Subcontracting - Direct delivery with MRP and Scheduling agreements

Hi All,
can anyone suggest where I am going wrong.
I have a sub con assembly A that is made up from parts B and C.
The source of supply is:
A by VENDA
B by VENDB
C by VENDC
I do not want part B arriving on site as it is situated next door to the sub con plant. (however I might want to stock it for spare purposes later)
So I would like to send Part B directly to VENDA
I have set up a scheduling agreement for part B for VENDB and I have changed the delivery tab to VENDA and ticked the SC vendor option.
My problem is that when I run MRP I get a planned order for Part B and not a schedule line. If I remove the tick then I do indeed get a schedule line.
I have read a few posts that indicate that this can only be done via MRP areas (which we dont have).....is this really true??
Kind regards
Ben

Hi Peter,
I have looked at the possibility of converting over to MRP areas and the migration was a technical iceberg   We have a lot of custom code which works along side MRP at plant level and I suspect this would require changing.
However you have triggered my curiosity again so I will have another play in my sandpit!
Take care
Ben

Similar Messages

  • I faile to create outbound delivery with reference to scheduling agreement by using BAPI_OUTB_DELIVERY_CREATE_SLS.

    Dear Team,
    Can you please help me by providing the BAPI name for creating the outbound delivery for Scheduling Agreement in SAP SD .
    I faile to create outbound delivery with reference to scheduling agreement by using BAPI_OUTB_DELIVERY_CREATE_SLS.
    The system says "missing data in the BAPI interface: VBAK VBTYP E". It seems another FM should be used for scheduling agreement only.
    Thank you for your help in this regard .

    Hi Raghu.
    As much as I don't want to do this but just to resolve this error I created an enhancement implementation in include LV50R_CREACSV form routine dcs_check_so_vs_interface and modified VBTYP to blank to avoid that error message.
    Got the tip from this thread http://scn.sap.com/thread/1972059
    Unless... anybody has a brighter idea (without modifying the standards)?

  • The uses of PO - Contract and Schedule Agreements

    Dear friends !
    does anyone knows the differences between 
    1 - PO
    2 - Contract
    3 - Sched.Agreement
    The integration  with MRP and other modules  ?
    We need this to start an study on use this documents in our enterprise.
    best regards
    Ale

    PO is a it's a legal purchasing document used for procuring goods/services from Vendor..
    there are various account assignments & Item catogeroies
    combinations for which you can procure..
    Contract:- It is called outline agreement and used for procurement for longer duration, as it provides you to get discounts based on your requirement.
    Sched.Agreement: It is also called outline agreement, used for for procurement for longer duration on specified delivery periods..
    The diff between Contract & SA is that ,
    for Contract there is no specified time.. we give only period..
    ex: I say I need 100 tons of steel from period 01/01/2008 to 31/12/2008..
    I may procure the steel as and when required or I may procure
    the total Qty of steel on 31/12/2008.
    But the SA will have diff schedules for delivery of the material..
    we will define the dates & time at which the material needs to be delivered in the SA itself...
    The integration with MRP and other modules ?
    MRP is an integration between PP & MM

  • Question regarding SAP note 765494 and Scheduling agreements

    In a SAP ECC 6.0 environment has anybody dealt with note 765494? It appears that the changes allow the user to change shipping data on stock transfer scheduling purchase orders using the ME22N screen (Enjoy) but not the ME32L scheduling agreement change screen. Does anybody know of a work around to change shipping data on a stock transfer scheduling agreement?

    Hi Mahesh,
    A contract is a type of outline purchase agreement against which release orders (releases) can be issued for agreed materials or services as and when required during a certain overall time-frame.
    Contracts are of two types:
    1. Quantity contracts - Use this type of contract if the total quantity to be ordered during the validity period of the contract is
    known in advance.
    2. Value contracts - Use this type of contract if the total value of all release orders issued against the contract is not to exceed a certain predefined value.
    But a scheduling agreement is a  form of outline purchase agreement under which materials are procured on predetermined dates within a certain time period.  A scheduling agreement consists of a number of items, for each of which a procurement type is defined. The
    The following are the procurement types:
    - Standard
    - Subcontracting
    - Consignment
    - Stock transfer
    Delivery of the total quantity of material specified in a scheduling agreement item is spread over a certain period in a delivery schedule, consisting of lines indicating the individual quantities with their corresponding planned delivery dates.
    Contracts and Scheduling Agreement transaction codes:
    Transaction codes:
    Contracts: ME31K to ME35K
    Scheduling agreements: ME31L to ME35L.
    Please award if helps!
    Thanks!
    preethi.

  • Regarding : Contracts and Scheduling Agreements

    Hi All SAP Proffessionals,
    Can anybody tell me what do we mean by Contracts/Scheduling Agreements?

    Hi Mahesh,
    A contract is a type of outline purchase agreement against which release orders (releases) can be issued for agreed materials or services as and when required during a certain overall time-frame.
    Contracts are of two types:
    1. Quantity contracts - Use this type of contract if the total quantity to be ordered during the validity period of the contract is
    known in advance.
    2. Value contracts - Use this type of contract if the total value of all release orders issued against the contract is not to exceed a certain predefined value.
    But a scheduling agreement is a  form of outline purchase agreement under which materials are procured on predetermined dates within a certain time period.  A scheduling agreement consists of a number of items, for each of which a procurement type is defined. The
    The following are the procurement types:
    - Standard
    - Subcontracting
    - Consignment
    - Stock transfer
    Delivery of the total quantity of material specified in a scheduling agreement item is spread over a certain period in a delivery schedule, consisting of lines indicating the individual quantities with their corresponding planned delivery dates.
    Contracts and Scheduling Agreement transaction codes:
    Transaction codes:
    Contracts: ME31K to ME35K
    Scheduling agreements: ME31L to ME35L.
    Please award if helps!
    Thanks!
    preethi.

  • "difference between sales order and scheduling agreement "

    hi, 
    i want to know difference between sales order and scheduling agreement and where use scheduling agreement & where sales order ?
    please help
    amit

    Hi Amit,
    Its not hard to find this info at help.sap.com
    Sales Order
    Definition: Request from a customer to a company to deliver a defined quantity of products or provide a service at a certain time. The sales area that accepts the inquiry is responsible for completing the agreement.
    Scheduling Agreements
    Purpose
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity. The following graphic shows the document flow for scheduling agreements.
    Integration
    You would use this component if you had outline agreements with the customer that contained future delivery quantities of materials that would be sent at certain times within a fixed time period.
    If you work with scheduling agreements for the component supplier industry you also need to choose the "Electronic Data Interchange" (EDI) component.

  • Report for purchase requisition, purchase order and schedulling agreement.

    Hi, thanks for your help.
    I need a report or query just to view in one screen the related docs. as purchase requisition, purchase order and schedulling agreement.
    I don´t know if there is a table or trx. with that information.
    Is it possible to get that information via query ?
    Thanks for your help.
    Regards.

    For PR and PO you can use ME5A
    For PR and Scheduling agreements also you can use ME5A.

  • Terms of payment in PO and Schedule agreement

    Dear Gurus,
    Is there any standard setting to update terms of payment without changing the PO and schedule agreement manually. My client wants that they will update terms of payment in vendor master at the first time and create 1 purchase order for the particular vendor.
    Later they will change the terms of payment in vendor master and the same has to picked up in PO automatically without changing the PO.
    Please let me know if there is any standard settings available or any user exit i have to apply.
    Regards,
    mohdsams

    Hi,
    If you have multiple payment term in one vendor then you can not put payment terms in vendor master.
    You put payment terms in at the time of P.O.
    Regards,
    Spradip

  • How to add Import PO condition types in PO and Scheduling Agreements

    Dear Friends,
    Pl tell me the procedure of adding Import PO condition types in PO and Scheduling agreement as these are not visible in the condition drop down list in ME21N and ME31L transaction. In pricing procedure theses conditions are available.
    Conditions are as follows:
    JCDB     IN Basic customs
    JCV1     IN CVD
    JECV     Ed.Cess on CVD
    J1CV     H.Ed.Cess on CVD
    JSDB     Ecess on BCD
    JEDB     Sec Ecess on BCD
    JADC     Addl.Customs Duty 4%
    Regards,
    ASK

    Hi
    1) please maintain tax code 0 on invoice tab
    2) check condition record for these condition through mek1/mek2
    3) check your defaulit condition in taxinn
    spro-logistic general-tax on good movement-india -basic setting-determination of excise duty-maintain excise defult
    Regards
    Kailas

  • Update delivery with material and quantity.

    hai abap gurus,
          My requirement is to create a sales order and create a delivery with sales order reference.
          I done both.But now i want to  update my delivery with material and quantity.
          Is there is any bapi or function module.
          can any one help for my request.
                                                             with regards,
                                                                  mallik

    Hi,
    You're on good way while using FM SERNR_ADD_TO_LS and SERIAL_LISTE_POST_LS .
    In the second function module you don't need to pass anything.
    Don't forget to make a commit work to avoid database error during synchronisation.
    I had also one case of updating the serial to the document. It was the Sales order. I have worked with the function module SERNR_ADD_TO_AU which is internally using the function module SERNR_ADD_TO_DOCUMENT. The following is the sample code for it:
      CALL FUNCTION 'SERNR_ADD_TO_AU'
        EXPORTING
          sernr                 = w_sernr
          profile               = c_zd01
          material              = w_matnr
          quantity              = '1'
          document              = w_vbeln
          item                  = '00010'
          debitor               = fs_header-sap_ship_to
          vbtyp                 = 'C'
          sd_auart              = w_doc_type
          sd_postyp             = w_item_cat
        IMPORTING
          anzsn                 = w_anzsn
          zeilen_id             = w_zeile
          serial_commit         = w_serial_commit
        EXCEPTIONS
          konfigurations_error  = 1
          serialnumber_errors   = 2
          serialnumber_warnings = 3
          no_profile_operation  = 4
          OTHERS                = 5.
      IF sy-subrc eq 0.
        CALL FUNCTION 'SERIAL_LISTE_POST_AU'.
        COMMIT WORK.
      ENDIF.
    And one more thing, don't forget to have the call to the function module 'SERIAL_LISTE_POST_AU' amd commit work if the return code is 0. This is also mandatory.
    regards
    Satish

  • Subcontract and scheduling agreement

    gurus can u tell n detail reg the subcontract n scheduling agreement followed during real time?

    Hi,
    Sub Contracting Cycle are:
    (1) You have a material (Finished Goods) that can be procured externally, and you have maintained BOM (CS01) with components (Raw Materials). Any waste generated and received during subcontracting process can be maintained as component with negative quantity in the BOM.
    (2) You create a subcontracting PO (ME21N, Item Category L with different document type ie.. from std one). Maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO(In ME2O directly or by MB1B with 541 Movement type). Material is sent to subcontractor.  As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor" .So no accounting document generated by supplying raw material to Sub Contracting Vendor.
    (4) You receive (MIGO) finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    (5) Invoice Verification (MIRO) for SC Invoice.
    (6) Payment in F-53
    The accounting entries are:
    FG BSX acc. Debit Acc.
    GR/IR Cle.acc. WRX acc. Credit Acc.
    FRL Acc. Debit Acc.
    BSV acc. Credit Acc.
    BSX acc. of components Credit Acc.
    GBB - VBO Acc. Debit acc.
    PRD acc. Some time Credit &
    Some time Debit
    If you are activate Price Diff. Acc. for SC-Vendor in....
    OLMB -
    > GR -
    > Price diff. acc.for SC order while you do GR for your Plant......then Price Diff. Acc. also will be trigered...
    Scheduling agreement is a long term purchase agreement, where you will keep issuing the delivery schedules whenever there is a change in requirement or at predetermined time intervals. The delivery schedule can be on hour/daily/weekly/monthly basis. SA is also an agreement with the vendor for the supply of matl, may be a quanity or value. The delivery dates will be maintained in ME38 ref the SA which are called delivery schedules.So you can maintain the delivery schedule and communicate the vendor on Forecase basis or JIT basis. And when you need some more matl then will only create SA deliveries using ME38. SA could be of 2 types:- without release documentation-system will transmit the delivery info to the vendor once you save the document. 
    With release documentation- after creating the delivery schedules you need to create SA release using ME84.So Process are ME01, ME11, ME31K with aggnrement type, ME38 & MIGO,
    For more follow the link;
    http://esoadocu.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/render.asp?packageid=DBBB6D8AA3B382F191E0000F20F64781&id=EB65A89F1AFD4C46AB61C6161BAF
    Regards,
    Biju K
    Edited by: Bijay Kumar Barik on Apr 23, 2008 7:00 AM

  • Outbound delivery and schedule agreement

    Hi,Gurus.
    I face a problem.
    we have lots of schedule agreement in SD and we create outbound delivery as per SA.
    We have a lot of materials to delivery to  a same customer and we have to create  an outbound delivery  for some SA which they had same devliery date.
    Which should I do?could you give me some suggestions.
    thank you in advance

    Hello,
    With reference to sales order  :::
    Schedule lines are the details in which SAP stores information about how much quantity will be delivered to customer from the complete order quantity & by what date it will be delivered.
    Line item is one material entry from a sales order which contains order from customer for various materials & clubbed together in one order.
    For more info  plase check following link :
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/55fb20545a11d1a7020000e829fd11/content.htm
    Hope this helps.
    Thanks..
    Mark points if helpful

  • V_V2 and scheduling agreements with ATP

    Dear SAP SD Experts,
    In our production environment we use Scheduling Agreements with ATP. This means we do perform ATP for each firm schedule line received from the customer. Every night we run a rescheduling job (transaction code V_V2 - program SDV03V02) which is basically taking into account all the lines/documents including these scheduling agreements. My question: from an standard SAP functionality point of view, is the rescheduling job actually performing a new ATP for the schedule lines in these scheduling agreements and re-determining new ATP dates?.Does it have any effect to reschedule schedule lines in scheduling agreements?.
    Thanks in advance,
    Luciano

    Hi Luciano
    What you asked is about ATP . and the Fixed date / qty  is something which we define in customer master data. in sales area  data. If fixed date/ qty is checked then no partial deliveries are allowed for that customer.
    so for an example
    if the customer X is checked for fixed date/ qty then whatever quantity you enter in the sales oder for that customer X that has to be delivered to the customer X at 1 time .so you cant deliver the material on partial basis.
    say u have a material in plant - 50 pcs
    customer oder is - 75 pcs
    so this is an unconfirmed order and this order should be done rescheduling . .
    you cant deliver these 50pcs to customer X even though stock is available as for this customer X fixed date  /qty is there
    only if the material is available for more than 75pcs in the plant  then only you can deliver
    I hope now you are clear with the doubt of fixed date / qty
    Reward if useful and any queries let me know and mark answered if you got ur answer
    Regards
    Srinath

  • RFQ and Scheduling agreement

    Hi
    I have set the release strategy for the RFQ .In the characterstics filed i have maintained the filed name as "BSART" and the doc type value as "AN" and  for the another filed name "EKORG" with value "PORG Value".
    My doubt is i was able to create the RFQ and entered quatation details and able to create PO wrt the RFQ without release RFQ.But in the activity release RFQ this rfq details is getting fetched and subject to release .Where the release strategy will have impact.Can i create a PO wrt the RFQ qithout releasing RFQ.
    Same pls help me to understand the release impact in scheduling agreement. Is that release of scheduling agreement is necessary for creating delivery schedules and the GR for the delivery schedules.The impact of release of scheduling agreement?

    Hi Yogesh
    Thanks for your reply
    This is my issue
    I have activated the release procedure for RFQ  through Char field Name  "Bsart" for order type and value maintained is "AN" and order value also given.
    Created RFQ ,when i go to me45 (relese RFQ) this rfq is getting dispalyed and release is active.I have not released the RFQ.
    Then i maintained quatation details for this RFQ ,and able to create PO wrt the RFQ without releasing RFQ.
    My doubt is in sap Help they says that "" An RFQ may be blocked via a release procedure (if its total value exceeds a predefined value - say $10,000 - for instance). Before this RFQ can be outputted (printed out or transmitted directly to the vendor), it must be approved (i.e. released)."
    My doubt is if the RFQ is subject to release ,the transmission of RFQ details to vendor for receiving quatations is possible only after release of RFQ or PO can only be raised only after release of RFQ?
    Pls help me ,sorry for killing your time.

  • Planning horizon and scheduling agreements

    We have a planning horizon that goes out 1 year.  However MRP stock requirements is showing planned orders for scheduling agreements that go out beyond the planning horizon.
    Is there a reason MRP sees these MRP elements with dates well beyond the planning horizon of 1 year?

    Hi,
    In MRP we can run the MRP with Planning run Type  With indicator
    NETCH(Net change planning) and NETPL(Net change planning in the Planning Horizon)
    Planning Run Type in the Initial Screen
    Use
    You use the planning run type (Processing key indicator in the initial screen of the planning run) to determine which materials are to be planned.
    Features
    There are three different planning run types:
    During regenerative planning, all materials are planned for a plant. This makes sense when you are carrying out the planning run for the first time as well as later during production if data consistency cannot be guaranteed due to technical error.
    The disadvantage of regenerative planning is the fact that the system has to deal with high capacity loads because all materials are planned, including materials, which may not be affected by the planning run.
    To overcome this disadvantage, it makes sense during production to carry out the planning run using the net change planning procedure. The only materials that are included in the planning run are those, which have undergone a change relevant to MRP since the last planning run, for example, because of warehouse issues or sales orders, changes to the BOM and so on.
    The net change planning procedure makes it possible for you to execute the planning run in short intervals, for example, in daily intervals. You can thus always work with the most up-to-date planning result.
    You can use net change planning in the planning horizon to shorten the MRP planning run even further. The system then only plans materials that have undergone a change relevant to MRP within the planning horizon. In order to also plan changes outside of the planning horizon, you must execute the net change planning run in greater time intervals.
    You define the planning horizon per plant or per MRP group in Customizing for MRP in the IMG activity Define planning horizon. The planning horizon should be at least long enough to cover the period when sales orders are received. It must also accommodate delivery periods and the total lead times of the materials.
    In single-item planning, you can only choose between net change planning and net change planning in the planning horizon. Regenerative planning is not useful, because the material has already been defined and does not have to be determined after the evaluation of the planning file.
    The system automatically flags the materials that have undergone a change relevant to MRP with a corresponding planning file entry in the planning file (see also  Checking the Planning File and  Planning Run Type).
    Regards,
    nandha

Maybe you are looking for

  • ALV Report output in Excel format

    Hi , I am facing a different behaviour in two computers , while trying to take an Excel format of an ALV report output. After generating the ALV output ,in one , when I click on the Excel Format button - the Excel spreadsheet opens with the output da

  • BPM and Proxy

    Hi all, first all, believe me than I have searched a lot in the SDN about it, but i Can't find answer to my question I'm trying to do a simple asynchronous BPM scenario.... SOAP ->BPM -> PROXY in mi Integration Process I have defined many "variables"

  • Error during import: eof on communication channel

    Oracle 8.1.7.4.1 on Win2k Hi there, I'm trying to import a dump into an existing schema: imp GIDAC/GIDAC@NT3 file=EXPGIDAC.dmp LOG=IMPORT.LOG FROMUSER=GIDAC TOUSER=GIDAC buffer=256000 commit=Y analyze=N Objects were exported by SYSTEM, not by GIDAC,

  • IC Elims script correction

    Hi, I have  prepared following script for BPC 7.0 MS Version for eliminating all the amounts in IC accounts irrespective of having Trading partner value. All the IC accounts are marked with property called ELIMACC with value of ICBAL OR ICdiff. But t

  • Txt file problem

    Hi all : would you mind tell me how to access txt file,but txt like as Database format as following: Name Ago tele A 12 123456 B 13 123445 C 14 12334213 In this TXT file , I want to get Record 1 field 2 What method can I use that? Thank you