Standar cost calculatin CK11N

Dear All,
Actually the problem is When the user is doing costing for one material, the price is picking from standard cost price where as the user wants to pick form purchase info record. In costing variant the strategy sequence is given as below.
1.     Future price from accounting
2.     Planned price 1
3.     price from purchase info record
4.     Standard price.
In the valuation tab it is showing "Material Valuation" as a standard price.
In material Master user did not maintain any Future price and Planned price. the next level is purchase info record price. User has maintained Gross price in purchase info record. So it has to pick from purchase info record. But it picking standard price.
could any body help me in this.
Thanks and best regards,
Mr.Rao.

Dear Ajay,
We have checked that purchase info record is not marked for outline agreements. Actually this purchase info record is created at Purchase organization level. not maintained for specific plant wise. We are using correct valuation variant.
Regards,
Mr.Rao.
Dear All,
SAP has given the below solution....
Info to SAP    
11.08.2011 - 11:09:30 CET - Reply by SAP     
Dear Customer,
Please check your customizing settings in valuation variant 001.
For the price from Purchasing Info Record, the quaotation price via
condition table has been maintained as sub-strategy. In this case,
a condition type must be maintained for plant L058 in the condition
table (txn OKYO). This has not been done yet.
However, if you want to valuate the material with the gross quotation
price from info record 5300237539, you may select sub-strategy
'Gross Quotation Price'.
Please review attached note 351835 for details.
Regards,
Mr.Rao.

Similar Messages

  • Exchange rate in cost estimate(ck11n)

    Hello All,
    Scenario: We have done cost estimate(ck11n) for material XYZ for September. The currency in info record is USD and the controlling area currency is EUR, now the old exchange rate from June has been picked up by the exchange rate type assigned to costing version. Can anyone please tell me on what parameters should I concentrate to pick the current exchange rate.
    Thanks
    Nivas

    Thanks for the answer,
    Can you please let me know where should I set the exchange rate in cost accounting.
    Thanks
    Nivas

  • With Standared Cost  MAP also updates how

    Dear friend
    When ever we run Standared cost Estimates it up dates Standared cost in  Material master along with that its also up dates the MAP .
    That is for raw material it  up dates Standared price and for Semi /Fg its up dates MAP.
    my Question is
    Is both Standared cost and MAP must be same or can be differ .
    If same its fine but it differ the how?
    Jain

    close

  • Error during Material Cost Estimate (CK11N)

    hi friends,
    I am getting am error during the material cost estimate run.(ck11n)
    "No control record for the activity type"
    please let me know what is the problem.
    regards
    Ramesh

    Ramesh,
    System is not able to determine activity type price.
    You need to input activity price in transaction KP26 for Version 0/Period/Cost Center/Activity Type combination.
    Regards,
    Prasobh

  • Cost estimate (CK11N)is not picking the overhead cost for some of the mat

    Hi all,
    we are facing a problem. The overhead key is defined. the calculation base is defined in the cost sheet. But the overhead cost is not picking  for some of the materials
    Bad Material 5019-0581 via CK11n.
    As you can see in the itemization, only the material and the routing are listed.  No amounts from the OH of ZPTA ( .10).  It should show a line #5 with an amount of (28 quantity  x .10) = $2.80 added to the Total value.
    first three line items it is picked from material and fourth line item from the internal activity.
    the fifth item from G overhead is not picked.

    Hi,
    Check whether u have assigned the cost sheet in u r costing variant which is being used in CK11N.
    Regards
    SudhakarReddy

  • Cost of Manufacture Cost from CK11N

    Hi All
    where can I get material cost estimate price for costing varient PPC3.
    I check all the tables KEKO ,CKIS AND KEPH
    but did not find the cost of goods manufactured "Total costs" in that table could you tell me which field it is ?
    Eg CK11N - Enter the material press execute twice and you will see the costs component view how can I get that price and from which field
    regards
    Piroz

    Hi Piroz
    i have the same requirement which u have explained.
    i need the final cost estimate value of the material, when i give MATNR as input.
    if u got the required solution for this issue, can u please post it for me.
    i gonna give u the points as soon as i get the solution from u.........
    thanx in advance
    Shyam

  • Does Costing Run CK11n update the Info record?

    Hi,
    Will a costing run (Transaction CK11n) update the purchasing info record? In the source list for the material, the vendor is fixed.
    Sincerely,
    Ketan

    No, Costing runs will only update the material with standard costs. For this standard costs it might refer the price maintained in the info-record, but the only update is on the material master, nowhere else

  • Production order costing with CK11n screen

    Hi,
    Can anyone explain  me how costing is done in production order (the one which appears in Producion order --> Goto --> Costing --> analysis sheet) and its relevancy with the CK11N transaction sheet..?
    Should the value appearing in both the screen be same or is there any of kind of comparison bet the two..?
    Thanks in Advance,
    Sabitha

    Dear Sabitha,
    In my understanding you will be able to see the cost that you see in CK13N in the production order also.
    CK11N will be used for creating a material cost estimate with quantity stucture.
    In case if any material component is getting added manually in the production order or else at the time of order confirmation,the
    same can be seen under variance or a difference in the value under actual costing.
    Regards
    Mangalraj.S

  • Costing run ck11n

    Dear experts,
    I am working on process order scenario. I have one FG which is maintaines as raw material.
    It has a BOM , master recipe, prod. version.
    but when I do CK11N, it is not picking BOM & REcipe.
    Plz guide where I am missing
    Thanks & regards,
    sachin ghogale

    Dear Sameer,
    Please check what's your quantity structure date,costing date from in CK11N and also the valdidity
    dates of your BOM and Master recipe.All these dates should match.
    Are you using ECM for BOM creation?If so means ,if you have used change number with release key
    means,check whether the release key has been set or not in CC03,If no means,first set and then check.
    Check and revert back.
    If not solved means,then you have to ask your CO consultant for further help.
    Regards
    Mangalraj.S

  • Scrap Costing while CK11N Std Cost Run

    Dear CO Experts,
    I want know that scrap costing while run CK11N, how the system takes either Assemble, Operation & Component scraps?
    Can any body give brief clarification regarding this. Is there any to take scrap is as by product ?
    Normally we can give either Material Master or BOM as percentage.
    Regards,
    KBREDDY.

    Hi ,
    Please refer to the following Link
    http://help.sap.com/saphelp_46c/helpdata/en/7e/cb84ab43a311d189ee0000e81ddfac/content.htm

  • Cost elements-CK11N Link

    Hi,
    In CK11N, we get cost by cost component sturctures. If we have cost components say Rawmateria, labor, subcontracting and if we see the cost by cost element in CK11N, we see cost of $200 for a mateial by cost element.
    How and where do we define the link of that particular rawmaterial with that particulare cost element, from where does the rawmaterial picks up this cost element?
    Thank you,
    Nivi

    Hi
    In T.code(OKTZ) Define cost component structure under Assignment: Cost component - Cost element interval: itself we define the link of different cost elements to each respective cost component attributes.
    Regards
    Laxmiprasad

  • Is Accounting View(MM) required to execute costing runCK40N(CK11N)?

    Hi Gurus,
    Can FERT be costed without errors even if accounting view is not maintained in material master?
    Is this standard functionality?
    Thank you

    Dear,
    Use T.code OMS2.
    Select Material Type & Click on detail button.
    See the quantity / Valuation area TAB.
    In Valuation Updating heading :
    In No Valuation area button should be selected for Non value-added material.
    Accounting view is mandatory for all Valuated Materials in material Master.
    From valuation class it will fetch GL of material type to valuated material.
    From Standard Price it would fetch price for STD cost estimation to run.
    Hope above will useful.
    GOPAN

  • Standar cost and product cost collector not updating the new price

    Hi,
    Created Standard cost estimate for one FG product and runned the product cost collector. Based on that consumption delivery everthing is made. Later on the work center and activity type changed in routing. Now i am trying to run the standard cost with new activity price (due to work center change) for the current period, system is showing only the previous rate(previous period) and it is not updating the new price becuase of already we have created the product cost collector.
    Can any one give the suggestion for how to update the new price in standard cost as well as new price updation in product cost collector.
    govind.

    Hi
    1. If the original cost estimate was run in the current month - Then you cant re-release cost estimate unless you reverse it from CKR1
    If the cost estimate was of previous months - then you can definetely release it again
    2. In cost collector, you need to manually cost it again using the Preliminary costing feature... Your cost coll will then show 2 cost estimates i.e. One from Original date to current date-1, and 2nd from Current date to 31.12.9999
    br, Ajay M

  • Difference in last year and current year Cost Run (CK11N)

    Hi Experts,
    I am getting the difference in Costing Run as explained below,
    1, Costing Run of year 2009 is not picking the two overheads as against 2008.
    What may be the couse, all overhead keys are extended to year 2009.
    Waiting for your reply.
    Sham

    Hi,
    Please check the validity of those 2 overhead rates. Probably the validity is till 12/31/2008, that's why it is not picking. In that case you can create another row with validity dates from 01/01/2009 to 12/31/2009 or 12/31/9999 as the case may be.
    The path for the same is mentioned below:
    IMG>Controlling>Product Cost Controlling>Product Cost Planning>Basic Settings for Material Costing>Overhead>Costing Sheet:Components>Define Percentage Overhead.
    Thanks,
    Prithwiraj.

  • Standard cost estimate (ck11n) &standard cost (ck24)

    hello sir ,
    how to do stadard cost estimate and standard cost in sap
    Thanks& Regards

    Hi
    Try below link
    http://help.sap.com/bp_iasifrsv1470/BBlibrary/Documentation/I56_BPP_EN_DE.doc
    http://help.sap.com/bp_blv1500/BL_US/documentation/Scenarios/V8Q_BPP_EN_US.doc
    http://help.sap.com/bestpractices/BBLibrary/Documentation/J74_BPP_EN_KO.doc
    VVR
    Edited by: Ramana on Jan 2, 2008 1:09 PM

Maybe you are looking for

  • Can't connect from Mac to PC using MS Remote Desktop

    I have a 5 day old Windows 8.1 laptop.  My daughter has an application called Microsoft Remote Desktop 8.0.5 on her Mac. It is Microsoft-made application for Mac, like Office. I want her to access my computer, using this application, to access my com

  • Message when opening VI "LABVIEW: VI not loadable

    I am receiving a message when opening my VI:  "VI not loadable".      The message box is attached in a Word document.      The VI is also attached. This VI was working this morning.    It uses DAQmx to acquire data from 3 load cells.    The data was

  • Very Confused - iPhoto version 9.1.3 will not launch, just infinite spinning spokes

    Ok, so I am a recent apple convert from Windows, which I have used all my life until I go a Mac Book Pro for Christmas, so I am a little unexperienced when it comes to all this stuff. I am running Mac OS X 10.6.7, and have had no problems until this

  • How to trigger an existing thread to be placed in another forum?

    Dear Moderators, dear forum users, I just found two (old) threads that are unanswered and placed in a totally wrong forum:           [Output tray in Format  SPAD transaction currently in SolManForum|/thread/901566 [original link is broken];          

  • I/O Exception in multithreading application

    I have a multithreading application that utilizes OracleDataSource with explicit caching enabled. The cache is sized to keep as little opened connections as possible. It works fine but under heavy load I'm getting I/O Exception: The Network Adapter c