SKF and AT cost element in cycle

Hi all,
Activity type cost element maintained in KL01.
SKF cost element not in KK01 but base on cost element in cycle.
Now, in cycle, let say, the tracing factor is using activity type, then system to use which cost element?
Say, in KL01, the cost element is 610000 whereas in cycle the cost element is 610020.
So now, system to use which cost element?
Thanks

Dear,
Thanks alot of your reply.
So meaning assessment or distribution, system will use cycle cost element 610020. correct?
So when to use AT cost element 610000? Only use when via kb21n? any other tcode when post using this AT will use 610000?
Thanks

Similar Messages

  • Settled costs don't display in hierachy and by cost element report!

    Hi Experts,
    After doing project settlement, I check in hierarchy cost report (S_ALR_87013533) and by cost element report (S_ALR_87013543) and found that: Costs which had been settled did not display anymore!!
    It's not my expectation because I want to see the total actual cost of project.
    Please help to advise.
    Thanks and best regards,
    Khoa Huynh

    Hi Sreenivas Kadiam,
    So you mean that only when we settle project cost to CO production order, in Project cost report, balance will be zero is the standard behavior, am I right?
    Because when I settled the project cost to AUC, the total actual cost of project still display in Project cost report.
    Thanks and best regards,
    Khoa Huynh

  • Fixed and variable cost element's cost

    hi,
    i would like to clarify. need your kind advice.
    1) can direct cost has both fixed and variable cost? can have example?
    2) can indirect cost has both fixed and variable cost? can have example?
    3) direct cost only happens in direct cost center and indirect cost only happens in indirect cost center?
    4) can direct cost center assign to fixed cost element and variable cost element? Likewise, indirect cost center assign to fixed cost element and variable cost element?
    thanks

    Hi,
    As per my understanding
    Direct cost  to a department could be variable or fixed.
    Example:  A supervisor in the X department would be a direct cost to the Dept A department. Since the X salary is likely to be the same amount each month regardless of the quantity of products manufactured, it is a fixed cost to the department. The supplies furnished to the X department will be a direct cost to the department, but will be a variable cost to the department if the total amount of supplies used in the department increases as the volume or activity in the department increases.
    Indirect cost is the Power used to operate a production machine.
    Example: The cost of the Power is variable because the total Power used is greater when more products are manufactured on the machine. Depreciation on the production machine is also an indirect product cost, except it is usually a fixed cost. That is, the machineu2019s total depreciation expense is the same each year regardless of volume produced on the machine.
    As you can see, costs can be direct and indirect depending on the cost object: product, department. The cost is fixed if the total amount of the cost does not change as volume changes. If the total cost does change in proportion to the change in the activity or volume, it is a variable cost.

  • Activity Types and Allocation Cost Element

    Hi
    What are the impact of having same Allocation Cost Element for different Activity Types. Is there any where we use this condition. SAP allows to have same allocation Cost Elements to different Activity Types, but i did not understand where we can utilizes this feature.
    Thanks
    Sivaram

    Hi Sivaram,
    in WIP customizing OKG5 you can assign specific cost center/activitity type combinations to different line-IDs, even though the same cost element is used. By this you can e.g. differentiate the value flow of one cost element in 2: one for capitalization, the other for non-capitalization.
    Personally I would not recommend to use this and stick to the rule "one activity type - one cost element" - makes it easier for IT and controlling departments.
    Regards
    Harald

  • Liquidity planner versus FF7B and CO cost elements

    What is the added value of SAP Liquidity Planner (only looking at actual data; the planning function I understand) when Liquidity Forecast (transaction FF7B) and CO (expense cost elements) have already been implemented?

    Please, take a look on this discussion
    Treasury - FF7B

  • GL account and Cost elements

    Hello All,
    I am looking for a report to check the GL accounts and the cost elements. I want to check if the cost element is been created for all the GL accounts and incase if I missed on the cost element for any GL account then I should create it.
    Is there  any standard report or even if I have to check 2 reports that would be fine.
    Thanks
    Priya

    Hi Priya,
    1. If automatic creation of the cost element is selected in your chart of accounts then you check it out list in transaction OKB2 where there is less scope to miss the creation of cost elements.
    2. If it was not activated or activated later then take the GL Account list from SKB1 and cost element list from CSKA and use VLOOKUP functionality of excel.
    Creating query will not help here because filed GL Account and Cost element are different even though they have the same value.
    Regards,
    Chintan Joshi

  • Cost center, cost element and asset

    Hi Experts,
      a) What is a cost element?
      b) Is there any link between the cost center and the cost element
      c) How can I tie a cost element to an asset?
    Thank you,
    Raneetha Weerasinghe.
    Moderator: Avoid asking basic questions

    Hi ,
    First and foremost thing , a cost element is the shodow account of all the Expense / Revenue nathure P&L accounts in CO i.e controlling . There are no B/S type accounts which are created as cost elements . Primary cost elements are P&L GL accounts which are created in chart of account and in CO you call them as cost elements , they have to be created in CO
    Secondly , In a cost element you can porovide the default cost center as to where it will post like if you have created cost element 1 then you can say that cost element 1 would always post to cost center 1 . else when there is a posting to be made in P&L account type GL then you will have to provide a cost objet which can be cost center .
    Thirdly assets to cost elements , that would be used in IMG setting only when you have the P & L type accounts for depn. , write off revenue / loss etc. there you mention those GL accounts and system derives the cost element from there .
    In the 3 rd Question what is the exact requirement please elaborate .
    Hope this helps .
    Regards ,
    Dewang T

  • Cost center and cost element in different collumns

    Dear all,
    I developed a report painter where the lead collumn has cost element and cost center. When I run the report it shows at the same collumn the cost centers and in a different line the cost element totalizing the amount of each cost center. So the report shows for each cost element the cost centers posted with this cost element. The report show like below:
    |-------
    Cost center A    | 100
    Coste center B  | 200
    |-------
    Cost element xxx - 300
    The problem is: How can I make the Cost element in a separate column ? Ex:
    Cost element xxx  |  Cost center A  | 100
    Cost element xxx  |  Cost center B  | 200
    Cost element xxx - 300 (In fact I don''t need the total)
    I need cost element and cost centers in different collumns to allow export it for other application..
    Regards

    Hi
    In report painter report we have only one lead column so we cannot have cost centers and cost elements in two different columns.Instead we can use the functionality of variation.Give the cost center in general data selection screen and select the variation functionality.So that cost centers are displayed on the left side of the report as hirearchy and only cost elements are only displayed in lead column.
    Thanks
    Sandesh

  • Cost center and cost element display through report painter/writer

    Hi
    Can any one suggest me how to display both cost center and cost element in the output of a report painter.
    Presently --- I am able to display cost center and its cost elements in the same leading coloumn and its periodical values for 16 consecutive col.s.
    Help Needed --- Suggest how to display cost center and cost element in the output of the report along the periodic values.
    Thanks
    Tangudu

    Can any one share some advice on this above query.
    Thanks
    Tangudu

  • Planning layout for material and cost element

    Dear all,
    i need to upload data from r/3 and start planning from data i have uploaded.
    data is as follows:
    year month material amount
    what i need to do is to put data in planning layout and put cost element next to that and manually enter cost element.
    so desired column is like that:
    year month costelement( enter manually) material amount(enter manually)
    is it possible and how?
    thanks

    Hi,
    You can do it.Take a  look at the best practice  below.It is telling step by step how to do cost center accoıunting planning.
    http://help.sap.com/bp_biv235/bi_en/html/BW/CostCtrPlan.htm
    Regards.

  • Mass Extension of cost center and cost element validity dates

    Hi SAP Gurus,
    We have around 5000 cost centers and 6000 cost elements for which "Valid to" date is 09/27/2008. We need to extend this date for another 5 years.
    Can you please suggest any pointers as how we can do the mass update.
    We have already tried KS12 which is not of any help.
    Thanks,
    Sreeni.
    1-408-307-7965
    CA, USA.

    Hi,
    Run the LSMW.
    Or Use the fuction automatic creation of Primary/Secondary cost elements in the SPRO.
    Or You can write a program which replaces the valid to date directly in the database table.
    For this you require ABAPER help.
    Regards,
    Edited by: Jagadeesh Sornapudi on Sep 13, 2008 8:25 AM

  • Cost Center Assessment - cost element type 42

    Hi dear All,
    I got issues running KSU5 to allocate planned costs under cost element type 42. we were expecting that all planned costs (primary and secondary(cost element type 42)) could be allocated by credit cost center (actual). only primary costs are being allocated.
    Scenario:
    cost center planning (kp06) 1000 currencies in primary cost element in cost center A
    running planning assessment - KSUB: cycle uses assessment cost element (type 42): sender cost center A, receiver cost center B (all planned values). assessment cyles posts 1000 currencies from CC A to cost center B
    planning in cost center B (primary cost elements through kp06, 500 currencies) total planning 1000 from previous assessment  with CE type 42, and 500 from cc planning in a primari CE.
    by the period end closing, tcode KSU5 (allocation actual) is running. new cycle created, based on planned values (origini not actual, but planned amounts).
    we were expecting to allocate 1500 currencies from cost center B to cost center C (using 100% and through assessment cost element)).
    result: credit actual cost center B = 500 currencies debit actual cost center C = 500 currencies.
    1000 currencies pending on cost center B (planned).
    do you know why SAP is not allocating the 1000? even if those 1000 were planned in cost center B by assessement, a new allocation cycle should be able to post them or not?
    thank you for your outcome.

    Hi dear Ajay, thank you for your answer.
    first, I understand the difference between KSUB and KSU5, in the defined scenario, we have both. planned values, become actual with the MEC activities. business definition.
    regarding the cycle, I have setup assessment cost element so we can get all planned lines posted as 1.
    On sender tab I have only the cost center. no cost element defined.
    receiver its cost center.
    furthermore, i've not setup allocation structure, so all cost elements should be allow, there is no restriction on this.
    the only difference is: planned costs which their origin is already an assessment are not being assessed again.
    I can show you the print screens with cycles setup if it helps
    best regards
    MF

  • How can I delete a cost element group

    Hy,
    I have a new system and the cost elements groups came with the questionary. Now I want to delete them, but I have an error like : "You want to delete object (Group element cost BON_1000). This is not possible because the object is being used in another object (group, report ... )." It is possible somehow to delete cost element group?
    I don't have any other dates in the system. Thank you!

    Hi Biro Dorel 
    The cost element group can be used by either back end configuration like cost component structure or front end transactions like allocation cycles.
    Please make sure none of any front end or back end functions are using the cost element group.
    If you do sure your system is new and no transactions use it. Please check whether the group is used by another cost element group. Or if you do not know where it is used, try to use the "where used list" to find the object using the group by click the buttom on the tool bar in the cost element group maintenance window (T_KAH3).

  • Activity allocaiton cost element reposting issue

    Hi Guru,
    Maintenance cost has been allocated to maintenance order using activity type MAINT1 ( allocation cost element MAINT1_ACT , category 43) , but business wanted to post to a different allocation cost element. So I created a new activity type MAINT3 with new allocation cost element MAINT3_ACT, and try to use KB65 to do reposting ( see below ), but this doesn't seem to have option of updating the receiving allocation cost element, the sending and receiving cost element still pointed to MAINT1_ACT. Idealy, it should empty out the postings on MAINT1_ACT and post to MAINT3_ACT.
    I also try to create reposting cycle, but don't know how to add activity type and cost element field on the receiver side. Please help if you can, thanks!!

    staring period is May 2009. by the way, i'm not getting that same error message if i will use PM01 control key. i'm thiking it's with the control key but can't pin point what .
    thanks.

  • Activity allocation cost element reposting

    Hi Gurus,
    Maintenance cost has been allocated to maintenance order using activity type MAINT1 ( allocation cost element MAINT1_ACT , category 43) , but business wanted to post to a different allocation cost element. So I created a new activity type MAINT3 with new allocation cost element MAINT3_ACT, and try to use KB65 to do reposting ( see below ), but this doesn't seem to have option of updating the receiving allocation cost element, the sending and receiving cost element still pointed to MAINT1_ACT. Idealy, it should empty out the postings on MAINT1_ACT and post to MAINT3_ACT.
    I also try to create reposting cycle, but don't know how to add activity type and cost element field on the receiver side. Please help if you can, thanks!!

    1. You can reduce the validity of the cost element via KA02 -> Edit -> Ananlysis period
    2. What do u mean by re-class.
    Activity type master data can be assigned only to a cost element category 43.
    Regards,

Maybe you are looking for

  • How do I upgrade my 800MHz PowerPC G4 eMac?

    What RAM modules do I use? I found a few different kinds and am not sure of the difference. Kingston 512MB PC2700 333MHz DDR SDRAM Memory Module KTA-G4333/512 Kingston 512MB PC133 SDRAM DIMM Memory Upgrade KTA-G4133/512 Lifetime 512MB SDRAM Memory Mo

  • Header and Item Text is not replicating from ECC6.0 to SAP CRM 7.0

    Hi SAP Experts, When the text is added at header and item in Texts tab from SAP CRM then this is transferring into ECC6.0 but the otherway round is not working i.e., from ECC6.0 to SAP CRM. Would appreciate for giving solution. Thanks in advance. Bes

  • When playing music through iTunes, it no longer starts at a random song.

    I have it set to shuffle and it used to start with a random song.  Now, it always starts with the first song in my library. I prefer the random start, but after the last update, it no longer does it.  Can I change this in a setting or something??

  • Levels on the main meter do not match levels on a plug-in meter

    When I play back a file in either a multi-track project or an audio file project, the levels showing on STP's built-in meters are 6 dB hotter than the levels on a plug-in (eg STP's Multi-Meter). In a multi track project I can adjust for this by bring

  • Syncing only titles and no content

    I had trouble setting up my apple tv to begin with, was getting intermitten appearances of the apple TV in iTunes. However, I was able to get the movies to sync via ethernet. So I bought a TV show and tried to get the episodes to sync. In iTunes it s