for that date to get deliverred in the supply plant .If there exists for that date the stock , planned order will not be created.If no stock available then a planned order will be created in MRP.
cHECK the availability check parameters assigned to material master in supply plant.
Regards, -
Type of planned order created by MRP run
hello,
I have one concern regarding planned order creation through MRP run..
our MRP creates automatically order type LA
I wanted that for some materials, the MRP creates planned order type PR ( with account assignment Q -> WBS element, coming from sales order)
what is the customizing point to make this ?Hi,
I think that this happens automically when the requirement is created in the WBS SEGMENT, AND cOLLECTIVE INDICATOR IS NOT SET TO 2 -
Planned order splitting during capacity planning
Hello,
anybody plese help me during the capacity planning in T.code.CM31 i want to split a planned order and want to assign alternative sequence. how can i do this and the capacity should be reschedule automatically to my requirement date. i am using backward scheduling.
plese suggest immediately
Thanks and reagards
BhaktaDear Bhakta
MRP does not perfom any Capacity Requirement Planning .While you are executing MRP with Lead Time Scheduling , MRP proposes Planned Order Dates based on the Routing Operation Timing not based on the Work Centre available Capacity because in SAP Std R/3 we did not have scope to check the finite scheduling and capacity requirement chek .MRP assume that Work Centre has infinite available capacity .
In MRP run , it will give you Detail scheduling of the Operation in Planned Order -Detail Scheduling tab and copied the routing , BOM as master data .When you convert that Planned order to Production order , it will copy the Routing details based on the Order Type denpendt Parameters -OPL8-Routing -Alternative sequnce and Automatic selection -3 option
Thats why we have Capacity Requirement Planning for Detail Capcity check and production order scheduling .
Note : Earlier to my first reply , please note that you have option in CM21 enter sequence number at order level which may applicable to you .CM21-Work Centre -exectute -Select the Order from order pool -Goto Order -Sequence number maintainence
This number( sequence number operation /order ) that can be assigned to production orders or planned orders at the level of the task list header and is therefore valid for all the operations in an order.
Hope this is clear .Revert if you nees farther help
Regards
JH
Edited by: Jiaul Haque on Jul 5, 2010 3:32 PM
Edited by: Jiaul Haque on Jul 5, 2010 4:01 PM -
Planned order deletion in mass
Hi,
I want to delete all palnned orders in the plant.
Planned order can be deleted using MD16. In MD16, MRP controller is the mandatory field. We can't delete all the planned orders in one stretch in a plant. We can delete the planned orders in a plant MRP controller by MRP controller only. My requirement is without giving MRP controller, the system has to delete all the planned orders in the given plant.
Is there anyother way to delete all the planned orders in a plant.
Regards,
V. SureshDear Suresh,
Check whether T code MDBA,can help you.
Also refer this thread.
Re: Collective deletion of Planned Orders
Regards
Mangalraj.S -
Dear ,
Can it be possible by single t-code i can delete all the planned order at plant level.Dear,
You can delete a planned order by tcode MD12 / MD04 OR delete the requirement in MD62 after that run MRP (MD02) with planning mode-3 deleted and recreated. OR MD16 is the only option to delete all planned orders in mass.
And check the result.
Regards,
R.Brahmankar -
Planned order created after mrp run instead of purchase req
Hi All,
I am facing a strange problem about planned order being created after mrp run jobs runs in background instead of purchase req. This is happening randomly. In the material master MRP view 2 procurement type is F and in the varient for the MRP job the in Purchase requisition control parmater 1 is marked that is purchase requisition. Also planning file is having the entry once there is shortage and hence MRP run is there always if there is shortage of material.
With Regards
TarunHi Tarun,
Please maintain the control parameters as
Processing Key NETCH
Create Purchase Requisition 1
Sched. Agreement Schedule Line 3
Create MRP List 1
Planning Mode 1
Scheduling 1
Please let me know the results.
Regards,
satyajit -
Sales Order costing error to prevent Plan Order generation in MRP run
Dear PP Experts,
We are into sales order costing due to Variant Config implementation.
Problem Statement: After sales order entry /Characterisitc value selection, while saving sales order , SO costing is auto triggered. Many a times one of the new Raw material price is not maintained( Purchase info record), hence SO costing occurs. SO costing is still saved, SO incompletion is not configured , so it is detected when Production order has 'No Target Cost'. This creates inconsistancy in FI postings.
My questions
- Can we set SO imcompletion for SO costing error( Standard Config?)
- Is there a enhancement to prevent MRP from processing Sales order with incompletion log i.e. Prevent MRP from generating Plan Order.
Best Regards,
JatinHello Jatin
You can use BAdI MD_CHANGE_MRP_DATA to make the sales order not relevant to MRP.
Check the following document for an overview of the BAdIs available on MRP:
BAdIs for MRP
BR
Caetano -
Planned order scheduling in mrp
hi
iam trying to run MRP at my client place
facing problem in planned order dates
i choosen tequirement type BSF and strategy group as 11
in md 61 pir was given in a month of june2008(monthly)
after mrp run at modo4 iam getting planned order with
execption message 64 called order date in past
means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
where as i need to my planned order satar date in MAY MONTH and
end date must be 1st of june
means i given PIR which is my start of my june month
checked scheduling parameters which says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
plz suggest which setting effects the planned order start and end dates??
regards
sasikanthhi
i selected schedule margine key with 0 flots (key000)
and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
plz suggest how to arrest message 64
regards
sasikanth
message 64 diagnosis enclosed
64: Production finish after order finish (P4)
Message no. MD427
Diagnosis
The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
System Response
This exception is displayed in the MRP list and in the current stock/requirements list.
Procedure
Check the times in the material master record and in the routing.
Check whether the order has to be rescheduled in. -
How to see planned orders for P3 mrp type products in APO?
Dear experts,
I have materials with P3 MRP type (not planned in APO but in R/3 using MRP)
I have active integration models with P3 and X0 mrp type products for planned orders
however I can not see in APO product view the planned orders for P3 materials,
is this normal or should I see those planned orders in APO?
Thanks for your answer,
best regards
ElynnHi,
The following prerequisites must be met so that planned orders can be transferred from SAP R/3 to SAP APO
and vice versa:
1.The material masters must be transferred to SAP APO.
2. PPMs must exist for planning in SAP APO.
3. The relevant integration models must be active.
4. An active integration model for planned orders must exist in SAP R/3.
5.An active integration model must also exist for materials, so that the components of the planned order are transferred.
6.The relevant distribution definitions must be maintained in SAP APO, so that planning results can be
transferred from SAP APO to SAP R/3.
Thanks,
nandha -
Mass T-code Of Planned Order Deletion
Dear All
Is there any mass T-code For Deletion of bulk planned order. An PIR.
Rgds
Pankaj AgarwalHi,
You can use function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
Features
SAP supplies the function module MD_SET_ACTION_PLAF for action control.
This function module includes the following actions:
Explode BOM
Explode BOM, check availability
Check availability, only explode BOM in the case of a requirement
Check availability, do not explode BOM
Reset availability
Change planned order data
Schedule planned order
<b>Delete planned order</b>
Confirm planned order (in repetitive manufacturing)
Firm planned order data
Firm planned order components
Print component overview
This is in the foll link...
http://help.sap.com/saphelp_470/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
Use T.code md75 to delete PIR.
Regards,
Senthilkumar SD
Maybe you are looking for
-
Hi, While i am try to delete Cash Journal system throws me error (Message No.:FCJ065: Numbering group 1001 can be used only for one Co. Code and Cash Journal). Kindly provide me solution on that. Regards, Tarak
-
I just bought Compressor 4.1.3. because I was told it's the only way to convert movies exported from finalcutprox to custom resolution. I need 800x600 and I looked up a tutorial that says the custom res option is in the "geometry tab". However, that
-
JPanels & Components not behaving properly.
Hi, I'm having great difficulties trying to get my panels and their components to work with each other. I want a few simple things on a JFrame in the following manner. |JLabel | JList | |JLabel | JTextField | |JLabel | JTextArea | |------------------
-
VMWare Evaluation Kit on Red Hat Linux
I have downloaded RHEL3-DVD2-Linux-v1[1].4.zip (793,301KB). When I try to open that file with WinZip I get the message "Cannot open file: bIt does not appear to be a valid archive. If you downloaded this file, try downloading the file again." I have
-
hai can anyone post me bdc using session method plz