Start And End Routine !

Hi All,
              In BI 7 we have a start routine and end routine. In end routine we delete all the transformed records that need not be updated to the infocube. Which we can also do it in the start routine. In that case Y do we need a End routine.
Regards.

Hi,
1. Start Routine : whenever you create a start routine, the system will automatically give you some predefined data declaration like structure of the type of your source. In start routine you can declare a local data declaration and Global data declaration also. I will give one example.
Suppose you are creating Start routine for transformation from Datasource to DSO. Then when you create start routine the System will provide you a structure of your datasource. By using this structure it will also define an internal table which will be used as changing parameter of a method of a class. It is this changing parameter where you have to do all sorts of manipulation. The changing parameter is both export as well as import parameter. This changing parameter will contain data in the package wise.
In start routine you can also read some database table and store that data into an internal table and this internal table data can then be read in the field level routine. In this case it acts as a substitute of master data look up in the field level transformation.
2. End routine : The end routine is also same as start routine, the only difference is that here the system will provide you with a structure of the target not the source. and rest is all same as start routine.
assign points if it helps
Thanks & Regards
santo

Similar Messages

  • What are start and end routines in BI 7.0..

    Hi,
    Can you please explain and give me a sample code ?
    thanks

    Hi,
    depending on your data flow you have to use the routines .
    Start routines - start routines:
    It is used to perform preliminary calculations.if you have any modifications required before the actual transformation is done, then you must write those routines in the start routine of 7.0.
    End routines - new:
    You can use an end routine to postprocess data after transformation on a package-by-package basis.
    Expert routine - update routine :
    You can use the expert routine if there are not sufficient functions to perform a transformation. The expert routine should be used as an interim solution until the necessary functions are available in the standard routine. You can use this to program the transformation yourself without using the available rule types. If you have already created transformation rules, the system deletes them once you have created an expert routine.
    Also Check the below link for detail info.
    Routine in Transformation.
    Reg
    Pra

  • Difference between Start Routine  and End Routine in Transformations

    Hi  Friends,
      I'm using BI 7.0... here in Transformations step  we have two options..that is START ROUTINE... and END ROUTINE... What is the Difference between Start Routine  and End Routine in Transformations..
       When  we go for Start Routine.. and when we go for End Routine..
    Plz clarrify... points will be rearded..
    thanks
    babu

    Hi,
    One real time scenario for End Routine.
    We have a scenario where in a datasource field is mapped to three infoobjects on the datatarget side. There are 2 key figures which need to get data after these these Infoobjects are filled. The best place for this to happen would be in a End Routine, where in we would loop through the results package and using the values of the infoobjects from the data target ( Cube in this case).
    Hope this helps,
    HD

  • How to delete data from a DSO using start or end routine

    Is it possible to delete records from a DSO in the start or end routine.
    My example:  I have order 123, item 10, sched line 1.  This gets loaded into the DSO.
    Next day I have order 123, item 10, sched line 2 coming in.
    I want to delete the first one (with sched line 1) from the DSO and load the second one (with sched line 2).
    Can code be put in the start or end routine to do this?

    unless I can do it within the start routine I don't want to have to create new records.
    In the start routine I am comparing records coming in with what are already in the DSO.  If there is a match on order and item and the sched line is different, then I want to delete the record from the DSO and load the new one.  Is there code that I can put in a start routine to accomplish this?

  • Contract start and end date in BAPI_CONTRACT_CREATEFROMDATA

    HI,
    I am using BAPI_CONTRACT_CREATEFROMDATA to create a contract from within a custom ABAP program. However I cannot figure out how to get the contract start and end dates into the contract header. I know that you can enter them into the ONTRACT_DATA_IN table parameter but these dates only appear on the line items and not the header.
    Does anyone know which parameters on the function map to the contract header start and end dates.
    Thanks.

    Hi,
    there are also fields QT_VALID_F and QT_VALID_T for quotation or inquiry. So it looks like for different contract types you need to use different fields. This BAPI calls FM SD_SALESDOCUMENT_CREATE which has subroutine ms_move_header_in which maps from BAPI fields to internal fields. Here is a small part of this routine.
      MOVE order_header_in-qt_valid_f       TO e_vbakkom-angdt.
      MOVE order_header_in-qt_valid_t       TO e_vbakkom-bnddt.
      MOVE order_header_in-ct_valid_f       TO e_vbakkom-guebg.
      MOVE order_header_in-ct_valid_t       TO e_vbakkom-gueen.
    When I check technical fields for the screen  fields "Valid from" and "Valid to" in VA43 I get names GUEBG and GUEEN. So it still looks like you should use CT_VALID_F and CT_VALID_T.
    I forgot to mention you can still debug BAPI to figure out where the problem is.
    Good luck
    Edited by: Martin Voros on Sep 11, 2009 9:57 AM

  • Editing Loop Start and End times via automation / MIDI controllers?

    I'm trying to play a sample in EXS24 and have the Sample Start, Loop Start and End times manipulated over the course of the song. I've tried to open up the EXS sample editor, click on the numerical value of the Loop Start, and then attempt to Learn Automation. All it does is assign the knob for the instrument Volume Level. Is there any way to do this? It's basically how an Akai S612 works: http://www.vintagesynth.com/akai/s612.shtml
    I switched gears and tried it also with Battery, and there's a way to map the Start and End times in there, but it's not seeming to work as I've intended. I can't seem to make the loops move as they should and there's ways to use up to 4 loops, but not a way to target each loop's start and end points via separate controllers.
    I could use my S-612 [and probably will], but in moments where I don't have one available, I'd love to find a solution to this.
    Thanks,
    +odd

    Anyone with any thoughts? would be great to solve this.

  • Problem with keyframe effect - at start and end (crop and scale)

    I'm having this odd problem with keyframe effects.
    Setup:
    I have a gif image that I have on video 1 for say 2 minutes.
    I have my real video on video 2.  It is a person talking.
    First I start with my video full size on top of video 1.
    Though the motion and cropping keyframe management I slowly reduce the scale and crop my video image so that it is reduced to the lower left bottom of the screen, on top of the gif, which is now revealed.
    My problem is at the start and end of the transition from full video to small box on lower left on top of my gif I often get 1-2 frames where the video goes blank and/or I get a bunch of random red bars on black background appearing on the video - Or I get the gif from video 1 without the video 2 at all (it disappears).
    I've tried moving my start of end of the transition to skip the bad spots - but these new transition starts or ends not get their own bad spots in the same way.  Its only a couple of frames but it's really unacceptable for the finished video.
    Note, when I say transition here I don't mean real transition events, but rather the start of effects that are managed with keyframes.  My move from start to end of the effect runs for about 4-6 seconds.
    Any ideas?

    Bill,
    Here is more detail and screen captures.
    Concept:
    I have 3 minutes of video.  It contains a person making a speech.  During parts of the speech I want to reveal a graphic image that will be discussed.  The speech will begin with the speaker full screen.  Half way in, the speaker will shrink down to 45% in the lower left corner of the screen.  While the animation occurs (the shrink, move and cropping) it will reveal the graphic below.  The graphic will take up the full screen with the speaker at 45%.
    Technique:
    I put the video in Video 2 and the graphic, a GIF image in Video 1.  The scene begins with the speaker talking at full screen.  After a minute, I animate the move of the speaker using Motion: Scale and Position and Effect: Crop changing Top, Bottom, Left and Right sides.  The animation occurs over approximately 8 seconds.
    I am manually adding keyframes at the start and end of the animation.  I set the ending state of the video image in the end keyframes.  The interpolation between these start and end keyframes should be managing the animation.
    Problem:
    At the beginning and end of the animation – usually 1-3 frames from the start and 1-3 frames from the end, where the change has barely begun or almost ended, I get these problems.  On some frames, the video (in Video 2) completely disappears only showing the Video 1 GIF image below.  On other frames, the video image turns black with horizontal red bands half way across.
    Troublshooting:
    I’ve tried deleting all start and end keyframes and moving the start and end earlier or later to see if I can fix this, but the problem continues to show up in these new locations.
    I have added a few screen shots.
    1:32:15 is the start of the animation change and 1:40:22 is the end of increasing from the mini video speaker to full size (on top of the GIF).
    At 1:40:16 the video image completely disappears only showing the GIF below.
    At 1:40:17 its back and slowly increases in size through the interpolation until it is full size at 1:40:22.
    Let me know if you need anything else.
    Thanks!
    Evan

  • Report for Validity Start and End Date in PO

    Dear All
    Is there any report where I can get PO validity start and end date which user input in addtional data header tab of PO?
    Regards
    Satish Kumar

    Hi,
    Yes, It is available standard report using T-code ME2N - Purchasing Document (PO) Per Document Number, enter the T-code and provide the following input data's are as follows.
    Scope of List                 :  ALV ( for Ms-Excel format report)
    Plant                               :   __________ to __________ (if required)
    Document Date              : ____________ to ___________ (if Required)
    Execute the report shown by default in excel format and if required PO validity start and end data, you have to select Change Layout button and open new window options screen right side field option as Validity Per.Start, Validity Period End, Commutative number field data's are selected and click <--- arrow button and then click bottom tick marked button. Now, the report shown your requirement.
    Hope, it is useful for you,
    Regards,
    K.Rajendran

  • XML Publisher pdf output need each page wise start and end number

    Hi ,
    I have xml publisher out put in PDF. Now i need on each page header and detail part.
    In header for each page it should repeat and should be print the min and maximam number of the columns.
    I mean in the header start and end number of the column value for that particular page.
    I did many ways but there is no luck.
    Can you please suggest me how to do.
    Thanks
    Sampath

    pls give me reply on this if any body have the answer

  • Is there a way to enter an event time in Calendar as a reminder for me and NOT have Calendar erase it in the info as it reads it into the event start and end times?

    Calendar can recognize and derive event start and end times from the text description entered.  However, when it seizes on a time (start and/or end) and automatically enters it as the start and/or end time, it also (sigh) deletes the time from the text.  I enter the times as reminders for me, how can one prevent them from being deleted by Calendar??

    I am having the same darn problem. I really dislike this auto feature in Calendar.
    Can anyone help us please?

  • Month View:start and END times

    Here is feature that i really need In the Month view: The option to have start and end times displayed. Now that their is no info drawer i have open and info drawer to see when the event is supposed to end. I have a lot of events in a day and some are for me and some are for my company and some are for my wife.
    I need to see the start and end time quickly. Outlook does it.
    Please make iCal do this incredibly useful view option.

    Start times are still viewable.
    It is a click box in the preferences that says show time in month view.
    What i need is the END time as well.
    I learned that the best place for this kind of discussion is on the feedback line for ical
    http://www.apple.com/feedback/ical.html
    Just tell them the features you need or miss. Please click the link and tell them what you think of iCal.

  • Showing start and end time in month view?   And email like notifications ?

    1- How to you set event so that they show the start and end time in month view?
    2 - I have a little "1" on my iCal icon in the dock what does that mean? There is also a little one in the line of one of my calendars? I know I should know this but I am at a loss/

    FDWifeCFD,
    1- How to you set event so that they show the start and end time in month view?
    AFAIK, this is not a feature of iCal.
    2 - I have a little "1" on my iCal icon in the dock what does that mean?
    That means an iCal invitation has been sent. Click the small envelope icon on the bottom right of the the screen to view the notification.
    There is also a little one in the line of one of my calendars?
    That represents the current time of day in the Day/Week view.
    ;~)

  • SSRS Bar Chart grouping date series into Months, setting scaler start and end ranges

    I've been trying to solve this issue for a few days now without writing a sql script to create a "blank" for all of missing data points so that I get a bar for each month.  I have date series (by day) data points grouped by two items
    that creates a set of bar charts.  EG:  one chart per product in the tablix detail grouped to site level.
    My issue is I would like the start and end of the charts to be the same for all charts and the only way I get it to work is with a chart that continues to show each date on the chart. 
    EG:
    I have the graph start and end points set and scaling by month as I would like but each bar is a day instead of aggregating to a month level.   My issue I hope to find a workaround for is if I go to Category Groups and define the grouping
    to group with a year and month function the series is no longer treated as date data and I cannot control scaling.  It works fine if all months have activity, but I can't figure out how to always have all charts start at "May 2012" in this example. 
    The only start and end point that I've been able to get to work once doing this are integer based, eg normal start would be 1 for each graph, but 1 doesn't equate to the same month from chart to chart.
    I hope SSRS can provide the solution.  I do know I can write a query that creates a ZERO value for each month/product/site but I don't want to leave the client with a query like that to support.
    -cybertosis

    Hi cybertosis,
    If I understand correctly, you want to display all month category label in the X-Axis. You have configure the Scalar Axis, however, it cannot display the requirement format.
    In your case, if we want the specific data format, we can configure Number property to set the corresponding Category data format. Please refer to the following steps:
    Right click the X-Axis, select Horizontal Axis Properties.
    Click Number in the left pane. Click Date option in the Category dialog box.
    Then, select Jan 2000 option.
    Please refer to the following screenshot below:
    If there are any misunderstanding, please feel free to let me know.
    Regards,
    Alisa Tang
    If you have any feedback on our support, please click
    here.
    Alisa Tang
    TechNet Community Support

  • How do I stop calendar inserting 'starts' and 'ends'

    I have recently bought a new laptop ( OS Yosemite version 10.10.2) and find the automatic entering of 'starts' and 'ends' times on my entries in calendar very irritating.
    How do I stop it doing this ?
    The previous version I used did not do this automatically by default.

    I had the Integrated Gmail 2.5.5 addon enabled.
    After disabling the addon the problem is gone.
    Hope it works to you guys.

  • TS1702 Maps program does not work. In standard it only shows a grid. If I ask for a route it shows start and end point and three route boxes but nothing else. It does show directions. If I switch to hybrid it shows to routes but no roads. Background is a

    Maps program does not work. In standard it only shows a grid. If I ask for a route it shows start and end point and three route boxes but nothing else. It does show directions. If I switch to hybrid it shows to routes but no roads. Background is a blur.

    Do you have a question? This is a user to user help forum. Apple is not here only other users like yourself. You don't report problems to Apple here.
    By the way, it might help if you indicated where you are located.
    To complain to Apple use http://www.apple.com/feedback/ipad.html

Maybe you are looking for

  • Strange behavior when I try to match a mpeg2 video with the menu size image

    hello all, got a strange behavior when I try to match a mpeg2 video with the menu size image, menu size is 1920 x 1080 (photoshop file) mpeg2 video 1920 x 1080 (1second 19 frames) the idea is to go from the menu link to the next sub menu with a video

  • Safari downloading without my knowledge....

    the past few days i am being asked if i want to run "ilike" downloaded by Safari on 16th June. I have no idea what ilike is and have no idea why or how Safari downloaded it considering i don't use it and have no clue when i last used Safari... I have

  • Xml is not generating the selected column

    Hi experts, I have selected the 3 column in my slect statement with 3 bind variable . But when I save my datamodel and generate the xml , My xml is not showing the selected three column...please find the blow query. Select BAL_ATT.TRANSACTIONAL_AMOUN

  • Device detection problem after 3.1.2 update

    Hello, I am having some issues with my 3GS since the 3.1.2 update. Whenever I connect it to my Windows box, it will only be recognized from the iTunes application. Previously, it was also available as a camera device, which allowed me to manage the p

  • Tooltip location problem

    Ok, i have a jfram with lots of components that uses different tooltips. The tooltips display some information and can get fairly big. The problem i have is that the tooltips for components are located so that they maybe go outside of the actual jfra