Solution Manager SMSY

Hi
This is a question on setting up BI systems in Solution manager transaction SMSY.
We have a BI landscape running on Netweaver 7.0 (ABAP+JAVA).
Under SMSY->SYstems, I have setup the systems under 'Product' SAP Netweaver and 'Product version' SAPNetweaver 7.0
But when setting up Logical Components I noticed that there is more granularity under SAP Netweaver->SAP Netweaver 7.0 -> 'Main Instnce'
where the options allow to choose 'Business Intelligence' but when I select this and configure the Logical component, I am unable to assign the created BI system to this logical componnet since I get a message 'No system found for this product/main instance'.
Because of this I had to create the Logical Component under SAP Netweaver->SAP Netweaver 7.0 ->Application  Server ABAP and assign the systems.
Just wondering if this is the right way to go to setup a Netwevare (ABAP+JAVA) based BI systems in Sol Man 7.0.
Thanks

Hi Rajeev
Under SMSY->System-> Create New system-> Product 'SAP Netweaver' do you see an option to choose  Business Intelligence ?
The only four options I see is
SAP Netweaver 7.1
SAP EHP1 FOR SAP Netweaver 7.1
SAP Netweaver 7.0
SAP Netweaver 04
However under Logical components I see an option to choose Business Intelligence under SAP Netweaver, but configuring the component here will not let you choose the systems created above under SAP Netweaver 7.0. This is my issue.
I am running Sol Man Ehp1 SPS20.
Thanks

Similar Messages

  • Update software components / Products in Solution Manager (SMSY)

    Hello,
    How can I update Software components / Products in Solution Manager (SMSY) or when this will be updated?
    I think I don't have an updated list of all software components because I install SAP SRM 7.0 EhP1 Java and I only have SAP SRM 7.0 version.
    Best regards,
    Filipe Sacadura Botte

    Hi Filipe.
    You do not need to maintain your system manually in SMSY. It will be a hard work if you need to update the SMSY every time you upgrade your system.
    I will try to explains you how it works.
    Firstly, you have to register your system to the Solman SLD. 
    For ABAP system it is done through the transaction RZ70 and for JAVA system it is done through the Visual Administrator, refer to the following link:
    http://help.sap.com/saphelp_nwpi71/helpdata/en/7c/1966ab384d42a78deaebc74d33c032/content.htm
    The managed system updates the SLD every day with all the system information which includes the software components.
    In the Solution manager system the LANDSCAPE FETCH job runs everyday. This job gets the information from the SLD and updates the SMSY.
    So, you have to ensure that this scenario is working in your systems.
    Regards.
    Allam

  • How to register automatically to solution manager "SMSY"

    Hi,
    I am quite new in the solution manager, Please advise how can i register my others sap system to the solution manager "SMSY" so i no need to key in manually the data.
    is that any document / link regarding this ?
    Thank you and Best Regards
    Fernand Lesmana

    how to create systems in smsy
    https://websmp202.sap-ag.de/~sapidb/011000358700000894082006E.sim
    New guded procedure for EHP1
    https://websmp202.sap-ag.de/~sapidb/011000358700001927282008E
    https://websmp202.sap-ag.de/~sapidb/011000358700000316542009E/Procedure_Configuration.exe
    Hope it solves ur problem
    Regards
    Prakhar

  • "newer version exist" in Solution Manager SMSY version 4.0

    Hello
    We do run Solution Manager version 4.0.
    We have configured our D/Q and P Systems for SAP BW 3.5 (Netweaver)
    When I goto Transaction SMSY there is always a yellow triangle for our BW Dev System which indicates "newer version exist".
    Does anyone of you know how I can get rid of that warning?
    Does this warning means that there is a newer version available? (SAP BI 7.0) or does thie warning indicate there there is a mismatch in my BW versions in the Solution Manager? Strange is also that BW Dev/Q and P match in terms of version in the Solution Manager nevertheless this warning is only visible for BW Dev environment.
    regards
    Nesimi

    Hello,
    Thank you for your valid input!
    When I goto "Other Object" and Select my BW Dev System (SBD) and than goto "Installed Product Versions" it already has the SAP NeWeaber 2004 Product selcted. I can get rid of the yellow triangle when I remove the hook fromthe SBD System in "Leading Product". But the strange thing about this is that I do have this hook enabled in my BW Q and P System and all of them (D,Q and P) run on exactly the same version.
    So now I got rid of the yellow triangle but this one little parameter is now different from D to Q and P.
    any suggestions?
    Thank you
    best regards
    nesimi

  • How to register external system in the solution manager SMSY ?

    Hi,
    I want to monitoring 1 of the external system in the customer landscape. i have done installing saposcol and sapagent in this server.
    but the i can't register this server in SMSY (Logical system) because always asking me to put installation number in the this system.
    since this system is not sap system so i can't put installation number because not space to key in the installation number.
    please advise ?
    Best Regards
    Fernand

    Hi,
    Check this link: http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c006f999-da37-2a10-d0aa-8df9c7ed2d52
    Thanks
    Sunny

  • Solution Manager 7 EHP1 - Implimentation Help

    Dear All,
    I am new to Solution Manager.
    I have install Solution Manager 7 EHP1 (ABAP+JAVA) on windows 2003 and applied later SP stack 24 available at Market place.
    We have SAP ECC 6, ABAP stack (we have not install JAVA stack for DEV/QAS or PRD Servers).
    On ECC 6 out landscap is DEV->QAS->PRD.
    Now after installing Solution Manager 7 EHP1, I have done automatic configuration using SOLMAN_SETUP i.e. upto BASIC CONFIGURATION successfully.
    Initially I want to use solution manager for
    1. Support Patch Approval
    2. SAP Note download
    3.Service Desk
    Now where and what I need to configure my DEV/QAS/PRD system to use above solution
    Thanks in advance,
    Nirav

    Hi,
    Did you add your ECC landscape DEV/QAS/PRD in solution manager smsy?if not that would be first step to proceed.
    1: Support patch approval check these links,you need to configure these in Solman system
    https://websmp206.sap-ag.de/~sapidb/011000358700000086852008E.sim
    www.alphasirius.com/Configuring_Using_MaintenanceOptimizer.ppt
    /people/issacnolis.ohasi/blog/2008/01/04/upgrade-sessions-whats-sap-solution-manager-maitenance-optimizer
    2. SAP Note download
    These setting can be done in individual system by configuring OSS connection to SAP
    3:3.Service Desk
    /people/bruyneel.guillaume/blog/2008/05/02/service-desk-implementation-guide-part-i
    /people/bruyneel.guillaume/blog/2008/06/13/service-desk-implementation-guide-part-ii
    Regards
    Uday

  • SLD Solution Manager & connections to other SAP productes in landscape?

    Hi All
    I have installed Solution Manager 4.0 SR3 in order to implement global monitoring across our landscape and I have decided to install and use the SLD.
    I have set up the SLD and followed the post installation guide, however I now want to connect all of our sytems to it so that Stack , version Information, components etc can be transfered to the SLD automatically. Once this is done in Solution Manager (SMSY) I can then view all of my systems.
    Firstly is this possible and does anyone have any information on how to do this?
    Many Thanks
    Phil

    Hi Phil,
    It is possible.
    Firstly in satelite systems you need to enter your SLD server info using transaction SLDAPICUST. Here you specify your Solution Manager system as host, user usually j2ee_admin and j2ee_admin's password. The alias can be anything and default port is 5<instance no>00.
    Secondly, you test the connection with transaction SLDCHECK. If it's green it's OK, you can ignore most warning messages.
    Then last you setup data collection and job scheduling and you do this in transaction RZ70.
    Sorry don't have any reference to notes or documentation but each transaction above should make sense of what I mentioned.
    Hope this helps.
    Regards,
    Nelis
    Message was edited by:
            Nelis Lamprecht

  • Early Watch Alerts Problem in Solution Manager

    Hello,
    I am trying to configure EWA for my SAP R/3 systems in Solution Manager 3.2. RFC connections are working fine. EWA report that is getting generated is showing me following problem :
    <b>EarlyWatch Alert - R/3 System</b>**********
    <b>Download Problem</b>
    We could not perform a correct analysis because essential parts of the download data are missing. The cause is probably a problem with data collection or transfer.
    Recommendation: Please check the log for this session in the Service Data Control Center (execute transaction SDCC or the new SDCCN in your system). If an error entry is listed, perform the Service Preparation Check.
    Implementation: To perform the Service Preparation Check, execute transaction SDCC and choose Information-> Service prep. check or if you use SDCCN create a new task 'Service Preparation Check'.
    The result of Service Preparation check ( as recommended) is not throwing any error.
    Can anyone help me out on this.
    Regards,
    Yashodhan

    Hello Yashodhan Mujumdar,
    we have warnings about differences in the function interface, but all works, so we ignore them.
    But the missing data interface seems to be the error.
    Did you read note 781680?
    Do you have the newest ST-PI (2005_1_xxx SP3) and ST/A-PI (01G_xxx, this is an installation, no patch)? Do you have the right flavour of ST/A-PI?
    Are ST03N and ST06 working?
    Do you refresh service definitions from sapnet? Did you generate (after service refresh) on the solution manager system the includes (SPRO -> SAP Solution Manager -> Basic settings -> SAP Solution Manager System -> Operations -> Setup Service Data Control Center -> Generate Includes....
    If these checks are all ok you might deactivate SDCCN both in satellite system and solution manager (SMSY -> Goto -> Solution Manager Operations -> Administration SDCCN) and activate it again.
    If this doesn't work you might use the big hammer:
    1) delete all the service definitions in satellite system like described in note 727998
    2) delete all entries in table /BDL/_GENER (satellite system)
    3) create in SolMan system a new session in order to collect and send data for this session in satellite system; if you don't see the session in the satellite system please execute there the "Maintenance Package"
    4) elaborate the data for this new session in SolMan system
    If all this doesn't help, open a message in sapnet
    Bye
    Message was edited by: Riccardo Escher

  • Syncronizing two Solutions Manager with One SLD

    Hello Experts, we have this issue: I am having one Central SLD  in PI and one productive Solution Manager (new one) that is pointing to that SLD, for incidents we are managing another ¨productive¨Solution Manager (old one) . There is a new system that I need it in my SMSY in my old Solution Manager and the best way to do it would be to point that old Solman to the same SLD that the new one is pointing. my question is: I only have to set the SLD in the old solution manager in the RZ70 and add that Solution Manager in the Central SLD?, so I would end with two solution manager pointing the same Central SLD, it doesnt mess with my new productive Solution Manager SMSY?, I want to be sure that some trash data in the old Solution Manager wont be present in the new Solman that is pointing the Central SLD right now.
    Best Regards,
    Paul

    Dear Mr. Paul,
    There are few things to understand:
    1. RZ70 is used to feed SLD with system information.
    2. landscape fetch job need to be scheduled within Solution manager system to update SMSY with the latest information available in SLD which you have configured during SOLMAN_SETUP.
    Here with your description it is clear that you have central SLD at your PI system and your both Solution manager system ( New and Old) are connected to the central SLD.
    Here what I understand if you want to add a new system say X in SMSY of your old solution manager.
    In order to do so you need to configure your new system to the central SLD using RZ70. Once you did this, system details of your new system would be available with central SLD.
    Now in next step to make that system available to your old solution manager, you need to rerun the smsy_setup job. This will referesh your SMSY and new system would be available in SMSY of your OLD solution manager.
    In this case there is a catch. Since you have added the system to the central SLD, the new system X would also appears in the SMSY of your new Solution Manager as well once SMSY of new solman gets refreshed.
    So if you just want to add this new system X to SMSY of your old solution manager only and not to the new one, you can add this system to the local SLD of old solution manager only not to the central SLD.
    Also you need not to worry about the trash data available in your Old solution manager. It would not effect the central SLD if your local SLD of old solution manager is not synch with central SLD.
    Regards,
    Sachin

  • How define ECC 6.0 system in smsy? Solution Manager 7.0 SP15

    Hi Colleagues,
    I have to define ECC 6.0 in my Solution Manager 7.0 SP15.
    At smsy transaction -> Landscape Components -> Systems I don't find name SAP ECC to create new system. So I created it on SAP ERP.
    My problem is when I go to create a logical component to assign my ECC system. So I go to transaction smst-> System Groups and Logical Components -> Logical components -> SAP ECC -> SAP ECC Server, I've created a Z New logical componets and at the right frame I am not able to assign my define system under SAP ERP. I get a pop-up "No system found for this product/main instance".
    Please could you help me?
    Thanks and Regards
    Raul

    Hi,
    The problem is solved.
    When I defined the system in smsy transaction, I made a mistake because I define it like a ERP 2005 and not a ECC 6.0, so in the next step when I want include this new system in a ECC 6.0 logical group, it wasn't able to find any ECC 6.0 system defined.
    Thanks, René for your reply.
    Regards

  • Adding systems with same SID in SMSY - solution manager

    Dear All,
    We are having systems with same SID's which  belongs to different landscape created for various customers.
    Currently We are having only one solution manager.
    I consider this example for explanation.
    Customer 1 : DEV --> QAS --> PRD ( SID's)
    customer 2 :  DEV --> ACC --> PRD  ( SID's)
    I would like to add  these 6 systems in a solution manager. For Customer 1 , I have included the systems in SMSY . But when i tries to add DEV, PRD for customer 2 , it fails  since this SID's are already present.
    Is there any other way to include by giving the different SID's DE2 but with correct IP and host Or we need to have one more solution manager ? Please anyone suggest me on this
    Thanks
    Raj

    Dear Juan ,
       We can add systems with same SID in smsy. I have attached the way in which i have done. This may help others. Thank you all for your suggestion
    Only use more than three characters if your landscape contains multiple systems with the same system ID (if you have a mirrored backup system that has the same ID as the original system, for example).
    If multiple systems in your landscape have the same system ID, choose as system name the system ID with a suffix of up to 5 characters (a sequential number, for example) to create a unique system name.
    The system accepts a system name of more than 3 characters if you choose Enter to confirm.
    Thanks
    Raj

  • Solution Manager data upload/synchronize from SMSY to Marketplace

    Hi Experts,
    One of our SAP System data has got deleted from SAP Marketplace system data maintenance section. The data is available in SMSY transaction of our solution manager system.
    I would like to know if there is any way that we can populate/synchronize  the data available in SMSY to Marketplace System Data.
    Please advice on this.
    Rg,
    Sandeep.

    Hi Anil,
    This issue is resolved now and i was able to populate data from SMSY to System data in marketplace.
    using SMSY - select system - system data in support portal - synchronize.
    It uploaded data from SMSY to OSS and all details are visible now.
    Rg,
    Sandeep.

  • Regarding this issue in the configuration on smsy in the solution manager

    hai all,
    i am havig an issue when trying to configure the smsy in the solution manager
    the issue is
    Invalid user s0001234567 when calling SAP Backend system
    all the rfcs related to the oss is fine
    i had maintained the user in the aisuser tcode correctly
    and then i router is finly working
    software component : st is 400 kernel and level is18
    hope all the experts of solution manger help me
    thanks & regards
    praveen kumar

    Invalid user s0001234567 when calling SAP Backend system
    Is it a valid S-USER?
    Use valid S-USER and update the user details in AIUSER.
    Regards,
    Nick Loy

  • SMSY t.code in Solution Manager 3.2

    I want the steps for using SMSY t.code. In detail i want to configure the SLD using SMSY.
    URGENT
    Satinder Lamba

    Hi Lamba,
    You cna see the detailed documentation with screens in SMP .
    Go to http://service.sap.com/rkt --> Solution Manager --> Solution manager 3.2 -->Technology Consultant & System Administrator --> System and Solution Maintenance 
    Thanks
    Prince Jose

  • Facing issue with adding systems in SMSY - solution manager

    Hi all,
        We are facing an issue with the solution manager in tcode smsy. When i create a system in the corresponding component say ECC with product version ECC6.0.The next screen shows that the <SID> has been added successfully. But when i navigate to the path and i unable to see the system SID which i have created.
       Again i have tried to create the same system with same SID, but it shows that " SID already exists "
       Also i need another suggestion, we have planned to add 60 systems in the same solution manager. Kindly suggest me , how many systems we can add in single solution manager in maximum and for configuring EWA ?
    Thanks
    Raj

    Hi Raj,
    You can delete the old system entry and then try creating the saem again..
    Also while creating mention correct product and version and the installation number.
    You can also use the assistant for this.
    Have you added all your servers and DB?
    regards,
    Raja. G
    Edited by: Raja Gunasekaran on Aug 28, 2009 1:26 PM

Maybe you are looking for