Some questions of BO Edge or Enterprise Xi 3.1 + updates

Good Morning,
I have some questions
I have SAP NW 7.01 EH1 SP5. sytem installed.
1- I want to install Bo Edge BI Standard 3.1
    a) its possible have BO Edge Bi Stantard 3.1 SP2 ?
    b) with Edge 3.1 (without sp) its possible Xcelsius Enterprise SP2 connect to BW?
2) I want to update/grade my BO XI 3.1.
How its work about support packages or fix? the sequencial? There is FIX and SP. After finishing BO XI 3.1, what I do next?
a)
1 - Install Sp1
2 - install fix 1.1 1.2 1.3 .... 1.x
3 - install sp2
4 - install fix 2.1 2.2 2.3 ....
b)
1 - Install sp1
2 - Install sp2
3 - install fix 2.1 2.2 .3
My question is, the SP2 for example has whole (sp1+ fix1.1 to 1.x) included? or just fix 1.1 to 1.x < sp 2.0 ?
Thx
Regards,
Amit

Hi,
1) a) SP 2 is not yet available for BO Edge.
1) b) If you ant to use the direct interface to BW queries within XCelsius then your dashboards must be stored/exported in the Netweaver. You do not need a BO Enterprise or Edge system for this. You can just install the XCelsius Designer 2008 SP2, create your dasbhoard and export it to SAP NW.
2) There is no SP1 for BO XI 3.1. BO XI 3.1 is considered to be BO XI 3.0 + Service Pack 1. You can say that BO XI 3.1 is the full (non-incremental) version of Service Pack 1 for BO XI 3.0. For Service Pack 2 exists currently only an incremental version ie. either you install BO XI 3.1 directly or you start from XI 3.0 and then upgrade to XI 3.1. In both cases you install SP2 at the end.
3) This depends on the type of the Service Pack (incremental or full version). I would recommend to always take a look at the release notes prior to the installation of a given Service Pack. Service Pack 2 for BO XI 3.1 can only be applied on a BO XI 3.1 system.
Regards,
Stratos

Similar Messages

  • Questions about the Apple Developer Enterprise Program

    Hi there,
    i got some questions about the Apple Developer Enterprise Program:
    - is there a way a company can create their own "AppStore" with only the APPs the employees should use?
    - when I developed the enterprise app are the install files on a apple hosted server or do i need my own infrastructure to distribute my app?
    Thanks in advance for answers!

    Google: MDM

  • IOS  Developer Enterprise Program:  Can I have a discussion with an Apple Representitive, I have some questions.

    My Company is interested in distributing apps through our existing web portal within our organization. Can I have a discussion with an Apple Representitive, I have some questions?

    https://developer.apple.com/contact/
    Regards.

  • Some question for Sun Java System

    Dear all:
    I use Sun Java System We Server 7.0 for my project.
    But I have some question on SJSWS 7.0
    My server runtime information
    1. OS is RedHat Enterprise 3
    2. memory: 2G
    3. SJSWS version: 7.0 preview 3
    My questions
    Q1. The speed that download image is slower than the speed that run JSP page . The image's size to smaller than 5 KB. Is it possible to speed up download image
    Q2. My machine has 2GB memory, The system use swap area always. I think it isn't enough of SJSWS 7.0. How much memory size that SJSWS 7.0?
    Many thank for everybody

    first off, please try the Update 1 release in stead of technology preview releases: http://www.sun.com/download/products.xml?id=467713d6
    Q1> So I want to ask it is possible to display image and text at the same time like use Tomcat ?
    there is nothing in the server end (whether it's Tomcat or any other web server) that affects how the content is displayed on the browser.
    Q2>I detect The ram was used over 800M~1G by SJSWS7. My website has 80~150 user in workinghour
    Are you seeing Web Server process measuring so much memory?
    Q3> Is it possible that the admin server use SJSWS7U1 and some or all of node use SJSWS preview 3, because the server is running on line, I can't stop them for update server
    No - you want to switch to U1 anyway, since it's a released version (and is absolutely FREE for production use).

  • Some questions on Information Broadcasting

    Hi,
    We're implementing Information Broadcasting. I have some questions and would be delighted if you could answer some or all of them!!
    1. When using Web-templates I get the following message after opening my zip-file (Independent HTML-file) thru e-mail:
    - Bex Broadcaster does not support Precalculation. What's the meaning of this? We get precalculate figures.
    - The broadcaster demands that Javascript can be executed in the browser. How to solve?
    2. When I broadcast a query as zip-file HTML with seperate MIME files then the precalculated views do not have drilldown functionality, i.e. the navigation block functionality does not work (static). I put navigation on Distribution channel. Is this normal way of working?
    3. Broadcast functionality does not give possibility for Distribution type: 'Export to Enterprise Portal'.
    We have an Enterprise Portal. Is additional customizing required?
    4. Process chains have the Event Data Change process. This only works if I attach it directly to a cube. When I connect it to the process load data (i.e. to an Infopackage) it does not work. Any ideas?
    Thanks in advance!!
    Kind regards, Harjan

    Hi Harjan,
      Not sure what the issue is with regard to (1).
      With regard to (2), you need to to click on the 'Filter Navigation' tab in the BEx Broadcaster, enavle filtering, and select the characteristics you wish to filter on.
      With regard to (3), yes, there's additional configuration required in order to be able to broadcast into the Enterprise portal. Here's the documentation: http://help.sap.com/saphelp_nw04/helpdata/en/84/30984076b84063e10000000a1550b0/content.htm
      With regard to (4), the idea behind integrating the broadcasting event into a process chain is to only perform the brodcast if the info provider was loaded successfully to ensure the end user has accurate and up to date information. http://help.sap.com/saphelp_nw04/helpdata/en/ec/0d0e405c538f5ce10000000a155106/content.htm
    Regards,
    Oliver

  • Hi team , I have some questions/Problem for my product apple (iPad,iPhone) , I want to employee speak and type thai language

    Hi team , I have some questions/Problem for my product apple (iPad,) , I want to employee that can  speak  or response me in thai language
    1. ผม อาคเนย์  พำนักอยู่ประเทศไทย กรุงเทพฯ  มีปัญหาสอบถาม ดังต่อไปนี้
       - กระผมได้ทำการตัดบัตร เครดิต เพื่อซื้อเกมส์ผ่าน itune store ผ่าน apple itune ID : misskor.yaprom@*** เพื่อซื้อเกมส์ Eleves Realm ในวันที่18 ก.ค. 56 เวลา 17.07น. ซึ่งทางบัตรเครดิตได้แจ้งเรียกเก็บเงินมายอดเงิน 39.99$ ซึ่งในระบบจริงๆ ทางกระผมต้องการตัดในยอด 99.99$ แต่พอได้ประสานงานไปยังธนาคาร ได้รับการแจ้งกลับมาว่า ได้ทำการตัดบัตรในยอดเงิน 39.99$ ซึ่งในความเป็นจริงนั้น กระผมไม่ได้สั่งซื้อเกมส์ในยอด 39.99$ ซึ่งในยอด 99.99$ นั้นพยายามตัดในระบบบัตรเครดิตอยู่ แต่ทางกระผมได้ยืนยันกลับไปว่าไม่ให้ระบบตัดนะครับ เพราะว่าเนื่องจากมีปัญหาในการชำระเงินระหว่าง Apple itune store อยู่
       - ทั้งนี้ขอให้ทางเจ้าหน้าที่ประสานงานตรวจสอบ apple itune ID : misskor.yaprom@*** เพื่อซื้อเกมส์ Eleves Realm ตามที่ได้ให้รายละเอียดโดยด่วนว่าเป็นเพราะว่าระบบมีปัญหาหรือว่ามีอะไรเกิดขึ้นในข ั้นตอนการชำระเงินครับ
    รบกวนประสานงานกลับมายังกระผม อาคเนย์ ที่หมายเลขโทรศัพท์มือถือ +**** / reply feedback  email : lekod1@*** โดยด่วน ในวันศุกร์ที่ 19 ก.ค. 2556 ครับ
    ขอบคุณครับ
    อาคเนย์  อุดปิน
    กด
    <Edited By Host>

    Google translation:
    พนักงานของ iTunes Store จะไม่ได้อ่านข้อความในเว็บบอร์ดนี้ ถ้าคุณต้องการความช่วยเหลือสำหรับปัญหาที่มีใน iTunes Store, คุณจะต้องติดต่อกับพวกเขาผ่านทางแบบฟอร์มเว็บนี้:
    http://www.apple.com/emea/support/itunes/contact.html

  • I have some questions regarding setting up a software RAID 0 on a Mac Pro

    I have some questions regarding setting up a software RAID 0 on a Mac pro (early 2009).
    These questions might seem stupid to many of you, but, as my last, in fact my one and only, computer before the Mac Pro was a IICX/4/80 running System 7.5, I am a complete novice regarding this particular matter.
    A few days ago I installed a WD3000HLFS VelociRaptor 300GB in bay 1, and moved the original 640GB HD to bay 2. I now have 2 bootable internal drives, and currently I am using the VR300 as my startup disk. Instead of cloning from the original drive, I have reinstalled the Mac OS, and all my applications & software onto the VR300. Everything is backed up onto a WD SE II 2TB external drive, using Time Machine. The original 640GB has an eDrive partition, which was created some time ago using TechTool Pro 5.
    The system will be used primarily for photo editing, digital imaging, and to produce colour prints up to A2 size. Some of the image files, from scanned imports of film negatives & transparencies, will be 40MB or larger. Next year I hope to buy a high resolution full frame digital SLR, which will also generate large files.
    Currently I am using Apple's bundled iPhoto, Aperture 2, Photoshop Elements 8, Silverfast Ai, ColorMunki Photo, EZcolor and other applications/software. I will also be using Photoshop CS5, when it becomes available, and I will probably change over to Lightroom 3, which is currently in Beta, because I have had problems with Aperture, which, until recent upgrades (HD, RAM & graphics card) to my system, would not even load images for print. All I had was a blank preview page, and a constant, frozen "loading" message - the symbol underneath remained static, instead of revolving!
    It is now possible to print images from within Aperture 2, but I am not happy with the colour fidelity, whereas it is possible to produce excellent, natural colour prints using its "minnow" sibling, iPhoto!
    My intention is to buy another 3 VR300s to form a 4 drive Raid 0 array for optimum performance, and to store the original 640GB drive as an emergency bootable back-up. I would have ordered the additional VR300s already, but for the fact that there appears to have been a run on them, and currently they are out of stock at all, but the more expensive, UK resellers.
    I should be most grateful to receive advice regarding the following questions:
    QUESTION 1:
    I have had a look at the RAID setting up facility in Disk Utility and it states: "To create a RAID set, drag disks or partitions into the list below".
    If I install another 3 VR300s, can I drag all 4 of them into the "list below" box, without any risk of losing everything I have already installed on the existing VR300?
    Or would I have to reinstall the OS, applications and software again?
    I mention this, because one of the applications, Personal accountz, has a label on its CD wallet stating that the Licence Key can only be used once, and I have already used it when I installed it on the existing VR300.
    QUESTION 2:
    I understand that the failure of just one drive will result in all the data in a Raid 0 array being lost.
    Does this mean that I would not be able to boot up from the 4 drive array in that scenario?
    Even so, it would be worth the risk to gain the optimum performance provide by Raid 0 over the other RAID setup options, and, in addition to the SE II, I will probably back up all my image files onto a portable drive as an additional precaution.
    QUESTION 3:
    Is it possible to create an eDrive partition, using TechTool Pro 5, on the VR300 in bay !?
    Or would this not be of any use anyway, in the event of a single drive failure?
    QUESTION 4:
    Would there be a significant increase in performance using a 4 x VR300 drive RAID 0 array, compared to only 2 or 3 drives?
    QUESTION 5:
    If I used a 3 x VR300 RAID 0 array, and installed either a cloned VR300 or the original 640GB HD in bay 4, and I left the Startup Disk in System Preferences unlocked, would the system boot up automatically from the 4th. drive in the event of a single drive failure in the 3 drive RAID 0 array which had been selected for startup?
    Apologies if these seem stupid questions, but I am trying to determine the best option without foregoing optimum performance.

    Well said.
    Steps to set up RAID
    Setting up a RAID array in Mac OS X is part of the installation process. This procedure assumes that you have already installed Mac OS 10.1 and the hard drive subsystem (two hard drives and a PCI controller card, for example) that RAID will be implemented on. Follow these steps:
    1. Open Disk Utility (/Applications/Utilities).
    2. When the disks appear in the pane on the left, select the disks you wish to be in the array and drag them to the disk panel.
    3. Choose Stripe or Mirror from the RAID Scheme pop-up menu.
    4. Name the RAID set.
    5. Choose a volume format. The size of the array will be automatically determined based on what you selected.
    6. Click Create.
    Recovering from a hard drive failure on a mirrored array
    1. Open Disk Utility in (/Applications/Utilities).
    2. Click the RAID tab. If an issue has occurred, a dialog box will appear that describes it.
    3. If an issue with the disk is indicated, click Rebuild.
    4. If Rebuild does not work, shut down the computer and replace the damaged hard disk.
    5. Repeat steps 1 and 2.
    6. Drag the icon of the new disk on top of that of the removed disk.
    7. Click Rebuild.
    http://support.apple.com/kb/HT2559
    Drive A + B = VOLUME ONE
    Drive C + D = VOLUME TWO
    What you put on those volumes is of course up to you and easy to do.
    A system really only needs to be backed up "as needed" like before you add or update or install anything.
    /Users can be backed up hourly, daily, weekly schedule
    Media files as needed.
    Things that hurt performance:
    Page outs
    Spotlight - disable this for boot drive and 'scratch'
    SCRATCH: Temporary space; erased between projects and steps.
    http://en.wikipedia.org/wiki/StandardRAIDlevels
    (normally I'd link to Wikipedia but I can't load right now)
    Disk drives are the slowest component, so tackling that has always made sense. Easy way to make a difference. More RAM only if it will be of value and used. Same with more/faster processors, or graphic card.
    To help understand and configure your 2009 Nehalem Mac Pro:
    http://arstechnica.com/apple/reviews/2009/04/266ghz-8-core-mac-pro-review.ars/1
    http://macperformanceguide.com/
    http://www.macgurus.com/guides/storageaccelguide.php
    http://www.macintouch.com/readerreports/harddrives/index.html
    http://macperformanceguide.com/OptimizingPhotoshop-Configuration.html
    http://kb2.adobe.com/cps/404/kb404440.html

  • Some questions about configuration in MAX.

    Hello,everyone!
    I have some questions about configuration in MAX(I am a jackaroo for motion control development),I hope I can get your help.
    I use PCI-7344+UMI-7764+Servo amplifier+Servo motor,my MAX version is 4.2 and I use NI-Motion7.5
    My question as following:
    1,In Axis Configuration,for motor type,why I must select stepper but not servo?my motor is servo motor!If I select Servo,my motor can't run,I don't know why.
     If I select stepper,though motor can work but I can't test encoder in MAX.
    2,In Stepper settings,for stepper loop mode,why I must select open-loop but not close-loop?If I select close-loop,the servo motor doesn't work too.
    3,If I want my two servo motors run at different velocity,How shoud I do?It seems I just can set the same velocity in MAX for my two servo motors.
     My English is poor,Pls pardon me!I come from China.
    Thank you for your help!
    EnquanLi
    Striving is without limit!

    Hi,Jochen,
    Thank you for your kindly help!
    The manufacturer of the drive and motor that I am using now is Japan SANYO DENKI,drive type is RS1A01AA,motor type is R2AA06020FXP00.
    And I use position control mode,thehe encoder's counts per revolution is 131072.I set the electronic gear ratio to 1:1 for drive.
    Now,I can use Close-Loop to control the motor but still has some problems.When I configure it to run in closed loop mode, the motors behave strangely and never move to the target position.When I configure it to run in closed loop mode, the motors behave strangely and never move to the target position.The detail situation is as following
    1,Motor can't run.
    2, Or motor moves to a position, then moves in the same direction agian and eventually stops.
    Except for the  two points mentioned above,"Following Error" is  occured frequently,I don't know why.
    I am still not clear why I must set the motor type be stepper in MAX .
    And I have another question:what the relationship between the steps and the counts?They have the proportion relations?I notice that there are a section said like this in help document: For proper closed-loop and p-command operation, steps per revolution/counts per revolution must be in the range of 1/32,767 < steps/counts < 32,767. An incorrect counts to steps ratio can result in failure to reach the target position and erroneous closed-loop stepper operation.
    I am verry sorry I have too many questions!
    I am very appreciate for your kingly help!Thanks again!
    EnquanLi
    China
    Striving is without limit!

  • Some Questions on Adobe PDF Forms

    Hi,
    I have some questions on Adobe Forms development (especially Adobe Forms in ABAP)
    1)     In a form interface, in the Code Initialization can we use Object Oriented Syntaxes such as class method calls, etc?
    2)     Can we declare Global Data variables with reference to Class References / Interfaces
    3)     Can we use the latest ECC 6.0 enhancement framework to add code in the standard form interface to enhance / enrich some logic within the form? This is to avoid copying the form interface into a Z in order to enrich the form via coding?
    Please let me know if this is possible at all and how
    Will award points
    Thanking You in advance
    Regards,
    Aditya

    That is possible of course. You should use the PDFObject API for that requirements.
    1. define a xml schema with all data given by SAP system.
    2. create a form template which uses this schema as data connection
    3. implement a java application (i.e. J2EE application) which:
    - gets the data from SAP system and generates some pdf files (using PDFObject API)
    - reads pdf files back to xml and submits the data to a BAPI
    Regards
    Sebastian

  • Some questions on SAP DMS

    Hello
    some questions on SAP DMS:-
    - can versions of same document be shown graphically. ?
    - can links be created for documents. can we make sure that links are not broken when document is moved ?(links to document on 1st location shall not be broken)
    - is there a notification mechanism(user can recieve e-mail when document gets changed)
    - is there a review mechanism, before doc. is archived.(sort life cycle)
    Thanks

    Hi Shovon,
    1. can versions of same document be shown graphically?
    You can display all existing versions of a document info record by using the menu 'Extras' >> 'Versions'. Then you will see all existing document version for this specific document number. Further you will see which is the current version at the moment.
    2. can links be created for documents. can we make sure that links are not broken when document is moved ?(links to document on 1st location shall not be broken)
    I'm not quite sure what you mean by links to documents. If you mean linking document info records together, I can confirm that this works also in DMS. You can maintain the object DRAW for object links in the customizing and then you will be able to link one document info record to another. The data for all document info records is stored in table DRAW.
    If you are talking about originals which are linked to document info records, please note that if you check in an original the system creates a unique LOIO- and PHIO-ID which is stored in the Content Server and in the database tables DMS_DOC2LOIO and DMS_PHIO2FILE. But there are also different reports to migrate original data from one content Server to another (e.g. DMS_RELOCATE_CONTENT).
    3. Is there a notification mechanism(user can recieve e-mail when document gets changed)
    Yes you can activate an event type linkage for object
    DRAW     CHANGED     DOKST
    DRAW     CHANGED     DWNAM
    in transaction SWE2. Here you just have to set the flag for 'Type linkage' (linkage activated). Then everytime the document is changed a notification is sent to the entered USER of this document info records.
    4. Is there a review mechanism, before doc. is archived.(sort life cycle)
    Normally there is no special lifecycle. You can control this by maintaining a released status and if there are more versions always version with the release status is the current one. But there is no specific date when the document info record expires or something like that.
    Best regards,
    Christoph
    P.S.: Please reward points for useful information.

  • Some questions on versioning and synchronizing metadata

    Hy all!
    I am quite new to warehousing and Oracle Warehouse Builder, and so i would have some questions regarding on some common issues. I would appriciate if you guys would who have experience in this domain to share some good practice knowledge :)
    I am using OWB 10.2
    So first of all i would like to know if you have some proposal of the way of versioning control and synchronizing projects between team memebers when working on a bigger project, team memebers that don't work on the same repository (cause i saw that OWB has an integrated multiuser support for handeling object locks and user sessions).
    I saw that a way of migrating data from one place to a nother is using the import/export options integrated in OWB. This creates mdl files wich are some kind of "dumps" of the metadata informations, but the thing with these mdl files wich i don't think is a good way to synchronize is that first of all the .mdx and .xml files contained in the .mdl (wich is kind of a zip) contains many informations in it (like creation date, some timestamps, etc) wich are always updated when exporting, and if synchronizing these files maybee using CVS, we always will get differences between the files alltough they would contain the same thing, only timestamps changed.
    Then a nother issue with this, is that we could have 2 alternatives: dump the whole project, wich is odd to have to synchronize a single file between users, especialy on a big project, then the orher way would be doing for each object from the project (each mapping, each table, etc) an separate .mdl filem then to synchronize each file of each object, wich will be unefficient on reimporting each file in part.
    So please if you can share the way you work on a big project with many implementers with OWB, i would really appriciate.
    A nother thing i would like to know is: is there a way to generate from an existing project (like one created with OWB) the OMB commands dump (maybee in a tcl script)? Cause i saw that the way the exeprienced users implement warehousing is using TCL with OMB language. I downloaded the example from oracle for warehouse project, and i saw that is entirely made from tcl scripts (so no mdl file involved). And this i think would be nice, to have the OMB commands generated from an existing projects.
    I see this OWB projects like a database wich can be built up from only OMB commands and OWB a graphical tool to do this (same as constructing a database only from DDL commands or using SQL developer to do this), this is why i am asking about a way of dumping the OMB commands for creating an OWB project.
    Please give me some advices, and correct me if i sad some dumb things :D but i really am new to warehousing and i would really appriciate if you guys with experience could share some informations.
    Thank you verry much!
    Alex21

    Depends. Having everyone working on the same project certainly simplifies things a lot regarding merging and is generally my preference. But I also recognize that some projects are complex enough that people wind up stepping on each other's toes if this is the case. In those cases, though, I try to minimize the issue of merging changes by having common structural objects (code libraries, tables, views, etc) retained in a single, strictly controlled, central project schema and having the developer's personal work areas reference them by synonym, thus being unable to alter them to the detriment of others.
    If they want to change a common object then need to drop their synonym and make a local copy which they can alter, and then there is a managed process by which these get merged back into the main project schema.
    This way any changes MUST go through a central schema, we can put processes in place to notify all of the team of any impending changes, and can also script updates across the team.
    Every hour a script runs automatically that checks for dropped synonyms and notifies the project leader. It especially checks for two developers who have built local copies of the same object and notifies each that they need to coordinate with each other as they are risking a conflict. When a structural change is submitted back to the central shared schema, it is added to a batch that is installed at end of business and a list of those impending changes is circulated to the team along with impact analysis for dependencies. The install script updates the main schema, then also drops the local copy of the object in the developer's schema who made the change and re-establishes the synonym there to get back to status quo for the change monitoring. Finally, it then updates itself in all of the developer areas via OMBPlus. So, each morning the developers return to an updated and synched environment as far as the underlying structure.
    This takes care of merging structural issues, and the management of the team should minimize other metadata merging by managing the worklist of who is to be working on a given mapping or process flow at a given time. Anyone found to be doing extraneous changes to a mapping or process flow when it is not in their job queue without getting pre-approval will be spoken to VERY firmly as this is counter to policy. And yes, OWB objects such as mappings are then also coordinated to the central project via import/export. OMBplus scripts also propogate these changes daily across the team as well.
    Yep, there is a whole lot of scripting involved to get set up.... but it saves a ton of time merging things and solvinv conflicts down the road.
    Cheers,
    Mike

  • Some questions on whitespace and &

    Dear all,
    I have some questions on whitespace and & that need you kind help:
    1. Except /n /t /r and space, is there any characters that are whiteSpace characters?
    2. When parsing XML document, when the ignorableWhitespace() method is called? Will it be called from characters() ?
    e.g. Where the white space after <a> is called, and where is the white space between test1 and test 2 indied <b> is called?
    <a>
       <b>test1 test2</b>
    </a>  3. When the & should be escaped in a well-formed (or validated) XML file by replacing &?
    It should be excaped in any element content, such as <b>test1 & test2< /b> - except for <![CDATA[ section?
    It should NOT always be used in attributes? e.g. <a b="test1 & test2"/>  - has to do escaped by entity & - am I right?
    Thanks!
    Thanks
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

    Thanks DrClap.
    >
    2. When parsing XML document, when the
    ignorableWhitespace() method is called? Will it be
    called from characters() ?It will be called when the document has a DTD and the
    parser is a validating one that is actually
    validating, when the parser sees whitespace that is
    not part of a DTD element. It will not be called from
    characters() because that is a method that you write.I wrote a contentHandler and using Xerces parser to parse an XML document. When I set validating feature to false, I found that for:
    <a>
       <b>test1 test2</b></a>The white space between <a> and <b> (including newline) is actually called from characters(), not in ignorableWhitespace(). So does this mean that if validating - white space is always called from ignorableWhitespace(), and if not validating, if it is always called from characters()?
    >
    3. When the & should be escaped in a well-formed(or
    validated) XML file by replacing &? The XML Recommendation says "The ampersand character
    (&) and the left angle bracket (<) may appear
    in their literal form only when used as markup
    delimiters, or within a comment, a processing
    instruction, or a CDATA section. If they are needed
    elsewhere, they must be escaped using either numeric
    character references or the strings "&" and
    "<" respectively."So in this sense, both & in <b>test1 & test2< /b> and <a b="test1 & test2"/> is illegal unless replacing them by & - right? What does the markup delimiters mena in above XML Recommendation ? Example?
    Thanks!

  • Some questions on filter

    Hi Experts,
    I have some questions on IP. I am comfortable working with BPS but I dont know how they work in IP.
    1) Suppose we take an example
    I have put filter on some char. say "Sales Region" from values A to D. and now I associate a planning function repost values (with filter) for only A "Sales Region" (So I keep only value A in fields for condition)
    So Question is will sales region B to D will be locked for write access for some other operation ??
    And in BPS there is no concept like locking on basis of filters put on Planning Level and Planning Package right ???
    Entire transactional cube is locked for any other user if some user is running a layout in a particular Planning Area even if filter conditions in Planning Level and Planning Package do not overlap in any other layout on same Info Area ?? m i correct ??
    Ask me if I am not clear in explaining.
    Good conceptual answers would be really appriciated.
    Thanks,
    Mihir

    Hi Mayank,
    Thank you for your answer. I tried and tested ur BPS answer regarding locking at planning package. It works well.Before I used to restrict at planning level.
    But once I restrict at package and hit "save all" as well as "save modal" and log off the system those filters get removed when I relogin and see the same package. Why is this so ???
    Would like to hear from you....
    Thank again,
    Mihir

  • Some questions regarding ESB system.

    Hi all,
    I've used my ESB system for a few months now, so I thought it would be interesting to look at what's going on in my database schema created by my esb system (oraesb). This led to some questions (and raising eyebrows), I hope some of you soa-experts might have an answer.
    * Is my system installed properly:
    I noticed that the oraesb schema created by running IRCA.zip installs only tables, views, topic queues and 1 procedure (create_queue). However, looking at the sql scripts in ${soaSuite_home}/integration/esb/sql/oracle there are far more stored procedures defined. Is it normal cq. okay that these objects are not installed or is my esb system faulty?
    * No constraints or indices:
    My system is yet very small, so it is still performing good/fast. I imagine that when the esb system is going further, performance and locking becomes an issue due to lack of indices on foreign key columns and primary/foreign constraints.
    * Only small part of schema used:
    When browsing through the tables of the oraesb user I notice that only a few tables are filled with data. For example all "Slide Tables" (this is the name given to these group tables in file ${soaSuite_home}/integration/esb/sql/oracle/wfeventc.sql) are empty. Is this normal? What kind of processes should enter data in these tables? What is the use of the "Slide tables"?
    * AQ-tables not being used:
    My esb system has five aq-queue tables (esb topics), but they are never used! I recall another thread on this forum about these queue tables growing enormous in size. I guess there must be a sort of switch somewhere to switch between jms-queue's and aq-queue's? Can anyone please explain how switch on the aq-queue's or point me to the proper documentation. I must have overlooked this in the documentation.
    Kind regards,
    Happy new year,
    H

    When your podcast is accepted you should receive an email telling you this and giving the URL for its page in the iTunes Store. The string of numbers at the end is the ID number.
    It usually takes somewhat longer for a new podcast to appear in the search results. Once you can find it by searching on the title, you can get the Store page URL, if you still don't know it, by control-clicking on the podcast image (or where it should be) and choosing 'Copy Podcast URL'.
    You may find this page helpful in giving you basic information about podcasting:
    http://www.wilmut.org.uk/pc

  • Some questions about the integration between BIEE and EBS

    Hi, dear,
    I'm a new bie of BIEE. In these days, have a look about BIEE architecture and the BIEE components. In the next project, there are some work about BIEE development based on EBS application. I have some questions about the integration :
    1) generally, is the BIEE database and application server decentralized with EBS database and application? Both BIEE 10g and 11g version can be integrated with EBS R12?
    2) In BIEE administrator tool, the first step is to create physical tables. if the source appliation is EBS, is it still needed to create the physical tables?
    3) if the physical tables creation is needed, how to complete the data transfer from the EBS source tables to BIEE physical tables? which ETL tool is prefer for most developers? warehouse builder or Oracle Data Integration?
    4) During data transfer phase, if there are many many large volume data needs to transfer, how to keep the completeness? for example, it needs to transfer 1 million rows from source database to BIEE physical tables, when 50%is completed, the users try to open the BIEE report, can they see the new 50% data on the reports? is there some transaction control in ETL phase?
    could anyone give some guide for me? I'm very appreciated if you can also give any other information.
    Thanks in advance.

    1) generally, is the BIEE database and application server decentralized with EBS database and application? Both BIEE 10g and 11g version can be integrated with EBS R12?You, shud consider OBI Application here which uses OBIEE as a reporting tool with different pre-built modules. Both 10g & 11g comes with different versions of BI apps which supports sources like Siebel CRM, EBS, Peoplesoft, JD Edwards etc..
    2) In BIEE administrator tool, the first step is to create physical tables. if the source appliation is EBS, is it still needed to create the physical tables?Its independent of any soure. This is OBIEE modeling to create RPD with all the layers. If you build it from scratch then you will require to create all the layers else if BI Apps is used then you will get pre-built RPD along with other pre-built components.
    3) if the physical tables creation is needed, how to complete the data transfer from the EBS source tables to BIEE physical tables? which ETL tool is prefer for most developers? warehouse builder or Oracle Data Integration?BI apps comes with pre-built ETL mapping to use with the tools majorly with Informatica. Only BI Apps 7.9.5.2 comes with ODI but oracle has plans to have only ODI for any further releases.
    4) During data transfer phase, if there are many many large volume data needs to transfer, how to keep the completeness? for example, it needs to transfer 1 million rows from source database to BIEE physical tables, when 50%is completed, the users try to open the BIEE report, can they see the new 50% data on the reports? is there some transaction control in ETL phase?User will still see old data because its good to turn on Cache and purge it after every load.
    Refer..http://www.oracle.com/us/solutions/ent-performance-bi/bi-applications-066544.html
    and many more docs on google
    Hope this helps

Maybe you are looking for

  • Contact Picture on the display by incoming sms

    I'm really happy about my new Iphone. Just one little thing im wondering about. My old Sony Ericson showed me, when i got a sms, on the display the contact picture. that was quite nice. Do you know if it's possible to set this also for iphone? And ma

  • How do you award duke dollars

    How do you award duke dollars

  • Short dump ITS_ERRMSG_EXCEPTION in prod.

    Hi, Could anybody of you tell me what is the reason for getting frequent Short Dumps in SRM Production system as Short dump ITS_ERRMSG_EXCEPTION and what should be the remedy to get rid of that. Looking forward to listen you in this regard. Regards.

  • Maps tells me I'm in England

    Friday Apr 25 while traveling south between Eckert and Fredricksburg TX on 16 I asked Google Maps to locate me. Three time over about ten minutes it told me I was in England. Where I was: http://maps.google.com/?ie=UTF8&ll=30.347695,-98.787346&spn=0.

  • No encoding occurs in "Project info" window

    Can anyone explain why no encoding seems to occur in the "Project info" window? I have a small project with a single "Asset," a .mov file. To the right under "Encoding" is an empty progress bar region. Even when I save the project as a disc image, th